Loading...
HomeMy WebLinkAbout38827-Z SCTM#: SCTM#: AsE�Y �� 3 1000-86-01-3.1 1000-86-01-3.3 D Z -�- � N All* " w 1020.47' - -- -- D 150' 50' 100' a NEW ® TOP SOIL AGGREGATE METAL Z RIP-RAP yO{ ` o' "a D.P.W. 782 TOTAL TOWERf f SNOW No ,z58ASE POLICE m BUILDING m DEPARTMENT P. -{ o ___-_- FENCE 3 N m �i a II Bo' ( 0 N Existing p. o O . 2,500 Gal- ° �,' SAND- -i 205.00' GRAVEL " r S. 36°53'00" E. -CP fl o°° .o a r °°° 52 BASE x3HIGH ��r N OOp ,�,,...r+ 155 TOTAL O „�ws w .n wFwi SCTM#: DRIVE`✓Ar Ar_CESS __ -_ .u k .." 100' x 1000-75-05-13 ?WASH SCREENED o STREET SAND �t00 " ' CO SWEEPINGS 0 N o � SOUTHOLD 00000 p 1� o SCTM#: - TOWN 1000-75-05-12HIGHWAY Drainage o v, Supplies YARD 12 BASE x 1 HIGH eee 12 TOTAL • Miscellaneous e� ASE x 1 HtG foraga o_ B SCTM#: POLE BARN C&D , 12 1000-75-05-11 EQUIPMENT 8 8 cn 22 BASE x 2 HIGH 12 TOTAL DRY STORAGE 44 TOTAL gu e.n OPEN FLOOR PLAN '1 p7p 4 Bay Oo N. 30°10'50" W. 'oma ` '0 �S� X 4�+' N �� Constable o OD n - co 4 r4 n� S. 32°33'10" E. 674.87 pLy Z ❑ Z� ° `o SCTM#: S. 30°19'00" E. u °10' 10'10' v' o N 9 9 O 1000-75-05-1.1 ❑ l0 4 i O s (n SCTM#: N m # o 1000-75-05-11 o �� pllllilll N Cl) �t y U) rn C) £` o � v o 0 PECONIC LANE • � 4 m Overall Site Plan NEW METAL D.P.W. BUILDING N I Scale: N T S • DEMOLITION NOTES: 1. EXISTING MASONRY PORCH AND SIDEWALK SoWhWd Town TO BE REMOVED BY OTHERS. 2. EXCAVATIONS, GRADING & THE SAW CUTTING OF ASPHALT REQUIRED FOR THE NEW WORK SHALL BE BY THE CONTRACTOR. 0 0o s U Oo o I I � ti C) N PLATFORM 0 ac, i RAMP DOWN "v Rd. C 00 O ry BROOM FINISH U P 4 R. v F-M r•+ LL xW 3 Z A 3 RAMP DOWN - ■■ �./ G V BROOM FINISH � Z— - - — - - - - - - - - — o Q � o = • a 2 --!� a, W ice, CL 8" 5--0' 81-0. 181-01 3'-0- PITCH AS NEEDED 1/12 MAXIMUM PLATFORM RAMP PLATFORM STEPS oLu d ■ A. O -' REPLACE EXISTING SID WALK r >: °z z w oma,, .°c NEW CONCRETE CURBING-See Detail Sheet A-2 a O H 1 0 O � � �o RAMP ■■ - M O 0 = w 2._8. 54._8" 2'-8" GO N Z o H 60._0.. V O N 6. M (a X' o a�� q ti �► Drawing: RAMP / ENTRY PLAN SCALE: 3/16"=1'-0" Ami I Sheet# 1 Of - 3 3r-s- ED 13 -0- 8'-4" 16._4. 5'-8" 7'-4- 8 7._0. 8" 10'-4" 6'-0- 6" �Oo���00�1 �OWffll ♦--FINISH FLOOR ELEVATION 0'-0" EXISTING FOUNDATION DlS��u 11��U0� 151Y'C411111o0U l4 TW 0'-0' I TW (-)2'-8" TW 0'-0" ao — TW 0._0. �., — bo U ITW O 0'.8" TW 0'-0" r . .. co CD 2TW (-)0'-a— �TW 0 0"— — — TW 0.-0.. C� p 4-J A� W 3 .0 oZ _ VJ 6.. 5 0" 81-0. 181-0" CU V ?-•� CL 3 5•-8" 26'-0" 6•-0- L W (� 3r-8' RAMP FOUNDATION PLAN r SCALE: 3/16"=1'-0" N W Z FS== z 50'Right-of-Way TOWN OF SOUTHOLD J y O .i LO Z; C 12"MIN. 4'-0" SIDEWALK24"MINIMUM 9" H Q 3 8" 1" Lu I TOP OF SIDEWALK ASPHALT WEARING SURFACE Y/ v O O Saw Cut as Needed to accommodate !a MINIMUM 2"ABOVE new work. O °� 0 TOP OF CURB a ■■ N a1tJ5 C GRADE PITCH 1/4"Per Foot � 111=111=111=11 ,:. N °� — — =1 I EI I I—I I I-1 I ':m ,_ 4"THICK SIDEWALK3,000 PSI TYPICAL CONCRETE I I1=UNDISTURBED OR I COMPACTED SUB-GRADE \\ �� Drawing: \\\\ NEW 3,000 PSI CONCRETE CURB UNDISTURBED SOIL A=2 SIDEWALK & CURB - SECTION DETAIL t {{, SCALE: 1/2"=V-0" —. 02 dF Sheet# 2 of3 PROVIDE 1 114"SCHEDULE 40 , • ALUMINUM PIPE RAINING SYSTEM. (PAINTED BLACK) PROVIDE CONTINUOUS WELD AT ALL JOINTS PROVIDE 12"THICK CONCRETE PROVIDE 1 114"SCHEDULE 40 HAUNCH AT TOP OF STAIR ALUMINUM HAND RAIL INSTALL PROVIDE 1 114"SCHEDULE 40 TO A.N.S.I.STANDARDS S OQ I�pQ5�h d p own ALUMINUM HAND RAIL INSTALL (PAINTED BLACK) PROVIDE CONTINUOUS WELDS Efi TO A.N.S.I.STANDARDS (��Qjl(�;(a;p�Q�� (PAINTED BLACK) 3'-0"O.C. 1 AT ALL JOINTS MAKE QUAL W M a U GRADE I GRADE CONCRETE FOUNDATION WALL W 8"THICK 3,000 P.S.I.CONCRETE Ca Q 4-J FLOAT TOP OF WALL FOR ._J %" A FINISH SURFACE. TYPICAL r', ^ V 8"x 16"-3,000 P.S.I.CONTINUOUS 4"THICK 3,000 P.S.I.CONCRETE ALL FILL BELOW CONCRETE SLABS PROVIDE SOLID CONCRETE BLOCKING r►� h+^i CONCRETE FOOTING AT 3'-0"BELOW SLABS WITH 6x6-10/10 WIRE MESH SHALL BE CLEAN SAND&GRAVEL FROM TOP OF FOOTING TO PLACEMENT `,J h+� GRADE.TYPICAL TYPICAL(PROVIDE BROOM FINISH) COMPACTED IN 12"LIFTS TO 95% OF CONCRETE STAIR-(12"Tred-8"Rise) M"'1 U 'Z DENSITY. TYPICAL x CROSS SECTION it 1 - 1 11 o 0 O SCALE: 3/16"=1'-0" W Q� CL CL PROVIDE 1 1/4"SCHEDULE 40 ALUMINUM PIPE RAINING SYSTEM. (PAINTED BLACK) h PROVIDE CONTINUOUS WELDS ■ AT ALL JOINTS -j 3'-0"O.C. I W @ >:4.-8.. 12.. MAKE EQUAL� � � z PROVIDE 1 1/4"SCHEDULE 40 Z ALUMINUM HAND RAIL INSTALL kW y 0 .� TO AN.S.1.STANDARDS — —�� O a _ J (PAINTED BLACK) + Q Q �' a(l�5 .t PROVIDE CONTINUOUS WELDS `* O V Qp to AT ALL JOINTSH IN cm- N 0 g g R GRADE GRADE r 00 O ,..:... N O Cd = 4"THICK P.S.I.CONCRETE O N CONCRETE FOUNDATION WALL SLABS WITHITH 6 6x6-10/10 WIRE MESH o 8"THICK 3,000 P.S.I.CONCRETE El TYPICAL FLOAT TOP OF WALL FOR F.O v 9-- A FINIRJq SH SURFACE. TYPICAL ALL FILL BELOW CONCRETE SLABS 4"THICK 3,000 P.S.I.CONCRETE PROVIDE 12"THICK CONCRETE V H L M HAUNCH AT TOP OF STAIR SHALL BE CLEAN SAND&GRAVEL SLABS WITH 6x6-10 110 WIRE MESH �D A/�G, N r Q N CC 8"x 162'-3,000 P.S.I.CONTINUOUS COMPACTED IN 12"LIFTS TO 95% TYPICAL(PROVIDE BROOM FINISH) �� G CONCRETE FOOTING AT 3'-0"BELOW DENSITY. TYPICAL ` A GRADE.TYPICAL Drawing: CROSS SECTION It 2 - 2 " a �- A=3 SCALE: 3/16"=1'-0" QF' 'w`�p'G1'•(� Sheet# 3 of —3