Southold Town Board of Trustees
Field Inspection/VVorksession Report
Date/Time:
Anthony Vivona on behalf of PEBBLE BEACH FARMS requests a pre-
submission inspection to discuss the replacement of a wood retaining wall
and steps down to beach. Located: 1745 The Strand, East Marion.
SCTM#30-2-59
Typqu~=lo~f area to be impacted: SZ"~ound Bay
__Saltwater Wetland Freshwater Wetland
Distance of proposed work to edge of wetland
.Pa/~f Town Code proposed work falls under:'
~" Chapt.275 Chapt. 111 other
Type of Application: __ Wetland
__Administrative__Emergency
__Coastal Erosion __Amendment
Pre-Submission Violation
Info needed:
Modifications:
Conditions:
/'~B. Ghosio '
Present Were: r"'//J. Doherty ~ J. King_
J. Bredemeyer___ D. Dzenkowski __other
Form filled out in the field by
Mailed/Faxed to: '~
Date:
'~. Bergen,
Fine EdiCt View Toolbar Window Help
Ready
[745 The Strand, Esst Marion
P e
marshall
poetzel
bble Beach Farms
BEACH ACCESS RENOVATION - PHASE 1
East Marion, NY
PRELIMINARY BID FORM
NOTES:
1. This form is for budgeting purposes only. Contractors will have a chance to re-bid once final
matedal selections are made and details are completed.
2. Simply leave blank any items for which you do not wish to bid on.
3. Bids are due at 12900 Main Road, Mattituck, or PO Box 1263, Cutchogue, NY 11935 no later
than Monday, July 25th at 3pm.
Contractor Name:
1. SITE PREPARATION & GRADING
REMOVE EXISTING STEPS, HAND RAIL, AND FACE OF
RETAINING WALL (WALL TIE-BACKS TO REMAIN)
PROVIDE DALLY RATE, ANTICIPATED
NUMBER OF DAYS, AND SIZE OF CREW
2. HARDSCAPE
REPLACE EXISTING RAILROAD 11E WALL (115 LF)
OPTION A: NATURAL BOULDER WALL
SEE DETAIL 1.
OPTION B: INTERLOCKING CONCRETE WALL
UNILOCK 'ROMAN PISA' OR EQUAL
See Manufacturer's Detail
OPTION C: REPLACE RAILROAD TIE WALL IN-KIND, IN-PLACE
GRADING/FILL: ALLOWANCE FOR 30 CU.YDS. INSTALLED.
STAIRWAY RENOVATION
OPTION A: Replace existing steps with (24) new RR-Tie
and 24 - 4'x5' gravel landings
OPTION B: Replace existing RR tie steps with
(24) 6"x6" natural Stone or Granite and
(24) 4'x5' polysand landings
Step length varies belween 6u8' long, as per plan
HANDRAIL:
(113 LF) #2 Cedar Handrail (See Photo On Sheet D2)
REPLACE WOODEN STAIRCASE: $
Replace existing wooden staircase at bottom of bluff.
tn-kind, in-place (See Photo On Sheet D2)) Handrail on both sides to match new handrail
3. PLANTING $
DISTURBED AREAS TO BE REVEGETATED AS PER PLAN - IRRIGA11ON BY OTHERS
L
,/
BEACH ACCESS RENOVATION
PLAN
PEBBLE BEACH FARMS
DRAFT
..... RP-1
BOULDER WALL DETAIL
REPLACE RAILROAD 11E WALL - OPIION A; NATURAL BOULDER WALL
REPLACE RAILROAD TIE WALL -OPTION B: UNILOCK 'ROMAN PISA' OR EQUAL
UNILOCK 'ROMAN PISA' DETAIL
BEACH ACCESS RENOVATION
PHOTOS + DETAILS
PEBBLE BEACH FARMS
DRAFT