Loading...
HomeMy WebLinkAbout38646-Z �,FFoc� Town of Southold Annex 7/8/2014 P.O.Box 1179 54375 Main Road "w W Southold, New York 11971 fil CERTIFICATE OF OCCUPANCY No: 37012 Date: 7/8/2014 THIS CERTIFIES that the building GENERATOR Location of Property: 61700 CR 48, Greenport, SCTM#: 473889 Sec/Block/Lot: 45.-2-10.4 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this officed dated 1/8/2014 pursuant to which Building Permit No. 38646 dated 1/28/2014 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: COMMERCIAL CO-GENERATOR AS APPLIED FOR The certificate is issued to San Simeon By The Sound (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 38646 07-01-2014 PLUMBERS CERTIFICATION DATED Authorized Signature TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 38646 Date: 1/28/2014 Permission is hereby granted to: San Simeon By The Sound 61700 CR 48 Greenport, NY 11944 To: install a Commercial Co-Generator System as applied for At premises located at: 61700 CR 48, Greenport SCTM # 473889 Sec/Block/Lot# 45.-2-10.4 Pursuant to application dated 1/8/2014 and approved by the Building Inspector. To expire on 7/30/2015. Fees: COMMERCIAL ADDITION/ALTERATION $250.00 CO -COMMERCIAL $50.00 ELECTRIC $100.00 Total: $400.00 Building Inspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines,streets,and unusual natural or topographic features. 2. Final Approval from Health Dept.of water supply and sewerage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building,industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and"pre-existing"land uses: 1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees I. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00, Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential $15.00,Commercial $15.00 / Date. New Construction: v Old or Pre-existing Building: (check one) Location of Property:_ fo 00 e-Ae 4r c rVVE House No. Street Hamlet Owner or Owners of Property: Eftri S f-1Mr t,,--- Suffolk County Tax Map No 1000,Section S Block Lot 7 Subdivision Filed Map. Lot: Permit No. �o Date of Permit. Applicant: Health Dept.Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) hh -(�7 Fee Submitted:$ S V Applicant Signature pF SO!/ryol 0 Town Hall Annex Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 1179 G • �� roger.riche rt(CD-town.southoId.ny.us Southold,NY 11971-0959 CpUNTY,�� BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: San Simeon By the Sound Address: 61700 cr 48 City: Greenport St: NY Zip: 11944 Building Permit#: 38646 Section: 45 Block: 2 Lot: 10.4 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: Francis J McLoughlin Elec License No: 4046-e SITE DETAILS Office Use Only Residential Indoor X Basement Service Only Commerical X Outdoor X 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks Disconnect Switches F1 Twist Lock Exit Fixtures 11 TVSS Other Equipment: install co-generating system to operate in parallel with grid, to include 74KW natural gas powered generator,2-400a three phase disconnects and all required control panels,pumps,switches, Notes: sensors(high and low voltage) Inspector Signature: Date: July 1 2014 81-Cert Electrical Compliance Form.xls i pF SO(/jyol TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1 ST [ ] ROUGH PLUMBING [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY PQIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] CAULKING REMARKS: DATE / '� INSPECTOR FIELD R SPEMON REPORT DATE COMMENTS FOUNDATION OST) G) FOUNDATION(2ND) ROUGH FRAMINQ& PLUMBING . pQ INSULATION PER N.Y. y STATE ENERGY CODE • fi ' 4 FINAL ADDITIONAL COMMENTS te. Wpc CJS — o of z e TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey SoutholdTown.NorthFork.net PERMIT NO. Check"R 50 Septic Form N.Y.S.D.E.C. - ---1 Trustees Flood Permit Examined / ,)!e 20 f 7 I .. (- -��]� ` ! Storm-Water Assess ent Form �� I I ,.. ' i iQ �� Contact: � � 8 2014 Approved f .��r 20— —ILVI ;i• Mail to: Disapproved a/c 7 ' n Phone: Expiration 20) 5 yi 3 r36— i , C-. , t J Buildin nspector APPLICATION FOR BUILDING PERMIT Date ✓[1V\vC-,/y �-h�Q , 20 /9 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans,accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. c.The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building pen-nit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter,a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code,and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. 14 C �� iS (Signat&e of appficanflof name, if a corporation) 10A (Mail' g address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder •TfrtcT <fC Name of owner of premises ) G v ��w. 0,1 j, t��e �o v�c� �I�v✓S,rE�A � ►� 7r p' ✓�SC�f.� (As on the tax roll or latest deed) If applicant is a corp ration, signature o duly authorized officer FEE: �,____ Le, ,- nNOTIFY BUILCr4f 1_FARTMENT / (Name and title of corporate offider') °, ��`a 11,' 765-1802 8 ANI I(�� �� PM FOR TN! FOLLOWING INSPL'MONS: 1. FOUNDATION --1 VO REQUIRED 1 Builders License No. 1°��1�'A F FOR POURED COV",-YETE. Plumbers License No. 9 y 2. ROUGH-FRAMING,PLI '!NG. Electricians License No. y STRAPPING. ELECTRICAL & Other Trade's License No. 3. INSULATION 4. FINAL-CONSTRUCTION &E! MUST BE COMPLETE FOR C.0 1. Location of land on which proposed work will be done: /� ALL CONDUCTION SHALL MEE' ZUc0 �te `7� �0e"OR '11XE ENTSOFTHECOD'-, `!! House Number Street Ham RK STATE. NOT RESPONSIE__F,.:R DESIGN OR CONSTRUCTION ERRORS. County Tax Map No. 1000 Section . B."lrrek ` Lot Subdivision "s ""`` Filed Map No. Lot I OF SO(/r�o Town Hall Annex 411 Telephone(631)765-1802 54375 Main Road P.O.Box 1179 e roger•richertCa taO`wn sou�t�i0 ny.us Southold,NY 11971-0959 "�V111 tie � BUILDING DEPARTMENT TOWN OF SOUTHOLD } APPLICATION FOR ELECTRICAL INSPECTION ' REQUESTED BY: AJ, S�r Date: Company Name: Name: c Lou License No.: : Address: (� X S 0( !1&-0 Phone No.: I . JOBSITE INFORMATION: (*Indicates required information) *Name: ,� S �' .' ,��� *Address: 7C *Cross Street: *Phone No.: 12 Permit No.: Tax-Map District: 1000 Section: Block: Lot: J- *BRIEF DESCRIPTION OF WORK(Please Print Clearly) (Please Circle All That Apply) Is job ready for inspection: ' YES NO Rough In Final *Do you need a Temp Certificate: YES/ NO Temp Information(if needed) *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: Re-connect Underground Number of Meters Change of Service Overhead Additional Information: PAYMENT DUE WITH APPLICATION i 82=Request for Inspection Form C N/18/2014 F-19:47 6317656641 SOUTHOLD TRUSTEES PAGE. 01102 r Hall Annex i Tz5.train now � � Telephone(63 1)?(g5.1302 P.O.Box 117.9 ' m�er.richart its"n 1)7 'Q� Southold,NY 1197,1.0959 3 I sZMDLNG DEPAR'Z'UENT TOWN OF 80tr 'IjOir l 'PLTI1=� LT1 A� IN-Si P CTiON i fAddress: QUESTED BY: _ Date: pany Name: e: nse No.: t_l 0 L4 C. F --�---�-- ._ �� Po 000. 60 `�' �.P�� NIc 1 9 3 v I Phone No.: t 38 t ►o►g—` - i JOBSITE INFORMATION: (*Indicates required information) Name: S A N r s v *Address: ti *CMss Street; --�-— ! 4+ �-,� PrL L 'Phone No.: '7 Permit No.: � �_JrL� f Tax-Map District: 9 0 secaom �--------- - _.. Lot: I 'BRIEF DESCRIPTION OF WORK(Please Print Clearly) --------------- (Please Circle All That Apply) *Is job ready for inspection: CEJS/ NO Dough In tnalJ 1 Do,you meed a Temp Certitloste. ! YES l NO r Temp Information(If needed) *Semce Size: 1 Phase 3Phase 100 150 200 300 350 400 Other I� 'New Service: Re-connect Underground Number of Meters Change of Service Overhead Additional Information: P, YMi=�7 DUE 1NPTH&PPLICATI �I E2+Request(Cr inspection norm JUN 2 4 2�) " 4 Sj 0112412014 17:16 f AX)1413SM970 P.0011003 P.O. Box 2511 AEGIS ENERGY Springfield, MA 01101.2511 SERVICES Jackson Street Holof yoke, MA 01040 FAX C OYER S H E ET . >P a g e x o f• DATE: 11-L--1 1 Phone: (631 )u S .. �. Fax: (63l)-7cf-,7TcZL, JAN 2 4 2014 a Phone, (413) 536-1156 FAX: (413) 536-1104 MESSAGE °- ��a�" b- �o.nn J•Yrs soy,\ ,, 6v,�4, c.r�T g tie S) L/ Urgent Fatjor review Reply ASAP Please comment 01124/2014 17:16 (FAK)1413SM970 P.0021003 AEGEN THERMO*POWERTm 75 LE The AEGEN THERMOXPOWERT" 75 LE is a low emissions, compact, modular combined heat and power(CHP) system producing 75 kW of power and 5.23 therms of heat per hour. A three-way non- selective catalyst reduction (NSCR) emissions control package includes a catalytic converter and temperature and oxygen controls designed to reduce emissions of nitrogen oxide, carbon monoxide, and hydrocarbons. The CHP module has a natural gas-tired reciprocating engine, an induction generator, heat recovery system, a sound attenuating enclosure, electrical switchgear, and solid-state controls for automatic and unattended operation. High efficiency heat recovery components consist of oil cooler, engine jacket for heat transfer, marine type exhaust gas manifolds and exhaust gas heat exchangers. The AEGEN THERMO/✓POWERTm 75 LE operates in parallel with existing m chanical and electrical systems in the facility. The module includes an advanced utility-grade relay , or electrical protection and redundancy as standard equipme Features . .:-__..... ' ■ Reliable, proven technology=; a Highly efficient m Environmentally sound with low emissions a Quiet operation a Modular—scaleable into larger systems ■ Compact—easily fits in most buildings a Indoor or outdoor installation m Ease of installation—no business disruption ■ U. L. listed ■ Rernule rnunituring and uunLrul ra Digital display and user-friendly interface ■ Infinite system life with maintenance program m Electric and thermal load following a Modbus compatible for networking with building automation systems Electrical Power Output 75 kW • Thermal Output 523,000 Stus/hour Output Voltage 208V or 460V nominal,3 phase,3-wlre Efficiency 82A%at HHV of 1,020 Stus/scf { Gas Input 930 standard cubic feet per hour(scfh) Required Gas Pressure 10 to 28 inches water column Hot Water Flow 22 gallons per minute Max Output Water Temperature 230°F Emissions Meets stringent NY air quality standards Acoustic Level(enclosed) 70 decibels(dBA)@ 20 feet (� Suspension Vibration isolation mounts Dimensions 46"width x 89"length x 49"height Weight 3,050 pounds AEGENCOTe, Inc. Aegis Generator Company 55 Jackson Street, Holyoke, MA D1040 Phone: (413)536-1156 Fax: (413)536-1104 M O 0 rT O 0 a �----59A9am T1R L� CrT r az G%L apt 199A 6mAL TWX 19.43 —3S43 9PTIWNAL Lad tFvel SY!!TCU .TO• Wr V= s-------���� - r Nor tDR WT 8R1 1 P' a<1 a ITNxT C .7;r NFT NOW ® 411 boas }— t 05 LDT=>�c o c� I Iwo coag f . am "r. . L AiRF1NIM —vm---{ 269 Im �---939!--4�--to rYP. 4am >rnat.RANr;Tnm eD>< aba TYr— #At mmw PKU 443 1 t 3 6.69 T 11 PA 7a Romm SAMA n[FfO®4LLr SUPIWI FNM H N3 IN TV. RNMON AS$Mr.FLEXM.E ee►aa9cn—s3nan—ma vm rom To RAMOM a LUME m1AO=NW 3r Ormw o Zoos=ASE arm JM sofa. s M1 OUTE 3S 7TNINPo Vm EOWLM Km Nd SERTPR.aN PR. AMD N1911sACKSM 31R1C OO WYEARA A COME==Ljm►Sunt"m YMLY WEN=on umm wwwacrwRm D""Wma wm mm Doom WHM TH11111IO16 PIP£coME6T at + + O SJW IANC RM C#RYOW X Or INCO[rum IN ROTATDR FUM�ilLSRYNVPCW An1E TMK=Mr AR3W PM M NUMIUR AS iPM MW ARP 7AlLC 'M M11 m amm TAMK A FOR H MX=UNF4rATXP AND IDML MROMMNIS WO TO EOM.OUV LL. nown o wL I mw I miumm SNE NCR MOOOLAIR 3 rAml n RIM TWE RR33MATVR L r D 9 3 OIL YaOfROaR1OO $� 71RY wccmr 737 L�f iMPdQiItE fAe e� sa �easAa ws...r... .� NAIL OP RATM Pracm mx m- ��q���[•�■a MA4L OPEMTm TO4'ER lm 3w r L1PF>aR R�a� O HEITOR N N T Q NOTES: S )ikN SIMEON 13ID13ENEIIP FII) N SYS7rEM DRAWING INDEX SHEET NO. TITLE OF DRAWING T-001 TITLE SHEET GENERAL NOTES MECHANICAL SYMBOLS LIST 1 . CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD PRIOR TO CONSTRUCTION, AND REPORT TO ENGINEER ALL ERRORS, M -001 HVAC SCHEDULES/FLOW DIAGRAM DISCREPANCIES, OMISSIONS, DEFECTS, OR UNUSUAL WORK CONDITIONS BEFORE COMMENCING CONSTRUCTION. ® CIRCULATION PUMP M -002 MECHANICAL LAYOUT - BASEMENT 2. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE RULES AND REGULATIONS OF ALL TS TEMPERATURE SENSOR M -003 MECHANICAL DETAILS GOVERNING AGENCIES INCLUDING BUT NOT LIMITED TO THE CODES AND REGULATIONS AS SET FORTH BY THE VILLAGE OF SOUTHOLD AND STATE OF NEW YORK. A BALL VALVE 3. CONTRACTOR TO SECURE ALL NECESSARY PERMITS REQUIRED FOR THE STIPULATED WORK PRIOR TO COMMENCING BUTTERFLY VALVE P -001 PLUMBING LAYOUT - BASEMENT/ON GRADE WITH CONSTRUCTION OR DEMOLITION. UNION 4. ALL ASBESTOS REMOVAL, PLUMBING, ELECTRICAL, WELDING WORK, ETC. TO BE PERFORMED BY LICENSED CONTRACTORS SUBCONTRACTED BY AEGIS ENERGY SERVICES. ELECTRICAL LAYOUT - BASEMENT ON GRADE THERMOMETER E-00 1 / 5. ALL CONTRACTORS, WORKMEN, AND AGENTS WORKING AT OR VISITING THE SITE SHALL BE COVERED BY ALL ONE E LINE DIAGRAM RAM & _ DETAILS NECESSARY STATUTORY INSURANCE INCLUDING LIABILITY, WORKMEN'S COMPENSATION, DISABILITY,ETC. PRESSURE RELIEF VALVE FOR: E 002 ELECTRICAL BIDIREvrEw 6. ALL WORK SHALL BE PERFORMED IN A NEAT, CLEAN, ORDERLY MANNER AND THE SITE KEPT CLEAN FROM DUST AND AQUASTAT DEBRIS AT ALL TIMES. 7. CONTRACTORS TO PROVIDE ALL NECESSARY TEMPORARY LIGHTING, POWER, WATER, WATERPROOFING, ETC. NEEDED TO ISI STRAINER - Y TYPE CONTRACTOR: ENSURE PROJECT SAFETY AT ALL TIMES. 8. CONTRACTORS TO PROVIDE ALL NECESSARY SHORING, BRIDGING, BARRICADES, SIGNS, ETC. NEEDED TO ENSURE MAVQ MANUAL AIR VENT AEGIS ENERGYSERVICES INC PROJECT SAFETY AT ALL TIMES. FLOW DIRECTION 55JACKSON ST 9. ALL WORK, INCLUDING TESTING AND TEMPORARY SHUT DOWN OF SERVICES IS TO BE COORDINATED WITH OWNER'S HOLYOKE,MA 01040 SCHEDULE FOR DELIVERIES, WORKDAYS, TIMES, ETC. 4COGEN TEMPERATURE SENSOR PH: 413-5361156 10. ALL NEW WORK TO BE THOROUGHLY TIED AND BONDED TO EXISTING WORK FX413-5361104 PARKING 11 . ALL PATCHING AND JOINING SHALL BE NEAT, CLEAN, AND SQUARE, MATCHING ADJACENT SURFACES IN FINISH AND —m--GATE VALVE TEXTURE. —NI­--CHECK VALVE ENGINEER: ® 12. ALL FIRE RETARDANT MATERIALS SHALL BEAR STAMPS, SEALS, AND/OR PERMANENT LABELS AS REQUIRED. AFFIDAVITS 20 SHALL BE PROVIDED WHEN REQUESTED. CARLBERNMPJ)T,JR.,P.E. 13. ALL WORK TO BE PLUMB, LEVEL, AND TO THE BEST OF WORKMANSHIP FAN/COIL UNIT 424 CEDAR LANE 14. CONTRACTOR TO FULLY COORDINATE HIS WORK AND EFFORTS WITH OTHER TRADES TO ENSURE A NEAT, PROPER, PO BOX 331 DIMENSIONALLY ACCURATE JOB IN ALL RESPECTS TO RELATED WORK. CIIESHIRE, CT 06410 AREA 15. THE JOB SHALL BE ADEQUATELY STAFFED AT ALL TIMES TO ENSURE CONTINUITY AND PROGRESS, WITH ALL a OF WORK PROPERLY COORDINATED. � 3-WAY VALVE F c PARKIN OF PHASES/SEGMENTS A: NORMALLY CLOSED PROJECT: WORK 16. ALL DEFECTIVE OR UNACCEPTABLE WORK SHALL BE REMOVED AND REPLACED, INCLUDING ANY SURROUNDING B: NORMALLY OPEN z AB: MIXED WATER SAN SIMEONBYTRE SOUND EFFECTED AREAS, AT NO ADDITIONAL COST TO THE OWNER. COGENERATIONPROJECT 17. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SAMPLES FOR ENGINEER'S APPROVAL WHERE REQUIRED BY N.O. NORMALLY OPEN DOCUMENTS PRIOR TO PROCEEDING WITH WORK 61700RTE48 18. ALL WORK, UNLESS OTHERWISE SPECIFIED, TO BE GUARANTEED FOR A MINIMUM OF ONE YEAR FROM FINAL N.C. NORMALLY CLOSED GREENPORT,NY 11944 C.W. CLOSED WINTER ACCEPTANCE. PARKING PARKING C.S. CLOSED SUMMER V�, 19. AND MATERIAL COMPOSITION WHICH IS QUESTIONABLE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. SHEET TITLE: THE DETERMINATION OF THE ACCEPTABILITY OF ALL MATERIALS SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER. e POINT OF CONNECTION TO EXISTING 20. ANY CONFLICT BETWEEN THE SPECIFICATIONS AND DRAWINGS IS TO BE BROUGHT TO THE ATTENTION OF THE —CWF—COLD WATER FILL SHEET PARKING ENGINEER PRIOR TO WORK. BUILDING LOOP SUPPLY (HEATING/COOLING) 21 . ALL PIPES TO BE INSULATED WITH 1" HEAVY DENSITY FIBERGLASS INSULATION WITH ALL SURFACE JACKET. SEAL & SIGNATU ?4sw . —DHWR—EXISTING BUILDING DHW RETURN L PARKING 22. ALL PIPING TO BE COPPER "L" GRADE UNLESS OTHERWISE SPECIFIED. � —DHWS—EXISTING BUILDING DHW SUPPLY ,� � 360' FROM CHAPEL LANE PARKING —C—COGEN PIPING/EQUIPMENT i TENANT SAFETY NOTES -E—COGEN EXHAUST PIPE �y�F� 298" a� ? —G—COGEN GAS LINE PARKING 1 . CONSTRUCTION WORK WILL BE CONFINED TO THE BUILDING INTERIOR OR EXTERIOR AS APPLICABLE AND WILL NOT CREATE DUST, DIRT, OR OTHER SUCH INCONVENIENCES TO THE RESIDENCES OR RESIDENTS WITHIN THE BUILDING. Date: 12- 10- 13 2. CONSTRUCTION WORK WILL NOT BLOCK HALLWAYS OR MEANS OF EGRESS FOR TENANTS OF THE BUILDING. Project N0: 3. CONSTRUCTION OPERATION WILL BE CONFINED TO NORMAL WORKING HOURS: 8:00 AM THROUGH 5:00 PM, MONDAY Drawing by: NS THROUGH FRIDAY, EXCEPT LEGAL HOLIDAYS, UNLESS AUTHORIZED IN WRITING BY OWNERS. CHECKED BY: CB DWG NO: T-001 .00 Sheet 1 of 7 NOTES: PUMP SCHEDULE PLATE HEAT EXCHANGER H.X.-1 PLATE HEAT EXCHANGER H.X.-2 TEMPERATURE SENSOR SCHEDULE PUMP NO. SERVICE FLOW HEAD PUMP H.P. PHASE PUMP MODEL DESIGN MANUFACTURER API HEAT TRANSFER DESIGN MANUFACTURER API HEAT TRANSFER TS NO. SERVICE SENSOR MODEL NO. WELL TYPE COGEN LOOP 25 GPM 70 FT 3/4 HP 3 PH BELL & GOSSETT SERIES 1535 353T MODEL SBM7M-40 MODEL SBM7M-40 TS-1 COGEN SUPPLY TO BUILDING PLATE HX-1 MAMAC TE-703—C-5A AT-225 P-1 TYPE BRAZED PLATE TYPE BRAZED PLATE TS-2 BUILDING HX-1 TO BUILDING HX-2 MAMAC TE-703—C-5A AT-225 P-2 BOILER ZONE 1 LOOP HEATING 30 GPM 33 FT 3/4 HP 3 PH BELL & GOSSETT SERIES 60-13T ETT SERIES PL-456 MATERIAL COPPER MATERIAL COPPER TS-3 BUILDING HX-2 TO DHW HX-3 MAMAC TE-703—C-5A AT-225 P-3 DOMESTIC HOT WATER 30 GPM 15 FT 1/6 HP 1 PH BELL & GOSS DUMP RADIATOR LOOP 30 GPM 33 FT 3/4 HP 3 PH BELL & GOSSETT SERIES 60-13T SERVICE BOILER HEAT SERVICE DOMESTIC WATER TS-4 DHW HX-3 TO COGEN DUMP HX-4 MAMAC TE-703—C-5A AT-225 P-4 SIDE HOT COLD SIDE HOT COLD TS-5 COGEN DUMP HX-4 TO COGEN RETURN MAMAC TE-7 3—C-5A AT-225 FLUID TYPE WATER WATER FLUID TYPE WATER WATER TS-11 HX FROM BOILER LOOP MAMAC TE-703—C-5A AT-225 FLUID FLOW 20 GPM 40 GPM FLUID FLOW 20 GPM 40 GPM TS-12 HX TO BOILER LOOP MAMAC TE-703—C-5A AT-225 CONTROL VALVE SCHEDULE TEMP IN 225 165 TEMP IN 225 165 TS-21 HX TO DHW RETURN MAMAC TE-703—C-5A AT-225 VALVE NO. SERVICE FLOW TYPE SIZE VOLTAGE VALVE MODEL ACTUATOR TEMP OUT 176 189.3 TEMP OUT 176 189.3 TS-22 HX TO DHW SUPPLY MAMAC TE-703—C-5A AT-225 V-1 BUILDING BOILER LOOP MIXING 1-1/2" 24 V TAC VS2313-526-9-54 MS40-7043M MODULATING PRESSURE DROP 0.77 PSI 2.71 PSI PRESSURE DROP 0.77 PSI 2.71 PSI TS-23 TANK TEMPAT-225 MAMAC TE-703—C-5A V-2 DHW LOOP MIXING 1-1/2" 24 V TAC VS2313-526-9-54 MS40-7043M MODULATING INLET SIZE 2" NPT 2" NPT INLET SIZE 2" NPT 2" NPT TS-31 HX TO RAD RETURN MAMAC TE-703—C-5A AT-225 TS-32 HX TO RAD SUPPLY MAMAC TE-703—C-5A AT-225 PLATE HEAT EXCHANGER H.X.-3 AIR COOLED RADIATOR H.X.-4 DESIGN MANUFACTURER API HEAT TRANSFER DESIGN MANUFACTURER IEA OR EQUAL MODEL SBM7M-40 FLOW RATE 30 GPM TYPE BRAZED PLATE GROSS HEAT LOAD 500 MBH MATERIAL COPPER INLET WATER TEMP 196 DEG F SERVICE GLYCOL DUMP LOOP OUTLET WATER TEMP 160 DEG F COGENERATION SCHEDULE SIDE HOT COLD BLOWER FAN 2 HP DESIGN MANUFACTURER AEGENCO DUMP RADIATOR FLUID TYPE WATER 40% PROP. GLYCOL NUMBER OF FANS 1 FUEL NATURAL GAS H.X.-4 COGEN DUMP RADIATOR FUEL INPUT 930 SCFH 20 GPM 30 GPM PROVIDED BY AEGIS, DESIGN BASE MODEL HCR—M-14-02-08—SO2 FLUID FLOW MECHANICAL SUB TO TEMP IN 225 160 THERMAL OUTPUT 523 MBH MAKE CONNECTIONS, FAN SPEED 1160 RPM TS-31 TS-32 1-1/2" COPPER TEMP OUT 176 193.6 ELECTRICAL OUTPUT 75 KW CONNECTIONS, SEE MEDIUM 60% WATER / 40% P.G. DETAIL 3/M-3 PRESSURE DROP 0.77 PSI 1.73 PSI POWER GENERATOR INDUCTION GLYCAMATICr CH�CK INLET SIZE 2" NPT 2" NPT ACOUSTIC LEVEL 70dba ® 20ft VIBRATION ISOLATION YES 1/2" p_4 CONTROLS MICROPROCESSOR BASED UNIT WEIGHT 3050 LBS MODEL TP-75LE AVG INLET MP 170 DEG F DUMP HX I EWATERG It�O� H.X. AVG OUTLET FROM EXISTING E EMP 220 DEG F H.X.-4 MA GAS BOARD APPROVAL # G1-04-06-12 COGEN DUMP MODULE DHWSNG PROVIDED BY AEGIS, MECHANICAL SUB TO TS-23 MAKE CONNECTIONS UP EXISTING TO MODULE, 1-1/2" RECIRCS TS-3 COPPER CONNECTIONS t-1/2" 36" X 18" X 48"H FOR: TS-4 BID/P.EVMW J c J CONTRACTOR: P TIE IN SUPPLY TO 40 t/z"APOLLO BUILDING DHW LINE �-�-� BEFORE RETURN "ASCU NC TEMPERATURE SENSOR Priv�� /z AND AFTER LAST36C-1AEGIS ENERGYSERVICES INC 10-35 PSI 24VAC o vtivE RECIRC TIE IN POINT o-� PS. z4vAc SS JACKSON ST HOLYOKE,MA 01040 OUTSIDE AIR PLq�E FRAME 1 1/2" PH. 413-536-1156 V-2 HEAT EXCHANGER 1 1/2" TS-21 EXTG DHW EXTG DHW TS-10 H.X.-3 STORAGE STORAGE COGEN PUMP MODULE I FX.' 413- 36--1104 PROVIDED BY AEGIS, 14 T I SII--II P_3 1 1/2" MECHANICAL SUB TO _ MAKE CONNECTIONS UP TS-22 �� TO MODULE, 1-1/2" TS-2 Lzi ENGINEER: COPPER CONNECTIONS I I CARL BERNHARDT,JR.,P.E. 1 1/2- 424 CEDAR LANE 0 COGEN DHW LOAD MODULE PO BOX 331 0 D PROVIDED O z M MECHANICALLYSUBGTO MAKE CHESHIRE, CT 06410 C M m P-1 CONNECTIONS UP TO TO EXISITING MODULE, 1-1/2" COPPER On m _I p CONNECTIONS H.X. 36" X 18" X 66"H z IT TIE IN RETURN TO BUILDING DHW LINE PROJECT: BEFORE RETURN TEMPERATURE SENSOR AND AFTER LAST SAN SIMEONBYTRE SOUND RECIRC TIE IN POINT SUPPLY TO BUILDING COGEAERA77ONPROJECT 61700 RTE 48 TIE IN TO BUILDING GREENPORT,NY 11944 HEAT SUPPLY AS SHOWN loll SHEET TITLE: HVAC SCHEDULES/ COGEN SPACE HEATING FLOW DIAGRAM MODULE ZONE 1 PROVIDED BY AEGIS, MECHANICAL SUB TO MAKE CONNECTIONS UP TO MODULE, 1-1/2" SEAL & SIGNATURE OF 14E IV COPPER CONNECTIONS, BERN/ , 36" X 18" X 66"H 1 1/2" EE � V-1 Hgy�pp,EA�EXFCHANGER 1 1/2" TS-11 V F H.X.-1 r-- -�— I IHI I1 P-2 1 1/2" L� �— RETURNS , F TS-12 1 l� s 0529 r FES 1 1/2- Date: 12- 10- 13 TIE TO BUILDING Project N0: HEATNLNE BEFORE Drawing by: NS TS-1 RETURN TEMPERATURE SENSOR AND AFTER CB LAST RETURN BRANCH CHECKED BY: IN LINE DWG N0: M-001 .00 Sheet 2 of 7 COGENERATION MECHANICAL FLOW DIAGRAM SCALE: NTS 7 1 f NOTES: NOTES: PENETRATE INTO EXISTING VENTILATION 1 . ALL DUCT COMPONENTS SHALL BE RADET PIT, TERMINATE WITH FOR 200 DEG F AND SUPPLIED BY z CONNECT TO EXISTING 3" 40 1-1110" ELBOW WITH CONTRACTOR EXHAUST, ABANDONED FROMM OLD BIRD SCREEN TO 2. VENTILATION FAN POWERED & GENERATOR. EXHAUST CONTINUES DIRECT AIR AWAY CONTROLLED FROM COGEN CONTROL TO ROOF LINE FROM INTAKE ABOVE PANEL GRADE 10" ROUND i 0 ROUND TAKE OFF PENETRATE WALL AND HOT AIR TIE IN TO EXISTING PROVIDE 3" FLANGES BOX FAN BOILER FLUE MUFFLER IS 3" MALE MPT DOUBLE 45 KEEP AS HIGH AS POSSIBLE FOR COGEN SERVICE SILENCER PROVIDED WITH COGEN AND PREHUNG OFF THE NOTES: PROVIDE 4" X 10" TO 7" PUMP MODULE FRAME ROUND TRANSITION OFF TOP 1. ALL PIPE 3 INCH SCH 40 7" DUCTING STEEL (OR SCH 10 304 STAINLESS OF THE COGEN STEEL) WITH 1" FIBERGLASS KEEP 3" OFF OF THE MUFFLER INSULATION WITH SERVICE JACKET. EXTERIOR PIPE INSULATION TO BE COVERED WITH ZESTON JACKET 2. EXHAUST PIPE TO BE #27R 4"X10"X7" REGISTER BOOT PIPE TO PITCHED AWAY FROM COGEN HOSE AND TOWARDS TERMINATION. ADAPTER 3. EXHAUST PIPE TO BE 3" HOSE SUPPORTED ON EACH MARINESIDE OF SILENCER FOR SERVICING GRADE -� ALL PROVIDED WITH COGEN HOSE CLAMPS-� COGEN UNIT COGEN COGEN UNIT EXHAUST OUTLET 0 O FOR: BID/REVIEW CELLAR CONTRACTOR: AEGIS ENERGY SERVICES INC 2 COMBUSTION EXHAUST DETAIL SSJACKSONST COGEN HOT AIR VENTING DETAIL HOLYOKE,MA 01040 M.003 SCALE: NTS PH.- 413-536-1156 SCALE: NTS FX• 413-536-1104 ENGINEER: COGEN CARL BERNHARDT,JR.,P.E. PUMP MODULE 424 CEDAR LANE OUTLET 1 1 COPPER AIR WATER PO BOX 331 ELIMINATOR STRAIN R CHESHIRE, CT 06410 COGEN PUMP TEMPERATURE MODULE GAUGE INLET 1 1/2" COPPER MLX'�� PROJECT: NOTES: EXPANSION SANSIMEONBYTHESOUND I 1 . RADIATOR MOUNTED ON COGENERATIONPROJECT 611 POURED CONCRETE SLAB /�FA�� RATURE �� 61700 RTE 48 AT 4 ABOVE GRADE LEVEL. BALANCING VALVE PUMP P-1 GREENPORI,NY 11944 PRESSURE COGEN PUMP HOT GAUGE MODULE PUMP SUPPLY I 2. ALL PIPING TO BE INSULATED WITH 1 FIBERGLASS INSULATION SHEET TITLE: " MECHANICAL COLD EXTERIOR INSULATION TO BE NOTE: DETAILS COVERED WITH A ZESTON JACKET. PUMP MODULE PROVIDED AND RETURN BUILT BY AEGIS ENERGY SEAL & SIGNATUR OF mt:w 1,O 0 CIO y, IJ MP MODULE DETAIL Date: 12- 10- 13 AIRFLOW CONCRETE PAD AEGENCO Moo3 PLJ - Project N0: 4" ABOVE G RADE COGENERATION MODULE I -T-i SCALE: NTS Drawing b y: NS o 'I D • CHECKED BY: CB D • � • • • �• •• . , .. : . • .. . .. .•. . . . •. . . , • . : .• • . . . . . . • • • . •.• . , ". •, : . ... • . , • • •: . • . . . . • ,'.. . .' .. '• . . ; . . •.: . . . . . . . . DWG NO: 3 M-003 .00 COGEN RADIATOR DETAIL .OoL Au - SCALE: NTS Sheet 4 of i NOTES: NOTES: OSPACE MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), MECHANICAL SUBCONTRACTOR TO MAKE CONNECTIONS UP TO MODULE, SEE M-001 FOR DETAILS. ODHW MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), MECHANICAL SUBCONTRACTOR TO MAKE CONNECTIONS UP TO MODULE, SEE M-001 FOR DETAILS. ODUMP MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), MECHANICAL SUBCONTRACTOR TO MAKE STORAGE CONNECTIONS UP TO MODULE, SEE M-001 FOR DETAILS. ® PUMP MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), MECHANICAL SUBCONTRACTOR TO MAKE CONNECTIONS UP TO MODULE, SEE M-001 FOR DETAILS OCOGEN RADIATOR PROVIDED AND SET BY AEGIS, INSTALLED ON EXISTING FLAT ROOF. SET ON (2) 4"X6'X8' PT TIMBERS TO SPREAD LOAD. © TIE IN TO EXISTING HYDRONIC SUPPLY & RETURN AS SHOWN, 2 PLACES. USE THREADOLETS AND WET TAPS TO PREVENT LOSS OF SYSTEM PRESSURE. SEE M-001 FOR DETAILS. O7 TERMINATE COGEN EXHAUST INTO EXISTING 3" STEEL, ABANDONED STACK, FROM OLD GENERATOR. ® TERMINATE COGEN 10"0 WARM AIR DISCHARGE TO OUTDOORS THROUGH EXISTING VENTILATION PIT. PENETRATE INTO EXISTING VENTILATION PIT, TERMINATE WITH 10" ELBOW WITH BIRD SCREEN TO DIRECT AIR AWAY FROM INTAKE ABOVE GRADE. SEE M-003 FOR DETAILS. O9 RADIATOR PIPING DOWN TO BASEMENT BOILER ROOM, THROUGH EXISTING VENTILATION PIT. 10 MUFFLER INSTALLED & SUPPORTED OFF PUMP MODULE BY AEGIS, DETAIL ON 2/M-003 11 PROVIDE (1) 3" 150# FLANGE, TO MOUNT TO PROVIDED MUFFLER FLANGE 1 COGEN HOT AIR BOX FAN, 10" INLET AND OUTLET PROVIDED BY AEGIS INSTALLED BY SUBCONTRACTOR. 13 SEE COGEN HOT AIR VENTING DETAIL ON 1/M-003. * MECHANICAL SUBCONTRACTOR RESPONSIBLE FOR FIRESTOPPING ALL PENETRATIONS. ALL FIRE STOPPING MUST USE APPROVED SYSTEMS AND METHODS AND MUST MEET OR EXCEED 2 HR RATING * ALL EXISTING HYDRONIC SYSTEM & PIPING TO REMAIN. EX BOILERS EXISTING STEAM SYSTEM TO REMAIN UNCHANGED. 38c4 EX HTO PUMPS 5 COGEN DUMP RADIATOR EXISTING 9 ELUE s 10" DIA GALV STEEL DUCT 26 GA FOR: X D H TAN K BID/REVIEw X CONTRACTOR: AEGIS ENERGY SERVICES IlVC 2 x EX HTG HOLYOKE MA 01040 _ = PUMPS PH: 413-5361156 1-1/2" 0FX 413-536-1104 6 � 1-1/2" � U ENGINEER: Q X 0 w 424 CE�ANETL .,P.E. PO BOX 331 CHESHIRE, CT 06410 V 11 6 L 1-1/2" r'ffo PROJECT: EX BOILERS 13AEGENCO SAN SIMEON BY THE SOUND 1 &2 4 COGENERATION COGENERATIONPROJECT BOILER 4 1-1/2 3 61700 RTE 48 ROOM o GREENPORT,NY 11944 11 [ r SHEET TITLE: CCP MECHANICAL LAYOUT FIRST F 3" SCH 40 BLACK SEAL & SIGNATOR O ® � �� r 'cook CORRIDOR 05208 sF°moo s Date: 12- 10- 13 C� Project N0: Drawing by: NS CHECKED BY: CB DWG NO: M-002 .00 PATIENTS CLOTHING COGENERATION MECHANICAL PIPING LAYOUT - BASEMENT Sheet 3 of 7 GENERAL STORAGE M.00 SCALE: sus" _ 1' 0" PARTIAL PLAN °��, i z NOTES: I STORAGE EX BOILERS 3&4 EX H PUMPS COGEN DUMP RADIATOR EXISTING FLUE X DH TANK OLE x EX HTG = x PUMPS x a � U4 NOTES: w 1 TIE INTO DHW AT O TANKS. SEEM-001 FOR DETAILS 5 GENERAL STORAGE ABM= L DHW MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), EX BOILERS O2 MECHANICAL SUBCONTRACTOR TO MAKE CONNECTIONS UP TO &2 0 , BOILER MODULE, SEE M-001 FOR CONNECTION DETAILS. ROOM � O � PUMP MODULE PROVIDED AND SET BY AEGIS (COGEN VENDOR), r CCP O MECHANICAL SUBCONTRACTOR TO MAKE CONNECTIONS UP TO MODULE, SEE M-001 FOR DETAILS CORRIDOR 4 PROVIDE 2" GAS BALL VALVE AND DRIP TEE AND UNION AT O COGEN, COGEN GAS TAP 1" FM THREAD. 00 � ORUN GAS LINE DOWN ON LEFT SIDE OF MODULE FRAME EDGE a (RIGHT SIDE FOR ELECTRIC). PLUMBER RESPONSIBLE FOR FIRESTOPPING ALL PENETRATIONS. PATIENTS CLOTHING © GENERAL STORAGE ALL FIRE STOPPING MUST USE APPROVED SYSTEMS AND METHODS AND MUST MEET OR EXCEED 2 HR RATING FOR: TIE-IN COGEN GAS LINE TO EXISTING OUTDOOR HIGH PRESSURE o BID/REVIEW O GAS SYSTEM PER NGRID SPECIFICATIONS 0 0 U ® INSTALL NEW COGEN GAS METER TRAIN & REGULATOR PER NGRID SPECIFICATIONS, 14" WC SERVICE FOR COGEN. CONTRACTOR: O RUN GAS LINES DOWN INTO BUILDING AND DOWN INTO EXISTING CORRIDOR 9 CRAWL SPACE. AEGIS ENERGY SER VICES INC SS JACKSON ST HOLYOKE,MA 01040 MAINT. OFFICE SUP. OFFICE PH: 413-536-1156 FX 413-5361104 ENGINEER: CARL BERNHARDT,JR.,P.E. 424 CEDAR LANE P�rO BOX 33+1 `� CRAWL SPACE CMIRRE, Cl 06410 PROJECT: SANSIMEONBY THE SOUND COGENERATIONPROJECT 61700 RTE 48 GREENPORT,NY 11944 SHEET TITLE: PLUMBING LAYOUT FIRST FLOOR SEAL & SIGNATURE �0 ico ysF 0 a1 0 Date: 12- 10- 13 Project N0: M Drawing by: NS CHECKED BY: CB N PLUMBING LAYOUT - BASEMENT M COGENERATION DWG N0: PARTIAL PLAN y P-001 .00 SCALE: 1/8" = 1' o" ray Sheet 5 of 7 0Z NOTES: NOTES: TO CCP FROM COGEN TO CCP FROM SPACE MODULE STORAGE 16 �O LOW VOLTAGE 1 PUMP MODULE PROVIDED AND SET BY AEGIS, ELECTRICAL CONTRACTOR TO MAKE UP O HIGH VOLTAGE CONNECTIONS TO MODULE FAN F-1 VALVE TA 2) #12 WITH GROUND 2) #18 W/ SERVICE SW OCOGEN CONTROL PANEL (CCP), 24x36x8", PROVIDED BY AEGIS, DDC MOUNTED ABOVE, AND SERVICE SWITCH 1) 18/2 SHIELDED POWERED WITH 120 V FROM CCP. CO MONITOR MOUNTED ABOVE WITH 24VAC POWER PUMP P-1 TS-1,1 1,12 FROM CCP 3) #12 W/ GROUND AND 3) #18/2 SHIELDED OSPACE MODULE PROVIDED BY AEGIS, ELECTRICAL CONTRACTOR TO MAKE UP CONNECTIONS 3 POLE TOGGLE SWITCH Q TO CCP FROM DUMP MODULE TOMOD RADIATOR PROVIDED BY AEGIS, ELECTRICAL CONTRACTOR TO MAKE UP CONNECTIONS TO 17 TO CCP FROM COGEN HIGH VOLTAGE ® LOW VOLTAGE P3) #MP MODULE COGEN KW OUT 12 WITH GROUND & DHW MODULE PROVIDED BY AEGIS, ELECTRICAL CONTRACTOR TO MAKE UP CONNECTIONS 1) #18/2 SHIELDED 3P TOGGLE SWITCH O TO MODULE 1115 & 1116 IN COGEN © DUMP MODULE MODULE PROVIDED BY AEGIS, ELECTRICAL CONTRACTOR TO MAKE UP COGEN S/S TO CCP FROM DUMP MODULE LOW VOLTAGE CONNECTIONS TO MODULE 2) #18 TS-3,4,31,32 717-523 IN COGEN 4) #18/2 SHIELDED O COGEN FEEDER, (3) 400MCM WITH #3 GND IN 3" CONDUIT. (NO NEUTRAL) COGEN ALARM NEW COGEN FUSED DISCONNECT, VISIBLE BREAK, PROVIDED BY ELECTRICIAN, 240VAC, 400 2) #18 Q® TO CCP FROM TANKS AMP RATED, WITH 350 AMP FUSES. 621-622 IN COGEN COGEN RUN STATUS LOW VOLTAGE NEW COGEN NON-FUSED DISCONNECT (89L), VISIBLE BREAK, PROVIDED BY ELECTRICIAN, TS-23 2) #18 O 240VAC, 400 AMP RATED, NEMA 3R, 3 POLE 537-538 IN COGEN 1) #18/2 TAP EXISTING MDP ON EXISTING INCOMING LUGS, UTILIZING 25 FT TAP RULE, (3) 400 CO ALARM TO EXISTING SUB PANEL FROM 10 MCM CONDUCTORS, W/ #3 GROUND IN 3" EMT 2) #18 ® CCP EX BOILERS 1 1 EXISTING SUB PANEL FOR CCP POWER DEBIEXISTING IN COGEN 3) #12 0 GROUND NG 1) 3P 20 AMP CB 3 4 * USE 3/4" EMT MINIMUM FOR ALL RUNS, SEPARATE CONTROL AND LINE VOLTAGE WIRE. 1) #18/2 SHIELDED 2) # 12 W/ GROUND �/ * PROVIDED BY OWNER, (2) CAT5 COMMUNICATIONS LINES FOR COGEN & DDC. BI 1137-1138 IN COGEN 1) 1P 20 AMP CB EX H TG * ELECTRICIAN RESPONSIBLE FOR FIRESTOPPING ALL PENETRATIONS. ALL FIRE STOPPING 18 TOSC 1P0 FROM OUTSIDE AIR TO CCP FROM DHW MODULE PUMPS MUST USE APPROVED SYSTEMS AND METHODS AND MUST MEET OR EXCEED 2 HR RATING HIGH VOLTAGE 1) #18/2 SHIELDED PUMP P-3 19 TO CCP FROM SPACE MODULE 2) #12 VCE WITH GROUND & HIGH VOLTAGE SW PUMP P-2 3) #12 W/ GROUND AND © TO CCP FROM DHW MODULE COGEN DUMP 3 POLE TOGGLE SWITCH LOW VOLTAGE VALVE V-2 RADIATOR 12) #18/2 SHLD SERVICE SW .21,22 EXISTING TS-2 3) 2# 8/2 SHIELDED E�U E FILL SOLENOID ) #18 (C7 TO CCP FROM 4 HIGH VOLTAGE RADIATOR 11 18 FAN F-2 3) #12 W/ GND & 3P NEMA 3R DISCONNECT FOR: X DH TANK BID/REVIEW O CONTRACTOR: O AEGIS ENERGY SERVICES INC X EX H TG 89L 55JACKSONST HOLYOKE,MA 01040 © _ = PUMPS PH.• 413-536-1156 FX: 413-536-1104 Z W � U x ENGINEER: Q W CARL BERAH4RDT,JR.,P.E. CL 424 CEDAR LANE (I7 PO BOX 331 ® CHESHIRE, CT 06410 19 PROJECT: EX BOILERS SANSIMEONBY THE SOUND I & 2 16 0 AEGENCO COGENERATION 61700 17 � 61700 RTE 48 BOILER GREENPORT,NY 11944 ROOM 2 O o ® O SHEET TITLE: 1 CCP ELECTRICAL LAYOUT 1ST FLOOR SEAL & SIGNATOR �pF NEW�®411 CORRIDOR EX MDP EX EDP Date: 12- 10- 13 Project N0: Drawing by: NS CHECKED BY: CB DWG NO: e (@ E-001 .00 PATIENTS CLOTHING COGENERATION ELECTRICAL LAYOUT - BASEMENT zo GENERAL STORAGE SCALE: 3/8" = 1' 0~ PARTIAL PLAN �'� Sheet 6 of 7 P NOTES: COGEN EXISTING MAIN CONTROL M ELECTRICAL METER CABINET ACCT: 967-20-7015-3 312 & 3 PHASE 3 PHASE SERVICE COGEN LOOP PUMP MOTOR METER: 99823766 15 AMP FUSES IEC MOTOR STARTER 3/4 HP 3 PHASE 208V 208V 3 PHASE W/THERMAL OVERLOADS SWITCH & START/STOP SWITCH PRE WIRED IN CONTROL CAB EXISTING M COGEN LOOP PUMP WIRING DIAGRAM 120/208 VOLT 600A PANEL FOR PUMP P-1 EDP EXISTING 120/208 VOLT EXISTING 600A MAIN CB LOADS CCOGEN ONUTILITY SERVICE TROL M 3 PH 4 WIRE CABINET 312 & 3 PHASE 3 PHASE COGEN LOOP PUMP MOTOR EXISTING 15 AMP FUSES IEC MOTOR STARTER SERVICE 3/4 HP 3P 208V LOADS 208V 3 PHASE W/THERMAL OVERLOADS SWITCH & START/STOP SWITCH N PRE WIRED IN CONTROL CAB LD EXISTING NEW COGEN DISCONNECT (89L) SPACE LOOP PUMP WIRING DIAGRAM LOADS LOCATED OUTDOORS ON GRADE FOR PUMP P-2 E o AT BACK ENTRANCE,400 AMP RATED, NONE USEDMA , EXISTING EXISTING 208 VOLT, VISIBLE BREAK, 120/208 VOLT 120/208 VOLT EXISTING GANG OPERATED, 3/8" SHANK 600A ATS 600A DISCONNECT 120/208 VOLT LOCKABLE, AT ARMS HEIGHT • EGEN 175 KW EMERGENCY COGEN F 7�7A A CONTROL IVI GENERATOR CABINET 2#12 & SINGLE PHASE SINGLE PHASE PUMP MOTOR EXISTING 15 AMP FUSES 24 VAC COIL SAFETY 2/5 HP 1P 120V 120/208 VOLT 115V SINGLE PHASE SWITCH 600A PANEL MDP 89 PRE WIRED IN CONTROL CAB 666 CIRCUIT BREAKER 350 AMPS 208 VOLTS DHW LOOP PUMP WIRING DIAGRAM EXISTING 2I 3PH ALLEN-BRADLEY: 140U-K3D3-D35 FOR FAN P-3 150ACB ( ) 3 FUSES #19,20,21 (3) 400 MCM CU 1/10 AM P NEW COGEN FUSED CONDUCTORS WITH #3 BECKWITH EXISTING DISCONNECT NEXT TO EXISTING GROUND IN 3" EMT (3) VOLTAGE TAPS COGEN 150ACB MDP, 400 AMP, 208 VOLT (NO NEUTRAL) PROTECTION CONTROL M RATED WITH 350 AMP FUSES, RELAY CABINET EE M341 OA 3 PHASE 3 PHASE PUMP MOTOR (3) CTS 300:5 27 59 81 SERVIC 1 SELF BECKWITH 3112 GROUND IEC MOTOR STARTER 12 & SWITCHE 3/4 HP 3P 208V TEST OUTPUT #2 15 AMP FUSES W/THERMAL OVERLOADS 120V 1 PHASE 24 VAC COIL EXISTING 150ACB TAP NORMAL SIDE OF EXISTING 600 PRE WIRED IN CONTROL CAB a AMP MDP PANEL USING 10 FT TAP GLYCOL DUMP LOOP PUMP WIRING DIAGRAM RULE, (3) 400 MCM WITH 3/0 GROUND IN 3" EMT (NO NEUTRAL) INTELLISYS FOR PUMP P-4 EXISTING BECKWITH 200ACB INTERTIE OUTP T #1 FOR: CONTACTOR — M SYMBOL LEGEND 208 VOLT BID/REVIEW COGEN If I F 7-7M27 PHASE UNDERVOLTAGE 350 AMP CONTROL 59 PHASE OVERVOLTAGE CABINET + CONTRACTOR: EXISTING 81 OVER/UNDER FREQUENCY GENERATOR WYE 12 1OOACB CONNECTION 2#12 & SINGLE PHASE SINGLE PHASE PUMP MOTOR 521T INTERTIE BREAKER VDC -_ RELAY SAFETY 2/5 HP 1P 12ov 89L COGEN DISCONNECT 14 15 AMP FUSES 24 VAC COIL ENGINE GAS - AEGISENERGYSERVICESINC 115V SINGLE PHASE SWITCH GOVERNOR PRE WIRED IN CONTROL CAB PROTECTIVE RELAY SETPOINTS IGNITION COIL VALVES BATTERY CHARGER 55JACKSONST HOT AIR FAN WIRING DIAGRAM E ooAce 27 (-50 TO -88%) 2 SEC (120 CYCLE) DELAY � HOLYoxE,MA 01040 27 (-50%) 0.16 SEC (9 CYCLE) DELAY PH: 413-536-1156 FOR FAN F-1 59 (+110 TO 120%) 1 SEC (60 CYCLE) DELAY STARTER SM 120 VAC FROM FX 413-536-1104 59 (+120%) 0.16 SEC (9 CYCLE) DELAY CONTROL TRANSFORMER 2-1 81U (<57.0 Hz) 0.16 SEC (9 CYCLE) DELAY FROM COGEN _INPUT 81 U (<59.0 Hz) 300 SEC (18,000 CYCLE) DELAY ENGINEER: FROM C 810 (>60.5 Hz) 0.16 SEC (9 CYCLE) DELAY COGENERATION UNIT 75 kW COGENERATION UNIT 208 VOLTS 3 PHASE LOCATED IN BOILER ROOM CARLBERNHARDT,JR.,P.E. COGEN VARIABLE 75 KW INDUCTION GENERATOR 424 CEDAR LANE CONTROSPEED CABINET CONTROL Hi M SITE ELECTRICAL ONELINE DIAGRAM UTILITY INTERFACE AND PROTECTION SCHEMATIC POBOX331 CHESHIRE, CT 06410 3#12 VSD 3 PHASE SCALE: NTS FAN MOTOR 2.0 HP 15 AMP FUSES LOCATED IN SAFETY 3 PHASE R 2. 208V 3 PHASE CONTROL CAB SWITCH NEMA 3R PRE WIRED IN CONTROL CAB PROJECT: RADIATOR WIRING DIAGRAM COGENERATION PUMP MODULE DETAIL SAN SINEONBYTIIESOUND COGENERATIONPROJECT FOR FAN F-2 SCALE: NTS 6170ORM48 THREE WAY MODULATING VALVE WIRING DETAIL GREENPORT,NY 11944 COGEN CONTROL TYPICAL 3 VALVES, SCALE: NTS PANEL SHEET TITLE: ELECTRICAL ONELIlVE ATTACH TO UNISTRUT IN SPACE PROVIDE VAC POWER DIA RAM DET FOR ELECTRICAL CONDUIT (GAS LINE ISTAW EXPANSMN 120 VOLTS SEAL & SIGNATU ® ALSO ATTACHED THIS STRUT) MAIN COGEN RED BLACK FEEDER � V � 3" EMT # 24 Vac �cys 0529 �w TRANSFORMER ATTACH TO UNISTUT r7 BLK (L2) IN SPACE PROVIDED mm=Rw FOR ELECTRICAL SERVICEZSWITCH CONDUIT (GAS LINE IS 0 RED L1 ALSO ATTACHED THIS STRUT) =0 DDC Date: 12- 10- 13 CONTROLS RED A01 YEL BLK OP1 Project N0: BLACK C GREY COM Drawing by: NS CHECKED BY: CB TEMPERATURE BLUE(AO) C DWG NO: CONTROLLER CAP—NOT USED GREEN 3—WAY VALVE ACTUATOR E-002 . 00 GREENFIELD GROUND PROPORTIONAL HD WAY UP TERMINAL DURA-DRIVE SERIES MODULE STRIP Sheet 7 of 7 90 GREENFIELD Lpj Lai IN CCP CONNECTOR NIPPLE