Loading...
HomeMy WebLinkAboutPBA-04/08/2013 MAILING ADDRESS: PLANNING BOARD MEMBERS1``~OF SQ(~Jy P.O. Box 1179 DONALD J. WILCENSKI 0~ Southold, NY 11971 Chair h OFFICE LOCATION: WILLIAM J. CREMERS ~ ~ Town Hall Annex PIERCE RAFFERTY ~ ~ 54375 State Route 25 JAMES H. RICH III ~ ~ Q (cor. Main Rd. & Youngs AveJ MARTIN H. SIDOR IyC~U111 , Southold, NY 11 I , Telephone: 631 765-1935 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD PUBLIC MEETING AGENDA APRIL 8, 2013 5~~..1, i J ~,,Nfl rlP,r~ 6:00 p.m. SETTING OF THE NEXT PLANNING BOARD MEETING Board to set Monday, May 6, 2013 at 6:00 p.m. at the Southold Town Hall, Main Road, Southold, as the time and place for the next regular Planning Board Meeting. SUBDIVISIONS -SKETCH DETERMINATIONS Fohrkolb, Andrew -This proposal is for a Standard Subdivision of a 5.89 acre parcel into two lots where Lot 1 equals 0.93 acres and Lot 2 equals 4.96 acres, located in the R-40 Zoning District. The property is located at 1050 Greton Court, Mattituck. SCTM#1000-107-3-2 SUBDIVISIONS -FINAL DETERMINATIONS New Suffolk Waterfront Fund. Inc. 8 Robins Island Holding LLC -This proposed Lot Line Change will transfer 1.12 acres from SCTM#1000-117-8-18 to SCTM#1000- 117-8-19. SCTM#1000-117-8-19 will increase from 0.46 acres to 1.58 acres, and SCTM#1000-117-8-18 will decrease from 3.43 acres to 2.31 acres in the MII Zoning District. The property is located at 650 & 380 First Street, on the east side of First Street, approximately 32.20' south of King Street, in New Suffolk. SITE PLAN DETERMINATIONS Laurel Links Maintenance Building Addition -This Amended Site Plan is for a proposed 5,000 sq. ft. addition to an existing 4,204 sq. ft. maintenance building & pump house on 154.7 acres in the A-C Zoning District. The property is located at 6400 Main Road, ±1,000 ft. west of Bray Avenue and NYS Rt. 25, Laurel. SCTM#1000-125-4- 24.23 Southold Town Planning Board Page Two April 8, 2013 G.W. Mead Farm -This Site Plan is for the proposed construction of a 5,200 s.f. horse barn connecting to a 14,400 s.f. indoor arena for the keeping/breeding/raising and training of horses and a riding academy with 10 parking spaces. Also on the property area 1,140 s.f. single-family dwelling, a 1,965 s.f. frame barn and a 700 s.f. frame building on 10.004 acres in the A-C Zoning District. The property is located at 1375 Ackerly Pond Lane, 1,100'± West of Lower Road and Ackerly Pond Lane, Southold. SCTM#1000-69-5-7.1 8 Hands Farm -This Site Plan is for the proposed construction of a 60' x 120' (7,200 s.f.) metal barn on a 25.69 acre Town of Southold Development Rights parcel and the conversion of an existing 4,200 s.f. barn to a farm stand on the adjacent 1.84 acre reserved parcel that includes atwo-story dwelling in the A-C Zoning District. The property is located at 4735 Cox Lane, ±550' s/o CR 48 and Cox Lane, Cutchogue. SCTM#1000-96-2-10.1 & 10.2 STATE ENVIRONMENTAL QUALITY REVIEW ACT -Negative Declaration New Suffolk Waterfront Fund, Inc. & Robins Island Holding, LLC -SCTM#1000- 117-8-18 & 19. APPROVAL OF PLANNING BOARD MINUTES Board to approve the minutes of: March 18, 2013. MAILING ADDRESS: PLANNING BOARD MEMBERS ` OF S~Vl P.O. Box 1179 DONALD J. WILCENSH7 y~ Southold, NY 11971 Chair l~ OFFICE LOCATION: WILLL4M J. CREMERS ~ ~ Town Hall Annex PIERCE RAFFERTY G Q 54375 State Route 25 JAMES H. RICH III ~ ~,p~~ (cor. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyCOU M ~ a Southold, NY IY 1, Telephone: 631 765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 9, 2013 Mr. Anthony Trezza KPC Planning Services, Inc. P.O. Box 1686 Westhampton Beach, NY 11978 Re: Sketch Plan Approval: Proposed Standard Subdivision of Andrew Fohrkolb Located at 1050 Greton Court, Mattituck SCTM#1000-107-3-2 Zoning District: R-40 Dear Mr. Trezza: The Southold Town Planning Board, at a meeting held on Monday, April 8, 2013, adopted the following resolution: WHEREAS, this proposal is for a Standard Subdivision of a 5.89 acre parcel into two lots where Lot 1 equals 0.93 acres and Lot 2 equals 4.96 acres, located in the R-40 Zoning District; and WHEREAS, on November 20, 2012, the agent submitted the required Sketch Plan Application and Sketch Plans; and WHEREAS, on December 17, 2012, the Planning Board at their Work Session agreed to the following: 1. Accepted the Sketch Plan and ERSAP; 2. Found the application incomplete with a condition that the agent must submit proof that the parcel meets lot recognition pursuant to §280-9 of the Southold Town Code; 3. Agreed to waive the Yield Plat requirement subject to a covenant and restriction to be placed on the property that will prohibit further subdivision of the parcels; and WHEREAS, on February 19, 2013, the agent submitted proof that the parcel meets lot recognition; and Andrew Fohrkolb Page Two April 9, 2013 WHEREAS, on February 25, 2013, the Planning Board at their Work Session found the application complete and that all requirements have been met pursuant to Article V Sketch Plat; be it therefore RESOLVED, that the Southold Town Planning Board hereby grants Sketch Plan Approval upon the map prepared by Peconic Surveyors, P.C., entitled "Sketch Plan for Andrew T. Fohrkolb", dated August 29, 2012. Sketch Plan Approval is valid for six months unless an extension of time is requested and granted by the Planning Board. The next step in the subdivision process is the Preliminary Plat Application. Please submit a complete Preliminary Plat Application at your earliest convenience. Note that specifics regarding map changes, content of the Covenants and Restrictions, other legal documents and submission requirements needed for subdivision approval will be provided to the applicant by the Planning Board upon completion of the environmental review and receipt of comments from other involved agencies. The applicant is advised that design changes may be required prior to Final Plat Approval. If you have any questions regarding the information contained in this resolution, please contact the Planning Board Office. Very truly yours, `~~s~ Donald J. Wilcenski Chairman ` MAILING ADDRESS: PLANNING BOARD MEMBERS ~~F ~~Vry P.O. Box 1179 DONALD J. WILCENSKI 0~ 0~ Southold, NY 11971 Chair ~ ~ OFFICE LOCATION: WILLIAM J. CREMERS Town Hall Annex PIERCE RAFFERTY ~ • O 54375 State Route 25 JAMES H. RICH III '0 ~ (cor. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyC~U~ Southold, NY Telephone: 631 765-1935 Fax: 631765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 9, 2013 Abigail Wickham, Esq. P.O. Box 1424 Mattituck, NY 11952 Re: SEQRA & Final Plat Approval -Proposed Lot Line Modification for New Suffolk Waterfront Located on the a/s/o First Street, approximately 32.20' s/o King Street, New Suffolk. SCTM#1000-117-8-18 &19 Zoning District: MII Dear Ms. Wickham: The Southold Town Planning Board, at a meeting held on Monday, April 8, 2013, adopted the following resolutions: WHEREAS, this proposed Lot Line Change will transfer 1.12 acres from SCTM#1000- 117-8-18 to SCTM#1000-117-8-19. SCTM#1000-117-8-19 will increase from 0.46 acres to 1.58 acres, and SCTM#1000-117-8-18 will decrease from 3.43 acres to 2.31 acres in the MII Zoning District; and WHEREAS, a Lot Line Modification Application was submitted on November 19, 2012; and WHEREAS, the Zoning Board of Appeals (ZBA) requested comments from the Planning Board regarding Area Variances for Lots 1 and 2; and WHEREAS, on December 18, 2012, the Southold Town Planning Board at their Work ~ Session reviewed the application, responded to the requested ZBA comments and found the application incomplete. The Planning Board supported the requested Area Variances for Lots 1 and 2 because future development of the above-referenced property will be limited and the view shed to the water will be preserved through the Conservation Easement placed over key areas of the properties. These goals are consistent with the Town's Comprehensive Plan; and WHEREAS, on January 10, 2013, the agent submitted the requested items at the December 18, 2012 Work Session; and WHEREAS, on January 10, 2013, the agent submitted a draft Conservation Easement on Lot 2; and New Suffolk Waterfront Fund Page Two April 9, 2013 WHEREAS, on February 13, 2013, the agent submitted a copy of the Zoning Board of Appeals' Findings and Deliberations where they granted the requested variances; and WHEREAS, on February 21, 2013, the agent submitted revised plans as per the Board's request at the December 18, 2013 Work Session; and WHEREAS, on February 25, 2013, the Planning Board at their Work Session reviewed the revised submissions and found the application complete; and WHEREAS, on March 8, 2013, the agent submitted a DEC permit; and WHEREAS, on March 18, 2013, the Planning Board held and closed the Public Hearing; and WHEREAS, on April 8, 2013, the Planning Board at their Work Session reviewed omments from the Public Hearing; and WHEREAS, the Southold Town Planning Board, pursuant to Town Code §240-56 Waivers of Certain Provisions, may waive certain elements of the subdivision review if in its judgment they are not requisite in the interest of the public health, safety and general welfare. After reviewing the information submitted for this application, the Planning Board has determined that it is eligible for a waiver of the Environmental I Resources Site Analysis Plan (ERSAP), the Primary and Secondary Conservation Area Plan, the public hearing, and the Sketch Plan and Preliminary Plat steps of the subdivision process for the following reasons: 1. No new lots are being created; 2. No changes will occur as a result of this lot line change that would adversely affect the character of the neighborhood; and WHEREAS, the Planning Board performed an uncoordinated review of this Unlisted Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality Review Act (SEQRA); and WHEREAS, pursuant to the Lot Line Modification Policy set by the Planning Board in February 2011, this application is eligible for decision from the Planning Board prior to receiving approval by the Suffolk County Department of Health Services (SCDHS) as it I meets the following criterion set forth in that policy: • Where no new development potential will be created in the parcel to which the land is transferred; and WHEREAS, on April 8, 2013, the Planning Board has at their Work Session determined that the proposed action meets all the necessary requirements of Town Code §240 fora I~ Lot Line Modification; be it therefore New Suffolk Waterfront Fund Pape Three April 9, 2013 RESOLVED, that the Planning Board, pursuant to SEORA, hereby makes a determination of non-significance for the proposed Lot Line Modification and grants a Negative Declaration; and be it further RESOLVED, that the Planning Board hereby waives the requirements of Town Code §240 to submit the ERSAP, Primary and Secondary Conservation Plans, Sketch Plan and Preliminary Plat steps; and be it further RESOLVED, that the Planning Board hereby waives the requirement for SCDHS approval prior to Planning Board approval of this lot line modification; and be it further RESOLVED, that the Southold Town Planning Board grants Final Approval on the maps entitled "New Suffolk Waterfront Lot Change', dated September 11, 2012 and last revised February 19, 2013, prepared by Barrett, Bonacci and Van Weele, PC and authorizes the Chairman to endorse the map. Please submit a copy of the recorded deed to the Southold Town Planning Department within 62 days of the date of Final Approval, or such approval shall expire and be null and void. Please Note: The Southold Town Planning Board, in waiving the requirement for SCDHS approval prior to their own approval, is simply waiving a technical requirement of Final Plat Approval under the Town Code and makes no representations as to whether SCDHS approval is required. SCDHS approval of this lot line change may be necessary to be in compliance with the Suffolk County Sanitary Code, and to be eligible for future construction or renovations. If you have any questions regarding the above, please contact this office. Very truly yours, Donald J. Wilcenski Chairman Encl. cc: Assessors I understand that Southold Town Planning Board approval of this Lot Line Modification does not grant, guarantee or waive an approval, if required, from the Suffolk County Department of Health Services (SCDHS). I understand that I will nee/d~to apply separately to the SCDHS for anyT~ap~plicable approvals. ignature of Applicant or Agent Print Name i MAILING ADDRESS: PLANNING BOARD MEMBERS ~QF ~OUry P.O. Box 1179 DONALD J. WILCENSHI ~ Q Southold, NY 11971 Chair l~ OFFICE LOCATION: WILLIAM J. CREMERS Town Hall Annex PIERCE RAFFERTY G Q 54375 State Route 25 JAMES H. RICH III TQ ~ (cor. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyCOU,M'~~ Southold, NY I'I' , Telephone: 631 765-1938 Fax: 631765-3136 PLANNING BOARD OFFICE 'DOWN OF SOUTHOLD State Environmental Quality Review NEGATIVE DECLARATION Notice of Determination Non-Significant April 8, 2013 This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State Environmental Quality Review Act) of the Environmental Law. The Southold Town Planning Board, as lead agency, has determined that the proposed action described below will not have a significant effect on the environment and a Draft Environmental Impact Statement will not be prepared. Name of Action: Proposed Lot Line Change for New Suffolk Waterfront Fund SCTM#: SCTMs#1000-53-1- 6 & 7 Location: on the east side of First Street, approximately 32.20' s/o King Street, in New Suffolk SEAR Status: Type I ( ) Unlisted (X) Conditioned Negative Declaration: Yes O No (X) Description of Action: This proposed Lot Line Change will transfer 1.12 acres from SCTM#1000-117-8-18 to SCTM#1000-117-8-19. SCTM#1000-117-8-19 will increase from 0.46 acres to 1.58 acres, and SCTM#1000-117-8-18 will decrease from 3.43 acres to 2.31 acres in the MII Zoning District. Reasons Supporting This Determination: An Environmental Assessment Form has been submitted and reviewed and it was determined that no significant adverse effects to the environment were likely to occur should the project be implemented as planned. i Negative Declaration Page Two April 8, 2013 The determination was based upon the following: This lot line change will not have any undesirable impacts on the surrounding neighborhood or adjacent properties as this lot line change is being done to minimize development potential of the subject property, protects public access to the water and will presence the water view-shed. Future development will be limited, and the view- shed to the water will be preserved through the conservation easements placed over key areas of the properties. Therefore, the proposed application will have no bearing upon Article VI of the Suffolk County Sanitary Code and will, therefore, conform to Article VI of the Suffolk County Sanitary Code and will not be expected to adversely affect groundwater quality. 1. No substantial adverse change in existing air quality, ground or surface water quality or quantity, traffic or noise levels, no substantial increase in solid waste production, potential of erosion, flooding, leaching or drainage problems will occur as a result of this action. 2. No significant removal or destruction of large quantities of vegetation or fauna, no substantial interference with the movement of any resident or migratory fish or wildlife species, no significant impacts on a significant habitat area, no substantial adverse impacts on a threatened or endangered species of animal or plant or the habitat of such a species, and no other significant adverse impacts to natural resources will occur as a result of this lot line change. 3. The proposed action is not in a material conflict with a community's current plans or goals as officially approved or adopted. 4. The proposed action will not significantly impair the character or quality of important historical, archaeological, architectural, or aesthetic resources or of existing community or neighborhood character. 5. No major change in the use of either the quantity or type of energy will occur. Each existing improved lot will continue to have only one pre-existing single family dwelling on each. 6. No creation of a hazard to human health will occur as a result of this lot line change. 7. The proposed action will not cause a substantial change in the use, or intensity of use, of land including agricultural, open space or recreational resources, or in its capacity to support existing uses. 8. Based upon such, no significant adverse impacts to the environment are 'i expected to occur should the project be implemented as planned. For Further Information: Contact Person: Alyxandra Sabatino, Planner Address: Southold Town Planning Board Telephone Number: (631) 765-1938 ~I MAILING ADDRESS: PLANNING BOARD MEMBERS O~~OF SQUJyDI P.O. Box 1179 DONALD J. WILCENSEI Southold, NY 11971 Chair ~ ~ OFFICE LOCATION: WILLIAM J. CREMERS Town Hall Annex PIERCE RAFFERTY G Q 54375 State Route 25 JAMES H. RICH III ~ p~ (wr. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyCOU,M Southold, NY I'11, Telephone: 631 765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 9, 2013 Mr. Jeffrey T. Butler, P.E. 206 Lincoln Street Riverhead, NY 11901 Re: Approval: Proposed Site Plan for Laurel Links Maintenance Building Located at 6400 Main Rd., ±1,000 ft. w/o Bray Avenue & NYS Rt. 25, Laurel SCTM#1000-125-4-24.23 Zoning District: A-C Dear Mr. Butler: The following resolutions were adopted at a meeting of the Southold Town Planning Board on April 8, 2013: WHEREAS, this amended site plan is for a proposed 5,000 sq. ft. addition to an existing 4,204 sq. ft. maintenance building & pump house on 154.7 acres in the A-C Zoning District, Laurel; and WHEREAS, on October 15, 1998, the Southold Town Zoning Board of Appeals reviewed the application for a golf course, golf club house and related golf facilities and amenities, tennis courts, pool on 62 acres, whereby granting a Special Exception Permit in this A-C Zone as applied for with three (3) conditions; and WHEREAS, on October 4, 2012, Jeffrey T. Butler, agent to the applicant, submitted an application for site plan review; and WHEREAS, on November 8, 2012, the Planning Board reviewed the application and determined it incomplete, requiring further information and revisions to the site plan; and WHEREAS, on December 3, 2012, the Planning Board received the required information and accepted the application for review; and WHEREAS, the Planning Board performed a coordinated review of this Unlisted Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality Review Act (SEQRA); and WHEREAS, on December 5, 2012, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and Laurel Links Addition Page Two April 9, 2013 WHEREAS, on December 10, 2012, the Southold Town Engineer reviewed the above- referenced application and has determined that the proposed drainage meets the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on December 12, 2012, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on December 13, 2012, the Mattituck Fire District determined there was adequate fire protection for the site; and WHEREAS, on December 13, 2012, the Southold Town Architectural Review Committee reviewed the proposed project and approved of its design as submitted; and WHEREAS, on January 11, 2013, the Town of Southold LWRP Coordinator reviewed the above-referenced project and has determined the proposed project to be consistent with Southold Town LWRP policies; and WHEREAS, on January 14, 2013, a public hearing was held and closed; and WHEREAS, on January 28, 2013, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 -Site Plan Approval of the Town of Southold, have been met; and WHEREAS, on February 11, 2013, the Southold Town Chief Building Inspector reviewed and certified the proposed site plan as a permitted use in the A-C Zoning District pursuant to the October 15, 1998 ZBA Decision #4624 granting a Special Exception; and WHEREAS, on March 18, 2013, the Planning Board, pursuant to the State Environmental Quality Review Act §617.6, established itself as lead agency for this Unlisted Action; and WHEREAS, on March 18, 2013, the Planning Board, pursuant to SEQRA, made a determination of non-significance for the proposed action and granted a Negative Declaration; therefore, be it RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board grants Approval to the site plan entitled "Laurel Links Golf Club", dated June 11, 2007, last revised November 20, 2012, prepared by Jeffrey T. Butler, P.E. and authorizes the Chairman to endorse the site plan, including the following six (ti) plans: Laurel Links Addition Page Three Agril 9, 2013 1) Page S-1 2) Page S-2 3) Page S-3 4) Page S-4 5) Page A1.0 6) Page A2.0 Please also note the following requirements in the Southold Town Code relating to site plans: 1. Any outdoor lighting shall be shielded so the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. 2. All storm water run-off from grading, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Very truly yours, Donald J. Wilcenski Chairman Encl. cc: Building Dept. w/map; Town Engineer w/map MAILING ADDRESS: PLANNING BOARD MEMBERS ~QF ~DUTy P.O. Box 1179 DONALD J. WILCENSHI 0~ Ql Southold, NY 11971 Chair ~ Q OFFICE LOCATION: WILLIAM J. CREMERS Town Han Annex PIERCE RAFFERTY G • O 54375 State Route 25 JAMES H. RICH III ~ ~ (cor. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyCOU,M Southold, NY r11' Telephone: 631 765-1935 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 9, 2013 Mr. Bruce A. Anderson Suffolk Environmental Consulting, Inc. P.O. Box 2003 Bridgehampton, NY 11932 Re: Approval: Proposed Site Plan for G.W. Mead Horse Farm Located at 1375 Ackerly Pond Lane, Southold SCTM#1000-69.-5-7.1 Zoning District: A-C Dear Mr. Anderson: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, April 9, 2013: WHEREAS, this site plan is for the proposed construction of a 5,200 s.f. horse barn connecting to a 14,400 s.f. indoor arena for the keeping/breeding/raising and training of horses and a riding academy with 10 parking spaces. Also on the property area 1,140 s.f. single-family dwelling, a 1,965 s.f. frame barn and a 700 s.f. frame building on 10.004 acres in the A-C Zoning District, Southold; and WHEREAS, on July 1, 2011, Bruce Anderson, agent to the applicant, submitted an application for site plan review; and WHEREAS, on August 8, 2011, the Planning Board formally accepted the agricultural application for review; and WHEREAS, on August 12, 2011, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, on August 24, 2011, the Southold Fire District determined there was adequate fire protection for the site; and WHEREAS, on September 27, 2011, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and G.W. Mead Farm Page Two April 9, 2013 WHEREAS, the Planning Board performed a coordinated review of this Unlisted Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality Review Act (SEORA); and WHEREAS, on October 13, 2011, the Town of Southold LWRP Coordinator reviewed the above-referenced project and has determined the proposed project to be consistent with Southold Town LWRP policies; and WHEREAS, on October 17, 2011, the Suffolk County Planning Commission deemed the site plan application a matter for local determination as there appears to be no significant county-wide or inter-community impact(s); and WHEREAS, on October 19, 2011, the Planning Board, pursuant to SEORA, made a determination of non-significance for the proposed action and granted a Negative Declaration; and WHEREAS, on October 19, 2011, the Southold Town Zoning Board of Appeals reviewed the application and request for variances, whereby granting a Special Exception Permit and Area Variances as applied for with nine (9) conditions and shown on the survey of SCTM#1000-69.-5-7.1 dated May 31, 2011, last revised June 27, 2011, prepared by John T. Metzger, L.S., Peconic Surveyors, and the drawings by Joseph Fischetti, P.E. dated May 5, 2011 and labeled Sheet No.: 1 (Elevations) and 2 (Floor Plan); and WHEREAS, on October 19, 2011, a public hearing was held and remained open for a second hearing on November 14, 2011 and was closed; and WHEREAS, on October 27, 2011, the Southold Town Architectural Review Committee reviewed the application, provided comments, and the plans were revised to the satisfaction of the Planning Board; and WHEREAS, on March 20, 2013, the Southold Town Engineer reviewed the above- referenced application and has determined that the proposed drainage meets the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on April 8, 2013, the Southold Town Chief Building Inspector reviewed and certified the proposed site plan as a permitted use in the A-C Zoning District; and WHEREAS, on April 8, 2013, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 -Site Plan Approval of the Town of Southold, have been met; therefore, be it RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further G.W. Mead Farm Page Three April 9, 2013 RESOLVED, that the Southold Town Planning Board grants Approval to the site plan entitled "G.W. Mead Horse Farm", dated May 31, 2011, last revised February 19, 2013, prepared by John T. Metzger and authorizes the Chairman to endorse the site plan, including the following three (3) plans: 1. Sheet 1 of 3 2. Sheet 2 of 3 3. Sheet 3 of 3 Please also note the following requirements in the Southold Town Code relating to site plans: 1. Any outdoor lighting shall be shielded so the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. 2. All storm water run-off from grading, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Very truly yours, Donald J. Wilcenski Chairman Encl. cc: Building Dept. w/map Town Engineer w/map - ~ MAILING ADDRESS: PLANNING BOARD MEMBERS P.O. Box 1179 DONALD J. WILCENSKI ti~~~Of SUUlyplO Southold, NY 11971 Chair OFFICE LOCATION: WILLIAM J. CREMERS ~ ~ Town Hall Annex PIERCE RAFFERTY N ~ G Q 54375 State Route 25 JAMES H. RICH III '.2O ~ ~0 (cor. Main Rd. & Youngs Ave.) MARTIN H. SIDOR IyC~U~ ~ Southold, NY Telephone: 631 765-1935 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 9, 2013 Mr. Thomas Geppel 450 Harbor View Avenue Mattituck, NY 11952 Re: Approval -Proposed Site Plan for 8 Hands Farm 4735 Cox Lane, ±550' s/o CR 48 & Cox Lane, Cutchogue SCTM#1000-96-2-10.2 Dear Mr. Geppel: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, April 8, 2013: WHEREAS, this site plan is for the proposed construction of a 60' x 120' (7,200 s.f.) metal barn on a 25.69 acre Town of Southold Development Rights parcel and the conversion of an existing 4,200 s.f. barn to a farm stand on the adjacent 1.84 acre reserved parcel that includes a lwo-story dwelling in the A-C Zone, Cutchogue; and WHEREAS, on January 16, 2013, Thomas Geppel, owner, submitted an application for site plan review; and WHEREAS, on February 7, 2013, the Southold Town Land Preservation Committee reviewed the above-referenced application fora 60'x 120' Morton-style building to be located within the area of the property subject to a Town Development Rights Easement. The recorded easement for this property allows land within the easement to be used for the purpose of agricultural production, and as such, the application was approved as follows: (1) construction of a 60'x 120' Morton-style building to be located within the easement area, approximately 200' from Cox's Lane, as shown on the sketch submitted January 8, 2013; (2) building use is for animal housing, storage of hay and agricultural equipment and; (3) installation of two (2) 10'x 10' drywells with 8'6" effective depth in area sketched on survey; and WHEREAS, on February 11, 2013, the Planning Board formally accepted the agricultural application for review with revisions; and 8 Hands Farm Page Two April 9, 2013 WHEREAS, on February 14, 2013, the applicant submitted the required revisions to the site plan; and WHEREAS, on February 15, 2013, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments; and WHEREAS, the Southold Town Planning Board, pursuant to State Environmental Quality Review (SEAR) 6 NYCRR, Part 617.5 (c) (3), has determined that the proposed action is a Type II Action as it falls within the following description for 6 NYCRR, Part 617.5 (c) (3) "agricultural farm management practices, including construction, maintenance and repair of farm buildings and structures, and land use changes consistent with generally accepted principles of farming" and, therefore, not subject to SEQRA review; and WHEREAS, on February 27, 2013, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on February 27, 2013, the Cutchogue Fire District determined there was adequate fire protection for the site; and WHEREAS, on March 8, 2013, the Southold Town Architectural Review Committee reviewed the application, provided comments, and the plans were revised to the satisfaction of the Planning Board; and WHEREAS, on March 18, 2013, a public hearing was held and closed; and WHEREAS, on March 20, 2013, the Southold Town Engineer reviewed the application, provided comments, and the plans were revised to the satisfaction of the Planning Board; and WHEREAS, on March 21, 2013, the Southold Town Zoning Board of Appeals reviewed the application and request for variances, whereby granting the variances as applied for with no conditions in conjunction with the site plan dated January 10, 2007, prepared by Thomas Geppel; and WHEREAS, on March 25, 2013, the Town of Southold LWRP Coordinator reviewed the above-referenced project and has determined the proposed project to be consistent with Southold Town LWRP policies; and WHEREAS, on March 26, 2013, the Suffolk County Planning Commission deemed the site plan application a matter for local determination as there appears to be no significant county-wide or inter-community impact(s); and WHEREAS, on April 8, 2013, the Southold Town Chief Building Inspector reviewed and certified the proposed site plan as a permitted use in the A-C Zoning District; and 8 Hands Farm Page Three April 9, 2013 WHEREAS, on April 8, 2013, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 -Site Plan Approval of the Town of Southold, have been met; therefore, be it RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board grants Approval to the site plan entitled "8 Hands Farm", hand-illustrated on a survey for SCTM#1000-96.-2-10.2 dated January 10, 2007, last revised January 26, 2007, stamped received in the Planning Department on February 14, 2013 and authorizes the Chairman to endorse the site plan including the following eleven (11) pages: 1. Page 1: General Site Plan, stamped received February 14, 2013 2. Page 2: Detailed Plan of Farm Stand and Parking, stamped received March 27, 2013 3. Page 3: Renderings of Farm Stand, stamped received January 16, 2013 4. Page 4: Floor Plan for Farm Stand, stamped received January 16, 2013 5. Page 5: Floor Plan for 60'x 120' Barn, stamped received January 16, 2013 6. Page 6: Building Elevations from Southwest for 60'x 120' Barn, stamped received January 16, 2013 7. Page 7: Building Elevations from Northeast for 60'x 120' Barn, stamped received January 16, 2013 8. Page 8: Sign Light Fixture Cut Sheet 9. Page 9: Sign Light Fixture Photometric Data 10. Page 10: Wall Mount Fixture Cut Sheet 11. Page 11: Wall Mount Fixture Photometric Data Please also note the following requirements in the Southold Town Code relating to site plans: 1. Any outdoor lighting shall be shielded so the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. 2. All storm water run-off from grading, driveways and gravel areas must be contained on site. 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 8 Hands Farm Page Four Agril 9, 2013 5. Any changes from the Approved Site Plan shall require Planning Board approval. 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Very truly yours, Do~il~nski - Chairman Encl. cc: Building Dept. w/map Town Engineer w/map