Loading...
HomeMy WebLinkAbout1785 Cedarfields Dr Town of Southold P.O Box 1179 Southold, NY 11971 * * * RECEIPT * * * Date: 03/12/13 Receipt#: 147340 Reference Subtotal Transaction(s): 1 1 Excavation Permits 821 $190.00 Check#: 7990 Total Paid: $190.00 Name: Eastern, Utilities Contracting Corp 17 Maple Ave East Moriches, NY 11940-1342 internal ID: 821 Clerk ID: LINDAC Permit No. . TOWN OO HIGHWAY DEPARTM NT4& P.O. Box 178 RECEIVED Peconic, New York 11958 (631)765-3140 ,. MAR 1 2 X013 ��dd ..,,rr��AA APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR AP1�L W1TQ#KERE0�,made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County,New York, and other applicable laws,ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws,ordinances,codes and regulations, and to permit authorized inspectors to make necessary inspections of the job site. Print or Type t 1 , \ r� C",p 1� Ed,5 t M b r c S N� �� 1�b Name of Applicant -�� c� Address of Applicant 2. Name of Owner of Premises (� Address of Owner (� 3. `'oNl 0,\mr 5,kc \-7,SS 1s�4r�a eY�� ` Work Descripti&n and Location(Street Number,Hamlet,Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No k _ *If yes,other Town permits may be required. 4. Builder's License No. Plumber's License No. Electrician's License No. Other Trade's License No. Signature of Applicant 71 � Date 5. (a) Attached plot plan showing location of proposed excavation and relationship to adjoining premises or public street or areas, and giving a detailed description of layout of excavation. (b) Attach all other necessary permits and licenses for this project. (c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk, 6. Tax Map No.: Section Block Lot 7. Starting Date: 3�i��3 Completion Date: `a01� T 8. Work Schedule: Phase Completion Date Excavation Facility Installation Backfill&Completion Pavement Replacement 9. Under which authority is application being made: 10. Estimated Cost of Proposed Work: $ `7 D . 11. Remarks: D-39 1 of 3 12. 'Insurance Coverage:(Attach Copy) , (a)' Insurance Company: (b) Policy#: iln �- (c)State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily Injury,and$50,000 property damage. 13. Security: provided in the total Amount of$ (a)Surety Bond fiw 1�; or Certified Check P (b)Maintenance Bond provided: 2 years or 3 years. 14. Fees for Applications and permits: Basic Application Fee $150.00 Al. a /Service Connections excavations @$20.00 $ No. A2, /Additional Excavations same service @$10.00 $ No. B. Excavations 18" in depth or less 0-100 i.f. =$10.00;Additional i.f.@$0.10 $ C. Excavations 18" in depth to 5' in depth 0-100 i.f.=$30.00;Additional i.f.@$0.30 $ D. Excavations 5' in depth and over 0-100 i.f. =$50.00;Additional i.f.@$0.50 $ E. Utility Repair Excavations @$10.00 $ No. Repairs same service @$5.00 $ Additional TOTAL$ F. Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. * * * * Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to: in accordance with this application. SUPERINTENDENT OF HIGHWAYS TOrSOUTHOLD,NEW YORK P ter W,Harris 3 't'�J� � Date Received by the Town Clerk Date Q Date Permit Issued Permit No. NOTE: Permit expires one(1)year from date of issuance. No work to start without 48 hour notice to Superintendent of Highways. Permit must be available for inspection. 2 of 3 D-39 Copy Distribution: Highway Department Engineer (with page 3) Applicant Town Clerk (Original) INSPECTOR'S RECORDS Inspection Date Findings (use code) Applicant Notified 1 st 2nd 3rd 4th (To Permit Clerk) REMARKS CODE IB Improper Barricades IL Improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due to backfilling) BUC Building Under Construction WIP Work In Progress DB Improper Backfill(too high,not sufficient) HFS Inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 3 AIR 40 V- CSS M �Gd`r1 L3