Loading...
HomeMy WebLinkAbout38513-Z gUFO�,f Town of Southold Annex 6/25/2014 P.O. Box 1179 { 54375 Main Road c► �, �i� Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 36986 Date: 6/25/2014 THIS CERTIFIES that the building ALTERATION Location of Property: 1305 Bayview Ave, Mattituck, SCTM#: 473889 Sec/Block/Lot: 106.-6-20.4 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this officed dated 11/6/2013 pursuant to which Building Permit No. 38513 dated 11/18/2013 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: SOLAR HOT WATER SYSTEM TO AN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR The certificate is issued to Goehringer, Gerard&Goehringer, Barbara (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 38513 04-28-2014 PLUMBERS CERTIFICATION DATED Authorized Signature sUFF+ucc TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE �� • SOUTHOLD, NY sol ,�„ .►'�� BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 38513 Date: 11/18/2013 Permission is hereby granted to: Goehringer, Gerard & Goehringer, Barbara PO BOX 812 Mattituck, NY 11952 To: install an Solar Hot Water system to an existing dwelling as applied for At premises located at: 1305 Bayview Ave, Mattituck SCTM # 473889 Sec/Block/Lot # 106.-6-20.4 Pursuant to application dated 11/6/2013 and approved by the Building Inspector. To expire on 5/20/2015. Fees: SOLAR PANELS $50.00 CO -ALTERATION TO DWELLING $50.00 Total: $100.00 Building Inspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,propeity lines,streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 fornn). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from phunber certifying that the solder used in system contains less than 2110 of 1%lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non-conforming uses,or buildings and"pre-existing"land uses: 1. Accurate survey of property showing all property lines, streets.building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00.Alterations to dwelling$50.00. Swimming pool $50.00. Accessory building$50.00,Additions to accessory building$50.00.Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy- $.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy -Residential$1.5.00, Commercial$15.00 Date. New Construction: Old or Pre-existing Building: Y (check one) Location of Property: ���' �I/%E!/(J t� L House No, Street Hamlet Owner or Owners of Property: Jit r' Suffolk County Tax Map No 1000, Section Block Lot Subdivision Filed Map. Lot: Permit No. 'l��Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ o c Applicant Signature o1*OF SO�I�o Town Hall Annex A Telephone (631)765-1802 54375 Main Road Fax (631)765-9502 P.O. Box 1179 CA oroger.�� richert(a�town.southold.ny.us Southold, NY 11971-0959 'r4UNT1,� zzcc«� BUILDING DEPARTMENT TOWN OF SOUTHMD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Goehringer Address: 1305 Bayview Ave City: Mattituck St: NY Zip: 11952 Building Permit#: 38513 Section: 106 Block: 6 Lot: 20.4 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: as built DBA: License No: SITE DETAILS Office Use Only Residential X Indoor X Basement X Service Only Commerical Outdoor 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks Disconnect Switches Twist Lock F1 Exit Fixtures TVSS Other Equipment: inspection of solar domestic hot water system to include control panel and valves Notes: Inspector Signature: � -r, j� Date: April 28 2014 81-Cert Electrical Compliance Form.xls fjf so TOWN OF SOUTHOLD BUILDING DEPT. 3, 765-1802 r INSPECTION [ ) FOUNDATION 1 ST [ ] ROUGH PLUMBING [ ] FOUNDATION 2ND [ ) INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] CAULKING REMARKS: DATE INSPECTOR Jeffrey Havelin, PE- Engineering Services PO Box 270 Port Jefferson Station, NY 11776 4a 'I JUN 2 5 2014 June 22, 2014 - Town of Southold a Building Department Town Hall Southold, NY 11971 RE: Residential Solar Thermal System Installation SCTM# District 1000-Section 10600-Block 0600-Lot 020004 Owner: Gerald & Barbara Goehringer 1305 Bayview Avenue Mattituck, NY 11952 Findings: I have reviewed the solar hot water system installation at the subject address. The units have been installed in accordance with the manufacturer's instructions and the approved construction drawing. I have determined that the installation meets the requirements of the 2010 NYS Building Code, and ASCE7-05. To my best belief and knowledge, the work in this document is accurate, conforms to the governing codes applicable at the time of submission, and conforms with reasonable standards of practice, with the view to the safeguarding of life, health, property and public welfare. OF NEtti Y Sincerely, CO ,�P * �Z Jeffrey Havelin, PE �oARo0637T6NP��� FIELD INSPRCrXQN REPORT DATE CONMMS FOUNDATION(1ST) FOUNDATION(2ND) ; ROUGH FRAMING& r� t PLUMING4 r INSULATION PER N.Y. H STATE ENERGY CODE Y FINAL r a ADDITIONAL COMMENTS z rn T-(ckA � o ,•f z b to TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey SoutholdTown.NorthFork.net PERMIT NO. fir ) i Check C: -& rj a6l, f=6'O. -C Septic Fonn N.Y.S.D.E.C. Trustees Flood Permit Examined_ i 20 Storm-Water Assessment Fonn Contact: Approved 1 ,20 f Mail ter all &/G1fi Disapproved a/c Phone: Expiration Building Inspector ! NOV — ^ 2013 PLICATION FOR BUILDING PERMIT Date 20 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale.Fee according to schedule. b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas. and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building pennit shall expire if the work authorized has not commenced within 12 months atter the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months. Thereafter. a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold. Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings,additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws,ordinances,building code,housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) lqk `� -44 *�, Alklet A/V i[I<;, (Mailing address of applicant) State whether applicant is owner, lesseit!( ageutl�rchitect, engineer, general contractor, electrician, plumber or builder Nairne of owner of premises y (As n the tax roll or latest tiem);i)" tt, ,- If applicant is a corporation, signature of duly authorized officer FUS (Name and title of corporate officer) FGF, PDLL,"-,ECS C' fNCRI I 2 ROUGH-FR,[JP`11�G_ i1�Cl�r STRAPPING. ELECTRICAL & CAULFI; % Builders License No. _I U l7 3. lrvSULA-!iOP, Plnuubers License No. 4 r'!\;^•!_ CO��i t ;•) ,rl i' . ' [ _cTt' t ?,L Electricians License No. SS E ^UST 3E C 1 0R C O. Other Trade's License No. Nj THE H; J1 v. 1. Location of land on which propo ed work will be done: r 0"', 11 House Nmnber Streetl Hamlet f County Tax Map No. 1000 Section `f' Block Lot C> 1` 1 Subdivision Filed Map No. Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use and occupancy 3. Nature of work(check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work 0 K sr 4j{ - (Description) 4. Estimated Cost Fee (To be paid on filing this application) 5. If dwellurg, number of dwellurg units Number of dwelling units on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions of existing structures, if any: Front Rear Depth Height Number of Stories Dimensions of same structure with alterations or additions- Front Rear Depth Height Number of Stories 8. Diurensions of entire new construction: Front Rear Depth Height Number of Stories 9. Size of lot: Front Rear- Depth 10. Date of Purchase Name of Former Owner 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO 13. Will lot be re-graded? YES NO Will excess fill be removed fi-om premises?YES NO 14. Names of Owner of premises Address Phone No. Name of Architect Address Phone No Naive of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO V * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO ✓ * IF YES, D.E-C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on properly is at 10 feet or below,must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OFi ° 06 t ►'Ju�t1 (�( being duly sworn. deposes and says that(s)he is the applicant (Name of individual signing contract) above named, (S)He is the46eK__'1 (C rtractor,Agent. Corporate Officer. etc.) of said owner or owners, and is duly autlrori/-ed to perform or have performed the said work and to make and file this application-, that all statements contained in this application are true to the best of his knowledge and belief. and that the work will be performed in the rnnanner set forth in the application filed therewith. Sworn to before me this day of vE'w'4e v 20/ 3 otary Public / Signature of Applicant '6Z'3daS idx3 uoissiwwoD PENNY BEDELL f4unoD 4p#nS t pai;geno Notary Public,State of New York LTE660938 oN No.01BE6099317 rlJOA MON;o a3e3S'oi d Are4ON Commission ifW inSuffolkCoun ` 113438 ANN3 Expires Sept.29, oF soliryol 0 Town Hall Annex � � Telephone(631) 765-1802 54375 Main Road N (631)765-9g50 P.O.Box 1179 G Q roger.richertta�town.southo�d nv us Southold,NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY: Date: Company­Name: Name: License No.: Address: Phone No.: JOBSITE INFORMATION: (*Indicatep required information) *Name: *Address: — *Cross Street: *Phone No.: , S�/ — / /'X Permit No.: �� / Tax Map District: 1000 Section: i'C' L Block: Lot: *BRIEF DESCRIPTION OF WORK (Please Print Clearly) (Please Circle All That Apply) -- *Is job ready for inspection: - -y�S / NO Rough In Final *Do you need a Temp Certificate: YES / NO Temp Information (If needed) *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: Re-connect Underground Number of Meters Change of Service Overhead Additional Information: PAYMENT DUE WITH APPLICATION " 14 f2 82-Request for Inspection Form SURVEY OF PROPERTY —� S83°S1 '15'�E 40 ' N (in5ludin p/o lots #Iq .00 -21) Pio � MP O SHOR 9 LOT W E FILED JANUARY 3, lq 4 FILE No. 41 ,v, 9� � � 21 SITUATE: HATTI TUCK 9°031 l �r � s TOWN: SOUTHOLD �6 ,� UP�'�, , SUFFOLK COUNTY, NY rcpJ I PURVEYED Oq-Iq-OI S5 AMENDED 11-14-01, ,- `� 1 I2-13-0I P/O LOT ! 5GT# IOOb-106-6-16.2 $ \ Zz I y shed J o 0 � I CERTIFIED TO: P/O � y I GERARD P. 60EHRIN6ER 4 area o LOT BARBARA J. 60EHRIN6ER j �'vew P�� 9 ( / ZI VOO - a�'' t Pio I W �'�x� Y. y 2 aec� o/� /b^ PCO f LOT e zz �\+ LOT j Iq 22 7�� ae P/O O LOT Of 1A ' . t vii 2. `6 �` r1J� C/.) O 7�" .o+a.a.m>gaa a +use.tryeya - _ _ GQ� ftayd s..t tlWl b aG,ulatrM le q�b l" � • 1Gnlltatb.YbicobE 1ww•fkrl tbt Y NOTES: 0 A C�� � `\,` V� 1�IK Ibw YGrlc Slate AssCcblCn d Rd�s v ■ MONUMENT o �lq�6 �t✓ � s vP a a { S� 0 I 1 AREAS: tal ay.2y an0 tednq inl,Nia..sle0 li.�.c,t� e e..msgtic.d nr w.eay�xwc�.c.�.k AREA : 50,115 5F OR 1.15 ACRES JOHN C. EHLE S LAND AND SiRVEYOR 6 EAST MAIN STREET N.Y.S.LIC.NO. 50202 GRAPHIC SCALE I"=30' RIVERHEAD,N.Y. 11901 369-8288 Fax 369-8287 REF.—\\Hp server\d\PROS\01-274b.pr0 U_ Warning H Z t 1 w 7 It is a violation of the New York State Education Law for N any person,unless he is acting under the direction of a u7 H licensed professional engineer or land surveyor,to alter Z eeeeeeeeeeeeeeeeeeeeeee®eaeaee0 p an item in any way.If an item bearing the seal of an engineer or land surveyor is altered,the altering engineer Z 6 Z or land surveyor shall affix to the item his seal and the � 0 GENERAL NOTES g' notation'altered by"followed by his signature and the E- p 11 1 AX date of such alteration,and a specific description of the ix DIVISION 1- GENERAL REQUIREMENTS 3 alteration.New York Education Law,Article 145§7209 w JEFFREY HAVELIN, PE 1. Work performed shall comply with the following: 5 10 4 � O � PO BOX 270 a. These general notes unless otherwise noted on plans or specifications. O 11 � O� PT JEFFERSON STATION,NY 117 76 b. NYS 2010 Building Code as specified on the drawings. Q- Email:Info@haveRn-pe.com velin-pe.com LL PHONE:631-4{06913 - FAX 631-961-8815 R'R'W.HAVELIN-P1 .COM c. All applicable local and state codes, ordinances and regulations. 11 O ca d. In areas where the drawings do not address methodically,the contractor 'ee�°P = shall be bound to perform in strict compliance with the manufacture's Specifications ~ H u7 and/or recommendations. p 2. On-site verification of all dimensions and conditions shall be the responsibility W of the general contractor and subcontractors. LU Z 6AL t 3. Noted dimensions take precedence over scale. Never scale directly from drawings. 1 `�� Z = Contractor should consult Engineer in case of question. Plan View Of ATS-30 unit Side Elevation View-Variable Installation Angle ';CW am 4. The general notes and typical details apply throughout the job unless otherwise noted scale-Krs scala: W=1w Co oc or shown. Specifications Model ATS -30 W Isometric View-ATS-30 UCllt 1-Aluminum Header � 5. Discrepancies: The contractor shall compare and coordinate all drawings,when in the 2-Cross Bracing-18 gauge 304 Stainless Steel(4 ea) Gross area 55.11 SF °L � # DATE REVISION/ISSUE s'�B"TS 3-Evacuated Heat Tube(30 ea) Net Area 26.37 SF r! opinion of the contractor, a discrepancy exists he shall promptly notify the Engineer, in 4-Locking Tube retainer Unit(30 ea) Dry Weight 243 Lbs N H writing, before proceeding with the work or he shall be responsible for the same and any ,� 3" 5-Side rail-18 gauge 304 Stainless Steel(2 ea) Fluid Capacity 0.50 Gallons indirect results of his action. Use(2)Simpson's SDS \ " 6-Mounting foot-14 gauge 304 Stainless Steel(6 ea) Pressure tested to 160 PSIG O structural wood screws-Type 7-Pipe mletl Outlet %"Copper Tubingeach end Frame, racing, 6. Omissions: Engineering drawings and specifications shall be considered as part of the 316 stainless steel screws ( ) B &hardware is Stainless steel w Z g g g p �� - 8-Horizontal Bracing-18 gauge 304 Stainless Steel(2 ea) Manifold-anodized aluminum(color gray) tj H conditions for the work. In the event that certain features of the construction are not fully #SDS25300SS 9-Stand Bracing-18 gauge 304 Stainless Steel(2 ea) p shown on the drawings, current national, state and local codes, ordinances, regulations or ''' 10-Center rail-18 gauge 304 Stainless Steel(1 ea) Tubes-Borosilicate Glass 3.3 W O W agreements as well as current acceptable building practices shall govem, and their Rated capacity(ea.screw) ] Advanced Thermal Solar LLC 11-Adjustable length rear leg support(3 ea) a H construction shall be of the same character as for similar conditions that are shown or noted. DF/SP-420#capacity Z SPF/HF-300#capacity men Structural attachment Detail - Notes 7. The Engineer will not be responsible for and will not have control over construction means, Certification W LU LU W methods, techniques, sequences of procedures, or for safety precautions for the client or his CL an of the work to car out the work in ~ contractors, subcontractors, or anyone performing y ry 1.Using(2)va"�x 3"stainless steel-structural wood screws,attacheach mounting foot(6 total)to existing 1. All ATS solar collector units meet the requirements of the 2010 Residential code of New York State and the OO accordance with the approved contract documents. roof rafters,as shown.Use Simpson's SDS structural wood screws-Type 316 stainless steel screws specific requirements for Roof-Mounted collectors as per M2301.2.2 of the code. #SDS25300SS;no predrilling is required. W m 8.Any and all drawings and specifications for site work, plumbing supply or waste, electrical i 2.When installed in accordance the specific mounting requirements shown on this drawing,the frame of the solar > O circuitry, and heating, ventilating, fabricated trusses, and air conditioning systems that are not Heavy Duty-ATS 2.If an existingroof rafter is not located under the mounting foot therafter can be sistered with an 8'Ion g g collector unit can withstand wind forces of 120 MPH.If the existing stnxtiuure is not designed to withstand 120 MPH � WARNING a part of the professional services provided to the Client by the Engineer unless included under 14 Gauge Stainless Steel matching rafter section using staggered 1/2"0 bolts at 16"o.c.or"trifle"solid bridging can be installed winds or the existing structure is structurally unsound in anyway this certification shall be void. to A the agreement. Any discrepancies with these documents by any of the above listed services mounting"Foot" between rafters and attached with joist hanging brackets between agacent rafters. Z 4C as shown in documents prepared by others should be indicated in writing to the Engineer (6 each per unit) b < p IT IS A VIOLATION OF THE NEW immediately. 3.The collector may be mounted flush with the roof surface or elevated using the standard adjustable frame unit. o YORK STATE EDUCATION LAW FOR 3.Coat the lag bolt threads with clear silicone sealant and use va"sbinless steel washers as shown. LU 9. The conditions and assumptions stated in these specifications, shall be verified by the 4.All ATS solar collector units have been listed by the SRCC and have been certified to meet the OG-100 H ANY PERSON, UNLESS THEY ARE contractor for conformance to local codes and conditions. In the event of a discrepancy 4.Optional mounting method:Install a 2x6 strong back member under the series of rafters where the requirements. LU _ ACTING UNDER THE DIRECTION OF between these specifications and local codes or conditions,the contractor shall notify the collectors are getting installed and attach mounting feet to the strong back member using Ira"stainless steel 1-- H A LICENSED PROFESSIONAL Engineer in writing of the discrepancy and special Engineer requirements shall be applied to threaded rods with nuts and washers on each end of the rod. 5.Installation of ATS solar collectors shall only be attempted by licensed professionals in strict accordance with all LL_ ENGINEER TO ALTER THESE PLANS. insure the building's structural integrity. of the requirements of Chapter 23 of the 2010 Residential code of New York State. 5.Using expansion type bolts into the existing plywood is not an acoptable mounfing method. Q 10.ALL ELECTRICAL WORK SHALL BE BOARD OF FIRE UNDERWRITERS APPROVED 6.Custom modifications of the collector frame,stand,cross-bracing,horizontal bracing or hardware of any kind AND IN ACCORDANCE WITH NEC AND THE 2010 NYS CODES AND REGULATIONS Structural attachment Detail 6.Any damaged roofing members discovered during installation shI be replaced/repaired before attaching will void the structural certification of this product. O P.E.SEAL & SIGNATURE scale:NTS the solar collector units. Z w LU EN �OFr 1- DETAIL- B DESIGN CERTIFICATION W *� /Y o -s, n. LU ne STRUCTURAL ATTACHMENT DETAIL A. Geographic Design criteria in conformance with the 2010 NY State Building code is severe ac W Z NTS weathering, 120 mph wind zone, 20 pounds/square feet ground snow load and Seismic Design = Z Category"B". B. The roof structure is strong enough to support the additional weight of the Solar units as per O 063776 aO�2 H w 9 SENSOR PITCH%"/FT Section 1606 of the NY State Building Code. ix F=- �FSSIONP�'� PROBE I r r C. The mounting brackets and hardware meet or exceed NY State Building Code requirements for Q I the design criteria and respective wind pressures. u) Z V D. The actual in field attachment to the roof will meet or exceed 2010 NY State Building Code N requirements and 120 MPH high wind requirements of ASCE T-05. THIS PROJECT W ��,�p I E. Solar collectors fully comply with the NY State Building Code section 2606.12 and so noted on V7 W SOLAR THERMAL o ♦o documents. Z W LLl I LL I H = r F. Solar collectors are in full compliance with all of Chapter 141 of the NY State Mechanical Code. pC F- W Z G. Solar collectors are in full compliance with the NY State Plumbing Code sections 601.2 and 612. Z H H �-- CLIENT s" CLEAR PATH 120 MPH W W Je Goehrin er WIND LOAD CALCULATIONS ( ) w rry g Tempering SOLAR Z CONTROLLER w O 1305 Bayview Avenue Valve USING-ASCE METHOD 1 FIG 6-3(FOR CLADDING&C011UIPONENTS) Hot f- COLD IN 10 GALLON DRAIN BACK I -► HEIGHT ADJUSTMENT FACTOR =1, EXPOSURE =6 w/H=30 FT& 1=1.0 Q V) Mattituck, NY 11952 BASIC WIND SPEED V 120(mph); Roof Pitch=7 to 27 degrees; Roof Zone 2(Near ridge) _ V) Hot Out I H x NET DESIGN WIND PRESSURE P Nemo=-33.6 PSF; Using an effective wind area 50 SF M � ()ATS-30 Net area of Panel=30.49 sf Max Wind load =30.49 sf x 33.6 Ipsf=1024.5# O THIS DWG: Evacuated Tube collector N F-USH MOUNTED SCREW PULLOUT STRENGTH CALCULATIONS(See Detaill B) _ SOLAR PLAN & DETAILS With SPF/HF rafters DC Q (2)Lag Screws per foot, (6) Mounting feet per panel 12 lag bolts at 300#each=3600# a ix O W V SENSOR PROBE With DF/SP rafters ^ Z (2) Lag Screws per foot, (6) Mounting feet per panel 12 lag bolts at 420#each=5040# v ¢ own Of BRONZE PUMP Town BrooWwxm Existing PROPOSED Hot water 55 GAL _ "NET AREA(per panel)=30.49 SF; OVERALL WIND LOAD= 1024#<3600# or 5040# Tank Solar Storage Tank Screw pullout exceeds maximum wind forces by more than a safety factor of 3 DETAIL- A - LAYOUT T SUFFOLK COUNTY ROOF PLAN SOLAR THERMAL LA Note: The interstitial spaces between each tube are not included in the net area. TYPICAL RISER DIAGRAM SCALE:NTS DWG# SHEET# NTS A-101 .00 1 OF 1