· On going trail maintenance at Laurel Lake, Downs Farm,
Arshamomaque, Arshamomaque Pond, Dam Pond and Mill Road
Preserves.
· Completed the spring spruce up of the Downs Farm Preserve
· Painted and installed window treatment in the Assessors Office.
· Made repairs to the ceiling in the Welding Shop at the Highway
Department.
· Clean debris along the roadways adjoining Town Preserves.
· Repaired the generator at the Highway Department.
· All of the baseball fields (10) have been prepared for the 2012
season.
· Repair and opened Park bathrooms, including complete fixture
replacement at Tasker Park men's room.
· Began installation of fire doors at the HRC.
· Installed solar light at the on west side of the Town Hall entrance.
· Looked at erosion issues at the end of 4th Street, New Suffolk, with
the High Department.
· Repaired dishwasher backsplash at the HRC.
· Patched pot holes in Dean's and Cutchogue Parking lots.
· Mulched the gardens at the Human Resource Center.
· Conducted a safety inspection of all playground equipment at our
parks. Removed an old swing set at Klipp Park, Greenport.
· Repaired the counter door in the Building Department.
· The insulation of the ceiling at the Peconic Lane Community
Center has been completed.
· Painted handicapped spaces at the Pike Street parking lot.
· Spring clean up, outside windows and weeding around Town Hall
has been completed.
· The SCWA has completed the installation of a water main at the
Laurel Lake Preserve. Site restoration (seeding) of the disturbed
areas is scheduled for April.
· Attended a meeting with Fuel master in reference to the Fuel
Management System.
· Corrected Suffolk County Department of Health violations at the
Peconic Lane Community Center, in reference to labeling of fuel oil
tank and a light out on the overfill alarm.
· Tim Abrams is working with Suffolk Security System on problems
with the alarm system at Town Hall. New panel to be installed.
· Attended a meeting of the Safety Committee and a Department
Head meeting.
· Attended a meeting with LIPA in reference to wire removal on the
Sound View Dunes (Bittner) property.
· Attended a meeting with the Land Preservation staff in reference to
work to be done in reference to the acquiring of the Manor Grove
Preserve.
· Installed 4 new soccer nets at Strawberry Fields Fairgrounds for
the 2012 season.
· Renovations to the 4th room at the Peconic Lane Community
Center are almost complete. The stage is being repaired, sanded
and polyurethane applied. The carpet is to be installed, in the
room, the first week of April.
· Tim Abrams is working with NY Fire Company and Lighthouse
Security on the alarm system at the Southold Animal Shelter.
· DPW Maintenance Mechanics completed EPA training and
certification on lead paint abatement.
· DWP staff (6) made repairs to the Fishers Island Police Barracks,
with the balance of the repairs scheduled for completion in April.
· Attended a Recreation Committee meeting.
· Removed the signs on Town properties in reference to the
2011/2012 Deer Management Program.