Loading...
HomeMy WebLinkAboutStormwater Management Control Plan Check List APPLICANT: (Property Owner,Design Professional,Agent,Contractor,Other) NAME: Pleat Print Signature Telephom Number: S.C.T.M.# 1000 as,r�M ��SUFF�k o �' z O 0� CHAPTER 236 Stormwater Management Control Plan CHECK LIST Section Block Lot S M C P -Plan Requirements: Provide ONE copy of the Building Permit Application. * The applicant must provide a Complete Explanation and/or Reason for not providing all Information that has been Required by the following Checklist! Date: 1. A Site Plan drawn to scale Not Less that 60'to the inch MUST show all of the following items: YES NO NA If You answered No or NA to any Item, Please Provide Justification Here! If you need additional room for explanations, Please Provide additional Paper. a. Location& Description of Property Boundaries 000 b. Total Site Acreage. 000 c. Existing -Natural & Man Made Features within 500 L.F. of the Site Boundary as required by§236-17(C)(2). d. Test Hole Data Indicating Soil Characteristics&Depth to Ground Water. 0 0 0 e. Limits of Clearing & Area of Proposed Land Disturbance. 000 f. Existing& Proposed Contours of the Site (Minimum z lntervals) 000 g. Location of all existing& proposed structures, roads, driveways, sidewalks, drainage improvements& utilities. h. Spot Grades& Finish Floor Elevations for all existing& proposed structures. I. Location of proposed Swimming Pool and discharge ring. j. Location of proposed Soil Stockpile Area(s). 000 k. Location of proposed Construction Entrance/Staging Area(s). 000 1. Location of proposed concrete washout area(s). 0 0 0 M. Location of all proposed erosion&sediment control measures. 0 0 0 2. Stormwater Management Control Plan must include Calculations showing that the stormwater improvements are sized to capture,store,and infiltrate on-site the run-off from all impervious surfaces generated by a two(21 inch rainfall/storm event. 000 3. Details&Sectional Drawings for stormwater practices are required for approval. Items requiring details shall include but not be limited to: a. Erosion&Sediment Controls. b. Construction Entrance& Site Access. c. Inlet Drainage Structures (e.g.catch basins,trench drains,etc.) d. Leaching Structures (e. .infiltration basins,swales,etc.) 000 0 0 0 0 0 0 **** FOR ENGINEERING DEPARTMENT USE ONLY**** Additional Information is Required. Reviewed& Stormwater Management Control Plan is Not Complete. Approved By: 0 Stormwater Management Control Plan is Complete. Date: SMCP has been approved by the Engineering Department. I FORM # SWCP Check List-TOS MAY 2014