Loading...
HomeMy WebLinkAbout37130-ZTown of Southold Annex P.O. Box 1179 54375 Main Road Southold, New York 11971 6/21/2012 CERTIFICATE OF OCCUPANCY No: 35759 Date: 6/21/2012 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 5000 Paradise Point Rd, Southold, SCTM #: 473889 Sec/Block/Lot: 81.-3-1.4 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this officed dated 3/29/2012 pursuant to which Building Permit No. 37130 dated 4/10/2012 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof mounted electric solar panel system as applied for. The certificate is issued to James, Elyse (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. PLUMBERS CERTIFICATION DATED 37130 6/4/12 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 37130 Permission is hereby granted to: James, Elyse 18 Westcott Rd Riverside, CT 86878 Date: 4/10/2012 To: install a roof mounted electric solar panel system as applied for At premises located at: 5000 Paradise Point Rd, Southold SCTM # 473889 Sec/Block/Lot # 81 .-3-1.4 Pursuant to application dated To expire on 1011012013. Fees: 3/29/2012 and approved by the Building Inspector. SINGLE FAMILY DWELLING - ADDITION OR ALTERATION CO - ALTERATION TO DWELLING ELECTRIC Total: $200.00 $50.00 $100.00 $350.00 - Bui'~ding Inspector Form No. 6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location o£all buildings, property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and "pre-existing" land uses: 1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees I. Certificate of Occupancy - New dwelling $25.00, Additions to dwelling $25.00, AItarations to dwelling $25.00, Swimming pool $25.00, Accessory building $25.00, Additions to accessory building $25.00, Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy - $.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy - Residential $15.00, Commercial $15.00 Date. ..~ · 2 ~' t 2. New Construction: Old or Pre-existing Building: v/ Location of Property: .~OOO ~a.~'-na[t~ 'i~Otr',q' ~ (check one) House No. Street Owner or Owners of Property: Suffolk County Tax Map No 1000, Section Subdivision '~ r~' t ~ Block ~ Lot Filed Map. ~>"7~:, ( Lot: Applicant: ~__~ r~ ~at-~ t e- Underwriters Approval: PennitNo. -~"~1 .~ Health Dept. Approval: Date of Permit. Planning Board Approval: Request for: Temporary Certificate Fee Submitted: $ ~O Final Certificate: (check one) '/ Applicant Signature Hamlet Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NY 11971-0959 Telephone (631 ) 765-1802 Fax (631) 765-9502 ro,qer, richert~,town.southold.ny.us BUILDING DEPARTMENT TOWN OF SOUTItOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Elyse James Address: 5000 Paradise Point Road City: Southold St: NY Zip: 11971 Building Permit#: 37130 Section: 81 Block: 3 Lot: 1.004 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: Oreenlogic LicenseNo: 43558-me SITE DETAILS Office Use Only Residential ~ Indoor ~ Basement ~ Service Only ~ Commerical Outdoor 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Servicelph ~ Heat ~ DuplecRecpt ~ Service 3 ph Hot Water GFCi Recpt Main Panel NC Condenser Single Recpt Sub Panel NC Blower Range Recpt Transformer Appliances Dryer Recpt Disconnect Switches Twist Lock Other Equipment: Ceiling Fixtures ~ HID Fixtures Wall Fixtures I I Smoke Detectors Recessed Fixtures[E~ CO Detectors Fluorescent Fixture~.~ Pumps Emergency Fixtures~ Time Clocks Exit Fixtures ~ TVSS roof mounted PHOTOVOLTAIC SYSTEM to include 30 Sun Power spr 240 panel~ 1 Sun Power spt 7000 inverter with all required grounding and disconnects Notes: Inspector Signature: Date: June 4 2012 81-Cert Electrical Compliance Form.xls [ ] FOUNDATION 1ST [ ] FOUNDATION 2ND ] FRAMING / STRAPPING [ ] FIREPLACE & CHIMNEY [ ] ROUGH PLBG. [ ] INSULATION [ ] FINAL [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [~ELECTRICAL (FINAL) REMARKS: DATE ~/¢//~'/ INSPECTOR~ TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND I ] INS~I. ATION [ ] FRAMING/STRAPPING [ ,~FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS.'~~ DATE INSPECTOR Pacifico Engineering PC 700 Lakeland Ave, Suite 2B Bohemia, NY 11716 www.pacificoengineedng.com Engineering Consulting Ph: 631-988-0000 Fax: 631-382-8236 engineer@pacificoengineering.com June 4, 2012 Town of Southold Building Department 54375 Route 25, P.O. Box 1179 Southold, NY 11971 Subject: Solar Energy Installation for Roy and Elyse James 5000 Paradise Road Southold, NY 11971 I have reviewed the solar energy system installation at the subject address. The units have been installed in accordance with the manufacturer's installation instructions and the approved construction drawing. I have determined that the installation meets the requirements of the 2010 NYS Building Code, and ASCE7-05. To my best belief and knowledge, the work in this document is accurate, conforms with the governing codes applicable at the time of submission, conforms with reasonable standards of practice, with the view to the safeguarding of life, health, property and public welfare. Regards, Ralph Pacifico, PE Professional Engineer TOWN OI~$OUTHOLD BUILDING DEPARTMENT TOWN HALL SOUTHOLD, NY 11971 TEL: (631) 765-1802 FAX: (631) 765-9502 SoutholdTown. NorthFork. net Examined Approved Disapproved a/c PERMIT NO. BUILDING PERMIT APPLICATION CHECKLIST Do you have or need the following, before applying? Board of Health 4 sets of Building Plans Planning Board approval Survey Check Septic Form N.Y.S.D.E.C. Trustees Flood Permit Storm-Water Assessment Form Contact: ~ r ~r~ t,O~ l C- {~t~ Mail to:q3% O. canqu °dr2flA Expiration / , 201 ~ , O ~ ......... I - - ~ ~ ,'// {I i ..... DUllomg lnsBector :;; [ LICATION FOR BUIL.ING PEmT 10..,i}i' ~ ,'; ":/~ [ INSTRUCTIONS - a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, ~d wate~ays. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a pe~it shall be kept on the premises available for inspection throughout the work. e. No building shall be occupied or used in whole or in pa~ for any purpose what so ever until the Building Inspector issues a Ce~ificate of Occupancy. L Eve~ building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or h~ not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Depa~ment for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk Count, New York, ~d other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition ~ herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Si~ature of applicant or name, ifa ~orporation) (Mailing ~hdress o~applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Name of owner of premises [ x{,6~_. (As on the tax roll or latest deed) If applicon_ corp~re of duly authorized officer (Nan~ and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License Location of land on which proposed wo_9~rk will be d_onl:: House Number Street Hamlet County Tax Map No. 1000 Section Subdivision -~,~-~,~.L~-~E '~0~" Block ~ Lot ( 'OOdc Filed Map No. ~']~l Lot State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy -~trxr::~_~ -Pr,::z~twxt[~ b. Intended use and occupancy Nature of work (check which applicable): New Building. Repair Removal Demolition Estimated Cost ~o2~'t oho O Fee If dwelling, number of dwelling units If garage, number of cars Addition Alteration Other Work ~ v~rtOmr'~ $o~ (Description) (To be paid on filing this application) Number of dwelling units on each floor 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions of existing structures, if any: Front ~ ~>: ~ ' Rear ~,~ ~ ' Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Depth Height Number of Stories Rear 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories 9. Size oflot: Front t~%.% ? Rear lt./*/.f'~. Depth l 0. Date of Purchase l q ~ Name of Former Owner ~ ~ 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO v/ 13. Will lot be re-graded? YES NO ~ Will excess fill be removed from premises? YES NO ~/ 14. Names of Owner of Name of Architect'~,~e~co Name of Contractor Address~ Phone No. 2o ~ .4,~t g'- t o'~'"t Address 'l~r~.~,h''~ Phone No 6, St- tt ~>g -0ooo Address g~-~*- ~.,~:~-~,rv~J Phone No. ¢51-'1'~-~-I 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES ~/' NO __ * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES ~/' NO__ * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES __ · IF YES, PROVIDE A COPY. NO v/ STATE OF NEW YORK) counTY oF-Su,q*tr )s: Ix'[~'~ t~ ]5~Al'~OO/°r~lF~' being duly sworn, deposes and says that (s)he is the applicant ,CName of individual signing contract) above named, (S)He is the (~Ct4'V'~ c.4J OW' (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this ~ g day of ~:~re_~ 20 t ~ /~d~a~~ 6ASCIOTTA ~3t~ly Public, State of New York NO. 0~.-0A4894969 {~ualified in Suffolk CourJ.[y,., I Commilsion Expires May 11, ,;~u Signature of Applicant Jam~s F. King, President Bob Gho~io, Jr., Vice-President Dave Bergen John Brzdemeyer Michael J. Domino Town Hall Annex 54375 Main Road P.O. BOx 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 76.5-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 0754C Date: June 5, 2012 THIS CERTIFIES that the installation of a roof mounted solar electric system onto the existing dwelling. At 5000 Paradise Point Road, Southold, New York Suffolk County Tax Map # 81-3-1.4 Conforms to the application for a Trustees Permit heretofore filed in this office Dated February 24, 2012 pursuant to which Trustees Administrative Permit #7750A Dated March 21, 2012 was issued and conforms to all of the requirements and conditious of the applicable provisions of law. The project for which this certificate is being issued is for the installation of a roof mounted solar electric system onto the existing dwelling. The certificate is issued to ELYSE JAMES owner of the aforesaid property. Authorized Signature ~ ~ ]-~ ~ 17'7. JUN ] 2 2012 Town of Southold Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM PKOPERI'Y LOCATION: S,C.T.M. #: I~_ THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A [~) ~ ( ~ ~~[ STORM-WATER, GRADINGf DRAINAGE AND EROSION CONTROL PLAN o~i0t $,c,.. B~k t CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. SCOPE OF WORK - PROPOSED CONSTRUCTION i'llJ~V~# / WORK ASSESSMENT [ Yes No a. WhatlstheTotalAreaoflhePmjectParcels? ' 1 WillthisPmjectRetotsAllStsrm-WaterRen-Off (include Total Area of all Parcels located wllhin t he Scope of Work for Proposed Construction)'~/'~/' I I~ -'~ 1[~(~,~ Generated by a Two (2') tnch Rainfall on Site? '---~ r'~ b, Whal is the Total Area of Land Clearing (sy. t/~) (This itsm will include all run-off created by site clearing and/or construction activities as well as all and/or Ground Disturbance for the proposed Site Improvements and the permanent creation of construction activity? impervious surfaces,) (e...,~..~ 2 Does the Site Plan and/or Survey Show AIl Proposed PROVIDE BRI~ PROW, CT DI~CRIIvFION [P~.,~*,~:~ ~ .. ~ Drainage Structures Iodicating Size & Location? This Item shall Include all Prol:x~ed Grade Changes and I n$4- ll v-eonc moa. 4e StupeeCon ti,.gBe.acoWatur.ow. and sediment control practices that will be used to control site erosion and storm water discharges. This item must bo maintained throughout the Entire Construction Pealed. 4 Will this Project Redu[ra any Land Fir/lng. Grading or ! Exce~agon where there lsa chan~s to th$ Natural ~ ./ Existing Grade Involving more than 200 Cubic Yards of Material within any Parcel? I ~ WillthlsAppllcatlonRaguireLandDIstorbingActivities Encompassing an Area in Excess of Five Thousand (5.000 S.F.) Square Feet of Ground Surface? -- 6 is there a Natural Water Course Running throL~Jh the Site? Is this Project within the Trostses Jurludiction General DEC SWPPP Reuulremeofs: or within One Hund red (1001) feet of a Welland or -- Sub rnla~cn of a SWPPP is required for a~ Co~atru~on ad&vitJes InvMving $o~1 Beach? disturbances of one (t) or mom acres; includl.g disturbances of ~ Ihan one acre thai 7 Will there be Site preparation on Exisgng Grade Slopes are part of a larger coranto,q p~a~ teat will uitimetoly disturb one or mom acres of land: which Exceed Flfteen (15) feet of Vertlcst Rise to r~ inciud~g ~d'l°n acflvlUes Inv°lvi~9 soil ~i~sturbances I~' less teen °ne (1 t acre where One Hundred (100') of Hcrlzontsl Dislance? the DEC has de, ermined that a SPDES permit I$ requln~ for atorrn water diSCharges. 8WPPP's 8hall meet Ihe Minimum Req~lremento of the SPBES General Permff 8 Will Driveways. Parking Areas or other Imperious ~ / for ~towa Water Dl~cherge~ frml~ CenstruMion acit vity. P®mlR No. GP~-I 0~01 .) Surfaces be Sloped to Direct Storm-Water Run-Off 1. The SWPPP shall be prepema p~or to Ihe submittal of the NOI. The NOJ shall be Into and/or in the direction of a Town fight.of-way? eubmltod to the Def~ttment i~ior to the commencement of ~sltuatlon activity. 2. ~ ~/PPP shetl desodbe the en~lon and sedhnent control p~acfloe~ and where 9 Will this Project Raguim the Placement of Material. required, best-~op~lmcfloo sb~r~l water management pracUce~ thetv, fll be used ~mdlor Removal of Vegetation andlor the Construction of any conatmct~:l to mdu~ ~ p~lutant~ In *torm wat*t d~sc~r$~ ~nd to a.~u~ Itom Within the Town Right-of-Way or Road Shoulder STATE OF NEW YORK, 0--~ ~..~r.~ t k~ ' ......... ss ................................................................................ g y , eposes anct says mat he/She is me applicant for Permit, And that he/she is the .......................................... · "('~ E~;~&;;~,~'&i;'~i; ~;,'~ki ................................................................ Owner and/or representative of the O~]~ or Owners, and is duly authorized to perfoml or have per,brined the said work and to make and Fde this application; that all statements contah~ed in this application are true to the best of his knowledge mid belief; and that the work will be performed in the manner set forth in the application fded herewith. Sworn to before mc this; ....... ............ dayo +- x:.x z~.':~ ~ ........... , ........ ~e~.,~'~'~'~; .......................... FORM - 06/10 Notary Public. State of New York No. 01-CA4894969 ~ualified in Suffolk County Cemmi~$i0n Expires May 11, ~ 54375 Mah Road P.O. Box 1179 ~thold, NY 11971-0959 Telephone (631) 765-1802 m er rich · 'J~ (631) 7c~.qs(A g · e~to~.souinolo.ny-~ BUT[~DiNG DEPARTMENT TOWN OF $OUTHOLD APPLICATION FOR ELECTRICAL INSPECTION Company Name: Name: Li~nse No.: No.: Date: ,~ '2~ .1~- (05(-q'31. %ts~ *Name: *Address: *Cross Street: *Phone No.: Permit No.: TaxMap District: JOBSITE INFORMATION: (*Indicates required information) 1000 Section: ~ I *BRIEF DESCRIPTION OF WORK (Please Print Cleady) Block: 3 Lot: (Please Circle All That Apply) *Is job ready for inspection: *Do you need a Temp Certificate: Temp Information (If needed} *Service Size: 1 Phase 3Phase 100 *New Service: Re-connect Underground Additional Information: YES/(~ Rough In Final No 150 200 300 350 ,400 Other Number of Meters Change of Service Overhead PAYMENT DUE WITH APPLICATION 82,-Request for InspeclJon Form 13-- GREENLOGIC March 28, 2012 Town of Southold Building Department Town Hall $3095 Route 25 Southold, NY 1197:]. Dear Building Inspector: Please find attached a building permit application on behalf of Elyse James who has engaged us to install a roof-mounted (flat to the roof) solar photovoltaic (PV) electric system for her home at 5000 Paradise Point Road, Southold. In connection with this application, please find attached: · Building Permit application · A Storm Water Assessment Run-off Form · Certificate of Occupancy Application · 2Surveysofthe Premises · Four Engineer's Reports (2 originals and 2 copies) · Four Visio Diagrams of the proposed system · Two spec. sheets of the solar panels (SunPower SPR-240WHT) · Two Spec. sheets of the inverter (SunPower SPR7OOOm) · GreenLogic Suffolk County Home Improvement License · GreenLogic Certificate of Liability Insurance · GreenLogic Certificate of Worker's Compensation Insurance Coverage · Installation Manager's Master Electrician's License · Check for $250 (5200 building permit/S50 CO) · Application for Electrical Inspection with a check for $100 Please let us know if you need anything else in connection with this application. Yours truly, Barbara Casciotta Account Manager GreenLogic LLC 631-771-5152 ext. 117 : ~ ~' ,~: ! '~, Teh g77 7714330 Fax: 877 7714320 SOUTHAMPTON,'CORPORATE CUTCHOGUE MANORVILLE: NEW YORK CITY: i !, C tnty Rd 39A 1070 Depot Lane 40 S(}t Ii ;Irllr)trn, NY 1]968 Cutchogue. NY 11935 m~mrvi;ic NY ]1949 ROSLYN HEIGHTS: 24I 6th Avenue #3B 200S Service Rd., #108 New York, NY 10014 Ro~yhl Heights NY June 8, 2012 The Town of Southold Building Department 54375 Route 25 P.O. Box 1179 Southold, NY 1197! Re: Building Permit No. 37!30 Elyse James 5000 Paradise Point Road, Southold To the Building Inspector: Enclosed please find the Engineer's Certification Letter and the Town of Southold Board of Trustees Certificate of Compliance for Elyse James' solar electric system, which we installed at 5000 Paradise Point Road, Southold. Please arrange to send her the Certificate of Occupancy and close out the building permit. Please let me know if you have any questions about the installation. Sincerely, Barbara Casciotta Account Manager GreenLogic LLC 631-771-5152 ext. 1!7 JUN I 2 2012 BLDfi DEP1 TOWN OF SOUIHOLD F N. ,,~v,~ ;~,;~,~ i :. %4:877.7714330 Fax: 877771.4320 SOUTHAMPTON/CORPORATE: CUTCHOGUE: MANORVILLE: NEW YORK CITY: 4)5 (}OLir ty Rd 39A 1070 Depot Lane 40 We~odl ~r/d Averm{, 241 6th Avenue #3B %odtm}mptor . NY 11968 Cutchogue, NY 11935 M]ncJr¥11c NY 11949 New York, NY 10014 ROSLYN HEIGHTS; 200 S Scrvice Rd. #}08 Rosyh Heights NY 1157/ Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NY 11971-0959 Telephone (631 ) 765-1802 Fax (631 ) 765-9502 BUILDING DEPARTMENT TOWN OF SOUTI-IOLD June 11, 2012 GreenLogic LLC 425 County Rd 39A Southampton, NY 11968 RE: James, 5000 Paradise Point Rd, Southold TO WHOM IT MAY CONCERN: The Following Items Are Needed To Complete Your Certificate of Occupancy: **NOTE - Need Certification from an Architect or Engineer certifying the fastening of the panels to the roof system. Application for Certificate of Occupancy. (Enclosed) Electrical Underwriters Certificate. (contact your electrician) A fee of $50.00. __ Final Health Department Approval. Plumbers Solder Certificate. (All permits involving plumbing after 4/1184) __ Trustees Certificate of Compliance. (Town Trustees # 765-1892) Final Planning Board Approval. (Planning # 765-1938) Final Fire Inspection from Fire Marshall. Final Landmark Preservation approval. BUILDING PERMIT: 37130 - Solar Panels Suffolk County Executive's Office of Consumer Affairs VETERANS MEMORIAL HIGHWAY * HAUPPAUGE, NEW YORK 11788 DATE ISSUED: 12/10/2007 No. 43858-ME SUFFOLK COUNTY Master Electrician License This is to certify that ROBERT J SKYPALA GREI~,NLOGIC LLC doing business as having given satisfactory evidence of competency, is hereby licensed as MASTER ELECTRICIAN in accordance with and subject to the provisions of applicable laws, rules and regulations of the County of Suffolk, State of New York. Additional Businesses NOT VALID WITHOUT DEPARTMENTAL SEAL AND A' CURRENT CONSUMER AFFAIRS ID CARD Director ,, Subdivision Map Paradise Point, Sect/on Surf. Co. File No. 5761 X NOTES: Survey for: ROY JAMES & EL YSE JAMES Bayview Town of $outhold Suffolk County, New York S.C.T.M,: 1000-081,00-05.00-001.004 60 0 50 I ' SCALE: 1"=50' 1. AREA = 25,474 S.F. 2. · = MONUMENT FOUND, A = STAKE FOUND. 5. REFERENCE DEED L 11854 CP 798 4. ELEVATIONS SHOWN HEREON ARE REFERENCED TO N.O.V. DATUM (MSL 1929). 5. THIS PARCEL IS WITHIN ZONES SHOWN HEREON AS DILINEATEO ON FIRM BOUNDARY MAP NO. 56105C0167 G LAST DATED MAY 04, 1998. FEB. 16, 2012 UPDA~ TAX MAP # JAN. 5, 2012 UPDAIE SURVEY & TOPO MAR. 05, 2006 UPD~ SURVV~ JUNE 01, 2005 eE.VOWD ROW DATE: JULY 15, 2004 JOB NO: 2004-415 CERTIFIED TO: ROY JAMES & ELYSE JAMES OAVIO H. FOX N,Y.S.LS. #50254 FOX LAND SURVEYING 64 SUNSET AVENUE WESTHAMPTON BEACH, N.Y. 11978 (651) 288-0022 DWG: 2004-415 3 Strings of 10 SunPower 240 W panels, Each stdng 2400 watts Array total of 7200 Watts I I I I All panels to be grounded as par NEC code INVERTER 2, 30 AMP two pole DC switches from panels to inverter 240 VAC fi.om inverter to a 30 Amp switch near utility meter Sur~m'~ ,S~ar Panels are the most elTic.'mfll pJ~4~vollaic panels on the marlr4~ Our ~~ more power in the ~an~ amo~mt Qf ~pace- up to 50% more than ~'on~ntional d~igns and 100% ~ ~ thin film solar panels. More pow~ I~r ~ means [~wer panels I~r h~s~#. This saves ~ ti~ and ~. Proven materials, t~mpered front glass, and a s~dy onadized frame allow pan~t te ~ ~ in multiple SERIES The SunPowerTM 240 Solar Panel provides to~/s highest efficiency and perlormance. Utilizing 72 all back.contact solar cells, the SunPower 240 delivers a total panel conversion efficiency of 19.3%. The panel's reduced voltage-temperature coefficient, anti-reflective glass and exceptional Iow-light performance altributes provide outstanding energy delivery per peak power walt. 20%[ 15% 10% 10% SunPower's High Efficiency Advantage 18% 19% 14% 5% O% Thin Film Conventional SunPower SunPower E18 Series E19 Series Electrical Data Peak Power (+5/-3%1 Pmax 240 W Egiciency q 19.3 % Rated Voltage Vmpp 40.5 V Rated Currenl Impp 5.93 A Open Circuit Voltage Voc 48.6 V Short Circuil Current Isc 6,30 A Maximum System Voltage UL 600 V Temperature Coefficients Power (P) -0.38% / K Vollage ~/oc} -132.5mV / K Currenl (Isc) 3.SMA / K NOCT 45° C +/-2° C Series Fuse Rating 20 A Solar Cells Front Glass Junction Box Output Cables Frame Weight Mechanical Data 72 SunPower alH:~ack contact monocrystelline High transmission tempered glass with anti-reflective {AR) coating lPg5 rated with 3 bypass diodes Dimensions: 32 x 155 x 128 (mm) lO00mm length cables / MuhiContect (MC4) connectors Anodized aluminum alloy type 6063 (black) 33.1 lbs. (15.0 kg) I-V Curve Tested Operating Conditions Temperature -40° F to +185° F (40° C to + 85° C) Max load 113 psf 550kg/m2 J5400 Pa) front - e.g. snow; 50 psf 245kg/m2 (2400 Pa) fronl and back - e.g. wind Impact Resistance Hail 1 in (25 mm) at 52mph (23 m/s) Warranties Certifications Warranties and Certifications 25 year limited power warranty 10 year limited product warranty Tested to UL 1703. Class C Fire Rating Dimensions MM 2X 200 (IN} [7.85] [61.39~ [1.81] 2X 577 [22.70] t · 2X ~4,2 4X 12 [.47] [47.24] 4X 322 · 2X 915 · [,2.6'~/l [36.o21 I 2X 1535 [60.45] !7.07] [9.09] ~ ' [.43] 6X 754 [29.69] -). [7.8S] Pacifico Engineering PC 700 Lakeland Ave, Suite 2B Bohemia, NY 11716 www.pacificoengineering.com February 9, 2012 Town of Southold Building Department 54375 Route 25, P.O. Box 1179 Southold, NY 11971 Subject: Solar Energy Installation for Roy and Elyse James 5000 Paradise Road Southold, NY 11971 Engineering Consulting Ph: 631-988-0000 Fax: 631-382-8236 engineer~pacif'moengineedng.com /Gi i~OVED AS NOTED ~' ',~' 8 AM TO 4 P~ ~OR THE ., 'j~v~,G INSPECTIONS: F ~UNDATiON- TWO REQUIRED ~',}R ROURED CONCRETE 2 ~3JG~-FRAMING, PLUMBING, STRAPPING, ELECTRICAL & CAULKING 3 INSU~TION 4 FINAL- CONSTRUCTION & ELECTRICAL MUST BE COMPLETE FOR C.O ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR CLIMACTIC AND Gmum Wind Live load, point Speed, 3 prier30 per GEOGRAPHIC DESIGN Category iSnow Load sec gust, ASCE 7, pullout Fastener type CRITERIA Pg mph psf load, lb Roof Section A C - 20 120 37 379 #14-13x3" DPI Concealer Screw #14-13x5" DPI Concealer Screw ,?, ?-~ '1'-' / ~..~,,~.' \' ', Professional Engineer I have reviewed the roofing structure at the subject address. The structure car~'a~l/~31~all~ii3Hi'6t's'~'~''~°'~'~'~''~ n~ ~n~ the r~f mounl~ ~y~l~m. Th~ uni~ ~ ~ ~ in~l~ in ec~n~ ~i~ ~h~ m~n~m~ in~ll~on ins~o~ons. I h~e ~e~in~ lh~l ~e in~l~n ~ll m~ ~e ~uimmen~ of lh~ 20~0 NY8 Bui~in~ ~e, ~nd A~CE7~ when in~l~d in ~c~nce wi~h ~e m~nu~ctu~ in~ru~ion~. R~f ~ion A m~n ~f height 22 ~ ELECTRICAL pitch 1i.,~ INSPECTION REQUi~E9 r~f rafter 2x12 rafter s~ing 16 in OC Refl~ ~f m~r s~n 15.8 ff Table R80Z5.1(1) max 23.8 ff The clima~ and I~d in~rmafion is ~w: J LOGIC' ELIMINATING THE COST OF ENERGY Chimney 4' above roof. DRAW1NG NUMBER: Paciflco Engineering PC I OF 7 SURFACE I LAYOUT *Always double check measurements ~ ~ ~,,~ ,u c~ ~,~E~,;,,.~ GreenLogic, LLC - Approved 7.2kW _,_./avnut 30 .. ~.~un-ower 240w Panel Dimension = 61.39"x31.42" UniRac Solarmount Array Length =368.34 . Roy and Elyse James .~imuth = 305° Array Height = 63.84" ~oint ~itch = 4.S~ to the ~o~h Su~a~ ~im~n~on, ~a~ 0"x2~0" 5000 Paradise Southold, NY S~le 3/16" = 1.0' Magic ~ = N/A A) A~chment ~po ~nd count: ~ ~chm~nt ~oint B) Rail type and count: UniRac Sunframe : UniR~ Sola~ou~t ~{, '.J22~- ' 2x12" Douglas Fir Raflem 16" On C~ter Ralph Pac~co Professional Engin~r Layout Created By: MVP Date: 1-30-12 m ELIMINAI'ING THE COST OF ENERGY Chimn roof. DRAWING NUMBER: Paciaco Engineering PC SURFACE 1 ATTACHMENT *Always double check measurements GreenLogic, LLC - Approved 7.2kW Layout 30 ~ ~,eun-ower 240w Panel Dimension = 61.39"x31.42" UniRac Solarmount Army Length =368.34" .~ f-,~ NE~"~:., Roy and Elyse James Azimuth = 305° Array Height = 63.84" 5000 Paradise Point Pitch = 4.5° to the North Surface Dimensions =410"x270" Southold, NY Scale 3/16" = 1.0' Magic # = N/A ~!'~- I ~,,~ ~ / ~1\\ 'SSUES'SPEC' '"ST"UC"ONS PROJECT COMPONENT COUNT ~ Sunpower 240w A) Attachment type and count: 60 Fast Feet. , Attachment Point UniRac Solarmount B) Rail type and count: UniRac Sunframe ~ 2x12" Douglas Fir Rafters 16" Ralph Pacifico Professional En~]ineer On Center Layout Created By: MVP Date: 1-30-12 LOGIC ELIMINATING THE COST OF ENERGY IJ DRAW1NG NUMBER: Pacilico Engineering PC 3 OF 7 SURFACE 1 STRINGING 3X10 ON SPR7000M *Always double check measurements GreenLogic, LLC - Approved 7.2kW Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42" IUniRac Solarrnount Array Length =368.34" ../ Roy and Elyse James Azimuth = 305° Array Height = 63.84" 5000 Paradise Point Pitch = 4.5o to the North Surface Dimensions =410"x270" Southold, NY Scale 3/16" = 1.0' Magic # = N/A ISSUES I SPECIAL INSTRUCTIONS PROJECT COMPONENT COUNT A) Attachment type and count: ~ Sunpower 240w · Attachment Point ~; ~66 ~...~. ~,-~, B) Rail type and count: UniRac Sunframe ~ UniRac Solarmount ' IU~ 2x12' Douglas Fir Rafters 16" Ralph Pacifico Professional c ~"ng'neer ~ On Center Layout Created By: MVP Date: 1-30-12 LOGIC' I ELIMINAIlNG THE COSI OF ENERGY DRAV~NG NUMBER: Pacfflco Engineering PC 4 OF 7 BIDE ELEVATION *Always double check measurements GreenLogic, LLC - Approved 7.2kW Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42 .... - - UniRac Solarmount Array Length =368.~" Roy and Elyse James ~imuth = 305~ Array Height = 63.84" 5000 Paradise Point Pitch = 4.5~ to the No~h Su~a~ Dimensions =410"x270" Southold, NY Scale 3/16"= 1.0' Magic ~ = N/A PROUEC, COMPONENT C~N, ': Sunpower 24~ A) A~achment ~pe and count: e A~chment Point B) Rail ~ and count: UniRac Sola~ount UniRac Sola~ount ~ I~ 2x12" Do.las Fir Ra~rs 16" Ralph Pacifi~ Professional Engineer ' On Center Layo~Created By: ~P Date: 1-3~12 LOGIC ELIMINATING THE COST OF ENERGY JOB MATERIAL LIST Material List Eco-Fasten "Fast Feet" 6ase Plate 60 Eco-Fasten "Fast Feet" Aluminum Block 30 Eco-Fasten "Fast Feet" EPDM Flashing 60 #~.4-13x3"OPl Concealer Screw 360 #14-13x5"DPI Concealer Screw 120 UniRac 7" Standoff 30 DRAWING NUMBER: $OF 7 MATERIAL LIST *Always double check measurements. GreenLogic, LLC - Approved 7.2 kW Layout 30 Sunpower 240w Panel Dimension = 61.39"x31.42" ~ Sunpower 240w UniRac Solarmount Array Length = · Attachment Point Roy and Elyse James Azimuth = 305° Array Height = 5000 Paradise Point Road Pitch = 4.5N° Surface Dimensions = --~] UniRac Solarmount Southold, NY Scale 3/16" = 1.0' Magic # = N/A I 2x12" Douglas Fir Rafters 16" On Center PROJECT COMPONENT COUNT ISSUES I SPECIAL INSTRUCTIONS A) Attachment type and count: B) Rail type and count: UniRac Solarmount Layout Created By: MVP Date: 1-30-12 LOGIC £LIMINATING THE COST OF £NERGY Framing: 2x12 Douglas Fir rafters spanning 22'6", spaced 16" off center. 2x4 Douglas Fir exterior wall. DRAWING NUMBER: Pacifico Engineedflg PC 6 OF 7 FRAMING *Always double check measurements GreenLogicl LLC - Approved 7.2kW Panel Dimension = 61.39"x31.42" Layout 30 Sunpower 240w UniRac Solarmount Array Length =368.34" Roy and Elyse James Azimuth = 305° Array Height = 63.84" 5000 Paradise Point Pitch = 4.5° to the North Surface Dimensions =410"x270" Southold, NY Scale 3/16" = 1.0' Magic# = NIA PROJECT COMPONENT COUNT ~ Sunpower 240w A) Attachment type and count: · Attachment Point B) Rail type and count: UniRac Solarmount r UniRac Solarmount "~"~~ I I 2x12" Douglas Fir Rafters 16" On Center Ralph Pacifico Professional Engineer NYS Ll~l~ 0~6162 NJ L~ 249E04744~ Layout Created By: MVP Date: 1-30-12 I [ 18" Walkway DRA~MNG NUMBER: Paclflco Eflglneedng PC ~.s~ 7 OF 7 ~ ~.~.~ F~T TRACK PERMIT *A~ays double check measurements GreenLogic, LLC - Approved 7.2kW Panel Dimension = 61.39"x31.42" :~~ Layout 30 Sunpower 240w UniRac Sola~ount Array Length = Roy James ~'muth =305° Array Height= 5000 Paradise Point Road Pitch = 4,5N~ Suda~ Dimensions = Southold, NY Scale 3/32" = 1.0' Magic ~ =N/A ISLES I S~CI~ INSTRUCTIONS ~OJECT COMPONENT COUNT A) Number of Roof Layem: 1 ~ Sunp~er 24~ UniRac Sola~ount C) Materials Used: UniRac Fast foot, UniRac standoff, UniRac Sotarm( unt~ ~ 2x12· Douglas Fir Raffem 16" On Ralph Pac~ Professional Engineer D) Added Roof Load of PV System: 3.5 PSF center Layout Created By: MVP Date: 1-30-12