Loading...
HomeMy WebLinkAboutPebble Beach Farms Jill M. Doherty, President Bob Ghosio, Jr., Vice-President James F King Dave Bergen John Bredemeyer P.O Box 1179 Southold, NY 11971 Telephone (63 J 765-1892 Fax (631 ) 765-6641 Southold Town Board of Trustees Field Inspection/VVorksession Report Date/Time: Anthony Vivona on behalf of PEBBLE BEACH FARMS requests a pre- submission inspection to discuss the replacement of a wood retaining wall and steps down to beach. Located: 1745 The Strand, East Marion. SCTM#30-2-59 Typqu~=lo~f area to be impacted: SZ"~ound Bay __Saltwater Wetland Freshwater Wetland Distance of proposed work to edge of wetland .Pa/~f Town Code proposed work falls under:' ~" Chapt.275 Chapt. 111 other Type of Application: __ Wetland __Administrative__Emergency __Coastal Erosion __Amendment Pre-Submission Violation Info needed: Modifications: Conditions: /'~B. Ghosio ' Present Were: r"'//J. Doherty ~ J. King_ J. Bredemeyer___ D. Dzenkowski __other Form filled out in the field by Mailed/Faxed to: '~ Date: '~. Bergen, Fine EdiCt View Toolbar Window Help Ready [745 The Strand, Esst Marion P e marshall poetzel bble Beach Farms BEACH ACCESS RENOVATION - PHASE 1 East Marion, NY PRELIMINARY BID FORM NOTES: 1. This form is for budgeting purposes only. Contractors will have a chance to re-bid once final matedal selections are made and details are completed. 2. Simply leave blank any items for which you do not wish to bid on. 3. Bids are due at 12900 Main Road, Mattituck, or PO Box 1263, Cutchogue, NY 11935 no later than Monday, July 25th at 3pm. Contractor Name: 1. SITE PREPARATION & GRADING REMOVE EXISTING STEPS, HAND RAIL, AND FACE OF RETAINING WALL (WALL TIE-BACKS TO REMAIN) PROVIDE DALLY RATE, ANTICIPATED NUMBER OF DAYS, AND SIZE OF CREW 2. HARDSCAPE REPLACE EXISTING RAILROAD 11E WALL (115 LF) OPTION A: NATURAL BOULDER WALL SEE DETAIL 1. OPTION B: INTERLOCKING CONCRETE WALL UNILOCK 'ROMAN PISA' OR EQUAL See Manufacturer's Detail OPTION C: REPLACE RAILROAD TIE WALL IN-KIND, IN-PLACE GRADING/FILL: ALLOWANCE FOR 30 CU.YDS. INSTALLED. STAIRWAY RENOVATION OPTION A: Replace existing steps with (24) new RR-Tie and 24 - 4'x5' gravel landings OPTION B: Replace existing RR tie steps with (24) 6"x6" natural Stone or Granite and (24) 4'x5' polysand landings Step length varies belween 6u8' long, as per plan HANDRAIL: (113 LF) #2 Cedar Handrail (See Photo On Sheet D2) REPLACE WOODEN STAIRCASE: $ Replace existing wooden staircase at bottom of bluff. tn-kind, in-place (See Photo On Sheet D2)) Handrail on both sides to match new handrail 3. PLANTING $ DISTURBED AREAS TO BE REVEGETATED AS PER PLAN - IRRIGA11ON BY OTHERS L ,/ BEACH ACCESS RENOVATION PLAN PEBBLE BEACH FARMS DRAFT ..... RP-1 BOULDER WALL DETAIL REPLACE RAILROAD 11E WALL - OPIION A; NATURAL BOULDER WALL REPLACE RAILROAD TIE WALL -OPTION B: UNILOCK 'ROMAN PISA' OR EQUAL UNILOCK 'ROMAN PISA' DETAIL BEACH ACCESS RENOVATION PHOTOS + DETAILS PEBBLE BEACH FARMS DRAFT N