CHAPTER 236
Stormwater Management Control Plan CHECK LIST
Section Block Lot
S M C P -Plan Requirements: Provide ONE copy of the Building Permit Application.
* The applicant must provide a Complete Explanation and/or Reason for not providing
all Information that has been Required by the following Checklist!
Date:
1. A Site Plan drawn to scale Not Less that 60'to the inch MUST
show all of the following items:
YES
NO
NA
If You answered No or NA to any Item, Please Provide Justification Here!
If you need additional room for explanations, Please Provide additional Paper.
a. Location& Description of Property Boundaries
000
b. Total Site Acreage.
000
c. Existing -Natural & Man Made Features within 500 L.F.
of the Site Boundary as required by§236-17(C)(2).
d. Test Hole Data Indicating Soil Characteristics&Depth to Ground Water.
0
0
0
e. Limits of Clearing & Area of Proposed Land Disturbance.
000
f. Existing& Proposed Contours of the Site (Minimum z lntervals)
000
g. Location of all existing& proposed structures, roads,
driveways, sidewalks, drainage improvements& utilities.
h. Spot Grades& Finish Floor Elevations for all existing&
proposed structures.
I. Location of proposed Swimming Pool and discharge ring.
j. Location of proposed Soil Stockpile Area(s).
000
k. Location of proposed Construction Entrance/Staging Area(s).
000
1. Location of proposed concrete washout area(s).
0
0
0
M. Location of all proposed erosion&sediment control measures.
0
0
0
2. Stormwater Management Control Plan must include Calculations showing
that the stormwater improvements are sized to capture,store,and infiltrate
on-site the run-off from all impervious surfaces generated by a two(21 inch
rainfall/storm event.
000
3. Details&Sectional Drawings for stormwater practices are required for approval.
Items requiring details shall include but not be limited to:
a. Erosion&Sediment Controls.
b. Construction Entrance& Site Access.
c. Inlet Drainage Structures (e.g.catch basins,trench drains,etc.)
d. Leaching Structures (e. .infiltration basins,swales,etc.)
000
0
0
0
0
0
0
**** FOR ENGINEERING DEPARTMENT USE ONLY****
Additional Information is Required.
Reviewed& Stormwater Management Control Plan is Not Complete.
Approved By:
0 Stormwater Management Control Plan is Complete.
Date: SMCP has been approved by the Engineering Department.
I
FORM # SWCP Check List-TOS MAY 2014