HomeMy WebLinkAbout14300 Route 25 ' Town of Southold
P.O Box 1179
Southold, NY 11971
* * * RECEIPT * * *
Date: 02/09/12 Receipt#: 125750
Transaction(s): Reference Subtotal
1 1 Excavation Permits 751 $180.00
Check#: 7533 Total Paid: $180.00
Name: Eastern, Utilities Contracting Corp
17 Maple Ave
East Moriches, NY 11940-1342
Internal ID:751
Clerk ID: LINDAC
Peimit No.
TOWN OF SOUTHOLD
HIGHWAY DEPARTMENT
` P.O. Box 178
nr.,q
Peconic, New York 11958
(631)765-3140
APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR
APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit
pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County,New York, and other applicable laws, ordinances or
regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances,codes and
regulations,and to permit authorized inspectors to make necessary inspections of the job site.
Print or Type i 1 ��
i., L- ,5�t,f �� 1 2 5 �f (` ,^ ��� �� L��.1 "uW C C�nQ �i� 01 H O
Name of Applicant Address of Applicant
z. Oar Loll b'i (` CoA CR� MJ&41)3A k
Name of O erpof Pr-emises � - Address of Owner
3. b()!%L 11fY1rX Rf 1R 115 ��
Work Description and Location(Street Number,Hamlet, Cross Street)
(a) Is construction located within 75 feet of tidal wetlands? * Yes No
*If yes, other Town permits may be required.
4. Builder's License No. Plumber's License No.
Electrician's License No. Other Trade's License No.
�Signatiure
pplicant
Date
5. (a) Attached plot plan showing location of proposed excavation and relationship to adjoining premises or public street or areas,and
giving a detailed description of layout of excavation.
(b) Attach all other necessary permits and licenses for this project.
(c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk.
6. Tax Map No.: Section Block Lot
7. Starting Date: Completion Date:
8. Work Schedule: Phase Completion Date
Excavation , ' n
Facility Installation all �p pv,..Q
Backfill&Completion
Pavement Replacement 5"
9. Under which authority is application being made:
10. Estimated Cost of Proposed Work: $
11. Remarks:
D-39 1 of 3
12. Insurance Coverage: (Attach Copy)
(a) Insurance Company: WC
u� C5 COV-40 t- i,V c��� Iii,.S ��--
(b) Policy#: 1
(c) State whether policy of certification on file with the Highway Department:-
(d)Coverage required extended to the Town:
Bodily injury and property damage: $300,000/$500,000 Bodily Injury,and$50,000 property damage.
13. Security:
(a)Surety Bond / or Certified Check provided in the total Amount of$
(b)Maintenance Bond provided: 2 years or 3 years.
14. Fees for Applications and permits:
Basic Application Fee $150.00
Al. /Service Connections excavations @$20.00 $
No.
A2. /Additional Excavations same service @$10.00 $
No.
B. Excavations 18" in depth or less
0-100 i.f. =$10.00;Additional _i.f. @$0.10 $
C. Excavations 18" in depth to 5' in depth
0-100 i.f. =$30.00; Additional i.f. @$0.30
D. Excavations 5' in depth and over
0-100 i.f. =$50.00; Additional i.f. @$0.50 $
E. Utility Repair Excavations @$10.00 $
No.
Repairs same service @$5.00 $
Additional
II
TOTAL$
F. Notice to public utilities proof must be provided and attached to this application prior to issuance
of permit.
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to:
in accordance with this application.
SUPERINTENDENT OF HIGHWAYS
TO OUTHOLD,NEW YORK
n
L _
Peter Hams
7
/ �
Date Received by the Town Clerk Date
Date Permit Issued , � Z Permit No.
- -- / - - - -
c��J
NOTE: Permit expires lone(1) year from date of issuance.
No work to start without 48 hour notice to Superintendent of Highways.
Permit must be available for inspection.
D-39 2 of 3
Gopy Distribution:
Highway Department
Engineer(with page 3)
Applicant
Town Clerk (Original)
INSPECTOR'S RECORDS
Inspection Date Findings (use code) Applicant Notified
is`
2„d
3rd
4th
(To Permit Clerk)
REMARKS
CODE
IB Improper Barricades
IL Improper Lights
ST Sunken Trench or Excavation
UTM Unable to Measure(due to backfilling)
BUC Building Under Construction
WIP Work In Progress
DB Improper Backfill(too high, not sufficient)
HFS Inspector Holding for Final Settlement of Excavation
RFR Ready for Repair
D-39 3 of 3
DO(z f` D'' GnaD �v��SEtr �c��.Yn�tt�
n�g3`l - Yo 6745'�i
XQ caio
- s- 37
cot-•5T# (ooI3 GI 4 D
�l
f
# 14300 c � N
to y
O I JDr
A.A per- i
o �
l
v ff
� - 1
n
33'
V
v