BOARD OF TRUSTEES, TOWN OF SOUTHOLD
In the matter of applicant:
KIMOGENOR POINT COMPANY SCTM# 1000-116-6-24.1
RECEIVED
AUG 10 2011
Southolo Town Clerk
YOU ARE HEREBY GIVEN NOTICE:
1, That it is the intention of the undersigned to request a Permit from the Board of
Trustees to:
Construct approximalely 566 lineas f~et of vinyl bulkh~g in place of(and approximately 8 inches higher than)
exisgng timber bulkhead; remove and replace existing wood fence; remove and replace most landward +11 feet of 5'
wide bridge and add 8' ramp onto landward end thoreof; and incidantally dredge up to I0' off indicatod s~ions of
bulkhead to a depth of -2'ALW and rogeade r~malning ~honl a~jac~t to bridge to gradually slope away ~'om dredged
channel, which will r~tor~ tidal flow pattern around "i~lend,# and use approximstdy 300 cubic yards of sand spoil as
backfill, all as depicted on the project plan prepared by Eh-Consultants, deled August 1, 2011.
Ragrade and repave existing paved roadway landward of bulklmad and replace existing drain with a groundwater
infil~atinn sysmn to minimize the fr~uen~ and volume of pavement runoff discharged t~'ongh tbe ~xisting overflow
pipe to be maintained, all as depicted and des~ibed on the drainage plan prepared by Sag Harbor Engineering, dated
May 26, 2011.
2. That the property which is the subject of Environmental Review is located
adjacent to your property and is described as follows:
50 JACKSON STREET, NEW SUFFOLK
3. That the project which is subject to Environmental Review under Chapters
96,111 and/or 275 of the Town Code is open to public comment on:
DATE: AUGUST 24TH~ 2011 ~ 6:00 P.M.
You may contact the Trustees Office at 765-1892 or in writing.
The above-referenced proposal is under review of the Board of Trustees of the Town of
Southold and does not reference any other agency that might have to review same
proposal. KIMOGENOR POINT COMPANY
PROPERTY OWNERS NAME:
MAILING ADDRESS:
PHONE#:
C/O DANIEL BINGHAM
170 OXFORD BOULEVARD
GARDEN CITY, NY 11530
917-886-0130
AGENT:
EN-CONSULTANTS
MAILING ADDRESS: 1319 NORTH SEA ROAD~ SOUTHAMPTON, NY 11968
PHONE #: 631-283-6360
Enc: Copy of sketch or plan showing proposal for your convenience.
I
I
I
I
I
I
I
E N - CONSIJI.TA~
1319 NORIH SEA RD.
SOUlt. I~PTON, NV 11968
631,283-6360
SCa~ 3/8" = !'0~ ~'
SECTION A-A
FOOT B]~II'R3E AND RAMP
DRAINAGE SYSTEM CROSS SECTION
Scale I" = 5 fem'
3,7
PAVEMENT AND DRAINAGE PLAN
Scale 1" = 20 feet
The surface Ueatment shall be according to NYSDOT item 307-2.02 and slmll extend for the full width
of the exis6n~ gavemen~ from tbe wear end of the area of grade chense to tbe easterly end of the new
The 2" asi~alt binder i~m6ng course shall be according to NYSDOT item 403-2.
Sufl~ient impervious clayey sand from the drainage sh'uctute excavation shall be retained and dried to
be used to backfifl the ovefl]ow pipc ~ to imlxMC lateral drainage wilhln the backfllled trench.
Pavement reconstruction shall be lhe area where grade is changed plus areas disturbed by bulkhead
Stone be]ow drainnge s~
Removed from site
200 cubic ~
40 cubic yin*ds
4 cubic yards
165 cubic yanls
KIMOGENOR POINT COMPANY
PHASE II - BULKHEAD REPLACEMENT
DRAINAGE PLAN
SAG HARBOR ENGINEERING
POBox 1991, Sag Harbor, NY 11963
631-725-0868
May26, 2011
Sheet 1 of 2
DRAINAGE STRUCTURE - PIPING CROSS SECTION
Scale %"= I foot
PLAN DETAIL - OVERFLOW PIPE DISCHARGE
Scale %"= I foot
REPAVEMENT CROSS SEC'liON
No Scale
Narrative - Drainage of Pavement Area
An overflow pipe is proposed which will discharge to the creek when tidal flooding
e~--'~r~- ~he flow rate fl~rough the veflioal drain. Wben the level oflhe creek rises to the
level of the pipe outlet, ~he proposed b~ck flow I~'venter will prevent high tidal
conditions from flooding tl~ Imved ar~s until conditions are beck to normal.
Because the location of thls inlet and vertical drain, ~here is concern about the potential'
that ovedlows to lhe creek may contain contnminnms flora the lmved arv~ Minor
amounts of hydrooarbons from vchicle~ and lhe lmVemant itscffnre the most likely
contaminants to ente~ lhe system. They would mostly remain at the water surface within
the drainage structure. A tee section is proposed on the outlet which will PreVent
overflow discharge f~om the water surhce. When the water level drops, any floating
contaminants would enter ~he soil below rather than beirig dischfllgcd to thc CreW. A cap
will be provided in the tee to permit pipe cleaning, if necessa;y.
KIMOGENOR POINT COMPANY
PHASE II - BULKHEAD REPLACEMENT
DRAINAGE PLAN DETAILS
SAG HARBOR ENGINEERING
POBox 1991, S~g Ha~oor, NY 11963
631-725-0865
May 26, 2011
Sheet 2 of 2