Monthly Report
Date:
December 2012
· Hurricane Sandy clean up at Laurel Lake, Downs Farm,
Arshamomaque, Arshamomaque Pond, Dam Pond and Mill Road
Preserves and other Town facilities.
· Accepting and distribution deer delivered to the Deer Truck at the
Southold Recreation Center.
· Re-graded Town Beach and Goldsmith Inlet to protect the parking
lots at these locations.
· Attend several FEMA meetings and worked with Nancy Foote and
Jeff Standish to document and record the hours and damage to
FEMA for reimbursement.
· Removed several large trees at Laurel Lake & Downs Farm
Preserves that come down in December.
· Installed a new roof and gutters on the Southold Justice Court
building.
· Checked and repaired the Lifeguard stands for the 2013 season.
· The DPW staff replaced the gutters at the Downs Farm Preserve that
were damaged by Hurricane Sandy.
· Installed carpet in Captain Kruszeski's office at the Police
Department.
· Submitted permit applications to the NYSDEC, Army Corps.,
NYSDOS and Southold Trustees for the 4th Street, New Suffolk Road
End Restoration Project.
· Cut back ornamental grasses at Town Beach.
· Repaired the handrail at the Police Department.
· Replaced the ramp on the storage shed at Town Hall.
· Decorated Town Hall, the Gazebo and miscellaneous properties for
the Holidays.
· Installed (2) new overhead garage doors at the Southold Highway
Department.
· Repaired soffits, siding and minor roof damage at the Southold
Highway Department (Hurricane Sandy).
· Tim Abrams has completed the installation of energy efficient lights
at the Human Resource Center and Katinka House, as part of a
LIPA grant.
· Installed a handrail at the Peconic Lane Community Center.
· Installed a new sign at the Laurel Information Booth.
· Repaired the washers and dryers at the Southold Animal Shelter.
· Attend the annual inspection of the Downs Farm Preserve with the
Peconic Land Trust, as part of the conservation easement with the
Land Trust.