Loading...
HomeMy WebLinkAboutAldrich Ln * * * RECEIPT * * * Date: 09/12/13 Receipt#: 158499 Quantity Transactions Reference Subtotal 1 Excavation Permits 868 $150.00 Total Paid: $150.00 Notes: Payment Type Amount Paid By CK#4319 $150.00 R & R, Construction Name: R & R, Construction 282 Line Rd Manorville, NY 11949 Clerk ID: LINDAC Internal ID: 868 t � Permit N TOWN OF SOUTHOLD HIGHWAY DEPARTMENT Peconic Lane f1D Peconic. New York 11958 (631) 765-3140 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR RECEIVED APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 83 of the SEP 1 2 2013 Code of the Town of Southold, Suffolk County, New York, and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit Southold Town Clerk authorized inspectors to make' necessary inspections of the job site. Print or Type' 1) C,►'� ( �/1�lG�'; �' �'�.� •', �Sjr D��fa'L.�l-iG`-12� h j�fl1G��! i Name of Applicant Address 2) Name or Owner or Premises Address 3) Ai ` or Descripti and Location (Street Number, Hamlet, Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No- *If yes, other Town permits may be required. 4) Builder's License No. Plumber's License No. Electrician's License No. Other Trade's License No. Signature of Applicant Date 5) a) Attach plot plan showing location of proposed excavation and relationship to adjoining premises or public streets or areas, and giving a detailed descrip- tion of layout of excavation. b) Attach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section Block , Lot 7) Starting Date: 9-q-(3 Completion Date 3 8) Work Schedule: Phase Completion Date Excavation........................................ Facility installation................................ Backfill & Compaction............................. PavementReplacement............................. 9) Under which authority is the application made: 10) Estimated Cost of Proposed Work: $ 11) Remarks: S Iy i 7A 4-4 1,ZI i,t U-J UTTU LZLjC-` 7-i4 D-39 Page 1 of 3 12) Insurance Coverage: (Attach copy) a) Insurance Company: b) Policy # c) State whether policy of certification on file with the Highway Depart- ment d) Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage. 13) Security: Cpfl�5Let13.S.Pbi- a) Surety Bond or Certified Check provided in the total amount of $ b) Maintenance Bond provided: 2 years or 3 years b'Sm c 14) Fees for applications and permits: Basic Application Fee.........$r2s-68- Al. /Service Connections excavations @ $20.00 = $ No. A2. /Additional Excavations same service @ $10.00 = $ No. B. Excavations 18" in depth or less: 0-100 i.f. _ $10.00 i.f. @ $0.10 - $ Additional C. Excavations 18" in depth to 5' in depth: 0-100 I.f. _ $30.00 I.f. @ $0.30 = $ Additional D. Excavations 5' in depth and over: 0-100 Lf. _ $50.00 i.f. @ $0.50 = $ Additions E. No. Utility Repair Excavations @$40.00 = $ Additional Repairs same service @ $5.00 = $ F. Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to: in accordance with this application. SUP RI DENT OF HIGHWAYS TOWNFF S UTHOLD, NEW RK Peter W. Harris te L /} Date Received by the Town Clerk Date Permit issued _ 9 /a�—/� Permit No. i0 Date Note: Permit expires one (1) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways. Permit must be available for inspection. D-39 Page 2 of 3 1 1 � l \ J ' J �v �it�,r