Loading...
HomeMy WebLinkAbout270 Bay AveTown Of Southold P.O Box 1179 Southold, NY 11971 Date: 08/16/06 * * * RECEIPT * * * Receipt: 7080 Transaction(s): I 1 Permits Reference Subtotal 459 $170.00 Check~: 7080 Total Paid: $170.00 Name: Keyspan, Energy - Gas Cont Dept 175 E Old Country Rd Hicksville, NY 11801 Clerk ID: LINDAC Internal ID: 459 Permit No. _ File No. TOWN OF SOUTHOLD HIGI-I~VAY DEPARTMENT Peconic Lane Peconic, NewYork 11958 (6.31) 765-3140 APPLIC. · IONfPERMIT FOR HIGHWAY EXCAVATION AND REPAIR Re£#T100663236 APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for thc issuance of an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the job site. Print or Tyne I) KEYSPAN ENERGY - GAS CONSTR. DEPT. - 175 E. OLD COUNTRY RD. - HICKSVII~I.E. NY 11801 Name of Applicant Address 270 Bay Avenue, East Marion Name of Owner of Premises Address .3) Bay Avenue- bellhole on W/s approx. 265' s/o of Main Road to in~tnll a gas service to #270 4) 4)Builder's License No. Electrician's License No. Work Description and Location (Street Number, Hamlet, Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No *if yes, other Town permits may be required. Plumber's License No. Other Trade's License No. X Signature of Applicant 08-10-06 Date 5) a) Attachp~~tp~ansh~wing~~cati~n~fpr~p~sedexcavati~nandre~ati~nshipt~adj~iningpremises~r public streets or areas, nnd giving a detailed description of layout of excavation. b) At~ach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section , Block , Lot 7) Starting Date: Completion Date: 8) Work Schedule: Phase Excavation ......................................................................... Facility Installation ............................................................... Backfill & Compaction .......... ~ .............................................. Pavement Replacement ......................................................... 9) Under which authority is the application made: 10) Estimated Cost of Proposed Work: $ 11) Remarks: Completion Date 12) Insurance Coveraee (Attach Copy) a) Insurance Company: b) Policy# c) State whether policy of certification on file with the Highway Department: d) Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily lnjury, and $50,000 property damage. 13) SecuriW: a) Surety Bond. or Certified Check provided in the total amount of $ b) Maintenance Bonded provided: 2 years or 3 years 14) Fees for annlications and ~ermits: Basic Application Fee Al. _l~/Service Connections excavations ~ $20.00 = $20.00 $150.00 A2. /Additional Excavations same service ~ $10.00 = No. B. Excavations 18" in depth or less: 0-100 l.f. = $1o.oo - l.~ @ $o.10 = Additional Excavations 18" in depth to 5' in depth: 0-100 l.f. = Additional If. ~ .30 = D. Excavations 5' in depth and over: 0-100 l.f. = $50.00 l.f. ~ $0.50 $ Additional NO. Additional Utility Repair Excavations ~ $10.00 = $ Repairs same service ~ $5.00 = $ Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. TOTAL COST = $170.00 Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to: KEYSPAN ENERGY DELIVERY in accordance with this application. Received by thc Town Clerk SUPERINTENDENT OF HIGHWAYS I -~te ' Note: Permit expires one (l)yea~fi-om Date of Issuance. Nowork tostart without 48hour notice to the SuperintendentofHighways. Permit must ~ available for inspection. D-39 Page 2 of 3 Copy Distribution: Highway Department Inspector Applicant Town Clerk INSPECTOR'S RECORD Inspection Date 2nd 3rd 4th Findings (use code) Applicant Notified (To Permit Clerk) REMARKS CODE IB - Improper barricades IL - Improper lights ST - Sunken trench or excavation UTM - Unable to measure (due to backfilling) BUC - Building under Construction WIP - Work in Progress DB - Improper backfill (too high) (not sufficien0 HFS Inspector holding for final settlement of excavation RFR- Ready to Repair D-39 Page 3 of 3 PERMIT APPLICATION SKETCH DATN: LOCATION: TOWN: WORK CRDER: ~/10D~O6 10:22:'~7 AM 270 BAY AVE E MAP, ION T100~M3~36 VILLAGE OF CROSS ~fREET~ MAIN RD SURFAC~: 4' x 4' Bell Hole BAY AVE