Loading...
HomeMy WebLinkAboutFishers Island Pump Station Maintenance ADOPTED DOC ID: 8246 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2012-823 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON NOVEMBER 7, 2012: RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs Supervisor Scott A. Russell to execute the Preventative Maintenance Agreement between Weston & Sampson CMR~ Inc. and the Town of Southold for the maintenance of the Fishers Island Pump Station for a total of two visits at a total contract price of $2,174.00 for 2013, subject to the approval of the Town Attorney. Elizabeth A. Neville Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Jill Doherty, Councilwoman SECONDER: William Ruland, Councilman AYES: Ruland, Talbot, Doherty, Krupski Jr., Evans, Russell 273 Dividend Rd. Rocky Hill, CT 06067 Tel. 1800-726-7766 Fax. l-860-$15-1096 www. westonandsampson, eom Office of the Town Attomey Town of Southold P.O. Box 1179 Southold, NY 11971 November 1, 2012 Ref: WS CMR PREVENTATIVE MAINTENANCE AGREEMENT For: Fishers Island Pump Station The Preventative Maintenance Agreement for the above mentioned pump station is based on (2) visits. The total contract for the (2) visits is $2,174.00 The following items will be check during our visit: 1. Check pump operation. 2. Check wet-wall for any foreign materials that could be detrimental to the pumps. 3. Check float operation and cycle pumps. 4. Check alarm conditions. 5. Check motor amperages and voltages as not to exceed nameplate recommendations and record in a maintenance log kept inside the conlrol panel. 6. Clean float switches and pumps of foreign substances, (i.e: grease soap build up or anything that could hinder the proper operation). 7. Pumps to be pulled from the wetwell for determination of wear, inspect and cheek for debris. 8. Complete test of the alarms, contactors, and level controls. Check voltages in contactor coil, and check control voltage. 9. Confirm proper operation of the control panel. 10. Formal disclosure to be submitted at the conclusion of the inspection detailing current condition of each system and any findings from the inspection. 11. Maintenance procedures to be performed as per manufacturer requirements on the pumps were applicable. 12. Pump out by h-uck and/or station pumps and the disposal of the grease in the wetwell, PLEASE NOTE: Pump truck in not included in the quote and is provided by othem. 13. Pumps to be hoisted and inspected individually top maintain transfer system operation at all times. Doemnented inspection to be include the following: a. Pump impeller and housing b. Pump wiring c. Float and transducer mechanism d. Rail System e. General condition of the system If any repairs are required on the pumps or associated equipment they shall be performed at the normal rate plus parts and material. Please note: The above Preventative Maintenance Agreements represents a maintenance agreement only and does not in any way guarantee the function or the operation of the pump system. L. Reed Soley General Manager Please sign below if you are in agreement and return the Preventative Maintenance Agreement with the annual payment. Payment should be made by check or money order payable to Weston & Sampson, Inc CMR. This offer is extended for ninety (90) days for the date of this letter. _A~sree~ents receiyed ~ft~r this date may be reevaluated. -7~vo Very Truly Yours, Signed ~__g~e~~_~. Date / Phone Number ~,'~ [- q~:~j~'Z/t~F7