HomeMy WebLinkAboutLI-1025 - Structural Letter Rev 1.prn
S Ann R. Malick P.E., C.M.E.
Ma/ick & Scherer, P.C M& Principal
Glenn J. Scherer, P.E.
Principal
Consulting Engineers • Construction inspectors • Land Surveyors Colleen Connolly, P.E.
Associate
Robert Zalewski, P.E.
Associate
January 26, 2010 Michael J. Mcapin, P.L.S.
Director of Surveying
Steven C. Ragan , P.E.
Director of Structures
Town of Southold
53095 Route 25, PO Box 1179
Southold, NY 11971
RE: New Cingular Wireless PCS, LLC
Site # LI-1025
1040-B Horton's Lane
Southold, NY 11971
District 1000, Section 63, Block 1, Lot 10
Dear Building Official,
New Cingular Wireless PCS, LLC is proposing a 72' tall unipole, mounted atop a 3' tall caisson (75'
overall height to top of structure), and accompanying equipment on the above referenced
property.
Our client requires the pole and foundation to be designed to meet all applicable codes and
requirements including, but not limited to, The Building Code of New York State, TIA/EIA-222-F
and TIA/EIA-222-G. The unipole manufacturer will provide a structural analysis that will comply
with the codes and requirements listed above.
The accompanying equipment will be located within the adjacent storage facility building. The
equipment will be set on the existing concrete slab. The concrete slab has adequate structural
capacity to support the equipment as proposed.
Please feel free to contact me with any questions or concerns.
Very truly yours,
Glenn J. Scherer, P.E.
NY Professional Engineer #075376
One Salem Square a 295 Route 22 East *Whitehouse Station, NJ 08889
Phone (908) 534-4995 9 Fax (908) 534-0507 9 www.malickandscherer.com