Loading...
HomeMy WebLinkAbout1000-116.-6-24.1NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES, TOWN OF SOUTHOLD In the matter of applicant: KIMOGENOR POINT COMPANY SCTM# 1000-116-6-24.1 RECEIVED AUG 10 2011 Southolo Town Clerk YOU ARE HEREBY GIVEN NOTICE: 1, That it is the intention of the undersigned to request a Permit from the Board of Trustees to: Construct approximalely 566 lineas f~et of vinyl bulkh~g in place of(and approximately 8 inches higher than) exisgng timber bulkhead; remove and replace existing wood fence; remove and replace most landward +11 feet of 5' wide bridge and add 8' ramp onto landward end thoreof; and incidantally dredge up to I0' off indicatod s~ions of bulkhead to a depth of -2'ALW and rogeade r~malning ~honl a~jac~t to bridge to gradually slope away ~'om dredged channel, which will r~tor~ tidal flow pattern around "i~lend,# and use approximstdy 300 cubic yards of sand spoil as backfill, all as depicted on the project plan prepared by Eh-Consultants, deled August 1, 2011. Ragrade and repave existing paved roadway landward of bulklmad and replace existing drain with a groundwater infil~atinn sysmn to minimize the fr~uen~ and volume of pavement runoff discharged t~'ongh tbe ~xisting overflow pipe to be maintained, all as depicted and des~ibed on the drainage plan prepared by Sag Harbor Engineering, dated May 26, 2011. 2. That the property which is the subject of Environmental Review is located adjacent to your property and is described as follows: 50 JACKSON STREET, NEW SUFFOLK 3. That the project which is subject to Environmental Review under Chapters 96,111 and/or 275 of the Town Code is open to public comment on: DATE: AUGUST 24TH~ 2011 ~ 6:00 P.M. You may contact the Trustees Office at 765-1892 or in writing. The above-referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. KIMOGENOR POINT COMPANY PROPERTY OWNERS NAME: MAILING ADDRESS: PHONE#: C/O DANIEL BINGHAM 170 OXFORD BOULEVARD GARDEN CITY, NY 11530 917-886-0130 AGENT: EN-CONSULTANTS MAILING ADDRESS: 1319 NORTH SEA ROAD~ SOUTHAMPTON, NY 11968 PHONE #: 631-283-6360 Enc: Copy of sketch or plan showing proposal for your convenience. I I I I I I I E N - CONSIJI.TA~ 1319 NORIH SEA RD. SOUlt. I~PTON, NV 11968 631,283-6360 SCa~ 3/8" = !'0~ ~' SECTION A-A FOOT B]~II'R3E AND RAMP DRAINAGE SYSTEM CROSS SECTION Scale I" = 5 fem' 3,7 PAVEMENT AND DRAINAGE PLAN Scale 1" = 20 feet The surface Ueatment shall be according to NYSDOT item 307-2.02 and slmll extend for the full width of the exis6n~ gavemen~ from tbe wear end of the area of grade chense to tbe easterly end of the new The 2" asi~alt binder i~m6ng course shall be according to NYSDOT item 403-2. Sufl~ient impervious clayey sand from the drainage sh'uctute excavation shall be retained and dried to be used to backfifl the ovefl]ow pipc ~ to imlxMC lateral drainage wilhln the backfllled trench. Pavement reconstruction shall be lhe area where grade is changed plus areas disturbed by bulkhead Stone be]ow drainnge s~ Removed from site 200 cubic ~ 40 cubic yin*ds 4 cubic yards 165 cubic yanls KIMOGENOR POINT COMPANY PHASE II - BULKHEAD REPLACEMENT DRAINAGE PLAN SAG HARBOR ENGINEERING POBox 1991, Sag Harbor, NY 11963 631-725-0868 May26, 2011 Sheet 1 of 2 DRAINAGE STRUCTURE - PIPING CROSS SECTION Scale %"= I foot PLAN DETAIL - OVERFLOW PIPE DISCHARGE Scale %"= I foot REPAVEMENT CROSS SEC'liON No Scale Narrative - Drainage of Pavement Area An overflow pipe is proposed which will discharge to the creek when tidal flooding e~--'~r~- ~he flow rate fl~rough the veflioal drain. Wben the level oflhe creek rises to the level of the pipe outlet, ~he proposed b~ck flow I~'venter will prevent high tidal conditions from flooding tl~ Imved ar~s until conditions are beck to normal. Because the location of thls inlet and vertical drain, ~here is concern about the potential' that ovedlows to lhe creek may contain contnminnms flora the lmved arv~ Minor amounts of hydrooarbons from vchicle~ and lhe lmVemant itscffnre the most likely contaminants to ente~ lhe system. They would mostly remain at the water surface within the drainage structure. A tee section is proposed on the outlet which will PreVent overflow discharge f~om the water surhce. When the water level drops, any floating contaminants would enter ~he soil below rather than beirig dischfllgcd to thc CreW. A cap will be provided in the tee to permit pipe cleaning, if necessa;y. KIMOGENOR POINT COMPANY PHASE II - BULKHEAD REPLACEMENT DRAINAGE PLAN DETAILS SAG HARBOR ENGINEERING POBox 1991, S~g Ha~oor, NY 11963 631-725-0865 May 26, 2011 Sheet 2 of 2