HomeMy WebLinkAboutPBA-01/09/2012 WORK SESSION AGENDA
SOUTHOLD TOWN PLANNING BOARD
Monday, January 9, 2012
2:30 p.m.
Executive Board Room, Town Hall Annex
2:30 p.m. Applications
Location: The Presbyterian Church or Society of Cutchogue, 27245 Main Road
Description: The applicant requests co-location of a public utility wireless
communication facility having interior mounted antennas within an
existing church steeple and a related storage equipment area screened
from view. As pa~ of the application, the applicant proposes to remove
and replace a portion of an existing church steeple to match the existing
church building on a 0.91 -acre site located in the R-40 Zoning District.
Action: Review draft Final Inspection Letter.
Attachments: Draft Letter
SCTM#: 1000-102-5-26
Project name: Valero Service Station
Location: 28975 Main Road, on the n/w corner of Main Road and Depot Lane,
Description: This site plan is for the conversion of an existing automotive repair shop
and gasoline service station to a 1,206 s.f. convenience store and
gasoline service station on an 18,473 sq. ft. lot in the Hamlet Business
Zoning District.
Action: Review draft Final Inspection Letter.
Attachments: Draft Letter
Project name: Peconic Landing/Brecknock Hall SCTM#: 1000-35-1-25
Patio
Description: This proposal is to add a patio to the Brecknock Hall site.
Status: Pre-submission
Action: Review proposal to determine whether an amended site plan application
Attachments: Draft Plan
Project name: Currie, Lawrence SCTM#: 1000-59-6-18.1, 19.1 &
19.2
Location: Soundview Avenue, +/- 101.85 feet north east of Kenny's Road, in
Southold
Description: This proposed Lot Line Modification transfers 0.67 acres from
SCTM#1000-59-6-19.2 to SCTM#s 1000-59-6-18.1 and 19.1, eliminating
19.2 and increasing the two remaimng lots by approx. 0.2 acres.
Attachments: Staff Report
Southold Town Planning Board Work Session - Page Two - January 9, 2012
Location: Maple Lane, Southold
Description: This proposal is for a 3 lot standard subdivision in the R-40 Zoning
District.
Status: Pre-submission
Action: Review request for special exception to Town Code.
Attachments: Staff Report
Project name: Fischer, Daniel & Nancy SCTM#: 1000-15-8-1.1
Location: 38785 NYS Rt. 25, Orient
Description: This is a proposed 2 lot standard subdivision of a 1.67 acre parcel where
Lot 1 = 36,333 sq. ft & Lot 2 = 36,332 sq. ft. in the R-40 Zoning District.
~!~!U~i ~d~ ~[~li~i~[Y ~PP[~!
Action: Review Town Engineer's comments.
Attachments: Town Engineer's Comments
Project name: Guadagno, Patrick SCTM#: 1000-27-1-2
Location: north side of Orchard Street, approx. 1,008' west of Platt Road, in Orient
Description: This standard subdivision of a 10-acre parcel into two lots where Lot 1 is
1.5 acres and Lot 2 is 8.5 acres inclusive of a 2.5-acre building envelope
and 6 acres of subdivision open space.
Status: Conditional Preliminary Plat Approval
Project name: Sherwood House Vineyards SCTM#: 1000-100-4-5.3
Location: 2600 Oregon Road, Mattituck
Description: This site plan is for the proposed construction of two patios, one of brick
at 180 s.f. and the other a cedar deck at 490 s.f. for an outdoor wine
tasting area that will include a 4,453 s.f. gravel parking lot with a
Action: Status Up-date
SCTM#: 1000-53-4-44.1 & 44.3
Location: W side of Kerwin Boulevard, 575 +/- feet W of August Ln., Greenport.
Description: This proposal is to subdivide a 7.725-acre parcel into four lots, where Lot
1 equals 29,869 sq. ft., Lot 2 equals 29,869 sq. ft., Lot 3 equals 29,869
sq. ft., Lot 4 equals 29,869 sq. ft. and the open space parcel equals 4.1
Status: Conditional Sketch Approval
Action: Review Final Plat.
Attachments: Staff Report
Southold Town Planning Board Work Session - Page Three - January 91 2012
Project name: T.K. Alpha, LLC Shopping Ctr. SCTM#: 1000-140-2-20
Location: 535 Pike Street, Mattituck
Description: This site plan is for the proposed construction of a 2,475 s.f. mix-use
building consisting of two store fronts for a 1,100 s.f. retail store and
1,375 s.f. restaurant. There is an existing 605 s.f. building proposed to
be removed on an 11,561 s.f. parcel located on the north side of Pike
Street, approximately 100 feet east of Love Lane, in the Hamlet Business
Action: Review revised site plan.
Project name: New Cingular Wireless at Orient by the Sea SCTM#: 1000-15-9-8.1
Location: 40200 SR 25, Orient
Description: This revised site plan is for the proposed construction of a 70' monopole
wireless facility having internally mounted antennas at 67' and 57' for
New Cingular Wireless along with related base equipment on a 400 s.f.
area. The site includes an existing restaurant and boat marina on 4.7
Status: New Application
Action: Review for completeness.
Attachments: Staff Report
For Discussion:
Proposed Local Law re: Amendments to Chapter 21 9, Shellfish &
Other Marine Resources
Wind Energy Code Amendment
Cooper Agricultural PDD
3:45 p.m. Review Public Meeting Agenda