HomeMy WebLinkAbout06/2011Department of Public Works
Monthly Report
Date: June 2011
· McCabe's Beach and Kenny's Beach clean up has been completed
and the restoration of Town Beach has been completed, except for
the final course of asphalt. We are still waiting for permits for the
Sound View Avenue Road Restoration Project.
· DPW staff assisted in the "Relay for Life" event at Cochran Park.
· Set-up and break down for the Auto Club event at Strawberry Fields
Fairgrounds.
· Assisted the North Fork Chamber of Commerce and the Mattituck
Park District in applications for funding from the Suffolk County
Downtown Revitalization Program.
· Attended a meeting of the Executive Safety Committee.
· Attended a meeting with John Sepenoski in reference to the Bay to
Sound Project.
· On going trail maintenance on Laurel Lake, Downs Farm,
Arshamomaque, Arshamomaque Pond, Dam Pond and Mill Road
Preserves.
· Held a pre-demolition meeting with the contractor that was awarded
the bid for the demolition and removal of the concrete block building
and old dock at the Laurel Lake Preserve.
· Met several times with Laure Klahre from the Land Preservation
Office, in reference to stewardship & management plans.
· Continuing work with Lori Hulse and the Army Corps of Engineers
in reference to the Mattituck Inlet Dredging Project.
· Dumped additional material in the hole, for the 3rd time in 2011, in
back of the Town bulkhead at the end of Mill Road, Mattituck. This
bulkhead may need to be replaced in 2012.
· Lawn mowing and maintenance is in full swing at all Town facilities
with some weeks averaging over 85 acres of mowing.
· Replaced concrete sidewalk entrance to Katinka House.
· Met with Phillip Beltz to address the reduction of the federal funds
for the Community Development Block Grant.
· Met with Phillip Beltz on the Comprehensive Plan- Parks, Beaches
& Recreation Plan.