HomeMy WebLinkAboutMill LnTown Of Southold
P.O Box 1179
Southold, NY 11971
Date: 08/29/08
* * * RECEIPT * * *
Receipt#: 28354
Transaction(s):
1
Permits
Reference Subtotal
581 $754.70
Check#: 15751
Total Paid: $754.70
Name:
Keyspan, Energy - Gas Cont Dept
175 E Old Country Rd
Hicksville, NY 11801
Clerk ID: LINDAC Internal ID: 581
Permit No.
File No.
TOWN OF SOUTHOLD
HIGHWAY DEPARTMENT
Peconic Lane
Peconic, New York 11958
(631) 765-3140
APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR
Re£#TI00838826
APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of
an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other
applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all
applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the
job site.
Print or Type
I) KEYSPAN ENERGY - GAS CONSTR. DEPT. - 175 E. OLD COUNTRY RD.- HICKSV1LLE, NY 11801
Name of Applicant Address
2) Mill Lane MaHituck
Name of Owner of Premises~ g:C EIV;' O
3) Install approx. 1~950' of gas main on Mill Lane. n/o Main Rd. (Rt. 25) ,~ J .
4) Work Description and Location (Street Number, Hamlet, Cross Street)
(a) Is construction located within 75 feet of tidal wetlands? *Yes No__~fll~[tra]d TOWn
*If yes, other Town permits may be required.
4) Builder's License No.
Electrician's License No.
Plumber's License No.
s)
Other Trade's License No.
08/22/~8
Date
a) Attachpl~tplansh~wingl~cati~n~fpr~p~sedexcavati~nandrelati~nshipt~adj~iningpremises~r
public streets or areas, and giving a detailed description of layout of excavation.
b) Attach all other necessary permits and licenses for this project.
c) Work covered by this application may not commence before issuance of a Highway Excavation Permit
by the Town Clerk.
6) Tax Map: Section .,Block
7) Starting Date: Completion Date:
8) Work Schedule:
Phase
Excavation .........................................................................
Facility Installation ...............................................................
Backfill & Compaction .........................................................
Pavement Replacement .........................................................
9) Under which authority is the application made:
10) Estimated Cost of Proposed Work: $
Il) Remarks:
, Lot
Completion Date
D-39
12) Insurance Coverage: (Attach Copy)
a) Insurance Company:
b) Policy #
c) State whether policy of certification on file with the Highway Department:
d) Coverage required extended to the Town:
Bodily injury and property damage: $300,000/$500,000 Bodily injury, and $50,000 property damage.
13) Security:
a)
Surety Bond or Certified Check provided in the total amount
ors
b) Maintenance Bonded provided: 2 years or 3 years
14) Fees for applications and permits: Basic Application Fee
Al. /Service Connections excavations ~ $20.00 =
100' trench fee
A2. /Additional Excavations same service @ $10.00 =
No.
$150.00
+ 20.00 bellhole +30.00 for
And .30 ea. foot from 101'
$99.00)
B. Excavations 18" in depth or less:
0-100 l.f. = $10.00 -
I.f. ~ $0.10 =
Additional
C. Excavations 18" in depth to 5' in depth:
0-100 l.f. =
Additional lf~ .30 = 1849ft of trench
D. Excavations 5' in depth and over:
0-100 l.f. = $50.00
I.f. ~ $0.50 = $
Additional
No.
Additional
Utility Repair Excavations ~ $10.00 = $
Repairs same service ~ $5.00 = $
Notice to public utilities proof must be provided and attached to this application prior to issuance of
permit.
TOTAL COST = $754.00
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation Permit to:
KEYSPAN ENERGY DELIVERY in accordance with this application.
Received by the Town Clerk
Date
Permit Issued ~6~' - ~ ~ ~
SUPERINTENDENT OF HIGHWAYS
.x~SOUTHOLE?,oNEW YORK
Peter W'7~arris ~
Not~e: Permit expires one (1) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways
Permit must be available for inspection.
D-39 Page 2 of 3
Copy Distribution:
Highway Department
Inspector
Applicant
Town Clerk
INSPECTOR'S RECORD
Inspection Date
l~t
3~
4th
Findings (use code)
Applicant Notified
(To Permit Clerk)
REMARKS
CODE
lB - Improper barricades
IL - Improper lights
ST - Sunken trench or excavation
UTM - Unable to measure (due to backfilling)
BUC - Building under Construction
WlP - Work in Progress
DB - Improper backfill (too high) (not sufficient)
HFS- lnspectorholding for final settlement ofexcavation
RFR- Ready to Repair
D-39 Page 3 of 3
SITE MAP
LEGEND
PROPOSED GAS MAIN - NEW INSTALLATION BY
CONVENTIONAL TRENCHING
PROPOSED PIPE JACKING OR DIRECTIONAL
DRILL OF GAS MAIN
EXISTING KEYSPAN GAS MAIN
PROPOSED GASVALVE
EXISTING WATER MAIN
P-21
EXISTING UNDERGROUND TELEPHONE
HAY BALES AND I OR SILT FENCING
EXISTING POLE (LIPA / VERIZON)
EXISTING RISER POLE WITH
UNDERGROUND ELECTRIC
PERMIT APPLICATION - TOWN OF SOUTHOLD
~= .- GAS CONSTRUCTION - LI POINT OF CONTACT:
Thomas Buckleman 516-924-6861
PROJECT: Mattituckl Cutchogue Reinforcement
PROGRAM: Gas Reinforcement Project I WORK ORDER: Tt00838826
DRAWING # TITLE PAGE
DESCRIPTION: Install approximataly 1980 feet of 12" steel 124 psi gas main on
Mill Lane in Mattituck. This project Is needed to Increase the KEYSPAN GRID:
reliability of the gas supply to the eastern North Fork of Long 101-11, 12, 13, 18, 26, 35
Island. SCALE: NONE
....... ~ ~,~+,~ TEL.
WATER
<,
BARN
PROPERTY LINE
TEL ................
PROPOSED '12" STEEL GAS MAIN - 424 PSi
MAIN ROAD - NYS RT 25
TOWN OF SOUTHOLD - PERMIT APPLICATION
nationalgrid GAS CONSTRUCTION - LI POINT OF CONTACT:
Thomas Buckleman 516-924-6861
PROJECT: Mattituck/Cutchogue Reinforcement
PROGRAM: Gas Reinforcement Project I WORK ORDER: T100838826
DESCRIPTION: Install approximately 1950 feet of 12" steel 124 psi gas main on DRAWING # 1 OF 3
Mill Lane in Mattituck. This project is needed to increase the KEYSPAN GRID:
reliability of the gas supply to the eastern North Fork of Long 101-11, 12, 13, 18, 26, 35
Island.
SCALE: NONE
FARM PROPERTY
BURIED SPRINKLER PIP
<,
II
I 12" GAS UNDER
I ,
FARM PROPERTY
TOWN OF SOUTHOLD - PERMIT APPLICATION
nationalgrid GAS CONSTRUCTION - LI POINT OF CONTACT:
Thomas Buckleman 516-924-6861
PROJECT: Mattituck/Cutchogue Reinforcement
PROGRAM: Gas Reinforcement Project I WORK ORDER: T100838826
DESCRIPTION: Install approximately 1950 feet of 12" steel 124 psi gas main on DRAWING # 2 OF 3
Mill Lane in Mattituck. This project is needed to increase the KEYSPAN GRID:
reliability of the gas supply to the eastern North Fork of Long 101-11, 12, 13, 18, 26, 35
Island.
SCALE: NONE
' Ci3UNTY ROAD 48 - MIDDLE ROAD
INSTALL A 16" STEEL CASING
SLEEVE UNDER THE LIRR
ALONG MILL LANE IN
MATTITUCK (EAST SIDE OF
LIRR) UTILIZING PIPE
JACKING/BORING
TECHNOLOGY.
CASING SLEEVE APPROX. 80
FEET IN LENGTH AND A
MINIMUM DEPTH OF 7 FEET
TO BE INSERTED WITH 12"
STEEL GAS MAIN. ALL
VENTING PER LIRR
SPECIFICATIONS.
LIRR PROPERTY LINE
LONG ISLAND RAIL ROAD
OFFSET 12" STEEL
GAS MAIN INTO PIPE
CASING
RECEIVING PIT
OUTSIDE LIRR
PROPERTY
10' LX 10'WX 10'D
LIRR PROPERTY LINE
15'
OFFSET 12" STEEL
GAS MAIN INTO PIPE
CASING
LU
n,,'
I
PIPE JACKING PIT I
OUTSIDE LIRR
PROPERTY
40' LX 10'WX 10' D
TOWN OF SOUTHOLD - PERMIT APPLICATION
Nationalgrid GAS CONSTRUCTION - LI POINT OF CONTACT:
Thomas Buckleman 516-924-6861
PROJECT: Mattituck/Cutchogue Reinforcement
PROGRAM: Gas Reinforcement Project I WORK ORDER: T100838826
DESCRIPTION: Install approximately 1950 feet of 12" steel 124 psi gas main on DRAWING # 3 OF 3
Mill Lane in Mattituck. This project is needed to increase the KEYSPAN GRID:
reliability of the gas supply to the eastern North Fork of Long 101-11, 12, 13, 18, 26, 36
Island.
SCALE: NONE