Loading...
HomeMy WebLinkAbout675 Westview DrTown Of Southold P.O Box 1179 Southold, NY 11971 Date: 11/01/07 * * * RECEIPT * * * Transaction(s): 1 1 Permits Reference Subtotal 527 $170.00 Check~:9434 Total Paid: $170.00 Name: Keyspan, Energy - Gas Cont Dept 175 E Old Country Rd Hicksville, NY 11801 Clerk ID: LINDAC Internal ID: 527 Permit No..// File No. TOWN OF SOUTHOLD HIGHWAY DEPARTMENT Peconie Lane Peconic, New York 11958 (631) 765-3140 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR Re£#TI00810744 APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the job site. Print or Type 1) KEYSPAN ENERGY - GAS CONSTR. DEPT. - 175 E. OLD COUNTRY RD.- HICKSVILLE. NY I lg01 Name of Applicant Address 2) 675 Westview Dr., Mattituck Owner of Premises Address 3) 4) Builder's License No. Electrician's License No. N/s Westview Drive 435' S/o Brower Rd. to install a gas service at #675 tidal wetlands? *Yes No X *If yes, other Town permits may be required. Plumber's License No. Other Trade's License No. __ 10-29-07 Date 5) a) Attachp~~tp~ansh~wing~~cati~n~fpr~p~sedexcavati~nandre~ati~nshipt~adj~iningpremises~r public streets or areas, and giving a detailed description of layout of excavation. b) At~ach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section , Block ., Lot 7) Starting Date: Completion Date: 8) Work Schedule: Phase Excavation ......................................................................... Facility Installation ............................................................... Backfill & Compaction ......................................................... Pavement Replacement ......................................................... 9) Under which authority is the application made: 10) Estimated CostofProposedWork: $ !1) Remarks: Comoletion Date 12) Insurance Coveraue (Attach Copy) a) Insurance Company: b) Policy # c) State whether policy of certification on file with the Highway Department: d) Coverage required extended to the Town: 13) Security: a) Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage. Surety Bond or Certified Check provided in the total amount of $ h) Maintenance Bonded provided: 2 years or 3 years 14) Fees for aDtdications and permits: Basic Application Fee $150.00 Al. _l~/Service Connections excavations ~ $20.00 - $20.00 A2. /Additional Excavations same service ~ $10.00 = No. B. Excavations 18" in depth or less: 0-100 l.f. = $10.00 - l.f. ~ $0.10 = Additional Excavations 18" in depth to 5' in depth: 0-100 l.f. = Additional If. ~ .30 = D. Excavations 5' in depth and over: 0-100 l.f. = $50.00 L~ @ $0.50 = $ Additional No. Additional Utility Repair Excavations ~ $10.00 = $ Repairs same service @ $5.00 = $ Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. TOTAL COST -- $170.00 Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to: KEYSPAN ENERGY DELIVERY in accordance with this application. SUPE~-~DENT OF HIGI~AYS Peter W. Harris Date // Received by the Town Clerk ~ //~/~/~ Permit Issued ~_5'~:3~"?-, £5~./)~e~ permit No. .,O~r-"~ ~' Not~: Pemit expires one ( 1 ) ye~ ~om Date of Issu~ce. No work ~ s~ wi~out 48 hour notice to the Superintendent of Highways. Pemit must be avMlable for inspection. D-39 Page 2 of 3 Copy Distribution: Highway Department Inspector Applicant Town Clerk INSPECTOR'S RECORD Inspection Date l~t 3,d 4th Findings (use code) Applicant Notified (To Permit Clerk) REMARKS CODE IB - Improper barricades IL - Improper lights ST - Sunken trench or excavation UTM - Unable to measure (due to backfilling) BUC - Building under Construction WIP - Work in Progress DB - Improper backfill (too high) (not sufficient) HFS - Inspector holding for final setfiement ofexcavation RFR- Ready to Repair D-39 Page 3 of 3 I~RMIT APPLICATION $I~TCH DAT~: LOCATION: TOV~: WORK (~t DER: 10/29~20078:22:2~ AM 6V$ WESTV]EW DR MAT'FI'IUCK T100510744 VILLAGE OF ~OSS STR~ !~ BROWER RD M~lam Road ~ Howe NO. 435 4' x 4' Ben Hole V~r_.~TV IEW DR