Loading...
HomeMy WebLinkAboutPBA-12/19/2011 WORK SESSION AGENDA SOUTHOLD TOWN PLANNING BOARD Monday, December 19, 2011 2:30 p.m. Executive Board Room, Town Hall Annex 2:30 p.m. Special Meeting Applications: Project name: New Cingular Wireless at MGH SCTM#: 1000-15-9-6.1 Enterprises Location: 40200 SR 25, Orient Description: This proposed site plan is for new construction of a 100' monopole cellular communication tower with Cingular locating antennas at 97'-0" and 67'-0" internally mounted in the tower. The site includes an existing boat marina and restaurant on a 4.7-acre parcel in the Mil Zoning District. Status: New Application Action: Discuss comments to ZBA. Attachments: Staff Report Project name: Sparkling Pointe Warehouse SCTM#: 1000-69-3-3 Location: 1270 CR 48, Southold Description: This site plan application is for a proposed 46' x 120' warehouse, for employee use only, with a 16'x 16' accessory office and bathroom on a 1.002 acre parcel in a Light Industrial Zoning District on Old North Road, Southold. Four parking stalls are proposed and an asphalt driveway. Status: New Application Action: Review for completeness. Attachments: Staff Report SCTM#: 1000-59-10-1 Project name: Sparkling Pointe Addition Location: 39750 CR 48, Southold Description: This proposed amendment to a site plan is for the addition of a 12'4" x 21'4" office along with the enclosure of an existing 56' x 50'6" area that currently operates as a paved outdoor crushing area and the addition of a 23'6" x 50'6" covered crushing pad, all for employee access only, to the existing tasting room site of Sparkling Pointe Winery on a 12.066 acre parcel in the A-C Zoning District. Status: New Application Action: Review for completeness. Attachments: Staff Report Project name: Sherwood House Vineyards SCTM#: 1000-100-4-5.3 Location: 2600 Oregon Road, Mattituck Description: This site plan is for the proposed construction of two brick patios, one at 160 s.f. and the other at 706 s.f., for an outdoor wine tasting area that will include a 3,666 s.f. gravel parking lot with connecting paved footpaths. Status: Pending Action: Review revised site plan. Attachments: Staff Report For Discussion: Review comments to ZBA re: Selwyn Stand. Sub., SCTM#1000-15-6-28 & 29. Review Draft Planning Board Monthly Report for November.