HomeMy WebLinkAbout36666-Z Town of Southold Annex 9/12/2013
P.O. Box 1179
54375 Main Road
~y Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 36500 Date: 9/12/2013
THIS CERTIFIES that the building ADDITION/ALTERATION
Location of Property: 630 RUCH LA. GREENPORT,
SCTM 473889 Sec/Block/Lot: 52.-2-26
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this ofiiced dated
12/12/2008 pursuant to which Building Permit No. 36666 dated 9/1/2011
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
additions and alterations, including covered porch outdoor shower and rooftop deck to an existine one family dwelling
as annlied for.
The certificate is issued to DEBRA LACHANCE
(OWNER)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO.
PLUMBERS CERTIFICATION DATED 1/2/8, 6/6/12 Timothy Taub, Michael Siarco
Authorized Signature
TOWN OF SOUTHOLD
~y BUILDING DEPARTMENT
~ ap TOWN CLERK'S OFFICE
~'+s~~~~ SOUTHOLD, NY
f
~3~ } ~t .
~u,~
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit 36666 Date: 9/1/2011
Permission is hereby granted to:
DEBRA LACHANCE
- _
120 BOND STREET _
BROOKLYN, N.Y. 11217
To: ADDITIONS AND ALTERATIONS TO A ONE FAMILY DWELLING AS APPLIED FOR.
REPLACES EXPIRED B.P. # 34343
At premises located at:
630 RUCH LA. GREENPORT, N.Y. 11944
SCTM # 473889
Sec/Block/Lot # 52 -2-26
Pursuant to application dated 12/12/2008 and approved by the Building Inspector.
To expire on 3/1/2013.
Fees:
PERMIT RENEWAL $150.00
CO -ADDITION TO DWELLING $50.00
Total: $200.00
i
ildi Inspe
FORM NO. 3
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Town Hall
Southold, N.Y.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL
COMPLETION OF THE WORK AUTHORIZED)
3~~
PERMIT NO. ~ Z Date DECEMBER 12, 2008
Permission is hereby granted to:
DEBRA LACHANCE
72 MIDDAGH ST
BROOKLYN,NY 11201
for
ADDITIONS AND ALTERATIONS TO A ONE FAMILY DWELLING AS APPLIED FOR.
THIS PERMIT REPLACES BP 31751.
at premises located at 630 RUCH LA GREENPORT
County Tax Map No_ 473889 Section 052 Block 0002 Lot No. 026
pursuant to application dated DECEMBER 12 2008 and approved by the
Building Inspector to expire on JUN 12, 20
Fee $ 150.00
~ /
Author' d Signature
COPY
Rev. 5/8/02
FORM NO. 3
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Town Hall
Southold, N.Y.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL
3/ COMPLETION OF THE WORK AUTHORIZED)
PERMIT NO. 3 1 Z Date JANUARY 24, 2006
~~3y3 ~E~~~
Permission is hereby granted to:
SANDRA L SCHPOONT C.~A C.L>
128 LINCOLN PLACE
BROOKLYN,NY 11217
for
ADDITIONS AND ALTERATIONS TO A SINGLE FAMILY DWELLING AS APPLIED
FOR. THIS PERMIT REPLACES VOIDED PERMIT #30791
at premises located at 630 RUCH LA GREENPORT
County Tax Map No. 473889 Section 052 Block 0002 Lot No. 026
pursuant to application dated JANUARY 19, 2006 and approved by the
Building Inspector to expire on JULY 24, 2007.
Fee $ 150.00
orized Signature
ORIGINAL
Rev. 5/8/02
~3 l ~ ? ~ .
Form No. 6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
TLis application must be filled in by typewriter or ink and submitted to the Building Department with'the following:
A. For new building or new use:
I. Final survey of property with accurate location of ail buildings; property lines, streets, and unusual natural or
.topographic features.
2. Final Approval from Health Dept. of water supply and seweragedisposal (S-9 form).
3. Approval of electrical installation from Board of Fite Underwriters.
4. Sworn statement from plumber citifying that the solder used in system contains Less than 2110 of 1 %lead.
5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate
of Code Compliance from andhitect or ongineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. Fvr existing buildings (prior to Apri14, 1957) non-conforming uses, or buildings and "pre-existing" land uses:
1. Accurate survey of property showing all property tines, streets, building and unusual natural or topographic
features.
2. A properly completed application and cgnsent to inspect signed by the applicant. If a Certificate of Occupancy is
denied, the Building Inspector shall state the reasons therefor in writing to the applicant.
G Ftes
1. Certificate of Occupancy -New dwelling $50.00, Additions to dwelling $50.00, Alterations to dwelling $50.00,
. Swimmirig pool $50.00, Accessory building $50.00, Pdditions to accessory building $50.00, Businesses $50.00.
2_ Certificate of Occupancy on Pre-existing I3ui[ding - $ 100.00
3. CoQy of certificate of Occupancy - $.25
4. Updated Certificate ofOccupaitcy - $50.00
5. Temporary Certificate of Occupancy -Residential $.15.00, Commercial $15.00
Date. ~ '
New Cbnstniction: Old or Pre-existing Building: (ch~k onej
LocationafProperty: ~ ,3p l~~i P-2j!'~~~?~
House No. Street Hamlet
Owner or Owners of Property: D ~ a ~a ~~~r~
Saffolk County Tax Map No 10f10, Section 5 0~ Block a2 Lot a6'
Subdivision Filed Map. Lot:
Permit Nq. 3loloG la. Date of Permit. 9' / ' Applicant:
Health Dept. Approval: Underwriters Approval:
Planning Board Approval:
request for: Temporary Certificate Final Certificate: (check one)
~ceSubmitted:$ SQ,~~t~y
~ °
_ _ _ _
Electricallnspection Certificate
Issue Date Electrical Inspection Service, Inc. Application Number
7/24!2007 375 Gunton Avenue 108889C
East Patchogue, New York 17772
(637) 286-6642
Issued To: Ms. Debra La Chance
Street: 630 Ruch Lane
Village: Southold Zip: 11971 Town: Southold
Section: Block: Lot:
Contractor: G. J. Electric (L) (cc) Lic. # 4839-E
Was examined and found to be in compliance with the National Electrical Code.
? Commercial ? NVDefects ? Pool U 1st Floor IX Indoor ?X Basement Hot Tub
~i Residential ? Det. Garage ? Attic X? 2nd Floor Q Outdoor ? Addition ? Survey
Switches Receptacles Fixtures GF/ Heaters A/C Fans
27 29 57 8 1 3
Dishwasher Washer/Amps Oryer/Amps Oven Range/Amps Microwaves
1/20a 1 30 1/40a 1 Gas
Furnace Oil Gas Circulators Smoke Detector Belt Transformer
1 x 5
Meter Amps Phase UG/OH Jacuzzi Television CO Detector
1 200 1 L, / 2
Bldg. Permit:
Other Equipment ~ _ 9
1-200 amp M/B Panel I `'L"~'~
1-30 amp A/C Disc. Hu o S. SUrdi
1-20 amp Air Handler Disc. g
I President
Rough Inspection: 05/26!2006
[nspectOr: Denn"~s Brandi
Fnal Inspection: 07/18/2007
Inspector: John Mc Mahon III
This certificate must not be altered in any manner. Inspectors may be ident~etl by their credentials.
Tow411nU,53093MstoR09d ~ ~ Fax(631)7b5.SSii
FA. 8ooc 1179 ~ ~ ?ekphace (632 763-i862
Sattbold, Nexv York 1 SS71.0959
RUILDIIS4 AEFARTMBNT
~rowly oz~ saxo>E.u
CERTIFICATION
Date: ~(1r\ t9a7 A00~
~y ~'.N~---~
Building Perm~,it/~Nop. ~~~/-~-J=~1 ~ ~3~3 rC n ~
Owner: ~ mar/ F-+~ ~i~ ~ r~i
(p
l/ease print)
Plumber: / Md rh• /~U`j
(p ease print)
I certify that the solder used in the water supply system contains less than 2/10 of 1% lead.
lumbers ignature)
M1~
Sworn to before me this
day of ~(y,h 20Q~
~cti4..3~,. 110 r ~;a
.r...a._, Nnt,.~ ~+~t'ork
r;. ,
Qual ~ 7rin 4 ivil; County
Comma iu~~::pir ~/d-/3~/o~~f;l9
Notary Public, y •Tl o ~ County
~pF SOUTH,
°~o
Town Hall Annez y ~ Telephone (831) 765-1802
54375 Main Road - Faz (631) 76$-9502 -
P.O. Box l 179 G
Southold, New York 11971-0959 ~
~Vvu111
BUILDING 1)EPAR'L'NtENT
TOWN OF SUUTHOLD
CERTIFICATION
Date: flr"~ Off! l
BuildingPerm~i`t~No. cJ ~~t~WZ--
Owner: ~Ve`Dd`A ~G~ G('10. ~ C_.L---
(Please print)
Plumber: r~, l ~c.e~ ~ ~ (n\ C~
(Please print)
I certify that the solder used in the water supply system contains less than 2/10 of 1%a
lead.
~C-
(Plumb s Signature)
Sworn to before me this ~1
day of 20 CONNIE D..9UNCH
Notery Public, Stnts of New Yark
No.01t3U8185050
n QuaNfled in 8uffoik County
A _ ~ , ~ Commission EtWires April 14; 2 b~ ~a
Notary Public, ~ County
/ / I
J3 ~ ~ ~ ~ ~ ~~,Of 80GTy~
# f
3~/ z
TOWN OF SOUTHOLD BUILDING DEPT.
765.1802
INSPECTION
[ ]FOUNDATION 1ST ROUGN PLBG.
[ ]FOUNDATION 2ND [ INSULATION
FRAMING /STRAPPING [ ]FINAL
[ ]FIREPLACE & CFIIMNEY [ ]FIRE SAFETY INSPECTION
REMARKS:
d- /P
~
d-
S~~;A-Q~
DATE INSPECTOR
3 ~ ~o~,~oF sourya6 -
Jb JF®JF
TOWN OF SOUTNOLD BUILDING DEPT.
765.1802
INSPECT ON
[ ]FOUNDATION 1ST [ ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ]FRAMING /STRAPPING [ ]FINAL
[ ] FIREPLACE~B~~CENIMrN/EY [ ]FIRE SAFETY INSPECTION
REMARKS: V ~ 5 ~ ~ ~i~-~S~i~
c9~ AS.r~
f/+
~S~c~ ~
~oi
DATE ~ ~ ~ INSPECTOR
i
"~~y7~ ~o~,AOF SOpTy~~
YY 3 * ~ 5i~ Gti~K
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ]FOUNDATION 1ST [ ROUGH PL
[ ] F NDATION 2ND [ ]INSULATION
ING /STRAPPING [ ]FINAL
FIREPLACE A CHIMNEY [ ]FIRE SAFETY INSPECTION
~ _
REMARKS: `S~~
- ~ f~
` ~sf~ ~~sr• 3rd s
'fir
/ R
DATE ~ ~ INSPECTOR
~ ~ / ~ hO~y,OF SOUTyo~
3~3
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
1 NSPECTION
[ ]FOUNDATION 1ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ]FRAMING /STRAPPING [ ]FINAL
[ ]FIREPLACE 8~ CHIMNEY [ ]//FIRE SAFETY INSPECTION
REMARKS: ~ Ui~~ f
,c%r C. T~5`
DATE ~ INSPECTOR
J v~i~~/ O~~pFSOUTyo -
JO
TOWN OF SOUTHOLD BUILDING DEPT.
765.1802
1 NSPECTION
[ ]FOUNDATION 1ST [ R UGH PLBG.
[ ]FOUNDATION 2ND [ INSULATION
[ ]FRAMING /STRAPPING [ ]FINAL
[ ]FIREPLACE & CHIMNEY [ ]FIRE SAFETY INSPECTION
REMARKS: ~ ~-^J
` 7~
~ p
DATE ~ ~ ~ INSPECTOR c
~ 6 < G.. ~o,~~'OF SOGTyo<o
~ ~
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
1 NSPECTION
[ ]FOUNDATION 1ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ]FRAMING /STRAPPING [ ]FINAL
[ ]FIREPLACE 8~ CFIIMNEY [ ]FIRE SAFETY INSPECTION
REMAR dL1'
p ~ D~1
-
DATE INSPECTOR
3
TOWN OF SOUTNOLD BUILDING DEPT.
765.1802
1 NSPECTION
[ ]FOUNDATION 1ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ?~FRAMING /STRAPPING [ ]FINAL
[ ] FIREPLACE A CHIMNEY [ ]FIRE SAFETY INSPECTION
REMARKS:
DATE ~ ~ INSPECTOR ~
~le do ~ ~ 7 ~~~utN ~-e ,~o~~OF SO~Tyo6
~ ~ ~
TOWN OF SOUTFIOLD BUILDING DEPT.
765-1802
INSPECTION
[ ]FOUNDATION 1ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ]FRAMING / STRAPPING FINAL
[ ]FIREPLACE & CHIMNEY [ ]FIRE SAFETY INSPECTION
[ FIRE CONSTRUCTION [ ]FIRE RESISnTANT PENETRATION~~ ~ ° ~
E RKS: \c~, ~ c.m~
~2~~~~ ~
_ ~ ~
DATE I ~ ~ ® INSPECTOR
.
- ,,,.-tee., ~ , ~ ,
3~~G lam-
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ]FOUNDATION i ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ]INSULATION
[ ]FRAMING /STRAPPING [ FINA
[ ]FIREPLACE 8~ CHIMNEY [ ]FIRE SAFETY INSPECTION
[ ] FlRE RESISTANT CONSTRIICI'ION [ ]FIRE RESISTANT PENETRATION
[ ] ELECTRN:A,L ROUGH) / [ ]ELECTRICAL (FINAL)
REMARKS: ~ `
,n
~
~
. r s.~
DATE INSPECTOR
TOWN O~ SOUTNOLD BUILDING DEPT.
765-1802
INSPECTION
[ ]FOUNDATION 1ST [ ]ROUGH PLBG.
[ ]FOUNDATION 2ND [ ] 1 ATION
[ ]FRAMING /STRAPPING [ FINAL
[ ]FIREPLACE 8~ CHIMNEY [ ]FIRE SAFETY INSPECTION
[ ]FIRE RESISTANT CONSTRUCTION [ ] FlRE RESISTANT PENETRATION
[ ]ELECTRICAL (ROUGH) [ ]ELECTRICAL (FINAL)
REMARKS:
DATE ~ INSPECTOR
FIELD INSPECTION REPORT DATE COMMENTS ~ ~ I
'^!$1
FOUNDATION (1ST) ~
a
.
FOUNDATION (2ND)
z
0
- -6-
ROUGH FRAMING &
PLUMBING
~ s ~
T'ss.~,~
b r9 a ~3,c.~ !/%ri-. /f s~ ~ CJi ~ T~
INSULATION PER N. Y. ~
STATE ENERGY CODE
K ~ ~
i
c.E s ,1' -~~r
1 .T
~ o - s 9-~
~ .?e- <
cn~,
FINAL ~f ~ "
k\r~
1 0 ~a
_ ,
D `
i 1s.,~14
AD ITIONAL COMMENTS ~~aJ.
3 0 06 0
Z
~0 ~ m'
~ V
c~ ~
S~ "
D ~ ~
o
z
i
x
x
~d
ro
' TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST
BUILDING DEPARTMENT Do you have or need the following, before applying?
TOWN HALL BoarzlofHcelth
SOUTHOLD, NY 11971 ~ 4 sets of Building Plans
TEL: (631) 765-1802 Planning Board approval
FAX: (631) 765-9502 ~~~~'a Survey
www. northfork.net/Southold/ PERMIT NO. Check
Septic Fomt
N.Y.S.D.EC.
Tmsmes
Examined , 20 Contact:
Approved , 20 Mail to:
Disapproved a/c
Phone:
Expiration ,20
1
I ` Building Inspector
`
` ~ ' APPLICATION FOR BUILDING PERMIT
JAN 3 1
Date , 20
~ _ 1 INSTRUCTIONS
_.J
• ' 14.° This appisafion MUST be completely tilled in by typewriter or in ink and submitted [o the Building Inspector with 3
'-sets
oPplans, accurate plot plan [o scale. Fee according [o schedule.
b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application inay not be commenced before issuance of Building Permit.
d. Upon approval of this application, the Building Inspector will issue a Building Permit [o the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e. No building shall be oceupied or used in whole or in part Cor any purpose what so ever until the Building Inspector
issues a Certificate of Owupancy.
C Every building permit shall expire if the work authorized has not commenced within 12 months after [he date of
issuance or has not been completed within 18 months from such date. ICno zoning amendments or other regulations affecting the
property have been enacted in the interim, the Building Inspector may authorize, in writing, [he extension of the pemtit for an
addition six months. Thereafter, a new permit shall be required.
APPLICATION IS HEREAY MADE to the Building Department for [he issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or
Regulations, for [he construction of buildings, additions, or alterations or for removal or demolition as horein described. The
applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
• (Signatm'c of applicant or name, if a corporation)
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect engineer, general contractor, electrician, plumber or builder
O W NG-~K_
Name of owner of premises f~ 1i~G ~ tJGE~
(As on the tax roll or latest deed)
If applicant is a corporation, signature of duly authorized officer
(Name and title of corporate officerl
Builders Liccnsc No.
Plumbers License No. _ _ _ _
Electricians- Liccnsc No.
Other Trade's License Nu.
1. Location of land on which proposal work will be done:
~p ~LO _ ~11 G1t-~_ 1t?_
.NF_i _ _._SOU~It-~Ol~~
I louse Number Street Hantlct
('ounly Tux Map No. 1000 Sccuau _ SZ 13oc: 2 I in 6
Suhdi cisiun Piled ~Uop A~n_ Lai
1Aluncl
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy ~~'S1t»'°G E-
b. Intended use and occupancy ~ y'1I~~Pi
3. Nature of work (check which applicable): New Building Addition~~Alteration
Repair Removal Demolition Other Work
(Description)
4. Estimated Cost Fec
(7o be paid on filing this application)
5. If dwelling, number of dwelling units 1 _ Number of dwelling units on each floor
If garage, number of cars
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.
r ~ ~
7. Dimensions of existing structures, if any: Front 7j0 Rear 70 Depth ~Q'
Height 13 t Number of Stories l
Dimensions of same structure with alterations or additions: Front '~jOt Rear
30'
Depth 4~t Height 26' Number of Stories
8. Dimensions of entire new construction: Front 2 Z ~ Rear 2 2 ~ Depth 30 t
Height L D ~ Number of Stories 1
• 9. Size of lot: Front 4$ , Rear So''12 t Depth ~ Fi8'~ ~ t
10. Uate of Purchase Name of Former Owner ~s~dv'O~RA exkY'Qppr~~' ~ST1r'V 6r-1 AX~.7cp
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES_ NO
13. Will lot be re-graded? YES_ NO ~ Will excess fill be removed from premises? YES NO
lA. Names of Owner of premises Address Phone No.
Name of Architect Address Phone No
Name of Contractor Address Phone No.
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland'? *YES NO
* IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland'? *YES_ NO
* IF YES, D.E.C. PERMITS MAY 6E REQUIRED.
16. Provide survey, to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey-
STATG OP NEW YORK)
/ SS: ~
COUN"~~Y OF
Mid
/ ~ ~ ~ ~ L- being duly sworn, deposes and says that (s)he is the applicant
(Name of individual sigm conuzcU above n' ned,
(S1Hcis the ~,~~-~it J~---~_
(Conlracto~t~enl, Coiparatc O(l icer, etc-)
of said owner or owners', and is' duly authot'ucd to perlonn or have perlimned the said work and to make and tilt this application;
that all Statements cumnincd in this application arc true to the best of his knowledge and beliel: and that the work will be
pcrlbrmed in tltc manner sd forth in the application tiled therewith-
Sr~at to br lure me thi ~ 1
n ~
S M day of ~it!wI YAI~4 '_U_~_ r/
c
_ V,
_ _ ,~~C__, ~
ut y Public Si _nnt arc ul Appliconl
YICTOR STARSIA
Pbtary Publlt, Sate d NeW 1AOIk
No.t7¢ST6084869
QuaRRed N tJew York Coui~l
:,ommissien Ex^ires DCC.16.
~ Vii'
A~ nygyy^~ ~'Y~~
_ h`
LT, E
Board Of .Southold -Town Trustees
h
SOUTHOLD, NEW YORK
-
' DATE 12/??103..:.....
PERMIT NO. Sa. ~J
r
SANDRA SCHPUUNT
ISSUED TO.........___............_._.._.....:..._...........__.__.._. _
x ~ ,~u#I~vri~a#ian
C
Pursuant to the provisions of Chapter 615 of the Lews of
the State of New York, 1893; and Chapter 404 of the laws of the
State of New York 1952; and fhe Southold Town Ordinance en-
tilled ."REGULATING AND THE PLACING OF OBSTRUCTIONS
IN AND ON TOWN WATERS AND PUBLIC LANDS and tl,e
REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM
LANDS UNDER TOWN WATERS;'.': and in accordance with the
Resolution of The Board edopted at a meeting held on ...Dec. 17,,..
2003 and in eonsideretion of the sum of :..50.00.._, paid by
- Sundna._Schpoon-~....._..._._......_.....__._.._......_.....__........_........._..._
Southo 2d _ _ _ N. Y. end subject fo the
of
Terns and Conditions listed on the reverse side Hereof,
of Southold Town Trustees authorizes and permits the following:
(Vet2nnd Pel~m,it .ta conafihuat a accord-~.Caon addi,Li,on .to .the exih.ti,
etingCe-6am.i.Cy dwe,P.P.i.ng, with .the condition dnywek,~6 & guttelyd wce
:~,na-takZed .ta eanta.i.n .the nooti nun-o6S, and a .fine ab afiaked hag
'ba.Eea .ia p.Caeed ax tihe .top o,,{{ zhgg6~YupeGCf~v~,ing Iona-fiicu~~,,~,~,,onn, and
e8 in accordance with the aeteiled s ieations as prese~rtad in
.the originating application. ~ dep~.a~ed on .the pear pnepaced 6y
a Jonathan S. Foa.te~c AIA ~~,~~y
IN WITNESS V~~REOF, Theiai~4Board of Trustaos here-
by causes its Corporate Sea! to be effixed, and these preseirts to
ba suiiscribed by a majority of the said Board as of this data.
a~~FFO~-
z _
.s~~ ,
s` rrwsleer
~ ,g.,.r - ~
Mar.29. 200n 3;42PM No,0319 P. 2
. .
James F. King, President ~OF SD(/j~, Town Hall
Jill M. Doherty, Vice-President r~~~ 5309ri Route `lS
P.O.13nx 7779
Peg(;y q, Dickerson # ~ Southold, New York 11971-09:09
'I;avc 1~ergen..
]ohnllol<agl'e1 ~ Telephoae(631)765-1892
~,p~~ ~ Fax (631) 765-6641
a~ 2 g '
r BOARD l"aF.TOWIV TRUSTEES
' TOWN OF SOL:1'HO1.D
March 22, 2006
David Howell
200 Park Avenue South, Suite 1518
New York, N.Y. 10003
RE: DEI>RA LACHANCE
630 RUCH LANE, SOUTHOLD
SCTM# 52-2-26
Dear 1~1r. Howell:
The i'oi!owing action was taken by the Southold Town Board of Trustees at their Regular
Meeting held on Wednesday, March 22, 2006:
RESOLVED, that the Southold Town Board of Tnstees APPROVE the Amendment to
Permit #5845 to include the renovation of the first floor with a 5'x 16' extension onto the
existing I louse, and as per plans last revised February 23, 2006.
This project will need a final inspecticn.
This is r=ot a determination from any ether agenc,~.
If you have any questions, please tali uur office at (631) 765-1892.
Sincc:r~ey,
07
James F. ' ng
President, Board of Trustees
hlov 17 04 08:14a 4ueene FosEer 914 478 0041 p•1
DFlr~lni )
rie~.v "i'or!c State i3t:partm2nt ofi ~nvirorrnr~~~.al Co;lservation
Division of Environmental Permits, Region Gne
Building 40 - SUNY, Stony Brook, New York 11790.2356
Phone: (631) 4,4-0365 FAX: (631) 444-0360
'f 7ia' i.c: 'Jv'>VI~V.LEC..i:_ic.i
~y.US
Erin M. Crotty
Commissioner
LETTtR OF NO JUR)SDICTION
i ` j ~ November 24, 2003
Sandy Schpoont
128 Lincoln Place
Brooklyn, New York 11217
Re: Application #1-4738-02145/00003
Schpoont Property, SCTNI #1000-52-62 :?6
Dear Sandy Schpoont; .
Based on the information you have submitted, this Department has determined that: The property
landward of the topographic crest of the dune as shown on the survey prepared by John C. Ehlers
dated August 21, 2003, is beyond jurisdiction of Article 25.
Therefore, in accordance with the current Tidal Wetlar~:i:: Regulations (BNYCRR Part 661) no permit
is required. Please be advised, however, that no ~-an;'truction, sedimentation, or disturbance of any
kind may take place seaward of the tidal wetlands ;uridictional boundary, as indicated above, without
a permit. It is your responsibility to ensure that all i i ;cautions are taken to prevent any
sedimentation or other alteration or disturbance trl ii a ground surtace or vegetation within Tidal
Wetlands jurisdiction which may result from your ;project. Such precautions may include maintaining
adequate work area between the tidal wetland jurtsdic+t~nal boundary and your project (i.e. a 15' to
20' wide construction area) or erecting a temporary `::~~ce, barrier, or hale bay berm.
Please be further advised that this letter does not re.leve you of the responsibility of obtaining any
necessary permits or approvals from other agencies.
Sincerely,
~ %i
Mark C. C~~r ire
Permit A:Iministrator
cc: Jonathon Foster
NIHP
fife -
01/24/2006 14:30 6314270297 ~ -
~ ARCALHEK ARCHITECTS
B~„~~~ au a.w.-... PAGE 02
~ wn
P P.V~LS Ad - r~w~tFAG711~aEi~ll
DMftiMIN_ BAfkD 51PA7faN9 ~ ~ py . ~ T
r'Xb' G1a 7 XD'
J XIO.OR WN762 3-dtl PH2 SLPPGIQT
V E FLOOR SHL~
4TN1NG
STrIIaTLRAL PAN5.5
I' OFt LE56 6d 6~5~E / I?'FII~.D
- 6R6ATB2 7HAN r' lOfd bi'P6f / 6'F~D
DU6pNAL 6iPARD~SfEATNIN6
1 Xb' OR 1'X6• Pl.~ SLP~RT
r wo' Olz raver 3-ed F®a 56FTioKT
! NAaa!as HmS ARE 4A5® ON hW.L SfEAAWi6 NAN.® 6' O.G. AT TIB PANH. 6~9E.
ff rUEL SNFAT1aNB 15 NAa.EA Ot. AT 7rE PANG. IDiNE TO OBTAIN NI®1@2 51EAR GAP
r41lLI/d6 ltIlllS r"+OR 57RIGTLRAI. 1 SrMll. BE AOI.QI.J~ OR ALiBatATE
GOMLGTOR5v5LYAl A$ SHEAR PLATPS 5/1AI.1 BE I!5® 70 MUNlI'AIN TNH LGAD PATH
? r~lBV ~rit,W.L SNEATNM615 GONI'IIIKW OvBZ COIKG7ID l TFE T.~IAT®aOF
NAM.9 5r W.1 BE P6PNIT1g7 TO 9E TO !-/Gd NAa. PHi FOIOT. -
J CQ2W0510N Rt'SlSTiV? N 61HF~ l7Ol7FlN6 NAILS AND M 6YUFE STAfiP5 ARE FH~NTT@7
IBC F+OR ACaO1TICNAL R¢~+BtET'1Bt15
CLIMATIC AND GEOGRAPHIC DESIGN CR! RW
oROU~n w>!ro SErsaac sue.~crTaauuoeFaoAr s+r¢an
sNOw oes/cN FRQSTLMIE PLOc
cawo sPFFO cRr?Ew~ wFATNERING DEPTH TERMITE oErAr NEUll1~D fIATN
-rls P5F c a'-s' >'r to N 5 m M a YE5
HIGH W/ND ANALYS_ _IS
MISCELLANEOUS PROJECT DATA
LOGAFIGN. aJOArIClfI.VVF SOIITIALD 1rY71
1'Mra~ 110ME. l20~oA
FJ6Y~. - B
rEAN ILA^f /EIR1rf. ~ ]B'Jl' -
E T A! L AccaeolNS I rTw ~ F~ rao~
rZae r assroar
. - - Clr4PTER9PRE OEBKiN
ROOFRAFTER/TRLISS TO TOP PLATE CONNECTION
n~errwnweaerw/
I~L¢S = sae+PBa rAetes3
~ ar'~u t yo~o ~ ~ PH2 TA9fE 33H - ll'ROV>DE +i0d C+OFFGN NApS
- _ ~ EACH RR..! G..L GONN6GTILW.TO TOP PLATES /TOE-/IAA/
wAL.c ro wACC coNNECrroN
rme~w
sss L9.1Q boa Pea rABLe 9.3 tY~ AerAU ~ FGY2 corrcc 1Ta1
rauAC /t,y~al t ~~D PER rAetF sab rrieovlDe rs! a6d cA'tnN rc~a. eAUI Bo
OF hY4' x ]io eS~E STRM
WALL ASSEMBLY TO FOUNDATION CONNECTION
11!/GMTbe OM'lwYlf
lPll[I Pei rABLF S.+re rFtao+~~
fd/ aAd car~r~N • ~N E!O aF
!-N4' X 2D 6iANE 57/?M
~liEYATT016 FOR LOU
P132 TABIF D.1B IPNOV/AE 1?B't7YA. AACIKJR - 75 • b'-O' OG.
W7iak BOO' CP A11 LG711a9L 6'-0' OL. AT
All. MTTS2KY2 ZO?~F LOGA SS ~-Gr'6 !'p'er
ALL /MHtlOr2 ZdE LL1CA Sa' ~-OK ~
I A t 4F/~n !''S2 Ti{gLE 9.7A PR011fJE 5/D' ALA AJILFL'Y2 TS
•J'-0' vt.
Permit ~ 3~'7
TAIL ~ NA I L I N G 5 G H E ~ U L~
9GALE~ 'NO' SCALE
Arcalhek
ARCHITECTS PC.
356 NEW VORK AVE.
HUNTINGTON, N Y. 11743
(631) 427-0295 FAX 427-0297
February 23, 2006
The Town of Southold
53095 Main Road
Southold NY, 11971
Re: Concrete and Framing Remediation
630 Ruch Lane
Southold NY, 11971
To Whom It May Concern:
Upon the contractor's inspection of the existing foundation, it was found that there was
no footing below the existing block foundation wall. 2'-0" X 2'-0" X 1'-0" deep
concrete piers were installed at all comers and all load bearing points. Refer to drawing
A-1 for new pier locations.
Further inspection found extensive termite damage at the south and east walls resulting in
their replacement as per NYSBC. Refer to drawing A-2 for wall locations. The existing
building footprint and window configuration remains as per the approved drawings.
Sigcerel- . ,;x
~ ~aFa
r,
d a , ~ e ~ ~ ~1
'
~ ; .,a
~
i~
a _ Y~.... ~i~!~
•
2.) Approval from the Southold Towu Board of Trustees: We have met with
the trustees and determined that you have gone beyond the scope of the permit
issued to you by that office. As a result, you may not continue any work until
that existing permit is amended to reflect the changes made to the project.
In order to obtain a variance for this project, please submit a check in the amount of $35
so that we may issue a notice of disapproval.
You may apply to the trustees directly.
If you have any questions, please feel free to contact this office at (631) 765-1802,
between the hours of 8:00 a.m. and 4:00 p.m.
Re Il s,
Auto ' ed Signature
CC: File
' _
-
2 9
Arcalhek
ARCHITECTS FC.
356 NEW VORK AVE
HUNTINGTON. N Y 11743
(631) 427-0295 FAX 427-0297
March 27, 2006
Mr. Michael J. Verity
Chief Building Inspector
SOUTH TOWN HALL
53095 Main Road
Southold, NY 11971-1179
Re: 632 Ruch Lane
Southold NY 11971
Dear Mr. Verity,
As per your request I am enclosing two sets of construction documents of the Lachance
Residence located at the above referenced location. We were successful in getting The
Trustees re-approval on the amended design at the March 22, 2006 meeting.
We look forward in getting your re-approval so that we may continue construction.
Sincerely,
Raym d
Mar•29. 2006 3:41 PM No.0319 P• 1
. - -
Date: March 29, 2006
To: Michael Verity
Company: Town of Southold .
1'ax: -.(631) 765-9502
From: Antony Martin
cc:
Pages: _2 (including cover)
Reference: 630 Ruch T.ane -Amended Trustee Yermit
0------
Michacl- find attached notice of approval from the Town Ttustecs. Please advise
when we can expect the approval to start work again.
Thanks for your help.
Antony
T)avid Howcll Tksigrt
200 Park Avcnuc South #15i 8
New York, NY lUW3
Tel. 212.477.7700
Fax. 212.477.0149
Southold Town Building Department
54375 Main Road Permit 34343
Southold, New York 11971 Permit Date: 12/12/2008
i<~ (631) 765-1802
y Expiration Date: 6/12/2010
'T~
* „nt~ Parcel ID: 52. 2-26
BUILDING PERMIT RENEWAL LETTER
FINAL NOTICE
Dated: 8/19/2011
Applicant: DEBRA LACHANCE
Location: 630 RUCH LA. GREENPORT, N.Y. 11944
Work Description: RESIDENTIAL ALTERATION
ADDITIONS AND ALTERATIONS TO A ONE FAMILY DWELLING AS APPLIED
FOR.
A FEE OF $150.00 IS REQUIRED TO RENEW THIS BUILDING PERMIT.
Owner: DEBRA LACHANCE
Address: 120 BOND STREET
BROOKLYN, N.Y. 11217
The permit listed above has expired. Please contact our office as soon as possible to begin
the renewal process. All work on the project must stop on the expiration date.
THANK YOU,
SOUTHOLD TOWN BUILDING DEPT.
r~~~~ Southold Town Building Department
~9 a 54375 Main Road Permit 34343
~ Southold, New York 11971 Permit Date: 12/12/2008
'i3 ~tiq (631) 765-1802
y~'~Myl } .~,G Expiration Date: 6/12/2010
„~~,,:n Parcel ID: 52.-2-26
BUILDING PERMIT RENEWAL LETTER
FINAL NOTICE
Dated: 8/19/2011
Applicant: DEBRA LACHANCE
Location: 630 RUCH LA. GREENPORT, N.Y. 11944
Work Description: RESIDENTIAL ALTERATION
ADDITIONS AND ALTERATIONS TO A ONE FAMILY DWELLING AS APPLIED
FOR.
A FEE OF $150.00 IS REQUIRED TO RENEW THIS BUILDING PERMIT.
Owner: DEBRA LACHANCE
Address: 120 BOND STREET
BROOKLYN, N.Y. 11217
The permit listed above has expired. Plense contnct our office as soon as possible to begin
the renewal process. All work on the project must stop on the expiration date.
THANK YOU,
SOUTHOLD TOWN BUILDING DEPT.
i
dhd
' orchliecture
design PItC
200 park avenue south
suite IStB
new York ny 10003
p 212 477 7700
1 212 d)7 0149
www.davldhowell.nel i
I
I
I
Southold Building Department
Town Hail Anhex Building
54375 Route 25 j
P.O. Box 1179 j
Southold NY 11971
i
September 23, 2010
t
Re: 630 Ruch Lane
Dear Southold Building Department:
I, David Howell, hereby certify to the Department of Buildings of the Town of Southold that I have
inspected the above locations; 1 have supervised the preparation of the building plans as per State
Education Laws; and t have determined to the best of my professional knowledge and belief that the
structural elements are safe and that the foundations, framing, windows, roofing, siding, high wind
strapping, insulation, and plumbing were installed in conformity, with the filed building plans, the New
York Residential Building Code, and generally approved construction practices.
If you should have any questions, please do not hesitate to contact me.
i
,~~R'~o aR~ .
Regards, ~~d~OPVyD KOiyFy/)~
- / ~ i
v Y~~ I~
1 * I,
David Howell
~9p ~3369~
F~F WEW ~O i
10!23!2007 15:30 6463368395 PAGE 01!02
,Oci.23. 2007 1:43PM. No. 2456 P. 1 ,
aoard o! Trustees appl3.oattoa
AuTBO1uaATraN
(where the applioaat is not the owner)
I, ~ residing at ~(~1d,a
' (print owner of propertp ~ma n5 sdara )
P~bo k. m Y n ao! do hereby authori,ae Ra DICT ! ~r'
y (Agemt)
~C.O~riG T~I~11 ~ ~t~ 1 • ttl apply for permit (a) from Che
Southold Board o~ Tdwn Trustees as my bet?a1t. .
(clwne~signat
Qom; ~3o R~~ ~,~~d~
•
B
10/23/2007 15:30 6463368395 PAGE 02/02
Oct. 23. 200712:59PM No. 2455 P. I
l~
W
To: Southold Building Department
From: Debra tachance
Re: Permk #31751, B30 Ruoh rd Gr¢enport
pats; 10/23/07
This letter is to request a 6-month e~Rension on permit #31751 in order to obtain
the fmal CQ, Also I am authorizing Robert l.ehnert at Pecortic Permit Fatpedtting
to ad as my agent
Thank you for your consideration and should you have any questions please feel
free to call me at 917-t39&3724
Sincerey,
Debra Lachance
~ _ ~
_ _J
I
dhd
archliecture ~
design PLLC ;
200 pork avenue south
suite 1518
new York ny 10003
p 212 477 7700
f 212 477 0149
www.david howell.nel
Southold Buildin De artment
g P
Town Hall Annex Building
54375 Route 25
P.O. Box 1179
Southold NY 11971
September 13, 2010 j
Re: 630 Ruch Lane
Dear Southold Building Department:
I, David Howell, hereby certify to the Department of Buildings of the Town of Southold that I have
inspected the above locations; I have supervised the preparation of the building plans as per State
Education Laws; and I have determined to the best of my professional knowledge and belief that the
structural elements are safe and that the foundations, framing, windows, roofing, siding, high wind
strapping, insulation, and plumbing were installed inconformity, with the filed building plans, the New
York Residential Building Code, and generally approved construction practices.
If you should have any questions, please do not hesitate to contact me.
,~~pt6D qq~
Regards, ~~O~oPV\O ?~ObyF~/).~
n
If I
David Howell
~9~. X3359'1 p~
lcpF NEW ~
I,
~O~~pf SOplyolo
Town Hall Annex yy Telephone (631) 765-IR02
54375 Main Road ~ ? ~ Fax (631) 765-9502
P.O. Box 1179
Southold, NY 119'71-0959 ~
~~'YOOUNTI N~
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
June 11, 2012
Debra Lachance
120 Bond St
Brooklyn, NY 11217
RE: 630 Ruch Lane, Greenport
TO WHOM IT MAY CONCERN:
The Following Items Are Needed To Complete Your Certificate of Occupancy:
Application for Certificate of Occupancy. (Enclosed)
Electrical Underwriters Certificate. (contact your electrician)
A fee of $50.00.
Final Health Department Approval.
Plumbers Solder Certificate. (All permits involving plumbing after 4/vaa)
stees Certificate of Compliance. crown trustees a rss~asz?
Final Planning Board Approval. (Planning # ~s5-~s38)
Final Fire Inspection from Fire Marshall.
Final Landmark Preservation approval.
BUILDING PERMIT: 36666 -Addition/Alteration
TOWN OF SOUTHOLD PROPERTY RECORD CARD ~
OWNER STREET VILLAGE DISTRICT SUB. LOT
FOR R OWNE(~ N E ~ j / ACREAGE /
~~lC; r f .W/{vA pit . ,r',. i ,
S W TYPE OF BUILDING
r,
~_-~~~~y,.e~~~r- ~~IC ~ ,s
RES. SEAS. VL. ~ FARM COMM. ~ IND. ~ CB. ~ MISC.
LAND IMP. TOTAL DATE REMARKS 7
:s
vC _/2c.% --~'/`7~ 3SDJ~' p- ~%19 r,<,q~~ T~ ~Er
~ ,i - ~~2 ~-Ll~q~ ~-Sk ~ Cad
_
- ~ ~
- -
~ ~ ~ a as ~.~k a8 ion - ~~xafi~~ s ~ k . ~ z-
- _ -
vY/ , .
N E~a~-7N
eR~~1 B$
~B E9~ ~ 2~?
B~V7~~ ~ C%''' ~ = / ~ '
9~ n ~ _ _ _ _ -
Farm ~ Acre Value Per Acre i Value
Tillable 1
Tillable 2 ~ - r~~~ /
- _ - -
Tilloble 3 ~ ~ a
-
Wcodlond ~ - _
- - - _
- I ~ -
Swampland
- ---L - _ -I _ _
- -
- -
Brushland ~
- - - -
~ - - - -
House Plots ~
I ; _
I
- - I _ _ _ - - -
Tctol ~ ~
`4 T`:
® 1
?.us ~,xzt- L W`.. ~ L~
S R~ . N ~ rt~
i I
i I o- ~
i I / i I j.. ~ .
v,
2 ~n _ _ r~.J,~
i i ~ 20 OZ'S
Ili ~I
._.1
~ ~p L
~ f
_ ~ ~.QQ~
N
52-2-26 11/02 ` I~ I _T I ~ i
r ~ ~
_ - ~ i
M. Bldg. ; -o ~ ~ ~~I ~ Foundation p iv~ ~ , Bath L _ -
3 D _ tXi - - -
Extension ~ 2,.[`L a'~~' 3~ ~ 2~~~ ~8osement ~ ~ Floors ~1 IZ
t. Walls ~ Interior Finish Lv
Extension i ~ ~ n St
Extension r y 3 ~p I Fire Place + ~ v Heot O ~ ~ ~ W
-
~r~/.St ~ i Porch ~ ~ Attic
~F+- - -
i ~ ltaqu~ Z~ ~ l 3 p p
~ Porch Rooms lst Floor
- -
~ ~20~ ~ '2'r GO Patio Rooms 2nd Floor
R ~ SX ~ L yo
Garage _ Driveway _ -
O. B. ~ ~
r
a~~-><,~~ I n7
2 ~~11 2~2 Fio A
I
No. Issued To Date
1 011NER l2/la/OS
Z2'-0' HOLD
2'-4' 1]'-a' 2'-4'
i a,/a' Fwxoow e'-]i/z' wxxowf a'-at/C No. Revision Dae
1 ?ECK DELE'rE0 I/23/0
B 0
- - - - - _
I I WALL i0 ALIGN PoiH I
E%IS11NG BELOW
I OVERHANG OF
r-----
I I (z)2xio (2)2xm I I
I I BEDROOM z n
~ j ~ I ~ I I
zx.z G.J. I sx.z L.J._ I David
D 16" O.C. i D 16' O.C
I ~ Z._D. ,2'_„3/~ % I Howell
~ z• ~ Des
_x -
I I r ~ ~ ~
I ~ h ® x= I £
I . O ~ W 200 PARK AVENUE SOUTH
~ I NEW YORK, NY 10003
(212) 477-7700
~ I 0° ~ I FAX (212) 477-0149
~ I 3 i/2' x ia' M.l I~ I \ \ E61A1L D.VID®.AYIDN.IIELL.. ET
r,~ a ~0 129I
' I Arcalhek
~ I ~ ®
I I
II ~ o ~ ~/z' x i ' M.L Rio E ARCHITECTS, P.C.
I ~ cns
® I 358 NEW YORK AVENUE
ai I ~ 0 FiREaLACE HUNTINGTON, NY 11743
2p7 I (831) 427 0295
I qq az' RLASMA rv FAX (631) 427-0297
a C i O "eE0R00M t E5L11L: ARCALY.2K9CCHYE°.SENT.NE:'
e ~ r ® 244
I!'os1 ! ~L2~12'_M.L~_ _
.I ' ~ ~ u Aj, pQSt~ ~ I 4 a
.S .i O x I Q < Ea
Y GUt I u. 'a
NiLIA. I ~ O ~ ® "I z6 FRAMELESS CLASS LaCHANCE
f- ~ i/z^ x it M.L. I BALUSmAOE RESIDENCE
29 n~ QQ`'t
I VP
I I. 830 RUCH LANE
I SOUTHOLD, NY 11971
I, FRAMELESS GLA56 ~ ~ ~ ~ ~
I BALU6tRADE
FIRST FLOOR &
I SECOND FLOOR
PLANS
I
I
~ L
. I.
9 D
A4 05-043
These plans are
3'-a,p' a'-D i/a' 4'-o i/a' y_p z•_o• z•_y a'-s i/a' an instrument
of service and
E rnrvoow f oow E wxoow E reuoaw wwvow E rnxoow are the property
s'-u D/C 6'-o i/a' of the Architect.
' Infringements
- 22'-D' will be
prosecuted.
I! Proj.
i Date
SELONU FLOOR
(2/18/05
i As Drawing No.
i noreo
~ Amended Set
Permit
S E C O N D F L O O R P L A N
I CALE~ 1 a" - 1'-0" Scale
F
w
- ~ ~ r
,~i6 i~ s.~ _ -
i r yam'
i f.
f
_ ~
~ !
1 _
n yy y
-'t 4~
' 'mow _
r~p~.,s . ~f4-
t Y.
fA 1 ~f'' ' < ~ •f'.
' t i ~ ~
P ~ >
i;
- ~ti„
,
- :,-~ti
k. - O
- r
.r'( - o.• Tern;
...+c , a,. t
~,Y
_ Vii'.
r ~
,ur 4 {
SURVEY OE PROi'ERTY
SITURTE: ~hRSHA~MOMAtQUE N
TOWN: SOUTNOLD
SUFFOLK COUNTY, NY e s
SURVEYED 08-21-03 W ~ ~ E
PROPOSED ADDITION 10-22-03, II-04-03, 12-18-03
REVISED ADDITION 10-13-2004
SUFFOLK COUNTY TAX ~ S
1000-52-2-26
CSItTIF)®TO:
Sandtal.. t
' Stevan D.
CommonvreaNh Lend TiUo Ineemce Compmy
~~~A
'X ~P
~ !/S
~ e ~
F '9
e
Qj ° 'po~'~'F
e" J
o
o ,
~ ~ o~ ~ ~~P
of or
.c zo
~o~ o
~
q ~n
Pia r~ , M1 °2y
v ~ ~C~ 0~0. s.
~ h~~
~ SOS } °~s ~ ~ I
0~~'~
q ~
~o h
Ot
O ,O
~@ SEO ep. u+~Yw P1a~
c
~ ^v oti.
e, ~a
•`.~o, t
e~
o` u
ess r
` i i ~
~OO~o°oo .C a
h
~`e' . t 2
< Zo,oti S< 00~ O'
> e,
3•'~ N F o
A u
Z F i
i+
F
9
`bft~ F/~Z l ~ ` N ~ ~O. at~
oF•, ~ (w/
e s~O.o• it :'t
? e•.,
iZ
l
~ Zi
~/9 s,9o h9
ei
sh ~9. Q, f,3
~g~~
o,~~
_ .
~ ~
NOTES: n _
~ MONUMENT FOUND 9 ~ ~ o..
p PIPE FOUND ~ ~a,«,o~~~a
<ow.. ~~m m~gro~ a
WELL LOCATION PROVIDED BY OTHERS e~'U`U,`~'
vE z"9°ya ~~~.a
ELEVATIONS REFERENCE N6VD'29 s^`°;;a~u
.~„m
ZONED R-40 ,~.M
b"n,.~"~~"~~o„..n.,,,„.,~
AREA = "T,Q83 sf or 0.18 acres JOHN C. EHLERS LAND SURVEYOR
6 EAST MAIN STREET N.Y.S. LIC. N0.50202
GRAPHIC SCALE I"= 20' RIVERHEAD,N.Y.11901
369-8288 Fax 369-8287 REF.\\FIp server\d\PROS\03-238.pro
Permit Number
1tEScheck Compliance Certiilcate Checked By/Date
New York State Energy Conservation Construction Code
REScheck Software Version 3.6 Release 2
Data filename: \\Arcalhek-server\ARCALHEK SERVER\Arcalhek ServeAResid[OS\LaChance\lachanceenergcalc.rck
PROJECT TTTLE: Lachance
COUNTY: Albany
STATE: New York
HDD: 6894
CONSTRUCTION TYPE: Detached 1 or 2 Family
HEATING TYPE: Non-Electric
WINDOW /WALL RATIO: 0.08
DATE: 01/23/06
DATE OF PLANS: 01-04-06
PROJECT DESCRIPTION:
OS-043
630 Ruch Lane
Southold, NY 11971
DESIGNER/CONTRACTOR:
Arcalhek Architects ~P tRpCy
356 New York Ave. q /
M
Huntington, AII' 11743 ~
+ Qy' ?
COMPLIANCE: Passes f
Maximum UA = 137 ~
Your Home UA = 127
7.3% Better Than Code (UA) e 9
Gross F .N~~
Area or Cavity Cot or oor
Perimeter R-Value R- -F r
Ceiling 1: Flat Ceiling or Scissor Truss 568 30.0 0.0 20
Wall l: Wood Frame, 16" o. c. 843 15.0 0.0 60
Window l: Wood Frarne:Double Pane with Low-E 66 0.340 22
Floor 3: All-Wood JoisUTmss:Over Unconditioned Space 568 21.0 0.0 25
COMPLIANCE STATEMENT: The proposed building represented in this document is consistent with the building
plans, specifications, and other calculazions submitted with this permit application. The proposed systems have been
designed to meet the New York State Energy Conservation Construction Code requirements. When a Registered Design
Professional has stamped and signed this page, they are attesting that to [he best ofhis/her knowledge, belied and
pro€ssional judgment, such plans or specifications are in compliance with this Code.
BuildedDesigner Date
r
r
COPPER ROOF SHINGLE SYSTEM
PART 1-GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and
Supplementary Conditions and Division-1 Specification Sections, apply to this
Section.
1.2 SUMMARY
A. This Section includes the following:
1. Copper Roofing System.
1.3 SUBMITTALS
A. General: Submit the following in accordance with Conditions of Contract and
Division-1 Specification Sections.
B. Product data including metal manufacturer's and fabricator's specifications,
installation instructions, and general recommendations for roofing applications.
Include certification or other data substantiating that materials comply with
requirements.
C. Manufacturer's Installation Instructions: Provide published instructions that
indicate preparation required and installation procedures.
D. Shop drawings showing manner of forming, joining, and securing copper roofing,
and pattern of seams. Show expansion joint details and waterproof connections to
adjoining work and at obstructions and penetrations.
1.4 QUALITY ASSURANCE
A. Installer: A firm with 3 yeazs of successful experience with installation of copper
roofing of type and scope equivalent to Work of this Section.
B. Industry Standazd: Except as otherwise shown or specified, comply with
applicable recommendations and details of "Copper in Architecture Handbook"
by Copper Development Association (CDA). Conform to dimensions and profiles
shown.
C. Wind Uplift: Provide roof assemblies meeting requirements of UL 580 for Class
90 wind uplift resistance.
D. Mock-Up: Before proceeding with final purchase of materials and fabrication of
copper roofing components, prepaze a mock-up of work. Incorporate materials
and methods of fabrication and installation identical with project requirements.
Install mock-up at roof azea location directed by Architect. Retain accepted mock-
up as quality standard for acceptance of completed copper roofing. If accepted,
mock-up maybe incorporated as part of copper roofing work.
f
h
1. Provide mock-up of sufficient size and scope to show typical pattern of
seams, fastening details, edge construction, and finish texture and color.
E. Design roof assembly to conform to the requirements of ASCE 7-782, Minimum
Design Loads for Buildings.
PART 2 -PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements,
manufacturers offering materials that maybe incorporated in the Work include,
but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide materials by
one of the following:
1. Revere Copper Products, Inc.
2. Zappone Manufacturing
2.2 MATERIALS
A. Copper Roofing System: Copper shingle complying with ASTM B 370 temper
designation, and as follows:
1. Available in a copper shingle that measures
15"x 9-1/8", with an exposure of 14-1/2"x 8-1/8". The copper
shingles are packaged 62 pieces to a carton and a carton covers 50 sq.
ft. The nailing flange contains two holes for the
fasteners.
B. Miscellaneous Materials: Provide materials and types of fasteners, solder, welding
rods, protective coatings, sepazators, sealants and accessory items as
recommended by copper sheet manufacturer and fabricator for copper roofing
work, except as otherwise indicated.
C. Expansion Joint Sealant: For hooked-type expansion joints, which must be free to
move, provide nonsetting, nonhazdening, nonmigrating, heavy-bodied
polyisobutylene mastic sealant.
D. Paper Slip Sheet: Minimum 4-lb. rosin-sized building paper.
E. Accessories: Except as indicated as work of another specification Section, provide
components required for a complete roof system, including trim, copings, fascias,
ridge closures, clips, seam covers, battens, flashings, gutters, louvers, sealants,
gaskets, and closure strips. Match materials and finishes of roof.
1. Sealing Tape: Pressure-sensitive 100 percent solids polyisobutylene
compound sealing tape with release paper backing. Provide permanently
elastic, nonsag, nontoxic, nonstaining tape.
2. Joint Sealant: One-part elastomeric polyurethane, polysulfide, butyl or
silicone rubber sealant as recommended by the building manufacturer.
Refer to Division-7.
Y
~ F. Bituminous Coating: Cold-applied asphalt mastic, SSPC paint 12, compounded
for 15-mil dry film thickness per coat, except as otherwise indicated. Provide
inert-type noncorrosive compound, nominally free of sulfur components and other
deleterious impurities.
G. Roofing Felt: Asphalt or coal tar saturated felt weighing not less than 301bs per
100 squaze feet.
H. Fabric Underlayment: Manufacturer's standard nonwoven polyester fabric
marketed for use in cold-applied single ply roof systems weighing 6.0 oz. per sq.
yd., white, nonswelling, rot and mildew resistant.
1. Product: E-6-N Rufon Fabric; Phillips Fibers Corp.
L Nails: Copper or hazdwaze bronze, 0.109 inch minimum not less than 7/8" long
barbed with large head.
J. Screws & Bolts: Copper, bronze or brass.
K. Cleats: 16 ounce cold rolled copper. 2" wide x 3" long.
L. Solder. ASTM Specification B-32, Composition 50% tin and 50% lead. 60/40
tin/lead for lead-coated copper.
M. Flux: Muriatic acid neutralized with zinc or approved brand of soldering flux.
N. Rivets: 1/8" - 3/16" diameter, with solid copper mandrels and washers.
PART 3 -EXECUTION
3.1 COORDINATION
A. Coordinate copper roofing with rain drainage work, flashing, trim and
construction of decks, pazapets, walls, and other adjoining work to provide a
permanently leakproof, secure, and noncorrosive installation.
3.2 PREPARATION
A. Clean surfaces to receive copper roofing. Substrate to be smooth and free of
defects. Drive all projecting nails or other fasteners flush with substrate.
3.3 INSTALLATION
A. Manufacturer's Recommendations: Except as otherwise shown or specified,
comply with recommendations and instructions of manufacturer of copper being
fabricated and installed.
B. Separate dissimilar metals by painting each metal surface in azea of contact with a
bituminous coating, by applying rubberized asphalt underlayment to each metal
surface, or by other permanent separation as recommended by manufacturers of
dissimilar metals.
C. Install underlayment and paper slip sheet on substrate under copper roofing to
greatest extent possible unless otherwise recommended by manufacturer of sheet
metal. Paper slip sheets must be installed over the underlayment. Use adhesive for
temporary anchorage, where possible, to minimize use of mechanical fasteners
under copper roofing. Lap joints 2" minimum.
J
D. Form and fabricate sheets, seams, strips, cleats, valleys, ridges, edge treatments,
integral flashings, and other components of copper roofing to profiles, patterns,
and drainage arrangements shown and as required for permanently leakproof
construction. Provide for thermal expansion and contraction of the work, as
indicated. Seal joints as shown and as required for leakproof construction. Shop-
fabricate materials to greatest extent possible.
E. Sealant-Type Joints: Where sealant-filled joints are used, embed hooked flanges
of joint members not less than 1" into sealant. Form joints to conceal sealant
completely. When ambient temperature is moderate at time of installation, 40 deg
to 70 deg F (4 deg to 21 deg C), set joint members for 50 percent movement either
way. Adjust setting proportionately for installation at higher ambient
temperatures. Do not install sealant-type joints at temperatures below 40 deg F (4
deg C). Comply with requirements of Division-7 "Sealant" Sections for handling
and installing sealants.
F. Fabricate and install work with lines and corners of exposed units true and
accurate. Form exposed faces flat and free of buckles, excessive waves, and
avoidable tool marks considering temper and reflectivity of metal. Provide
uniform, neat seams with minimum exposure of solder, welds, and sealant. Except
as otherwise shown, fold back sheet metal to form a hem on concealed side of
exposed edges.
G. Conceal fasteners and expansion provisions where possible in exposed work, and
locate so as to minimize possibility of leakage. Cover and seal fasteners and
anchors as required for a tight installation.
H. Tin uncoated copper surfaces at edges of sheets to be soldered, for a width of 1-
1/2", using solder recommended for copper work. Where surfaces to be soldered
aze lead-coated, do not tin the edges, but wire brush lead coating before soldering.
3.4 CLEANING
A. Remove protective film (if any) from exposed surfaces of copper roofing
promptly upon installation. Strip with Gaze to avoid damage to finishes.
B. Clean exposed metal surfaces of substances that would interfere with uniform
oxidation and weathering.
3.5 FINISHING
A. To retard natural weathering, apply a uniform coating of high grade paraffin oil,
or a cleaz lacquer coat.
3.6 PROTECTION
A. Provide final protection in a manner acceptable to installer that ensures that
copper roofing is without damage or deterioration at time of Substantial
Completion.
_,.**=.a* Revere Copper Products, Inc. -FreedomGray Tips & Techniques =,.-_*<<:
r r* a+ ± y rr o+
For Tech Support- 1-800-448-1776 ext. 2674 or 2707, Outside US 315-338-2022
For pricing estimates contact Larry Stearns at 1-877-674-4645 i*
=f yy = M.
Underlayment Second Course
Surfaces to receive Revere Copper Shingles are covered with Additional courses begin by placing joint pans a[ location of
approved underlayment. In absense of local code vertical shingle joints. Regardless of pattern or embossments,
requirements, this may be two layers of Type 15 or one layer shingle end should be offset at least 12" from a vertical joint
Type 30 felt applied to the field of the roof. In areas subject in the course immediately below.
to snow and ice build up (eaves, valleys, behind skylights,
etc.) use self sealing membrane (bituthane) or two layers of
Type 15 felt applied shingle fashion and cemented together
with roofing cement. Waterproof construction begins a[ eaves
and continues up the roof at least 36" beyond the inside face
of the exterior wall line. Underlayments are secured with
staples or roofing nails without plastic caps.
Eave and Rake Edge strips ~
When embossments are staggered one half tab (6") joint
Eave and rake edge strips must be of copper with ~h" pans are centered between nailing slots.
projecting double folds. Inner Flange extends onto the roof
deck a[ least 3" and is secured with copper nails spaced not Gable Rakes
more then 3"apart. .
~l" Cut shingles at rakes to protect 'h" beyond rake strip. Trim
locks Yo form a trapezoidal tab from [he lower edge to below
the bottom.
tYp
®wlrR~liMirllMlt~lllfl! * IMfM
First Course
Installation begins at location along the eave by locking a Bend tab down; set shingle in place and bend the tab around
joint pan over the eave edgestrip. Center of the first joint pan rake projection to finish lock.
should be at least 12" from a gable, hip or valley. A second
joint pan is locked over the edgestrip 4" o.c. from the first.
(On steeper slopes, securing joint pans by nailing through
their upper edges makes installation easier.)
Lower edge of [he first shingle locks over both joint pans and 7~C
edge strip; its sides should touch the raised ribs on the joint
pans. Shingle is secured with five copper nails through slotted
holes in its upper flange- one at each end and on the other
side of each embossment. (I[ is no[ necessary to nail both
sides of each embossment.) Nails are placed close to center Hips
of slots and driven so shingle is held tightly to the under-
layment but not so tight the flange is deformed. Cut shingles to fnish within 1" of hip (shingles do not have to
meet over hips) and finish hip with Hip & Ridge caps. Tabs are
~iiiil~ formed on the lower end of the first cap to lock over shingles
at eaves and cap is secured with two copper nails.
~ As an alternate, hips may be finished with custom copper hip
~ caps or rolls.
:t"IfRypAa~tMtlfirer..
Continue placing additional joint pans, 4" o. c., and shingles.
(If shingles are at least 50 degrees i[ is not necessary to
provide a deliberate space between them; if temperature is
below 50 degrees a 1/16" space will accommodate expansion
movement.) CAUTION: Interlocking feature of Revere
shingles allows less freedom to correct errors than a
simple overlap. The first course must be installed
straight and true.
- Revere Copper Products, Inc. -FreedomGray Tips & Techniques
i r er * i .r or ~
Far Tech Support- 1-800-448-1776 ext. 2674 or 2707, Outside US 315-338-2022 ~~E~~~
For pricing estimates contact Larry Stearns at 1-877-674-4645
Ridges Chimney & Skylight Flashing
Shingles are applied up to [he ridge from both sides; last Weatherproofing skylights, chimneys and similar roof
courses are cu[ to proper exposure and secured. Ridge penetrations employs Roof to Rising Walls and Roof to
venting may be achieved with under shingle vents (up to 1'• Adjacent Walls flashings.
thick) installed according to manufacturer instructions. Ridge
is finished with Hip & Ridge caps or custom caps, in manner Roof to Rising W011
described for hIDS.
>I~M~IIIYeA*R Shingles are installed to within ~h" of the wall. The last course
is cut lengthwise to [he proper exposure. A copper Flashing is
formed to extend over shingles at least 4" and up the wall 6".
When "over the shingle" flange exceeds 6" or in areas of
severe weather, secure flashing to shingles with locking strip
or cleats.
14+MR~raMM r
Open Valleys
tali
Open valleys are flashed with 30" wide by 10' long copper -
sheetr. Side edges of sheets are folded over 6 ~h" from
folded edges. Roof to Adjacent Wall
5/8" wide double folds (locks) are formed the length of the A copper base flashing is formed to extend onto the roof
sheet. Flashing sheets are centered in the valley and secured (under shingles) at least 4". Its outer edge is folded over Vz";
with 2" wide copper cleats 18" aprt on both sides. Note: DO not less than 3" from this edge 3/a" wide double fold (lock) is
NOT NAIL SIDES OF VALLEY! formed. This flashin
g is placed against wall and secured with
1/~",1>rlNrfa~e 2" wide copper cleats 16" o.c. along its outer edge. Shingles
are cut to required length (to double fold plus 'h"); lower and
upper locks are trimmed leaving a trapezoidal tab. Tab is
l1rr+" turned under as a 1'" open fold. Shingle is installed with itr
-Ml+rr folded edge engaging the lock in the Flashing, and secured
1~,,..~ O~ with at least two copper nails. ' (T
6WMdM.~Mblf !
Upper ends of valley sheets are nailed to roof deck; lower w!`..q
ends lap over [he sheet below at least 6". Shingles are cut to
required shape and length (to double fold plus 'h"). Lower YM-
and upper locks are trimmed to form a trapezoidal tab from rh,,.~
the lower edge [o below upper lock. Tab is turned down and
under as a Vz" open fold. Shingles are slid into place, folded
edge engaging lock in valley and secured with at least two
copper nails. Note: NAILS MUST NOT PUNCTURE THE
VALLEY! Change of Roof Slope
Mp '
~ Change of roof slope may be accomplished by bending Revere
Miblr copper Shingles at the proper location. Alternately, a change
~ of slope flashing is formed [o extend over shingles on the
lower slope at least 4" and under shingles on the upper slope
not less than 4". Often the flashings lower edge is turned
Bend tab down; set shingle in place and bend the tab arounf under 'h" to hook over a locking strip secured (soldered) to
rake project. the shingles, its upper edge.
N.#N .
tta' awn
r t~®
>war aw
,rpt~MYr*Ml+ AMMI'~M~.
L'1rNWNF
Zappone Roofing System
Application Guide
t
t1AA1VUFACTl1RIN+G
Producing America's Premier Copper and Aluminum Shingles
Since 1969
1
Table of Contents
Subject Page
Required Tools 2
Walking on Roof 2
Safety 2
Deck Preparation 2
Zappone Shingle and Common Accessories 3-4
Roof Jacks 7
Step-By-Step Application:
1. Roof Inspection 5
2. Starter Strip Installation 5
3. UnderlaymentApplication 5
4. Valley Installation 5
5. Gable-End Installation 7
6. Shingle Application 7-14
7. Hip and Ridge Cap Installation 13
Note:
This application guide has been prepared and is offered by Zappone Manufacturing as a service to
professional contractors and the "do-it-yourself' homeowner with the assumption and caveat that
common sense and accepted safety practices will be utilized.
These procedures and techniques are not intended to substitute for any local, state or national
building codes or safety requirements. It is highly recommended that the appropriate authorities
be contacted for any requirements specific to the intended installation.
As always when working with metal products, care must be given to avoid injury from cuts and
abrasions. Also, working on roofs is inherently dangerous. It is recommended that the proper
safety equipment and attire be wom.
Zappone Manufacturing assumes no responsibility for improper installation, property damage, or
personal injury that may result from working with this product and these guidelines.
2
Tools
Zappone Roofing Systems are easily applied by both professional contractors and
"do-it-yourself' homeowners. This list of require tools is minimal and includes:
Hammer Tin Snips
Tape Measure Hand Seamer
Ladder Utility Knife
Walking on Roof
The interior of Zappone Shingle is a recessed area, the "shadow-cup", which rests
flat against the deck. This eliminates the air space that makes other metal roofs so
noisy and allows for walking on the roof when necessary. Be sure to stay within
the recessed area of the shingle and do not walk on the interlocking edges.
Safety
It is impossible for Zappone Manufacturing to be completely aware of all local
requirements in al] regions. Therefore, nothing in this booklet should be construed
as to be contrary to any required safety regulation, procedure or device. Good
common sense must be utilized whenever one works on a roof or uses a ladder.
Please contact your local authorities for safety requirements.
Deck Preparation
Depending on applicable local codes, a Zappone Roofing System may be installed
over existing composition roofing. Caze should be taken to remove any "curled" or
uneven composition shingles and to provide as flat a surface as possible. The
system may not be applied over existing wood shake, other metal roofing or over
any roof that may prevent smooth and even application. These roofs would need to
be removed from the deck prior to application of the Zappone Roofing System.
The system requires "solid" decking (no spaced decking), an underlayment of
minimum of No. 30 Felt and a minimum slope of 3:12.
3
Zappone Shingles and Accessories
Zappone Shingle
ZR-100/ZR-1000
Available in copper and aluminum the shingle measures
15"x 9-1/8", with an exposure of 14-1/2"x 8-1/8". The
aluminum shingles aze packed 124 pieces to a carton and
a carton covers 100 sq. ft. The copper shingles aze
packaged 62 pieces to a carton and a carton covers 50 sq.
ft. The nailing flange contains two holes for the
fasteners.
Starter Strip
ZR-125
Produced in 8' lengths and applied at the eave edge. The
starter strip doubles as drip metal and interlocks with the
first course of shingles.
Continuous Valley
ZR-240
F
Produced in 8' lengths. It interlocks with shingles to
provide a leak proof condition.
Hip and Ridge Caps
ZR-145
Sold per piece. Each cap has 9-1/2" coverage. Applied on
both hips and ridges. A continuous ridge in 8' lengths for
commercial application is also available upon special
request.
End Wal]
ZR-135
Produced in 8' lengths. Utilized to flash the eave side of
chimney, skylights, solar panels and other protrusions
requiring enclosure at the roof's surface.
Side Wall
ZR-140
4
- Produced in 8' lengths. Utilized to (lash the rid~~e~ide and
gable/hip sides of chimney, skylights, solar panels and other
' protrusions requiring enclosure at the roofs surface.
Gable End
ZR-130
Produced in 8' lengths and applied to gable end/ rake conditions.
f.
j~~•.
Coil Stock
ZR-150
50'x16" coils available in aluminum and copper. l2" coils
available in copper only.
Touch -up Paint
ZR-2160
Sold by pints and quarts and available in all %appone aluminum
colors. Applied to cover application caused by scratches and to
paint roof vents and other small protnisions to match shingle
color.
Aluminum hails
ZR -164
Screw shank. Specify I -1'4" or I -3 ~4" Sold per Eu~und. For use
with aluminum product only.
Copper/Silicon Bronze Nails , ,
k
LR-164C ~ ~ . gg~~'
4Y ~ Mr 4 yi98~1~ ~I2
Ring Shank. Specify 1", 1-1/4", 1-3/4" or ?-l i?" Solder per ~
pound. For use with copper products only.
Roof Vent Flashing
LR-155 to ZR-158
Available in aluminum and copper. Specify l" to 1 -1/2", to
2-1 /2", 3" to 3-1 /2", 4" to 4-1 /2".
Hand Scamcr ,
.
LR-200
u wp
Hand operated tool for creating bends in metal shingles when
' n
needed for installation with valleys. ~sahlc end~~ and >ide wall.
5
' Step-by-Step Appltcatton
Step 1. Roof Inspection
Roof must have a minimum slope of 3:12 (Fig. 1). Deck must be solid with a minimum
thickness of 1/2" for plywood or 7/16" for wafer board and applied in accordance with
manufacturer's specifications.
If an existing roof is being covered, eliminate all curled and loose shingles, bumps,
buckles and anything that might interfere with the smooth application of the Zappone
Roofing System and the interlocking mechanisms that provide the water-tight
characteristic of the Zappone shingle.
Caution: Prevent Electrolysis. Use care to prevent any dissimilaz metals or corrosive
nonmetallic materials from coming into direct contact with the metal shingles and
accessories, particularly in area that may become wet. Do not allow water to flow from
dissimilar metals to the shingles.
Step 2. Install Starter Strip
Install the starter strip along the eave edge by nailing 6" on center and keeping the strip
straight. At adjoining sections, notch nailing flange back one inch from end (Fig. 2) and
overlap the preceding starter strip. Nail within 1" to 2" of eave in a zig-zag pattern.
(Fig. 3)
Step 3. Apply Underlayment
Apply an Underlayment of No. 30 felt. Underlayment is required when covering an
existing roof as well as when installing on bare deck. Start at the eave edge and roll felt
pazallel to eave edge, making sure the starter strip upper flange is covered. (Fig. 4)
Continue to apply and overlap felt as recommended by the manufacturer.
Some local codes require a second layer of felt or a thicker Underlayment at the eave
edge to a point beyond the bearing wall. Contact your local authorities far the
requirements in your area.
Step 4. Install Valleys
Install the continuous valley so that it covers and extends slightly beyond the starter
strip. (Fig. 5) Nail 10" on center in nailing flange.
When more than one continuous valley piece is required, overlap the upper piece over
the lower piece by 3"- 6" and seal with mastic. (Fig. 6)
If a valley intersects a ridge, cut and bend the continuous valley so that it overlaps the
ridge. If two valleys meet at a ridge, cut and bend the end of both valley pieces so that
the first overlaps the ridge and the second valley piece then overlaps the first valley
piece.
6
M
N
1 ~ .,,tr~C' y
I
i
Fig. 1 F'rg. 2
tW;" r~ ~,~I~I~U III~IIIIII
,e
3
k~ ~ _ Fig. A
~
Fib. S T'i~, b {
7
` Step 5. Install Gable End
Instal] the gable end overlaying the starter strip. (Fig. 7) Place the fascia leg firmly
against the gable-side fascia and fasten by nailing 10" on center in the nailing, flange.
When placing a number of gable-ends in succession you may either butt the pieces
together or notch (Fig. 8) and overlay the pieces. (Fig. 9)
Step 6a. Shingle Application
Install shingles from left to right beginning at the lowest lefr-hand comer of
any area to be covered. When working with a gable style roof, trim the first
shingle to remove the left side tapered lock and notch the nailing flange and
butt 3/4". Using a hand seamer, make a 90 degree downward bend creating a
3 /4" downward face on the ]efr side of the shingle. (Fig. 10) Place this face into
the receiving slot of the gable end and lock the butt of the shingle into the
starter strip. Press the shingle firmly upward and fasten by nailing through the
holes provided in the nailing flange. (Fig. 11)
When working with a hip style roof, trim the first shingle diagonally so that it aligns
with the center of the hip. Lock the shingle butt into the starter strip, press firmly
upward and fasten by nailing through the holes provided in the nailing flange.
Whether gable style or hip style, continue applying shingles left to right, placing file
projecting tab on the upper left of each shingle into the corresponding groove on the
upper right of the preceding shingle.
Rather than continuing each course the full length of the roof, after installing five or six
shingles work upwazd within your reach by beginning three or four more courses. Work
this pattern from lefr to right adding more upper courses as you work farther to the
right. (Fig. 12)
To set the splits appropriately, start the second course and then each alternating course
with half a shingle. (Note: When trimming shingles, most remaining pieces can be used
later. Try to save them in a box sepazate from the scrap)
A Word About Roof Jacks
The Zappone shingle can easily be jacked, if necessary, on steep roofs. First, secure the
Jack to the deck in accordance with manufacturer's specifications, then roof over the
jack. Make two cuts in the hook of the shingle's butt equal in distance to twice the width
of the jack. Bend the bottom portion of the hook between the cuts upward to allow jack
to protrude from beneath the shingle.
To remove, push upwazd on the bottom of jack until it slides out from under fasteners
and pull out from under shingle. Re-bend straightened portion of the hook and lock into
place.
8
E~ i~,. ? Fig. S
<3`
F"
6 4f b~Y.4
~
v ~1
~ x'~,
1
Fig. 1U
-s ' .
~ ::-4.
' ~ ~
II~~
9
' 6b. Shingle Application at End of Course
When ending a course at a gable end ,lay the last shingle in place extending over the
gable end and make a mark on the shingle at a point 3/4" beyond the gable end. Trim
the shingle at this mark and create a downward face on the right side of the shingle by
notching the nailing flange and butt and bending file remainder as was done on the first
shingle starting at a gable-end. Place the downwazd face into the receiving slot of the
gable-end piece, lock the butt of the shingle firmly in the starter strip and fasten in
place. (Fig. 13)
When ending a course at a hip, lay the last shingle in place extending over the hip and
make a mazk on the shingle at a point 2" beyond the center of the hip. Trim the shingle
at this point and at a diagonal matching the direction of the hip. Lock the shingle firmly
in place and bend the portion that extends over the hip firmly down on to the deck and
any shingle that may have been installed on the other side. (Fig. 14)
The installation of the hip/ridge cap, described later, will conceal this procedure.
6c. Shingle Application at the Ridge
When reaching the ridge, lay the last course in place extending the shingles beyond the
ridge. Make a mazk on the shingles at a point 2" beyond the center of the ridge and trim
the shingles at that mazk. Lock the shingles firmly in place and bend the portion that
extends over the ridge firmly down on to the deck and any shingle that may have been
installed on the other side. Again, the installation of the hip/ridge cap, described later,
will conceal this procedure.
6d. Shingle Application at Valleys
Coming into a valley:
Lay the shingle which will transect the valley into place and make a mark on the
shingle at a point 3/4" beyond the left valley "S" lock. Trim the shingle at this point and
at a diagonal matching that of the valley. Notch the right side nailing flange and shingle
butt back 3/4".
Using a hand seamer, bend the trimmed 3/4" 90 degrees downward. Measure 3/8" up
the newly bent downward face and make a second 90 degree bend inwazd, toward the
shingle. Lock this new under-fold into the valley "S" lock and nail shingle in place.
(Fig. 15)
For shingles running out of the valley, simply use the above process on the left side of
the shingle.
10
-
„xa -
P ~ z,
I
f,
Fib. FIB. ~ ~
E
~3
~h
~ ~ ~ ~ s
~ a
yS
~ `r ~
y~ . '~`5
~
3v;..
Fig. 1 S
E
~ i iy
! I !
x ~
F~?. l6 f1~;.
' Step 6e. Shingle Application at Plumbing Vents
Apply shingles from below up to the plumbing vent in normal fashion. Install vent
flashing overlapping the shingles below the vent. (Fig. 16) Install shingles above the
vent, cutting as necessary to ensure a tight fit around the collar of the vent. (Fig. 17) On
low slope roofs, a piece of adhesive backed ice and water shield can be placed on the
underside of the shingles that sit on the top (ridgeside) side of the vent.
6d. Shingle Application Around Chimney/Skylight/Dormer, etc.
(Roof to Wall Conditions)
Install end-wall and side wall pieces around the protrusion. Apply end-wall pieces to
those aeeas below leave-side) of the protrusion (Fig. 18) and sidewall piece to those
areas on the sides (Fig. 19), and above (ridge-side) of the protrusion. (Fig. 20)
Shingles Below Protrusion
Trim shingles at the top to assure a tight fit when inserted into the end-wall channel.
(Fig. 21) Fasten shingle to deck as closely as possible to the inside of the end-wall
channel. Cover nail head with mastic and touch-up paint.
Shingles to the Side of Protrusion
Trim shingle so that it extends beyond side wall "S" lock 3/4". Notch back nailing
flange and butt 3/4". Using a hand seamer, bend the remaining trimmed portion of the
shingle 90 degrees downwazd. At a point 3/8" up this newly bent face, make a second
90 degree bend inwazd, towards the shingle. This creates the "male" of an "S" lock.
Lock the shingle into the side wall and fasten to the deck. (Fig. 22)
Shingles Above Protrusion
If the courses do not work out so that a full shingle can be used above the protrusion
while keeping the course straight, trim the bottom of the shingle so that the nailing
flange lines up with the nailing flanges of the other shingles in the course and the
bottom extends 3/4" beyond the side-wall "S" lock. Notch the left and right side-lock
channels back 3/4".
Using a hand seamer, bend the remaining 3/4" trimmed section downwazd 90 degrees.
At a point 3/8" up from the bottom of this newly bent face, make a second 90 degree
bend inward towazds the shingle. Lock this newly created butt into the "S" lock of the
side wall and fasten to the deck. (Fig. 23)
12
ti
- _
~
~r
L
S ~2s
'®f
~'1
i xYB
i,..r v Z
~1f
~ e
' 1 ' ....~.i:
.e~
y ~t.
f
4,
5' ~
`43, _ x' t
p.
-,~....i_i F[~;.21
y
i~~ 'fit ~ k
i
1_ ~
~ ~
b ~
cs
~ ~
~ ~ £ an ~ ~ .
13
~I
ti Step 7. Install Hip and Ridge
When installing a hip style roof, install caps on all hips prior to the ridge.
Hips
To assist in a straight hip installation, snap a line from the bottom of the hip to the top.
Using a hand seamer, straighten and flatten the "S" hook on the butt of the first
hip/ridge cap. Place the cap at the bottom of the hip where two eaves come together.
Extend the cap 3/4" beyond the corner created by the eaves. (Fig. 24) Scribe or draw
diagonal lines on the cap from the center point to the sides, even with and parallel to the
eave. Trim and fold the bottom of the ridge cap so that the new hooks created will fit in
the "S" lock of the two adjoining starter strips (Fig. 25).
Lock the first cap into place and fasten with two nails in the nailing flange. (Fig. 26)
The second and each subsequent cap will lock into the nailing flange of the cap below.
Ridges
Whether working on a gable style roof or a hip style roof, begin installing hip/ ridge
caps on ridges by creating a "ridge cap starter strip". Trim the nailing flange from a
hip/ridge cap and fasten it to the roof at either end of the ridge. (Fig. 27) Install the first
ridge cap by locking it into the ridge cap starter and fastening it to the roof with two
nails through the nailing flange. (Fig. 28) Continue installing the caps across the ridge
in a like manner.
14
Fig. 2~ ~~ig.
r=~w~,a
~r °
F F
y, !
s;
I
I
i
~'ig. 26
i
{3
3
i
3
_
~~t~ ~ 6
I
r
is
sr
tta
N. 2928 Pittsburg St. Spokane,
Washington 99207
509.483.6408 800.285.2677
Fax: 509.483.8050 E-mail: copper@zappone.com
Website: www.zappone.com
Zappone Manufacturing ~ Spokane, WA
Copyright 2000 All Rights Reserved
This document is protected against any unauthorized copying, duplication or reproduction in any manner.
16
~ No. Issued To Date
I O1MER 12/l8/OS
Z2'-0' HOLD
2'-4' i]'-4' y'-{
a'-4 I/a' f wsouw s,-] ~/z° wwoow E a.-4 I/a' o. Revision Date
I DECK D8L8TED t/23 OB
B-B
A4
~ WALL i0 ALIGN WiH -
I E%IGIING 2ELOW I ObERHANC00F
Q- ~ --2o---~ I
r----- YYY
' I I r, (z)zxm (z)2xlG
I ~ I ~ VIII ~
I 2x12 G.J. 2x12 G.J.. I David
~ ~ ®le' o-c. ®Is' o.c
I I 1'_D' ,z'-„'/~ ~ Howell
I I -
I z' ~ ~ ~o Desi
I I ~I I~ o ~ K~ I ~
I 200 PARK AVENUE SOUTH
j ~ v NEN YORK, NY 10003
I (212) 477-7700
~ I I Q I FAX (212) 477-0149
~ I - I/z" x w' M.l I4L I \ EMAIL: DAVID®DAVIDHORELL.NET
r ~ d LADDIRfz i~ _ n
I ~ ~
e
~ Arcalhek
v ~ ~ _ I
o al/z'x l'M.i. RIDE
r- I ARCHITECTS, P.C.
I P Q rlaEpLACe ® I 356 NEW YORK AVENUE
I HUNTINGTON, NY 11743
' l= ~ O ~ (631) 427-0295
i b 1 +z' PLASMA Iv I FAX (631) 427-0297
a I 1 - 9EPR~6J EMAIL: ARCAWiER®COHVERSENT.NET
' wD r 204
N o x I Q a
i r Gut L. ~ Q n~p0 ~I I a o
Fnxan . e
'I UNE 9' ® r 26 FRAMELESS GLASG I LaCHANCE
I- 3 I/z" x Iz° M.L. euuslRaoE
( ~ I w RESIDENCE
~ i 3G _ _ _ .
29 n~ p0`'l
I 830 RUCH LANE
I - SOUTHOLD, NY 11971
FRAMELESS GLA55 ~ ~ ~ ~ ~
~ BALUSiRAOE
I ' FIRST FLOOR &
SECOND FLOOR
~ PLANS
i
i
L - - -
B B
A4 05-043
' These plans are
3 a,/a a D /a a o,/a z] z o z s a'-.t lp• an instrument
of service and
f m»oow f oooA f ..oow f .woow .xoow f rnwoax are the property
Is'-u 3/C G'-01/4' of the Architect.
Infringements
' zz•_o• Hill be
prosecuted.
Proj.
Date
li GEGONO FLOOR
I
l2/IB/OS
it NOTED Drawing Na.
i, Amended Set
Permit # 30"791
S E C O N D FLOOR P L A N
SCALE 1 4" - 1' D" Scale
l~ ~~l(J