LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MEMORANDUM
To: Jim King, President
Town of Southold Board of Trustees
From: Mark Terry, Principal Planner
LWRP Coordinator
Date: June 18, 2013
Re: LWRP Coastal Consistency Review for HAROLD WILMERDING & ALEX
WILMERDING
SCTM# 1000-9-9-3.1
Docko, Inc. on behalf of HAROLD WILMERDING & ALEX WILMERDING request a Wetland
Permit and a Coastal Erosion Permit to construct a 47LF. x Oft. wide fixed wood pile and timber
pier including 4 tie-off piles; an associated 3.5'x24' hinged ramp; a 8'x16' float; and restraint
pilings, all waterward of the apparent high water line. Located: 4997 Equestrian Avenue,
Fishers Island. SCTM# 9-9-3.1
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the
Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy
Standards. Based upon the information provided on the LWRP Consistency Assessment
Form submitted to this department, as well as the records available to me, it is my
recommendation that the proposal is INCONSISTENT with LWRP Policies 4.1 (below) and
therefore, INCONSISTENT with the LWRP.
4.1 Minimize losses of human life and structures from flooding and erosion hazards.
The following management measures to minimize losses of human life and structures
from flooding and erosion hazards are suggested:
A. Minimize potential loss and damage by locating development and structures
away from flooding and erosion hazards.
1. Avoid development other than water-dependent uses in coastal hazard
areas. Locate new development which is not water-dependent as far
away from coastal hazard areas as practical.
a. No development is permitted in natura? protective feature areas,
except as specifically allowed under the relevant portions of 6
NYCRR 505.8.
A portion of the proposed dock is within the Coastal Erosion Hazard Area (CEHA). All
development is prohibited in the nearshore area pursuant to § 111-11. unless specifically
provided for by Chapter 111, COASTAL EROSION HAZARD AREAS. Pursuant to § 111-6,
allowable activities in these areas may include open timber wiles or other similar open
work supports with a top surtace area of less than 200 square feet which are removed in
the fall of each year. Therefore, the dock, as proposed, is prohibited in the nearshore area
pursuant to Chapter 111, COASTAL EROSION HAZARD AREAS as it is greater than 200
square feet and not removable.
In the event that the action is improved it is recommended that the Board clarify if the
pilings will be treated with CCA. If so, an alternative to CCA treated pilings is
recommmeded.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in
preparing its written determination regarding the consistency of the proposed action.
Cc: Lori Hulse, Assistant Town Attorney
Towu of Southold
` LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
1. All applicants for permits* including Town of Southold agencies, shall complete this
CCAF for proposed actions that are subject to the Town of Southold Waterfront
Consistency Review Law. This assessment is intended to supplement other
information used by a Town of Southold agency in making a determination of
consistency. *Except for minor exempt actions including Building Permits and other
ministerial permits not located within the Coastal Erosion Hazard Area.
2. Before answering the questions in Section C, the prepazer of this form should review
the exempt minor action list, policies and explanations of each policy contained in the
Town of Southold Local Waterfront Revitalization Program. A proposed action will
be evaluated as to its significant beneficial and adverse effects upon the coastal azea
(which includes all of Southold Town).
3. If any question in Section C on this form is answered "yes" or "no", then the
proposed action will affect the achievement of the LWRP policy standazds and
conditions contained in the consistency review law. Thus, each answer must be
explained in detail listin¢ both supportive and non-snouortine falls. If an action
cannot be certified as consistent with the LWRP policy standards and conditions, it
shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's
website (southoldtown.northfork.net), the Boazd of T Office the Planning
Department, all local librazies and the Town Clerk's Office. n ~ ~ ~ ~ ~ ~ '
B. DESCRIPTION OF SITE AND PROPOSED ACTION I~II~nJl[il
MAY - 1 2013
SCTM# 1000 - 009 - 09-3.1
PROJECT NAME: New dock facility Southold Town
T
The Application has been submitted to (check appropriate response):
Town Board Planning Board Building Dept. Board of Trustees X
1. Category of Town of Southold agency action (check appropriate response):
a) Action undertaken directly to Town agency (e.g. capital
construction, planning activity, agency regulation, ~ac~'T~~--,J
_
b) Financial assistance (e.g. grant loan subsidy)
Jl!N ' n~C 3
c) Permit, approval, license, certification: X
Nature and extent of action:
Construct a 47(+/-) LF of 4-ft. wide wood timber and pile supported pier including 4 tie-off Hiles and
a 8' x 16' float with associated hinged ramp and restraint piling all waterwazd of the apparent high
water line. The overall length of the pier is 50 LF.
1
Location of action: Pmpertv off of Equestrian Avenue
Site acreage: Parcel = 3.12
Present Land use: Residential
Present Zoning Classification: Residential
2. If an application for the proposed action has been filed with the Town of Southold agency,
the following information shall be provided:
a) Name of applicant: Alex Wilmerdine
b) Mailing Address: 33 Tai Tam Road Apt. 7D, Tai Tam. Hong Kong
c) Telephone number: Area Code 011-852-2810-8362
d) Application number, if any
Will the action be directly undertaken, require funding, or approval by a state or federal
agency?
Yes X No _ If yes, which state or federal Agency? US ACOE, NYS DEC NYS
DOS
C. Evaluate the project to the following policies by analyzing how the project will further
support of not support the policies. Provide all proposed Best Management Practices that
will further each policy. Incomplete answers will require that the form be returned for
completion.
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community
character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a
coastal location, and minimizes adverse effects of development. See LWRP Section III -Policies;
Page 2 for evaluation criteria.
X Yes _ No _ Not Applicable
These new dock facility makes anpropriate use of an existine waterfront site and complies with
environmental desien factors published by the NYS DEC. and the DOS Coastal Management Program,
Southold Local Law No. 6.2004 and the Southold LWRP The pier will be built to a 4-foot deck width
and 5 foot hei~,ht over the bottom sediments until passine the apparent mean low water line Rails will
be 42 inches above the deck. There will be no impairment of waterflow or navi¢ation
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III -Policies Page 3 through 6 for evaluation criteria.
Yes No X Not Applicable
2
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold.
See LWRP Section III -Policies Pages 6 through 7 for evaluation criteria
_ Yes _ No X Not Applicable
The proposed work is the construction a 47 LF (LOA) of 4-FT wide fixed wood pile and timber
pier includine 4 tie off piles and an 8' x 16' float with associated hinged ramp and restrain piline . The
only visual access affected by this pmiect is at the applicant's site and immediate neighbers in this small
cove which is surrounded by trees The portion of the facility visible from the Kennedv's home the
south will look substantially the same as her own dock facility and Mr. Wilmerding's dock beyond this
rP
oiect.
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See
LWRP Section III -Policies Pages 8 through 16 for evaluation criteria.
Yes No X Not Applicable
The new dock facility will be constructed in Hay Hazbor and is acknowledged to be in a flood-prone
area• there is limited wave exposure at this site. The new pier will be desimed to accommodate
complete submersion and resist hydrostatic and hydrodynamic uplift pressures due to flooding.
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP
Section III -Policies Pages 16 through 21 for evaluation criteria.
_ Yes _ No X Not Applicable
This proiect will not have an~affect on suitability of or availability of drinking water on Fishers Island.
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems
iacluding Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III -
Policies; Pages 22 throng6 32 for evaluation criteria.
X Yes _ No Not Applicable
3
This proiect is consistent with this policy because it proposes the elevation of the Hier at an acceptable
heisht above the bottom sediments through which adjacent tidal wetlands vegetation may spread, the
dock site however is so rocky in nature surroundine the west shore of the cove that vegetation alone the
shoreline is minimal The pier spans over a shoreline boulder where no wetlands vegetation crows, and
so no adverse impact on tidal vegetation is anticipated as a result of the proposed project No submersed
aquatic vegetation was observed at the dock site or along the shorefront durins the survey. In addttton,
the NYS DEC prepared a study showing that the proposed pressure-treated Southern Pme tunber
products construction materials are suitable for this type of project in this location, except for deckmg
which will be of untreated woods or composite (or plastic) materials.
As mentioned earlier the design parameters shown on the drawings provides an optimum balance
between acceptable design and access standards without depriving the wetlands vegetation the
opportunity to spread.
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III -
Policies Pages 32 through 34 for evaluation criteria.
yes No X Not Applicable
There are no air quality issues related to this proiect No emissions will be generated by the dock
facili
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and
hazardous substances and wastes. See LWRP Section III -Policies; Pages 34 through 38 for
evaluation criteria.
Yes _ No X Not Applicable
There is no solid waste or hazardous substances to be ;venerated from this proiect. The pressure-treated
wood trimmings from the dock construction will be collected and disposed of in accordance with current
regulations so as to min;mi~r. any harmful affect.
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and
public resources of the Town of Southold. See LWRP Section III -Policies; Pages 38 through 46
for evaluation criteria.
Yes No X Not Applicable
4
This proiect is bein¢ built emanating_from private land The public trust lands and waters constitutes the
azea between the mean hish water line and mean low water line and the resources aze from the lush hde
line out These environmental resources are being protected by the desi¢t? standazds dictated by the
NYS DEC There is virtually no ~blic use of the waterfront in this area.
WORIQNG COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent
uses in suitable locations. See LWRP Section III -Policies; Pages 47 through 56 for evaluation
criteria.
X Yes No Not Applicable
This proiect is to construct a new dock facilityfor water-dependent recreational and transportation
boatin¢ This usage is defined as water-dependent in the LWRP because the new dock facility will be
for recreational boatine and provide boat transportation access to the mainland. The pier to shore is to
provide access while protectine existing habitat both by strateeic location and height.
Policy 11. Promote sustainable use of living marine resources in Long Island Sound the Peconic
Estuary and Town waters. See LW12P Section III -Policies; Pages 57 through 62 for evaluation
criteria.
Yes No X Not Applicable
This pier is not used for commercial fishine or shellfish industries or enterprises.
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III -Policies;
Pages 62 through 65 for evaluation criteria.
Yes No X Not Applicable
This pier is not used for or in support of any aazicultural or aquaculture industries or enterprises
Policy 13. Promote appropriate use and development of energy and mineral sources. See LW1tP
Section III -Policies; pages 65 through 68 for evaluation criteria.
Yes No X Not Applicable
This ier is not used for r in su of an ener or mineral minis or rocessin o tions.
2r~t^-
PREPARED BY eith B. Neilson, P.E. Docko. Inc. TITLE Agent DATE April 23, 2013
5
N A i6 \O• e N wb NW
FISHERS ISLAND / ~ " ~ n, ~o g
SOUND ~ p
////n/
i ~ x
i~ s y ~ ar' y
,
D ~
MAY - 1 2013 ~ ~ ~
Ifnn EN e. ~ ~ ~r o
~ C _ S ~ /~~All AMT ~
y ~ SoutholdT
N~ ar Tru LOGP.TIOIV MA.P• R
OF WILMERD NEW PIER cHazr:iz~T2
AND FLOAT x'~
_ 700 350 O 700 N Y'°~
NOTES
- SITE ~ ~ 1. ELEVATION DATUM IS APPARENT MEAN LOW
PRO~RTI'Of 'TENNIS WATER
RACKET 2 nDE DATA IS TAKEN FROM 2012 NOAH TIDE
W1L.MERDING ~~ISLPND' TABLES REFERENCE :SILVER EEL POND.
~3. PROJECT DESCRIPTION:
CONSTRUCT 47xLF OF 4-F'T WIDE FD(ED WOOD PILE
Vy~.::~ ~ AND nMBER PIER, INCLUDING UTL1l1EG AND KAYAK
i RACKS, INSTALL AN 8-FT X 16+T FLOAT WITH A
~ HINGED R
~ANDSRESn2NNT RLES. ALL
- . N/F PROPERTY ~ ~ ~ WATERWARD OF THE APPARENT HIGH WATER
OF KENNEDY l LINE CONSTRUCT 4-FT WIDE nMBER STA1R5 WttH
~ AS'' IATED LANDINGS LANDWARD OF THE
y ~ ~ APPARENT HIGH WATER UNE
4 ;
4. PROJECT PURPOSE
i nil5 IS A PRIVATE DOCK FOR RECREATIONAL
T 1 BOATING.
;y ~ 5.'fHESEAPPIJCATONDRAWINGSREPRESEPffA
_ r~ ` ~ COMPILATION OF SURVEYS FOR ENVIRONMENTAL
FISHERS ISLAND y; ~ E ~ - PERMR PURPOSES. THEY ARE NOT CONSTRUGnON
. ~ ~ -,r ~ CONTRACT DOCUMENTS. A TOWN PERMIT(S) MAY
' TOWN OF SOUTHOLD y t , BE REQUIRED.
k ~ v s _ t 6. ADJOINING PROPERLY OWNERS
s,
O~/ER~.LL PLAN ~
r~aA»nc scxe r • _.300 Y
300 0 30o PROJECT: NEW STAIRS, PIER and FLOAT
REVISED 4-18-13 T.o.s. LocAnoN: RsHERS Isl1wD - rowN of souTHOLD
F NEyy PROJECT DESCRIPTION SUFFOLK COUNTY, NEW YORK
IT WATERWAY: HAY HARBOR
~.`P~ON N DATE OCTOBER 15, 2012 ~ D O C $ 0
* ~ ~ ~ APPIJGAM: ALD( WIU'IERDING
r. 2 9
n , w AGENT: SHEET 1 OF 4
a I~OGKO, LNG. %6' • , ~
oses92•` Kenn e. Nelison, PE O 0 R P 0 R A~
a V`~ MysNc, CT 06355
~FESSIONP 860 572 8939 FAX 860 572 7569 DWG 12-09-?A40
EMAIL perrnits@docko.com
KeiPo B. Nelson. Dxka Irc. aQ6/2D13 T:49 AM WJmerding_tD d..g
~ n
aF r ®~'m rZ~x~ ~ ~ ~ v ~ ~ N
,1 ~ \ ~ v
~A ~PA~rw~LiERN1FLORa, -~a_, ~ ~ ~
~ ~ ~ EED LINEa~ ~ \
\ ~ o
~ ~ ~ \ \~~`LIMR of \ K SHORE, BOTTOM of
~ ~J ~ r~~\~~~\\\\\ 6XA' ROCK BANK and TIDAL WETLANDS UMIT
and NYSDE~ ~ \ V ~ MIT of ROCKY SHORE s
JURIS ON/+L UN ~ ~ \ ~AiWL O.O ~ ( ~
VEGETATED BANK ~ `~11NP `OR`' 1
vvwvvv ~ ~
\ \ ~ \ ~ ~ \ ~ \ \ \ FOOTPRINT of PROPOSED DOCK
C
~
_T I"ION ~~\\\\\\"11 275' \
\ \ 11111111 ~ ~ ~ ~ ~ H,a.Y HA~2BOR
4'~ ROCK
~ ~ ~ 1111111 ~ ~ / /
J ~ \I I 8'm ROCK BELOW PIER E=X1.~~- TI NG
/ ~ 4 I I , , f a,~ ~K ~ \ CONDITIONS
I / I I 1 11 ~ AM41.33':
I / I I IIII II I II 1 J6'm RaK ~ , 1I ~ so o so
/r I~ I III I ~ / { ~ LJf(11TSRO~KY ORE
TOP of BANK and tJY(SDEG_/~ I~I I drl I I II I IIII I ppf~~D OM pF K
JUWSDIGTION{hL UNE 3m ROCK`
I I IIIIII ~ sP L ~ ~
I (IIII ~
~O' TMN MN~.E \ ~ /
EXiST1NG c I ~ \ ~ ~ ALTERNIR.ORA \r~ ~ ~
RESIDENCE \ ~ MR of Ra~ SHORE
COASTAL EROSION i \ \ .
HA7?~RD LINE 1111 \ \ ~ \ NOTES: ELEVATIONS ARE BASED
I I I ~ \ a'm RocK1 3 ON AnvARENT La~v wATOZ ~a..wL>
/ J 1\\~\\\ ~ \p 5'm ROCK ~
v-~!~iA~IJDONEDBUILDING-~z
_ 1
SURVEY by GME ENGINEERING, L~+ND SURVEYING PROJECT NEW STAIRS, PIER and FLOAT
& PRCHTEG'fURE, PLLG
REV15ED3-20-13 DEG LOCATION: FlSFiER515lJWD-TOWNoFSOUTHOLD
I,~' PROPOSED FOOTPRINT SUF=01x COUNTY. NEW YORK
'S~ f
•Y WATERWAY: HAY HMffiOR
Q. N K Ty REVISED 4-18-13 T.OS.
~ ~ 9 PROPOSED FOOTPRINT DATE OCTOBER 15, 2012 D 0 C K 0
* ~ m ~ APPLICANT: PLFJC WILMERDING
_ A
r , w AGENT: SHEET 2 OF 4 f_ O
' ~ i 1~OGIGO, INC. d^c - ~ ~4'
Oq ~68892-~ 0 R P 0 R
9DFES510NP~ 860 572 8939 FAX 860 572 7569 D~VG 12-09-?<k10
EMA1L permNsQdadcocom
KekM1 B. Nelson, Docko Inc. M~6/201311G8 Af'I VJllmerding_2B.dwg
~ ~ ~ ~ DEED LINE
~ ~ ~ v
\\\V~V ~ ~ \ A \ ~ ~ _ i ~
~
\\~~\\A V ` unrr ~
ROCK sl+o~. BorroM ~ a
wK o~1~Dni wET~wDS unrr k ~ ~ ~
~ ~ VEGETATED SANK (TYP) ~ \ ~ ~ ~
~ LIMff of ROCKY SHORE ~ AZi~l
\~~~\~1 \ \o ~ , ` ~ in HAY 1-(ARBOR ^
~ ~ \ \ ` \ 1 III
\ l ~/(~4 5
\~~\V~\\\V~~ ~ ~ ~ ~ l 1Ul'X
\ SPARTII~.ALTERNIR.ORA
\ ~ ~ \ ~ \ New ne-oFF PILe
\ ~ ~ MAXIMUM 8-IN DW (TYP)
~ MHW~.76' ~~1~+~ N~B-FTXI6-FTFLOiiT
BeNCHMA>vc~ ~ ~ ~ ~
TOP MON ~ ~A ~ll I Ili, ~ ~ I\
EL =2424 NEW KAYAK RACKS NEW `3-1~-
~ X 2~ RAMP-~ \ 1 NEW KAYAK
``1i`11 ~1` ~ 1111 ~ 80ARD1NG STEP
j1 1 1 1 ~ / _
1 NEW 4-FT 4~~ 11111111111 ~ i
fD R~K I i / MAXIMU~O
N DfACTYP)
WIDE ~T?J' ' ~ J 1~
~ ~ ~ I ~ 9~~' ~ 1 NEW SUPPORT] PILE -MAXIMUM B-IN D1A (TYR)
f NEW 4~ WIDE ER with RAILS
NEW STaR I I I ~ 11 I ~8'
IROGK BELOW PIER 4
LANDINC>S ~ ) 4'(nROCK ~ ~ ~ 1
rj
~ ?A~' MAPLE ~ I ~ AHWL 33': I ~ 1
Il ~ I I ~ I
/ 1 II II ~ I} I I i I I I1 ~ , I 1 6'Pl ROCK I ~ ~ II ~~c.. ~VATONS ARE 9ASED
I ~ ~ I ~ ~^I ~ ~ ~ ~
l" ~ ~ IJ 15 OF ROCKY SHO ~ ON APPARENT LC7aV WATER (ALU/~)
TOPNYSDEG ~ ~ ' 1~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ BOTfOM~OF O~WK~
~uwsDlcnoNAL ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 3pl Rock ~ ~
uNE
{ ~ f ~ ~I ~ ~ ~ ~ ' I sPa~nt~u+<u.TERKR_oRAI \ MoowNG d
~ I I `I I ~ I I ~ 11 1 1lMIT of ROCKY SHORE GL_~.fV ~
I EW
30'TWIIMLPPLE ~ I I~I~III~~ KYS~ \ ~
SURVEY by GME ENGINEERING, LAND SURVEI'ING PROJECT: NEW STAIRS. PIER and FLOAT
ff ARE, PLLO
REVISED 3-20-L3 DEG LDC,ATION: RSHERS IUD -TOWN of SOUTHOfS7
STA1R LOG !E GONflGURATION SUFFOLK COUNTY, NEW YORK
F NEH. ~~c~ 418-13 T.OS. WATERNAY HAY HARBOR
EIT ~ DATE OCfOBER15.2012 D O C K p.
*,t~~N 9~^,Q* PIER LENGTH WILMERDING ~
r y¢ AGENT: SHEET 3 OF 4 r_ r 4
~ 4, ~OGKO, INC. '6~, acv
Keith B. Neilson. PE Q ~
F o ~ Mystic. GT 06355 R P O R
O 88892' Vey, 86p 5'72 8939 FAX BraO 572 7569 pWG 12-09_yki0
~901CF3510d~ EMAJL perm'rtsOdocko.com
KeNh B. Neilson. Docko Inc. 4/26/2013 17.46 PJ"I Wlimerdin¢3Edg
PPFROXIMATE GRADE
AT CREST OF BPNK NEW 4FT X 4-FT LANDING EL 22+FT NOTE FLOAT RESTRANT
PFPR07aMA.rE - PILES. RAMP aM CENTER
AT TOC I.olJarv~" ~ TIE-0FF PILE NOT SHOWN IN
THIS VIEW FOR GLARfIY OF
_ ,ice PIER GOMPt7NENT5.
+ t.., 4 '
I~~, NEW 4Fr X 4F7 LANDING EL 75sFf
NEW 4FT WIDE I~
sraRS wltl, Rats
NEW 8-IN DIA TIE-0FF FILE I'
I~' 4-FT roPELnsF°r(TYPj i. EIVD ~/IEW
OEGK
NEW 4FT WIDE FIER wvTH EW 70-IN DlA SUPFORr PILE (TYP) oRACriIG SrxE 1' = tD
END DECK EL 5-Y4af-T
h~~V l0 5 0
NEW SPLIT CLAMP acid NEW 10-FTX 16-F(Fi.OAT ~
CRO55 BRACE (7YP) wNh GON n~"fUDUS FLOATATON
- ADPRO9MATEGRAI7E ~ ~ ' - - - - - ^ -
_ AT END OF PFR - - - NEW KAYAK BOARDING
PPPRQ10hWTE C>RPDE 57EP whh HANDH01175 - - -
ATCENfEROFRAAT - „ t .
x
t z v ~.'4i ~ ) ?i4
t .t\i . t^r..c>,i r. ? 3 4 ~ ti r~ w.e ~
~Y. 'b` %a Y ~4~T/N ~ F~> Y) 4%Y f,'C' Y~ *Y S Z .,'bY M W+ t I .Y a U45
%Y 3+ i v 4 ii \ A'~1 - TY
a t ) y n a y~r v 5'-~i4 k / 'Cvrc ~ s~ e v. .a, r ~V r rr C ~ Lr >"-y ~ f+ t `c4: T`
CT 1, ti'}1, F A4.. .Lf ~4 Y y b C~ ..+ta h L ~ .)fa.t) I 1S k3' S 4 T% 4y
^ti.. ~ yr kr4 "t +.~v. `r~atMl, r~~,-,l 1 try ~ls ~ Myth ~ti~ r'.aL .may i
" -bt. t' -„Yk) sti ~ ~ ~h vo V. ,.a„(y-1. ~ th .4 Y. \i hJ'ki. 4' 1
4nM 1 2~5 'S 11 a Y ? \N Y /1 1~ l 4 3
~ _ s y 4 n.e - . .tt.- a :.;:::i i I '4•., ii
I NOTE DECKING - NOT GGA TREATED,
HARDWOODS MUST 8E GERTFlED 8Y
FOREST STEWARDSHIP GOUNGL
NEW 4FT WIDE X 65-FT ls1NDING EL 22tFT NEW B-FT X 16+7 FLOAT with
CONTINUOUS FLOATATION
3-FT CLEAR NEW 4-Ff X 4-F( NEW iQ/N GYA FLOAT RESTRAINT
~~=:aa" . LANDING EL 75tFT FII~ TOP EL n:FT (IYP)
~1 ,j F, ti SEGfNNfNG DECK EL 81FT
mow. NEW RAI NEW 4-FT WIDE FIER
.,~~``"a`~" (71'Pf END DECK EL
NEW 4FT WIDE;., 5-UCtFT NEW KAYAK
ST.NRS wkh RA25 T~.~~'
y BOARDING STEP
NEW KAYAK RACK (Tl'P) 5.FT Arn~t 33:
BOULDER e
f,y,:V d -MHW 2b'
3l ~ -P1.WL O.O
MAXIMUM SLOPE 10 1 -°`4~ ~:4 ~'s;. r. : :
u _~~;w y"~ ark:: v u~ ~ t v r
NEW 3-V2-FT X 24-FT RAMP ; -k NEW 8-IN DIA 71E-OFF R'LP TOF EL nsF'f (TYP)
NEW B-IN DIA PIER 5UPFORT PILE ' `
TOP EL 4-FTAEOVE DECK (l7P)
PROF=1 L_~
c,RA,nxcscaF 1•_~~
~o io o so
ELEVATIONS ARE BAS ON ppp,Ar1ENT WA7~ PROJECT: NEW STAIRS, PIER and FLOAT
REVISED 3-20-13 DEG LOCATION: FISHERS ISI.MID -TOWN of SOUTHOLD
STAIR CLEARANCE SUFFOLx COUNTY, NEW YORK
KE! f
~y REVISED 418-13 T.OS. WATERWAY: HAY HARBOR
~P PIER LENGTH DATE OCTOBER 15, 2012 ' D Q C K ~
* ~ 9~_ AFPLIC?~NT: ALDC WILMERDING
m
~ A ~ ~ AGENT: SHEET 4 OF 4 ~
~ ~ ~ !]OGKO, INC. %Y~ - , ~
,o aeesa2•'` ~ M~ysna8,'G~r
~3ss c ~ R p o R s~
9~FES510NP~' 8G0 572 8939 FAX 860 572 7569 DWG 12-09-2Ad0
EMAIL Rertnits@docko.can
Kel+h 8. Neilson, palm Inc. 4 /2 6/2013 11'47 AM Wlmerdlnq_4C.dwg