Loading...
HomeMy WebLinkAbout1005 Cedar Ln Town of Southold P.O Box 1179 Southold, NY 11971 * * * RECEIPT * * * Date: 09/09/11 Receipt#: 114147 Transaction(s): Reference Subtotal 1 1 Permits 726 $150.00 Check#: 3388 Total Paid: $150.00 Name: R & R, Construction 282 Line Rd Manorville, NY 11949 Clerk ID: LINDAC Internal ID:726 T Permit No. TOWN OF SOUTHOLD HIGHWAY DEPARTMENT Peconic Lane Peconic. New York 11958 (631) 765-3140 O 1 41 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to mlake'necessary inspections of the job site. Print or Type ``rUc>�1 1) Q 4 Z `�tSrin 671ct-Prtk:, JT yr Name of Applicant Address 2) Name of Owner of Premises ' 6.?-e -4 ddress X� 31� �I' OMV-- Mt ICX)5- 't6 c,6 r .?-e143 Work Description and Location (Street Number, Hamlet, Cross Street) ��+, (a) Is construction located within 75 feet of tidal wetlands? *Yes No *If yes, other Town permits may be required. 4) Builder's License No. Plumber's License No. Electrician's License No. Other Trade's License No. C A--8 =Wsrou A2 7�� Signat re f App lcant ate 5) a) Attach plot plan showing location of. proposed excavation and relationship to adjoining premises or public streets or areas, and giving a detailed descrip- tion of layout of excavation. b) Attach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section , Block , Lot _ 7) Starting Date:_ %3 Completion Date 3 1l 8) Work Schedule: Phase Completion Date Excavation........................................ RiCEi E1D Facility Installation................................ Backfill E Compaction............................. Pavement Replacement..................... _ 9 201 .... `' 9) Under which authority is the application made:__ C�.6Lev ISio!n 10) Estimated Cost ofProposed Work: $y_ OO(-) Sita ^:Id Tows r'0r 11) Remarks• MtSsiye (JA cf' (cAc- 4r0 A7U D-39 Page 1 of 3 12) Insurance Coverage: (Attach copy) a) Insurance Company: b) Policy # c) State whether policy of certification on file with the Highway Depart- ment d) Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage. 13) Security: a) Surety Bond or Certified Check provided in the total amount of $ b) Maintenance Bond provided: 2 years or 3 years ••• i SU.CAC) 14) Fees for applications and permits: Basic Application Fee..... 25.00- A i• /Service Connections excavations @ $20.00 = $ A2• No. /Additional Excavations same service @ $10.00 = $ B. Excavations 18" in depth or less: 0-100 I.f. _ $10.00 ��� Cfoa i'v I.f. @ $0.10 - $ d Additional �S C. Excavations 18" in depth to 5' in depth: 0-100 I,f. _ $30.00 Additional I.f. @ $0.30 = $ D. Excavations 5' in depth and over: 0-100 I.f. _ $50.00 Lf. @ $0.50 = $ Additiona E. Utility Repair Excavations @$')0.00. _ $ No. Additionai— Repairs same service @ $5.00 = $ F. Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to: In accordance with this application. SUPERINTENDENT OF HIGHWAYS Tf,�SOUTHOLD, ,FEW YORK Peter W. arris ate Received by the Town Clerk y fir' Date Permit Issued l Permit No. Mite Note: Permit expires one (1) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways. Permit must be available for inspection. D-39 Page 2 of 3 Copy Distribution: Highway Department Inspector Applicant Town Clerk I N S P E C T O R ' S R E C O R D Inspection Date Findings (use code) Applicant Notified 1st 2nd 3rd 4th (T) Permit Clerk) REMARKS CODE IB - Improper barricades iL - Improper lights ST - Sunken trench or excavation UTM - Unable to measure (due to backfilling) BUC - Building under Construction WIP - Work in progress DB - Improper backfill (too high) (not sufficient) HFS - Inspector holding for final settlement of excavation RFR - Ready to repair D-39 Page 3 of 3