HomeMy WebLinkAbout1000-104.-3-16.1 OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY 11971
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
L
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MEMORANDUM
To:
Jill Doherty, President
Town of Southold Board of Trustees
From: Mark Terry, Principal Planner
LWRP Coordinator
Date: June 21, 2011
Re:
Proposed Wetland Permit for ANTHONY & LYNDA LOMANGINO
SCTM#1000-104-3-16.1
GreenLogic LLC on behalf of ANTHONY & LYNDA LOMANGINO requests an Administrative Permit to
install roof mounted photovoltaic solar system onto the southerly roof of the dwelling. Located: 9205
Bay Ave., Cutchogue. SCTM#104-3-16.1
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of
Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards.
Based upon the information provided on the LWRP Consistency Assessment Form submitted to this
department, as well as the records available to me, it is my recommendation that the proposed action is
EXEMPT from LWRP review pursuant to:
§ 268-3. Definitions. MINOR ACTIONS item "Il" which states:
II. Additions to an existing building or rebuilt residential structure which results in no net increase in
ground area coverage, except where the parcel is located in a coastal erosion hazard area;
The proposed action is not located within a coastal erosion hazard area.
Cc: Lori Hulse, Assistant Town Attorney
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A~ INSTRUC~I'iONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Sonthold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
ffany question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP polio/standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in more detail and, if necessmy, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's
wchsite (southoldtown.northfork.net), the Board of Trustees Office, the planning Depamnent, all
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
SCTM# [0/~ - -
The Application has been submitted to (check appropriate response):
TownBoard [] PlannlngDept. ~-~ Building Dept. [] BoardofTrustees
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital []
construction, planning activity, agency regulation,,!apd transaction)
(b) Financial assistance (e.g. grant, loan, subsid.y)
(c) Permit, approval, license, cegdficafion:
Nature and extent of action:
Present land usc:
Present zoning classification: Ik~ ~ t~,,~0
(a) Name of applicant:
(b) Mailing address:
If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
(e) Telephone number: Area Code ().
(d) Application number if any:
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes [] No[~ ffyes, which state or federalagency?.
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation
criteria.
[] Yes [] No [-~ot Applicable
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Polivies Pages 3 through 6 for evaluation criteria
[] Ye~ ~'~ No ~Not Applicable
At~ach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Seclion HI - Policies Pages 6 through 7 for evalualion criteria
[] Yes [] No ~ot Applicable
Attach additional sheets ifne~essa~
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section II1 -Policies Pages 8 through 16 for evaluation criteria
[] Yes [] No [~Not Applicable
Atlach additional sheets if necessary
Policy $. Protect and improve water quality and supply in the Town of Southold. See LWRP Section HI
- Policies Pages 16 through 21 for evaiaalion criteria
[] Yes [] No ~Not Applicable
Attach additional sheets if neeessary
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section HI - Policies; Pages 22
through 32 for evalnatio/if criteria.
[] Yes [] No [ WI Not Applicable
Attach additional sheets if ncccssary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies
Pages 32 through 34 for evaluation criteria.
~-~ Yes [] No ~-~ot Applicable
Aaach additional sheets if nec~smy
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section Ill - Policies; Pages 34 through 38 for evaluation criteria.
Yes [] No ~ot Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Souihold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria.
~ Ye~ No ~Not Applicable
Atl~eh additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locatious. Scc L~/RP Section HI - Policies; Pages 47 through 56 for evaluation criteria.
[] Yes [] Nor~/L__~Not Applicable
Attach additional sheets if necessary
Policy 11. Promote sustainable use of living marine re~mrces in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section III - Policies; Pages $? through 62 for evaluation criteria.
[] Yes [~] No ~Not Applicable
AtXach additional sheets if ncceasary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section HI - Policies; Pages
62 through 65 for evaluation criteria.
[] Yes [] No [~ot Applicable
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section HI - Policies; P. ages 65 through 68 for evaluation criteria.
[] Yes [] No [~Not Applicable
Created on 5/25/05 11:20 AM
Pacifico I~nginee~ring PC
PO Box 1448
Sayville, NY 11782
www.pacificoengineering.com
May 3, 2011
Town of Southold
Building Department
54375 Route 25, P.O. Box 1179
Southold, NY 11971
Engineering Consulting
Ph: 631-988-0000
Fax: 631-382-8236
engineer@pacificoengineering.com
Subject: Solar Energy Installation for
Anthony Lomangino
9205 Bay Ave
Cutchogue, NY 11935
I AY 2 0 2011
S0uthhold lowa
Bo3fd o~ Tmstees _
I have reviewed the roofing structure at the subject address. The structure can support the additional weight of
the roof mounted system. The units are to be installed in accordance with the manufacturer's installation
instructions. I have determined that the installation will meet the requirements of the 2010 NYS Building Code,
and ASCE7-05 when installed in accordance with the manufacturer's instructions.
Roof Section A B
mean roof height 19 ft 26 ft
pitch 9 1/2 in/12 4 1/4 in/12
roof rafter 2x10 2x10
rafter spacing 16 in CC 16 in CC
Reflected roof rafter span 7.1 ft 11.4 ft
Table R802.5.1(1) max 20.6 ft 20.6 ft
The climactic and Icad information is below:
CLIMACTIC AND Ground Wind Live load, point
GEOGRAPHIC DESIGN Category Snow Load Speed, 3 pnet30 per pullout Fastener type
sec gust, ASCE 7, load, lb
CRITERIA Pg mph psf
Roof Section A C 20 120 33 346 5/16" dia screw, 4-1/2"
B 62 650 5/16" dia screw, 4-1/2"
~ ~illa~ ~ ngineor
,~1~_, Pacifico Engineering PC
Ralph Pacifico, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" L~-~--..~i Sunpower 238w
Layout 28 Sunpower 238w Array Length = 245.56"
UniRac Sunframe Array Height = 98.76" · Attachment Point
Lomangino, Anthony Azimuth =172° Surface Dimensions =297"x135" UniRac Sunframe
9205BayAve Pitch=38° Magic#=32.17, I J 2xl0"DouglasFir
Cutchouge, NY 11935 Scale 3/16"= 1.0'
Rafters 16" On Center
PROJECT COMPONENT COUNT iSSUES / SPECIAL INSTRUCTIONS
.A) Attachment type and count: 27 Standoffs
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
~GR EEN,_LOGIC®]
.~, Pacifico Engineering PC
Ralph Pacifico, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" .-~1 Sunpower 238w
Layout 28 Sunpower 238w Array Length = 245.56"
UniRac Sunframe Array Height = 98.76" · Attachment Point
Lomangino, Anthony Azimuth =172° Surface Dimensions =297"x135" UniRac Sunframe
9205 Bay Ave !Pitch =38°
Cutchouge, NY 11935 Scale 3/16" = 1.0' Magic # = 32.17" 2x10" Douglas Fir
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES / SPECIAL INSTRUCTIONS
A) Attachment type and count: 27 Standoffs
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
GREEN OGIC*
.~NERGY
ELIMINATrNG THE COST OF ENERGY
,~1~, P~.cifico Engineering PC
PO Box 1448, S~, NY 11782
Ralph Pacifico, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" ~----..I Sunpower 238w
Layout 28 Sunpower 238w Array Length = 251.36"
UniRac Sunframe Array Height = 126.53" · Attachment Point
Lomangino, Anthony Azimuth = 172° Surface Dimensions =310"x168" UniRac Sunframe
9205BayAve Pitch=20° Magic#=62.14,, I I 2xl0"DouglasFir
Cutchouge, NY 11935 Scale 3/16"= 1.0'
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES / SPECIAL INSTRUCTIONS
.A) Attachment type and count: 23 Standoffs
16 Sunpower 238w
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
C~GR EENLO~IC®
EL M NAT NG THE COST OF ENERGY
,~. Pacifico Engineering PC
PO Box 1448, Say~lle, NY 11782
Ralph Paciflco, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" ~ Sunpower 238w
Layout 28 Sunpower 238w Array Length = 251.36"
UniRac Sunframe Array Height = 126.53" · Attachment Point
I Lomangino, Anthony Azimuth = 172° Surface Dimensions =310"x168" UniRac Sunframe
9205BayAve Pitch=20° Magic#=62.14" ! I
Cutchouge, NY 11935 Scale 3/16" = 1.0' 2x10" Douglas Fir
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES / SPECIAL INSTRUCTIONS
'A) Attachment type and count: 23 Standoffs
18 Sunpower 238w
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
[~"~,~ G R EENLO~IC®
ELIMINATING THE COST OF ENERGY
.1~, Pacifico Engineering PC
PO Box 1448, Say'~lle. NY 11782
831-988q]000 ~.Dac~ficoenalneerina.com
Ralph Pacifico, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
Framing:
2x12 Micro-Lam Ridge.
2x10 Douglas Fir rafter spanning 11'3", spaced 18" on center.
2x10 Douglas Fir Collar Ties/Ceiling joists spaced 16" on center, 22" down from ridge.
2x6 Douglas Fir exterior wall spaced 16" on center.
'/~" Plywood sheathing.
2' Overhang.
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" ~ Sunpower 238w
Layout 28 Sunpower 238w Array Length = 245.56"
UniRac Sunframe Array Height = 98.76" · Attachment Point
Lomangino, Anthony Azimuth =172° Surface Dimensions =297"x135" -- UniRac Sunframe
9205 Bay Ave Pitch =38° Magic # = 32.17" I I
Cutchouge, NY 11935 Scale 3/16" = 1.0' 2x10" Douglas Fir
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES / SPECIAL INSTRUCTIONS
'A) Attachment type and count: 27 Standoffs
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
~TNE~GY
ELIMINATING THE COST OF ENERGY
.~, Paciflco Engineering PC
PO Box 1448. Say~lle, NY 11782
631-9~8-0000 www. Dacificoenoineerinq corn
Ralph Paciflco, Professional Engineer
NY Lic 066182 NJ Lic 24GE04744300
Eraming:
2x10 Douglas Fir raf~;lrs2sr~iaCnrr~nL;r~4'R~"d, gs~aced 16" on center. /
2x10 Douglas Fir Collar Ties/Ceiling joists spaced 16" on center, down 2'6" from ridge.
2x6 Douglas Fir exterior wall
%" Plywood sheathing.
1' Overhang.
GreenLogic,
LLC
Approved
6.66kW
Panel Dimension = 61.39"x31.42" I.~ Sunpower 238w
Layout 28 Sunpower 238w Array Length = 282.78"
UniRac Sunframe Array Height = 126.53" · Attachment Point
Lomangino, Anthony Azimuth = 172° Surface Dimensions =310"x168" ~ UniRac Sunframe
9205 Bay Ave Pitch = 200 Magic # = 62.14" I I
Cutchouge, NY 11935 Scale 3/16"= 1.0' 2x10" Douglas Fir
I
I
Rafters 16" On Center
PROJECT COMPONENT COUNT ISSUES / SPECIAL INSTRUCTIONS
,.A) Attachment type and count: 23 Standoffs
18 Sunpower 238w
B) Rail type and count: UniRac Sunframe
Layout Created By: MVP Date: 4-28-11
Board o~ T us e
z
SITE DATA
KEY MAP
DRIVE'O~'AY PIER
j ,, J