Loading...
HomeMy WebLinkAboutLI-1025 - Structural Letter Rev 1.prn S Ann R. Malick P.E., C.M.E. Ma/ick & Scherer, P.C M& Principal Glenn J. Scherer, P.E. Principal Consulting Engineers • Construction inspectors • Land Surveyors Colleen Connolly, P.E. Associate Robert Zalewski, P.E. Associate January 26, 2010 Michael J. Mcapin, P.L.S. Director of Surveying Steven C. Ragan , P.E. Director of Structures Town of Southold 53095 Route 25, PO Box 1179 Southold, NY 11971 RE: New Cingular Wireless PCS, LLC Site # LI-1025 1040-B Horton's Lane Southold, NY 11971 District 1000, Section 63, Block 1, Lot 10 Dear Building Official, New Cingular Wireless PCS, LLC is proposing a 72' tall unipole, mounted atop a 3' tall caisson (75' overall height to top of structure), and accompanying equipment on the above referenced property. Our client requires the pole and foundation to be designed to meet all applicable codes and requirements including, but not limited to, The Building Code of New York State, TIA/EIA-222-F and TIA/EIA-222-G. The unipole manufacturer will provide a structural analysis that will comply with the codes and requirements listed above. The accompanying equipment will be located within the adjacent storage facility building. The equipment will be set on the existing concrete slab. The concrete slab has adequate structural capacity to support the equipment as proposed. Please feel free to contact me with any questions or concerns. Very truly yours, Glenn J. Scherer, P.E. NY Professional Engineer #075376 One Salem Square a 295 Route 22 East *Whitehouse Station, NJ 08889 Phone (908) 534-4995 9 Fax (908) 534-0507 9 www.malickandscherer.com