HomeMy WebLinkAbout37130-ZTown of Southold Annex
P.O. Box 1179
54375 Main Road
Southold, New York 11971
6/21/2012
CERTIFICATE OF OCCUPANCY
No: 35759
Date:
6/21/2012
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 5000 Paradise Point Rd, Southold,
SCTM #: 473889 Sec/Block/Lot: 81.-3-1.4
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this officed dated
3/29/2012 pursuant to which Building Permit No. 37130 dated 4/10/2012
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
roof mounted electric solar panel system as applied for.
The certificate is issued to
James, Elyse
(OWNER)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO.
PLUMBERS CERTIFICATION DATED
37130 6/4/12
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit #: 37130
Permission is hereby granted to:
James, Elyse
18 Westcott Rd
Riverside, CT 86878
Date: 4/10/2012
To:
install a roof mounted electric solar panel system as applied for
At premises located at:
5000 Paradise Point Rd, Southold
SCTM # 473889
Sec/Block/Lot # 81 .-3-1.4
Pursuant to application dated
To expire on 1011012013.
Fees:
3/29/2012 and approved by the Building Inspector.
SINGLE FAMILY DWELLING - ADDITION OR ALTERATION
CO - ALTERATION TO DWELLING
ELECTRIC
Total:
$200.00
$50.00
$100.00
$350.00
- Bui'~ding Inspector
Form No. 6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use: 1. Final survey of property with accurate location o£all buildings, property lines, streets, and unusual natural or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal (S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead.
5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and "pre-existing" land uses:
1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied, the Building Inspector shall state the reasons therefor in writing to the applicant.
C. Fees I. Certificate of Occupancy - New dwelling $25.00, Additions to dwelling $25.00, AItarations to dwelling $25.00,
Swimming pool $25.00, Accessory building $25.00, Additions to accessory building $25.00, Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building- $100.00
3. Copy of Certificate of Occupancy - $.25
4. Updated Certificate of Occupancy- $50.00
5. Temporary Certificate of Occupancy - Residential $15.00, Commercial $15.00
Date. ..~ · 2 ~' t 2.
New Construction: Old or Pre-existing Building: v/
Location of Property: .~OOO ~a.~'-na[t~ 'i~Otr',q' ~
(check one)
House No. Street
Owner or Owners of Property:
Suffolk County Tax Map No 1000, Section
Subdivision '~ r~' t ~
Block ~ Lot
Filed Map. ~>"7~:, ( Lot:
Applicant: ~__~ r~ ~at-~ t e-
Underwriters Approval:
PennitNo. -~"~1 .~
Health Dept. Approval:
Date of Permit.
Planning Board Approval:
Request for: Temporary Certificate
Fee Submitted: $ ~O
Final Certificate:
(check one)
'/ Applicant Signature
Hamlet
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, NY 11971-0959
Telephone (631 ) 765-1802
Fax (631) 765-9502
ro,qer, richert~,town.southold.ny.us
BUILDING DEPARTMENT
TOWN OF SOUTItOLD
CERTIFICATE OF ELECTRICIAL COMPLIANCE
SITE LOCATION
Issued To: Elyse James
Address: 5000 Paradise Point Road City: Southold St: NY Zip: 11971
Building Permit#: 37130 Section: 81 Block: 3 Lot: 1.004
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: Oreenlogic LicenseNo: 43558-me
SITE DETAILS
Office Use Only
Residential ~ Indoor ~ Basement ~ Service Only ~
Commerical Outdoor 1st Floor Pool
New Renovation 2nd Floor Hot Tub
Addition Survey Attic Garage
INVENTORY
Servicelph ~ Heat ~ DuplecRecpt ~
Service 3 ph Hot Water GFCi Recpt
Main Panel NC Condenser Single Recpt
Sub Panel NC Blower Range Recpt
Transformer Appliances Dryer Recpt
Disconnect Switches Twist Lock
Other Equipment:
Ceiling Fixtures ~ HID Fixtures
Wall Fixtures I I Smoke Detectors
Recessed Fixtures[E~ CO Detectors
Fluorescent Fixture~.~ Pumps
Emergency Fixtures~ Time Clocks
Exit Fixtures ~ TVSS
roof mounted PHOTOVOLTAIC SYSTEM to include 30 Sun Power spr 240 panel~
1 Sun Power spt 7000 inverter with all required grounding and disconnects
Notes:
Inspector Signature:
Date: June 4 2012
81-Cert Electrical Compliance Form.xls
[ ] FOUNDATION 1ST
[ ] FOUNDATION 2ND
] FRAMING / STRAPPING
[ ] FIREPLACE & CHIMNEY
[ ] ROUGH PLBG.
[ ] INSULATION
[ ] FINAL
[ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [~ELECTRICAL
(FINAL)
REMARKS:
DATE ~/¢//~'/ INSPECTOR~
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND I ] INS~I. ATION
[ ] FRAMING/STRAPPING [ ,~FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
REMARKS.'~~
DATE
INSPECTOR
Pacifico Engineering PC
700 Lakeland Ave, Suite 2B
Bohemia, NY 11716
www.pacificoengineedng.com
Engineering Consulting
Ph: 631-988-0000
Fax: 631-382-8236
engineer@pacificoengineering.com
June 4, 2012
Town of Southold
Building Department
54375 Route 25, P.O. Box 1179
Southold, NY 11971
Subject:
Solar Energy Installation for
Roy and Elyse James
5000 Paradise Road
Southold, NY 11971
I have reviewed the solar energy system installation at the subject address. The units have been installed in
accordance with the manufacturer's installation instructions and the approved construction drawing. I have
determined that the installation meets the requirements of the 2010 NYS Building Code, and ASCE7-05.
To my best belief and knowledge, the work in this document is accurate, conforms with the governing codes
applicable at the time of submission, conforms with reasonable standards of practice, with the view to the
safeguarding of life, health, property and public welfare.
Regards,
Ralph Pacifico, PE
Professional Engineer
TOWN OI~$OUTHOLD
BUILDING DEPARTMENT
TOWN HALL
SOUTHOLD, NY 11971
TEL: (631) 765-1802
FAX: (631) 765-9502
SoutholdTown. NorthFork. net
Examined
Approved
Disapproved a/c
PERMIT NO.
BUILDING PERMIT APPLICATION CHECKLIST
Do you have or need the following, before applying?
Board of Health
4 sets of Building Plans
Planning Board approval
Survey
Check
Septic Form
N.Y.S.D.E.C.
Trustees
Flood Permit
Storm-Water Assessment Form
Contact: ~ r ~r~ t,O~ l C- {~t~
Mail to:q3% O. canqu °dr2flA
Expiration / , 201 ~ , O ~
......... I - - ~ ~ ,'// {I
i ..... DUllomg lnsBector
:;; [ LICATION FOR BUIL.ING PEmT
10..,i}i' ~ ,'; ":/~ [ INSTRUCTIONS -
a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans, accurate plot plan to scale. Fee according to schedule.
b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or
areas, ~d wate~ays.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a pe~it
shall be kept on the premises available for inspection throughout the work.
e. No building shall be occupied or used in whole or in pa~ for any purpose what so ever until the Building Inspector
issues a Ce~ificate of Occupancy.
L Eve~ building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or h~ not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an
addition six months. Thereafter, a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Depa~ment for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk Count, New York, ~d other applicable Laws, Ordinances or
Regulations, for the construction of buildings, additions, or alterations or for removal or demolition ~ herein described. The
applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
(Si~ature of applicant or name, ifa ~orporation)
(Mailing ~hdress o~applicant)
State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder
Name of owner of premises [ x{,6~_.
(As on the tax roll or latest deed)
If applicon_ corp~re of duly authorized officer
(Nan~ and title of corporate officer)
Builders License No.
Plumbers License No.
Electricians License No.
Other Trade's License
Location of land on which proposed wo_9~rk will be d_onl::
House Number Street
Hamlet
County Tax Map No. 1000 Section
Subdivision -~,~-~,~.L~-~E '~0~"
Block ~ Lot ( 'OOdc
Filed Map No. ~']~l Lot
State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy -~trxr::~_~ -Pr,::z~twxt[~
b. Intended use and occupancy
Nature of work (check which applicable): New Building.
Repair Removal Demolition
Estimated Cost ~o2~'t oho O Fee
If dwelling, number of dwelling units
If garage, number of cars
Addition Alteration
Other Work ~ v~rtOmr'~ $o~
(Description)
(To be paid on filing this application)
Number of dwelling units on each floor
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.
7. Dimensions of existing structures, if any: Front ~ ~>: ~ ' Rear ~,~ ~ ' Depth
Height Number of Stories
Dimensions of same structure with alterations or additions: Front
Depth Height Number of Stories
Rear
8. Dimensions of entire new construction: Front Rear Depth
Height Number of Stories
9. Size oflot: Front t~%.% ? Rear lt./*/.f'~. Depth
l 0. Date of Purchase l q ~ Name of Former Owner ~ ~
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO v/
13. Will lot be re-graded? YES NO ~ Will excess fill be removed from premises? YES NO ~/
14. Names of Owner of
Name of Architect'~,~e~co
Name of Contractor
Address~ Phone No. 2o ~ .4,~t g'- t o'~'"t
Address 'l~r~.~,h''~ Phone No 6, St- tt ~>g -0ooo
Address g~-~*- ~.,~:~-~,rv~J Phone No. ¢51-'1'~-~-I
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES ~/' NO __ * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES ~/' NO__
* IF YES, D.E.C. PERMITS MAY BE REQUIRED.
16. Provide survey, to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey.
18. Are there any covenants and restrictions with respect to this property? * YES __
· IF YES, PROVIDE A COPY.
NO v/
STATE OF NEW YORK)
counTY oF-Su,q*tr )s:
Ix'[~'~ t~ ]5~Al'~OO/°r~lF~' being duly sworn, deposes and says that (s)he is the applicant
,CName of individual signing contract) above named,
(S)He is the (~Ct4'V'~ c.4J OW'
(Contractor, Agent, Corporate Officer, etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn to before me this
~ g day of ~:~re_~ 20 t ~
/~d~a~~ 6ASCIOTTA
~3t~ly Public, State of New York
NO. 0~.-0A4894969
{~ualified in Suffolk CourJ.[y,., I
Commilsion Expires May 11, ,;~u
Signature of Applicant
Jam~s F. King, President
Bob Gho~io, Jr., Vice-President
Dave Bergen
John Brzdemeyer
Michael J. Domino
Town Hall Annex
54375 Main Road
P.O. BOx 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 76.5-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 0754C
Date: June 5, 2012
THIS CERTIFIES that the installation of a roof mounted solar electric system onto the
existing dwelling.
At 5000 Paradise Point Road, Southold, New York
Suffolk County Tax Map # 81-3-1.4
Conforms to the application for a Trustees Permit heretofore filed in this office
Dated February 24, 2012 pursuant to which Trustees Administrative Permit #7750A Dated
March 21, 2012 was issued and conforms to all of the requirements and conditious of the
applicable provisions of law. The project for which this certificate is being issued is
for the installation of a roof mounted solar electric system onto the existing dwelling.
The certificate is issued to ELYSE JAMES owner of the
aforesaid property.
Authorized Signature
~ ~ ]-~ ~ 17'7. JUN ] 2 2012
Town of Southold
Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM
PKOPERI'Y LOCATION: S,C.T.M. #: I~_ THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A
[~) ~ ( ~ ~~[ STORM-WATER, GRADINGf DRAINAGE AND EROSION CONTROL PLAN
o~i0t $,c,.. B~k t CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK.
SCOPE OF WORK - PROPOSED CONSTRUCTION i'llJ~V~# / WORK ASSESSMENT [ Yes No
a. WhatlstheTotalAreaoflhePmjectParcels? ' 1 WillthisPmjectRetotsAllStsrm-WaterRen-Off
(include Total Area of all Parcels located wllhin
t he Scope of Work for Proposed Construction)'~/'~/' I I~ -'~ 1[~(~,~ Generated by a Two (2') tnch Rainfall on Site? '---~ r'~
b, Whal is the Total Area of Land Clearing (sy. t/~) (This itsm will include all run-off created by site
clearing and/or construction activities as well as all
and/or Ground Disturbance for the proposed Site Improvements and the permanent creation of
construction activity? impervious surfaces,)
(e...,~..~ 2 Does the Site Plan and/or Survey Show AIl Proposed
PROVIDE BRI~ PROW, CT DI~CRIIvFION [P~.,~*,~:~ ~ .. ~ Drainage Structures Iodicating Size & Location? This
Item shall Include all Prol:x~ed Grade Changes and
I n$4- ll v-eonc moa. 4e StupeeCon ti,.gBe.acoWatur.ow.
and sediment control practices that will be used to
control site erosion and storm water discharges. This
item must bo maintained throughout the Entire
Construction Pealed.
4 Will this Project Redu[ra any Land Fir/lng. Grading or
!
Exce~agon where there lsa chan~s to th$ Natural ~ ./
Existing Grade Involving more than 200 Cubic Yards
of Material within any Parcel?
I ~ WillthlsAppllcatlonRaguireLandDIstorbingActivities
Encompassing an Area in Excess of Five Thousand
(5.000 S.F.) Square Feet of Ground Surface? --
6 is there a Natural Water Course Running throL~Jh the
Site? Is this Project within the Trostses Jurludiction
General DEC SWPPP Reuulremeofs: or within One Hund red (1001) feet of a Welland or --
Sub rnla~cn of a SWPPP is required for a~ Co~atru~on ad&vitJes InvMving $o~1 Beach?
disturbances of one (t) or mom acres; includl.g disturbances of ~ Ihan one acre thai 7 Will there be Site preparation on Exisgng Grade Slopes
are part of a larger coranto,q p~a~ teat will uitimetoly disturb one or mom acres of land: which Exceed Flfteen (15) feet of Vertlcst Rise to r~
inciud~g ~d'l°n acflvlUes Inv°lvi~9 soil ~i~sturbances I~' less teen °ne (1 t acre where One Hundred (100') of Hcrlzontsl Dislance?
the DEC has de, ermined that a SPDES permit I$ requln~ for atorrn water diSCharges.
8WPPP's 8hall meet Ihe Minimum Req~lremento of the SPBES General Permff 8 Will Driveways. Parking Areas or other Imperious ~ /
for ~towa Water Dl~cherge~ frml~ CenstruMion acit vity. P®mlR No. GP~-I 0~01 .) Surfaces be Sloped to Direct Storm-Water Run-Off
1. The SWPPP shall be prepema p~or to Ihe submittal of the NOI. The NOJ shall be Into and/or in the direction of a Town fight.of-way?
eubmltod to the Def~ttment i~ior to the commencement of ~sltuatlon activity.
2. ~ ~/PPP shetl desodbe the en~lon and sedhnent control p~acfloe~ and where 9 Will this Project Raguim the Placement of Material.
required, best-~op~lmcfloo sb~r~l water management pracUce~ thetv, fll be used ~mdlor Removal of Vegetation andlor the Construction of any
conatmct~:l to mdu~ ~ p~lutant~ In *torm wat*t d~sc~r$~ ~nd to a.~u~ Itom Within the Town Right-of-Way or Road Shoulder
STATE OF NEW YORK, 0--~ ~..~r.~ t k~
' ......... ss
................................................................................ g y , eposes anct says mat he/She is me applicant for Permit,
And that he/she is the
.......................................... · "('~ E~;~&;;~,~'&i;'~i; ~;,'~ki ................................................................
Owner and/or representative of the O~]~ or Owners, and is duly authorized to perfoml or have per,brined the said work and to
make and Fde this application; that all statements contah~ed in this application are true to the best of his knowledge mid belief; and
that the work will be performed in the manner set forth in the application fded herewith.
Sworn to before mc this;
....... ............ dayo +-
x:.x z~.':~ ~ ........... , ........ ~e~.,~'~'~'~; ..........................
FORM - 06/10
Notary Public. State of New York
No. 01-CA4894969
~ualified in Suffolk County
Cemmi~$i0n Expires May 11, ~
54375 Mah Road
P.O. Box 1179
~thold, NY 11971-0959
Telephone (631) 765-1802
m er rich · 'J~ (631) 7c~.qs(A
g · e~to~.souinolo.ny-~
BUT[~DiNG DEPARTMENT
TOWN OF $OUTHOLD
APPLICATION FOR ELECTRICAL INSPECTION
Company Name:
Name:
Li~nse No.:
No.:
Date: ,~ '2~ .1~-
(05(-q'31. %ts~
*Name:
*Address:
*Cross Street:
*Phone No.:
Permit No.:
TaxMap District:
JOBSITE INFORMATION: (*Indicates required information)
1000 Section: ~ I
*BRIEF DESCRIPTION OF WORK (Please Print Cleady)
Block: 3 Lot:
(Please Circle All That Apply)
*Is job ready for inspection:
*Do you need a Temp Certificate:
Temp Information (If needed}
*Service Size: 1 Phase 3Phase 100
*New Service: Re-connect Underground
Additional Information:
YES/(~ Rough In Final
No
150 200 300 350 ,400 Other
Number of Meters Change of Service Overhead
PAYMENT DUE WITH APPLICATION
82,-Request for InspeclJon Form
13--
GREENLOGIC
March 28, 2012
Town of Southold
Building Department
Town Hall
$3095 Route 25
Southold, NY 1197:].
Dear Building Inspector:
Please find attached a building permit application on behalf of Elyse James who has engaged us
to install a roof-mounted (flat to the roof) solar photovoltaic (PV) electric system for her home
at 5000 Paradise Point Road, Southold.
In connection with this application, please find attached:
· Building Permit application
· A Storm Water Assessment Run-off Form
· Certificate of Occupancy Application
· 2Surveysofthe Premises
· Four Engineer's Reports (2 originals and 2 copies)
· Four Visio Diagrams of the proposed system
· Two spec. sheets of the solar panels (SunPower SPR-240WHT)
· Two Spec. sheets of the inverter (SunPower SPR7OOOm)
· GreenLogic Suffolk County Home Improvement License
· GreenLogic Certificate of Liability Insurance
· GreenLogic Certificate of Worker's Compensation Insurance Coverage
· Installation Manager's Master Electrician's License
· Check for $250 (5200 building permit/S50 CO)
· Application for Electrical Inspection with a check for $100
Please let us know if you need anything else in connection with this application.
Yours truly,
Barbara Casciotta
Account Manager
GreenLogic LLC
631-771-5152 ext. 117
: ~ ~' ,~: ! '~, Teh g77 7714330 Fax: 877 7714320
SOUTHAMPTON,'CORPORATE CUTCHOGUE MANORVILLE: NEW YORK CITY:
i !, C tnty Rd 39A 1070 Depot Lane 40
S(}t Ii ;Irllr)trn, NY 1]968 Cutchogue. NY 11935 m~mrvi;ic NY ]1949
ROSLYN HEIGHTS:
24I 6th Avenue #3B 200S Service Rd., #108
New York, NY 10014 Ro~yhl Heights NY
June 8, 2012
The Town of Southold
Building Department
54375 Route 25
P.O. Box 1179
Southold, NY 1197!
Re: Building Permit No. 37!30
Elyse James
5000 Paradise Point Road, Southold
To the Building Inspector:
Enclosed please find the Engineer's Certification Letter and the Town of Southold Board
of Trustees Certificate of Compliance for Elyse James' solar electric system, which we
installed at 5000 Paradise Point Road, Southold. Please arrange to send her the
Certificate of Occupancy and close out the building permit. Please let me know if you
have any questions about the installation.
Sincerely,
Barbara Casciotta
Account Manager
GreenLogic LLC
631-771-5152 ext. 1!7
JUN I 2 2012
BLDfi DEP1
TOWN OF SOUIHOLD
F N. ,,~v,~ ;~,;~,~ i :. %4:877.7714330 Fax: 877771.4320
SOUTHAMPTON/CORPORATE: CUTCHOGUE: MANORVILLE: NEW YORK CITY:
4)5 (}OLir ty Rd 39A 1070 Depot Lane 40 We~odl ~r/d Averm{, 241 6th Avenue #3B
%odtm}mptor . NY 11968 Cutchogue, NY 11935 M]ncJr¥11c NY 11949 New York, NY 10014
ROSLYN HEIGHTS;
200 S Scrvice Rd. #}08
Rosyh Heights NY 1157/
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, NY 11971-0959
Telephone (631 ) 765-1802
Fax (631 ) 765-9502
BUILDING DEPARTMENT
TOWN OF SOUTI-IOLD
June 11, 2012
GreenLogic LLC
425 County Rd 39A
Southampton, NY 11968
RE: James, 5000 Paradise Point Rd, Southold
TO WHOM IT MAY CONCERN:
The Following Items Are Needed To Complete Your Certificate of Occupancy:
**NOTE - Need Certification from an Architect or Engineer certifying the fastening of the panels to
the roof system.
Application for Certificate of Occupancy. (Enclosed)
Electrical Underwriters Certificate. (contact your electrician)
A fee of $50.00.
__ Final Health Department Approval.
Plumbers Solder Certificate. (All permits involving plumbing after 4/1184)
__ Trustees Certificate of Compliance. (Town Trustees # 765-1892)
Final Planning Board Approval. (Planning # 765-1938)
Final Fire Inspection from Fire Marshall.
Final Landmark Preservation approval.
BUILDING PERMIT: 37130 - Solar Panels
Suffolk County Executive's Office of Consumer Affairs
VETERANS MEMORIAL HIGHWAY * HAUPPAUGE, NEW YORK 11788
DATE ISSUED: 12/10/2007 No. 43858-ME
SUFFOLK COUNTY
Master Electrician License
This is to certify that
ROBERT J SKYPALA
GREI~,NLOGIC LLC
doing business as
having given satisfactory evidence of competency, is hereby licensed as MASTER ELECTRICIAN in accordance
with and subject to the provisions of applicable laws, rules and regulations of
the County of Suffolk, State of New York.
Additional Businesses
NOT VALID WITHOUT
DEPARTMENTAL SEAL
AND A' CURRENT
CONSUMER AFFAIRS
ID CARD
Director
,, Subdivision Map
Paradise Point, Sect/on
Surf. Co. File No. 5761
X
NOTES:
Survey for:
ROY JAMES &
EL YSE JAMES
Bayview
Town of
$outhold
Suffolk County, New York
S.C.T.M,: 1000-081,00-05.00-001.004
60 0 50
I '
SCALE: 1"=50'
1. AREA = 25,474 S.F.
2. · = MONUMENT FOUND, A = STAKE FOUND.
5. REFERENCE DEED L 11854 CP 798
4. ELEVATIONS SHOWN HEREON ARE REFERENCED
TO N.O.V. DATUM (MSL 1929).
5. THIS PARCEL IS WITHIN ZONES SHOWN HEREON
AS DILINEATEO ON FIRM BOUNDARY MAP NO.
56105C0167 G LAST DATED MAY 04, 1998.
FEB. 16, 2012 UPDA~ TAX MAP #
JAN. 5, 2012 UPDAIE SURVEY & TOPO
MAR. 05, 2006 UPD~ SURVV~
JUNE 01, 2005 eE.VOWD ROW
DATE: JULY 15, 2004
JOB NO: 2004-415
CERTIFIED TO:
ROY JAMES & ELYSE JAMES
OAVIO H. FOX N,Y.S.LS. #50254
FOX LAND SURVEYING
64 SUNSET AVENUE
WESTHAMPTON BEACH, N.Y. 11978
(651) 288-0022
DWG: 2004-415
3 Strings of 10 SunPower
240 W panels,
Each stdng 2400 watts
Array total of 7200 Watts
I
I
I
I
All panels to be
grounded as par
NEC code
INVERTER
2, 30 AMP two pole
DC switches from
panels to inverter
240 VAC fi.om inverter to a 30
Amp switch near utility meter
Sur~m'~ ,S~ar Panels are the most
elTic.'mfll pJ~4~vollaic panels on the
marlr4~
Our ~~ more power in
the ~an~ amo~mt Qf ~pace- up to 50%
more than ~'on~ntional d~igns and
100% ~ ~ thin film solar panels.
More pow~ I~r ~ means [~wer
panels I~r h~s~#. This saves ~ ti~
and ~.
Proven materials, t~mpered front glass,
and a s~dy onadized frame allow
pan~t te ~ ~ in multiple
SERIES
The SunPowerTM 240 Solar Panel provides to~/s highest efficiency and
perlormance. Utilizing 72 all back.contact solar cells, the SunPower
240 delivers a total panel conversion efficiency of 19.3%. The panel's
reduced voltage-temperature coefficient, anti-reflective glass and
exceptional Iow-light performance altributes provide outstanding energy
delivery per peak power walt.
20%[
15%
10%
10%
SunPower's High Efficiency Advantage
18% 19%
14%
5%
O%
Thin Film Conventional SunPower SunPower
E18 Series E19 Series
Electrical Data
Peak Power (+5/-3%1 Pmax 240 W
Egiciency q 19.3 %
Rated Voltage Vmpp 40.5 V
Rated Currenl Impp 5.93 A
Open Circuit Voltage Voc 48.6 V
Short Circuil Current Isc 6,30 A
Maximum System Voltage UL 600 V
Temperature Coefficients Power (P) -0.38% / K
Vollage ~/oc} -132.5mV / K
Currenl (Isc) 3.SMA / K
NOCT 45° C +/-2° C
Series Fuse Rating 20 A
Solar Cells
Front Glass
Junction Box
Output Cables
Frame
Weight
Mechanical Data
72 SunPower alH:~ack contact monocrystelline
High transmission tempered glass with
anti-reflective {AR) coating
lPg5 rated with 3 bypass diodes
Dimensions: 32 x 155 x 128 (mm)
lO00mm length cables / MuhiContect (MC4) connectors
Anodized aluminum alloy type 6063 (black)
33.1 lbs. (15.0 kg)
I-V Curve
Tested Operating Conditions
Temperature -40° F to +185° F (40° C to + 85° C)
Max load 113 psf 550kg/m2 J5400 Pa) front - e.g. snow;
50 psf 245kg/m2 (2400 Pa) fronl and back - e.g. wind
Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s)
Warranties
Certifications
Warranties and Certifications
25 year limited power warranty
10 year limited product warranty
Tested to UL 1703. Class C Fire Rating
Dimensions
MM 2X 200
(IN} [7.85]
[61.39~ [1.81]
2X 577
[22.70]
t
· 2X ~4,2
4X 12
[.47]
[47.24]
4X 322 · 2X 915 ·
[,2.6'~/l [36.o21 I
2X 1535
[60.45]
!7.07]
[9.09]
~ ' [.43]
6X 754
[29.69]
-).
[7.8S]
Pacifico Engineering PC
700 Lakeland Ave, Suite 2B
Bohemia, NY 11716
www.pacificoengineering.com
February 9, 2012
Town of Southold
Building Department
54375 Route 25, P.O. Box 1179
Southold, NY 11971
Subject: Solar Energy Installation for
Roy and Elyse James
5000 Paradise Road
Southold, NY 11971
Engineering Consulting
Ph: 631-988-0000
Fax: 631-382-8236
engineer~pacif'moengineedng.com
/Gi i~OVED AS NOTED
~' ',~' 8 AM TO 4 P~ ~OR THE
., 'j~v~,G INSPECTIONS:
F ~UNDATiON- TWO REQUIRED
~',}R ROURED CONCRETE
2 ~3JG~-FRAMING, PLUMBING,
STRAPPING, ELECTRICAL & CAULKING
3 INSU~TION
4 FINAL- CONSTRUCTION & ELECTRICAL
MUST BE COMPLETE FOR C.O
ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
CLIMACTIC AND Gmum Wind Live load, point
Speed, 3 prier30 per
GEOGRAPHIC DESIGN Category iSnow Load sec gust, ASCE 7, pullout Fastener type
CRITERIA Pg mph psf load, lb
Roof Section A C - 20 120 37 379 #14-13x3" DPI Concealer
Screw
#14-13x5" DPI Concealer
Screw
,?, ?-~
'1'-' / ~..~,,~.' \' ',
Professional Engineer
I have reviewed the roofing structure at the subject address. The structure car~'a~l/~31~all~ii3Hi'6t's'~'~''~°'~'~'~''~ n~ ~n~
the r~f mounl~ ~y~l~m. Th~ uni~ ~ ~ ~ in~l~ in ec~n~ ~i~ ~h~ m~n~m~ in~ll~on
ins~o~ons. I h~e ~e~in~ lh~l ~e in~l~n ~ll m~ ~e ~uimmen~ of lh~ 20~0 NY8 Bui~in~ ~e,
~nd A~CE7~ when in~l~d in ~c~nce wi~h ~e m~nu~ctu~ in~ru~ion~.
R~f ~ion A
m~n ~f height 22 ~ ELECTRICAL
pitch 1i.,~ INSPECTION REQUi~E9
r~f rafter 2x12
rafter s~ing 16 in OC
Refl~ ~f m~r s~n 15.8 ff
Table R80Z5.1(1) max 23.8 ff
The clima~ and I~d in~rmafion is ~w:
J LOGIC'
ELIMINATING THE COST OF ENERGY
Chimney 4' above roof.
DRAW1NG NUMBER: Paciflco Engineering PC
I OF 7
SURFACE I LAYOUT *Always double check measurements ~ ~ ~,,~ ,u c~ ~,~E~,;,,.~
GreenLogic, LLC - Approved 7.2kW
_,_./avnut 30 .. ~.~un-ower 240w Panel Dimension = 61.39"x31.42"
UniRac Solarmount Array Length =368.34 .
Roy and Elyse James .~imuth = 305° Array Height = 63.84"
~oint ~itch = 4.S~ to the ~o~h Su~a~ ~im~n~on, ~a~ 0"x2~0"
5000
Paradise
Southold, NY S~le 3/16" = 1.0' Magic ~ = N/A
A) A~chment ~po ~nd count: ~ ~chm~nt ~oint
B) Rail type and count: UniRac Sunframe : UniR~ Sola~ou~t ~{, '.J22~- '
2x12" Douglas Fir Raflem 16"
On C~ter Ralph Pac~co Professional Engin~r
Layout Created By: MVP Date: 1-30-12
m ELIMINAI'ING THE COST OF ENERGY
Chimn
roof.
DRAWING NUMBER: Paciaco Engineering PC
SURFACE 1 ATTACHMENT *Always double check measurements
GreenLogic, LLC - Approved 7.2kW
Layout 30 ~ ~,eun-ower 240w Panel Dimension = 61.39"x31.42"
UniRac Solarmount Army Length =368.34" .~ f-,~ NE~"~:.,
Roy and Elyse James Azimuth = 305° Array Height = 63.84"
5000 Paradise Point Pitch = 4.5° to the North Surface Dimensions =410"x270"
Southold, NY Scale 3/16" = 1.0' Magic # = N/A ~!'~- I ~,,~ ~ / ~1\\
'SSUES'SPEC' '"ST"UC"ONS
PROJECT COMPONENT COUNT ~ Sunpower 240w
A) Attachment type and count: 60 Fast Feet. , Attachment Point
UniRac
Solarmount
B) Rail type and count: UniRac Sunframe
~ 2x12" Douglas Fir Rafters 16" Ralph Pacifico Professional En~]ineer
On Center
Layout Created By: MVP Date: 1-30-12
LOGIC
ELIMINATING THE COST OF ENERGY
IJ
DRAW1NG NUMBER: Pacilico Engineering PC
3 OF 7
SURFACE 1 STRINGING 3X10 ON SPR7000M *Always double check measurements
GreenLogic, LLC - Approved 7.2kW
Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42"
IUniRac Solarrnount Array Length =368.34" ../
Roy and Elyse James Azimuth = 305° Array Height = 63.84"
5000 Paradise Point Pitch = 4.5o to the North Surface Dimensions =410"x270"
Southold, NY Scale 3/16" = 1.0' Magic # = N/A
ISSUES I SPECIAL INSTRUCTIONS
PROJECT COMPONENT COUNT
A) Attachment type and count: ~ Sunpower 240w
· Attachment Point ~; ~66 ~...~. ~,-~,
B) Rail type and count: UniRac Sunframe ~ UniRac Solarmount '
IU~ 2x12' Douglas Fir Rafters 16" Ralph Pacifico Professional c ~"ng'neer
~ On Center
Layout Created By: MVP Date: 1-30-12
LOGIC'
I ELIMINAIlNG THE COSI OF ENERGY
DRAV~NG NUMBER: Pacfflco Engineering PC
4 OF 7
BIDE ELEVATION *Always double check measurements
GreenLogic, LLC - Approved 7.2kW
Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42 .... - -
UniRac Solarmount Array Length =368.~"
Roy and Elyse James ~imuth = 305~ Array Height = 63.84"
5000 Paradise Point Pitch = 4.5~ to the No~h Su~a~ Dimensions =410"x270"
Southold, NY Scale 3/16"= 1.0' Magic ~ = N/A
PROUEC, COMPONENT C~N, ': Sunpower 24~
A) A~achment ~pe and count: e A~chment Point
B) Rail ~ and count: UniRac Sola~ount UniRac Sola~ount
~ I~ 2x12" Do.las Fir Ra~rs 16" Ralph Pacifi~ Professional Engineer
' On Center
Layo~Created By: ~P Date: 1-3~12
LOGIC
ELIMINATING THE COST OF ENERGY
JOB MATERIAL LIST
Material List
Eco-Fasten "Fast Feet" 6ase Plate 60
Eco-Fasten "Fast Feet" Aluminum Block 30
Eco-Fasten "Fast Feet" EPDM Flashing 60
#~.4-13x3"OPl Concealer Screw 360
#14-13x5"DPI Concealer Screw 120
UniRac 7" Standoff 30
DRAWING NUMBER:
$OF 7
MATERIAL LIST *Always double check measurements.
GreenLogic, LLC - Approved 7.2 kW
Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42" ~ Sunpower 240w
UniRac Solarmount Array Length = · Attachment Point
Roy and Elyse James Azimuth = 305° Array Height =
5000 Paradise Point Road Pitch = 4.5N° Surface Dimensions = --~] UniRac Solarmount
Southold, NY Scale 3/16" = 1.0' Magic # = N/A I 2x12" Douglas Fir
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES I SPECIAL INSTRUCTIONS
A) Attachment type and count:
B) Rail type and count: UniRac Solarmount
Layout Created By: MVP Date: 1-30-12
LOGIC
£LIMINATING THE COST OF £NERGY
Framing:
2x12 Douglas Fir rafters spanning 22'6", spaced 16" off center.
2x4 Douglas Fir exterior wall.
DRAWING NUMBER: Pacifico Engineedflg PC
6 OF 7
FRAMING *Always double check measurements
GreenLogicl LLC - Approved 7.2kW
Panel Dimension = 61.39"x31.42"
Layout
30
Sunpower
240w
UniRac Solarmount Array Length =368.34"
Roy and Elyse James Azimuth = 305° Array Height = 63.84"
5000 Paradise Point Pitch = 4.5° to the North Surface Dimensions =410"x270"
Southold, NY Scale 3/16" = 1.0' Magic# = NIA
PROJECT COMPONENT COUNT ~ Sunpower 240w
A) Attachment type and count: · Attachment Point
B) Rail type and count: UniRac Solarmount r UniRac Solarmount "~"~~
I I 2x12" Douglas Fir Rafters 16"
On Center Ralph Pacifico Professional Engineer
NYS Ll~l~ 0~6162 NJ L~ 249E04744~
Layout Created By: MVP Date: 1-30-12
I [
18" Walkway
DRA~MNG NUMBER: Paclflco Eflglneedng PC
~.s~
7 OF 7 ~ ~.~.~
F~T TRACK PERMIT *A~ays double check measurements
GreenLogic, LLC - Approved 7.2kW
Panel Dimension = 61.39"x31.42" :~~
Layout
30
Sunpower
240w
UniRac Sola~ount Array Length =
Roy James ~'muth =305° Array Height=
5000 Paradise Point Road Pitch = 4,5N~ Suda~ Dimensions =
Southold, NY Scale 3/32" = 1.0' Magic ~ =N/A
ISLES I S~CI~ INSTRUCTIONS
~OJECT COMPONENT COUNT
A) Number of Roof Layem: 1 ~ Sunp~er 24~
UniRac Sola~ount
C) Materials Used: UniRac Fast foot, UniRac standoff, UniRac Sotarm( unt~ ~ 2x12· Douglas Fir Raffem 16" On Ralph Pac~ Professional Engineer
D) Added Roof Load of PV System: 3.5 PSF center
Layout Created By: MVP Date: 1-30-12