Loading...
HomeMy WebLinkAbout1000-37.-5-20 OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Jim King, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: February 15, 2012 Re: Proposed Wetland Permit for MADELINE SCHLAEFER SCTM# 1000-37-5-20 Costello Madne Contracting Corp. on behalf of MADELINE SCHLAEFER requests a Wetland Permit to remove existing ladder; remove sufficient portion of existing wood walkway to allow removal of 47' of existing bulkhead; construct 47' of new bulkhead in-place; re-install existing ladder; and replace removed walkway in-place as needed. Located: 100 Knoll Circle, East Marion. SCTM#37-5-20 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Prograrn (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the LWRP review provided the following best management practices are required: if the action is approved, to further Policy 5: Protect and Improve Water Quality in the Town of Southold and Policy 6; Protect and Restore the Quality and Function of the Town of Southold Ecosystem it is recommended that the Board require a silt boom during construction. § 275-11. Construction and operation standards. A. General. The following standards are required for all operations within the jurisdiction of the Trustees: (2) Erosion control. Installation of an erosion control structure is necessary during any building, grading, landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation of a silt fence, hay bales, wood chip berm and silt booms. The placement of the erosion control structure(s) shall be determined by the Trustees or their designee. All intertidal construction and excavation requires the installation of a silt boom that will retain all suspended sediments within the immediate project area. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Lori Hulse, Assistant Town Attorney Town of South, old LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information by a Town of Southold agency in making a determination of consistency, actions including Building Permits and other ministerial Before answering the questions in Section C, the minor action Waterfront Revitalization Program. A beneficial and of this form should review the exempt ~olicy contained in the Town of Southold Local action will be evaluated as to its significant all of Southold Town). If any question in Section C on this form is ~ achievement of the LWRP policy Thus, the action should be analyzed in determination that it is consistent to standards and conditions. If an standards and then the proposed action may affect the contained in the consistency review law. detail and, if necessary, modified prior to making a maximum extent practicable with the LWRP policy cannot be certified as consistent with the LWRP policy A cop> is available in following places: online at the Town of Southold's website the Board of Trustees Office, the Planning Departn~t, ail/ local libraries and th~ [rice. B. D~;CRIPTI~N OF SIT;; D ACTION ,. .... The Application has been submitted to ,priate response): TownBoard [~ Planning Dept. ['-] BuildlngDept. [-]' BoardofTrustees[~]/~~ Category of Town of Southotd agency action(check appropdateresponse): (a) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) (c) Permit, approval, license, certification: Nature and extent of action: Remove existing ladder. Remove sufficient portion of existing wood walkway to allow removal o£47' o£existing bulkhead. Construct 47' of new bulkhead in-place. Reinstall existing ladder. Replace removed walkway in-place as needed. Location of action: 100 KNOLL CIRCLE, EAST MARION Site acreage: 0.21 ACRES Present land use: SINGLE FAMILY RESIDENCE Present zoning classification: R-40 RESIDENTIAL LOW DENSITY AA If an application for the proposed action has been filed with the Town of Southold agency, the following ~ormation sM be provided: (a) Name of applicant: MAELEINE SCHLAEFER (b) Mailing address: PO BOX 753, EAST MARION, NY 11939 (c) Telephone number: Area Code ( ).§31.477.2412 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes [~ NoN Ifyes, whieh state or federai agency?NYSDEC, NYSDOS, ACOE DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. [~Yes ~-] No ~ Not Applicable Our proposal is an attempt o£ the upland property owners to maintain their property. The existing bulkhead is £ailing and we are proposing to reconstruct the structure so that the area is stab'dized. Ourproposal will not have any effect on the community character or preservation o£ open space. The adjacent properties have similar structures. ,~aacn aaamonm Sheets 1~ ll~asary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria ['-] Yes ~] No ~-] Not Applicable This property has no significant historic resources. Attach additional sheets if~eeessay Policy 3. Enlumce visual quality and protect scenic r~ources throughout the Town of Southold. Sec LWRP Section III - Policies Pag~ 6 through 7 for evaluation criteria [] Yes ~-~ No ~ Not Applicable Our proposal is an attempt to mztntala the property and to enhance the appearance o£ the property. The visual quali(y will be enhanced ~4th the new structure. Attach additional sheets it necessary NATURAL COAST POLICIES Policy 4. ~Iinimlze loss of life, structures, and natural resources from flooding and erosion. Sec LWRP Section Hl - Policies Pages 8 through 16 for evaluation criteria ~ Yes ~ No ~ Not Applicable Our proposal ~ not have any influence on the loss o£1ffe, structures and natural resources [rom flood~g and erosion. We are reconstructing a structure which has existed £or many years. The area has adapted to the structure and removing the structure would cause significant problems. Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III - Policies Pages 16 through 21 for evaluation criteria ~'~ Yes ~-~ No ~'~Not Applicable The proposal will not have any impact on the water quailO, or supply of the Town of Southold. Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southoid ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. ~'~ Yes ~-~No[~ Not Applicable This proposal will not have any impact on the Town o£Southold's ecosystem. Ail construction debris will be contained and ali Best Management guidelines will be adhered to. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria. N Yes [-~No[~ Not Applicable This proposal will not have any impact on the air quall~y of the Town of Southold. Atlach additional sheets if necessary Policy 8. Minimi~.e environmental degradation in Town of Southold from solid waste and Imzardous substances and wastes. See LWRP Section HI - Policies; Pages 34 through 38 for evaluation criteria. []Yes ~-~ No ~'] Not Applicable This proposal will not degrade the environment with solid waste or hazardous substances. PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreations! use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section IH - Policies; Pages 38 through 46 for evaluation criteria. otApplicable Our proposal will not limit the public's abili(y to access coastal waters, public lands or public resources of the Town o£Southold. There will be no seaward extension. Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southoid's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria. [~-']Yes ['--] No F'--] Not Applicable Our proposal'is to t~construct an existing bulkhead. The exfsting bulkhead is showing Jts age and being to fall. This property Is generalJy used to engage in water-dependent activities such as lfshtng and swimming by the properly owners and their famti~v. These activities will continue at the site once construction is complete. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. ElY. D No Not Applicahle The proposed reconstruct to the existing bulkhead will have no significant effects on the living marine _rOSOlll~S. Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. Ycs -- Not Ap licahle This proposal will have no impact on the agricultural lands ia the Town o£ Southold. Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. This proposal has no imTueace on the development of eaergy or mineral resources. Created on 5/25/05 11:20 AM V/c /).~/7'7' /L4~1~