HomeMy WebLinkAbout280 Dicks Point RdTOWN OF SOUTHOLD
HIGHWAY DEPARTMENT
Peconic Lane
Peconic, New York 11958
(631) 765-3140
APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR
ReL#TI00746731
APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of
an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other
applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all
applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the
job site.
Print or Type
1) KEYSPAN ENERGY - GAS CONSTR. DEPT. - 175 E. OLD COUNTRY RD. - HICKSVILLE. NY 11801
Name of Applicant
2) 280 Dicks Point Rd. Cutchogue
Address
Owner of Premises
Address
3) Dicks Point Road -bellhole - on the N/s of Dicks Pt. Rd. 100' w/o Holden Avenue to
install a Ilas service at #280 Dicks Point Road.
4) Work Description and Location (Street Number, Hamlet, Cross Street)
(a) Is construction located within 75 feet of tidal wetlands? *Yes No X
*~$yes, other Town permits may be required. ~
4)Builder's License No. ,/~ / / bQ Plumber's License No.
Electrician's License No. _~l Other Trade's License No.
5-01-07
Date
5) a) ARachp~~tp~ansh~wing~~cati~n~fpr~p~sedexcavati~nandre~ati~nshipt~adj~iningpremises~r
public streets or areas, and giving a detailed description of layout of excavation.
b) Attach all other necessary permits and licenses for this project.
c) Work covered by this application may not commence before issuance of a Highway Excavation Permit
by the Town Clerk.
6) Tax Map: Section ~ Block
7) Starting Date: Completion Date:
., Lot
8) Work Schedule:
Phase~
Excavation .........................................................................
Facility Installation ...............................................................
Backfill & Compaction .........................................................
Pavement Replacement .........................................................
Completion Date
9) Under which authority is the application made:
10) Estimated Cost of Proposed Work: $
11) Remarks:
12) Insurance Coverage (Attach Copy)
a) Insurance Company:
b) Policy #
c) State whether policy of certification on file with the Highway Department:
d) Coverage required extended to the Town:
Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage.
13) Security:
a)
Surety Bond or Certified Check provided in the total amount
orS
b) Maintenance Bonded provided: 2 years or 3 years
14) Fees for annlications and permits: Basic Application Fee
Al. _l~/Selwice Connections excavations ~ $20.00 =
$150.00
$2o.0o
A2. /Additional Excavations same service ~ $10.00 =
No.
B. Excavations 18" in depth or less:
0-100 l.f. = $10.00 -
L£ @ $0.10 =
Additional
Excavations 18" in depth to 5' in depth:
0-100 l.f. =
Additional Iff ~ .30 =
646 Ft of Trench
D. Excavations 5' in depth and over:
0-100 l.f. = $50.00
1.£ ~ $0.50 = $
Additional
No.
Additional
Utility Repair Excavations ~ $10.00 = $
Repairs same service ~ $5.00 = $
Notice to public utilities proof must be provided and aUached to this application prior to issuance of
permit.
TOTAL COST -- $170.00
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to:
KEYSPAN ENERGY DELIVERY in accordance with this application.
Received by the Town Clerk ~-q 'O~'~
Date
Permit lssued .~"q °0~'~
Permit No. ~
SUPERINTENDENT OF HIGHWAYS
TO ~Wl~OxF SOUTHOLD, NE~V YORK
Peter W. Harris
/ D6te
Not__e: Permit expires one ( 1 ) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways.
Pemfit must be available for inspection.
D-39 Page 2 of 3
Copy Distribution:
Highway Department
Inspector
Applicant
Town Clerk
INSPECTOR'S RECORD
Inspection Date
1~t
2nd
4~h
Findings (use code)
Applicant Notified
(To Permit Clerk)
REMARKS
CODE
lB - Improper barricades
IL - Improper lights
ST Sunken trench or excavation
UTM - Unable to measure (due to backfilling)
BUC - Building under Construction
WIP - Work in Progress
DB - Improper backfill (too high) (not sufficient)
HFS Inspector holding for final settlement of excavation
RFR - Ready to Repair
D-39 Page 3 of 3
PERMIT APPLICATION 5I~TCH
DAT~:
LOCATION:
TOWN:
WORK (~D~R:
Sel~002 8:24:14 AM
280 DICK~ POINT RD
CUTCHOGUE
T10074t;731
VILLAGE OF
CROSS ~REET: HOLDEN AVE
~Jl~A~:
MacM~.m RoM.
I-lo~ NO.
2~
4' x 4' Ben
DICKS POINT RD
Town Of Southold
P.O Box 1179
Southold, NY 11971
Date: 05/04/07
* * * RECEIPT * * *
Receipt#: 8506
Transaction(s):
1 1
Permits
Reference Subtotal
503 $170.00
Check#: 8506
Total Paid: $170.00
Name:
Keyspan, Energy ~ Gas Cont Dept
175 E Old Country Rd
Hicksville, NY 11801
Clerk ID: LYNDAB Internal ID: 503