RE:
BARRY ROOT
6315 INDIAN NECK LANE, PECONIC
SCTM# 86-6-20
Dear Mr. Russell:
The following action was taken by the Southold Town Board of Trustees at their Regular
Meeting held on Wednesday, June 22, 2011:
RESOLVED, that the Southold Town Board of Trustees APPROVE the Amendment to
Wetland Permit #7510 to move the bottom third stringer out of water and use as a back
clamp for strength of bulkhead; and as depicted on the revised site plan prepared by
R.J. Russell Enterprises, Inc., received on June 16, 2011, and stamped approved on
June 22, 2011.
Any other activity within 100' of the wetland boundary requires a permit from this office.
This is not a determination from any other agency.
If you have any questions, please call our office at (631) 765-1892.
Sincerely,
Jill]v1. Ooherty ~/
Pr6sident, Board of Trustees
JMD:eac
( !
JUN ] 6 201]
Soutl~ltold ~own
Board of Trustees
PA6~ e2
P,O. Box 117v
Southol~ Rew York 1197X,0~9
· ~l~lfl~oa~ (~31) 765-1892
PO/aO ~3t/d 808S-PL9-9~§ a8:6I
JUN .1 6 20tl
Board of Trustees
Jill M. Doherty, President
Bob Ghosio, Jr., Vice-President
James F. King
Dave Bergen
John Bredemeyer
Town Hail Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES
72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN
APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO
SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE
PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
1 st day of construction
% constructed
Project complete, compliance inspection
BOARD OF SOUTHOLD TOWN TRUSTEES
SOUTHOLD, NEW YORK
PERMIT NO. 7510 DATE: MARCH 23~ 2011
ISSUED TO: BARRY ROOT
PROPERTY ADDRESS: 6315 INDIAN NECK LANE, PECONIC
SCTM# 86-6-20
AUTHORIZATION
Pursuant to the provisions of Chapter 275 and/or Chapter I 11 of the Town Code of the Town of
Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on
March 23, 2011, and in consideration of application fee in the sum of $250.00 paid by Barry Root and subject
to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and
permits the following:
Wetland Permit to reconstruct various sections of existing 53 linear foot timber-sheathed
bulkhead and returns with new vinyl-sheathed bulkhead and returns along the northern section of
property; remove various sections of 110 linear foot existing timber-sheathed bulkhead and returns
along the northern section of property; install various sections of 113 linear foot new vinyl-sheathed
bulkhead and returns along the northern section of property; remove existing 100 square foot
concrete/stone ramp within the northeastern section of property; establish an area of beach and native
beach plantings (1,350 square feet) backed with a single-row of rip-rap (200-500 lb. rock at 50' length)
within northeastern section of property; install a single-row of rip-rap (200-500 lb. rock at 7' length) off
' southern terminus of bulkhead return within the northwestern section of property; and install a docking
facility off the northwestern section of property consisting ora 4'xl04' fixed elevated catwalk, 3'xl5'
hinged ramp, 6'x20' floating dock and two (2) 8' diameter tie-off pilings; with the conditions that the
dock and float are made into a "T" or "L' shape, and a 15' wide non-turf buffer is installed and
maintained along the landward side of the bulkhead; and as depicted on the site plan prepared by
Suffolk Environmental Consulting, Inc., last dated March 25, 1011, and stamped approved on April 4,
2011.
IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed,
and these presents to be subscribed by a majority of the said Board es of this date.
TERMS AND CONDITIONS
The Permittee Ban"/Root, residing at 6315 Indian Neck Lane, Peconic, New York as part of
the consideration for the issuance of the Permit does understand and prescribe to the following:
That the said Board of Trustees and the Town of Southold are released from any and all
damages, or claims for damages, of suits arising directly or indirectly as a result of any
operation performed pursuant to this permit, and the said Perraittee will, at his or her own
expense, defend any and all such suits initiated by third parties, and the said Permittee
assumes full liability with respect thereto, to the complete exclusion of the Board of
Trustees of the Town of Southold.
That this Permit is valid for a period of 24 months, which is considered to be the estimated
time required to complete the work involved, but should circumstances warrant, request for
an extension may be made to the Board at a later date.
That this Permit should be retained indefinitely, or as long as the said Permittee wishes to
maintain the structure or project involved, to provide evidence to anyone concerned that
authorization was originally obtained.
That the work involved will be subject to the inspection and approval of the Board or its
agents, and non-compliance with the provisions of the originating application may be cause
for revocation of this Permit by resolution of the said Board.
That there will be no unreasonable interference with navigation as a result of the work
herein authorized.
That there shall be no interference with the right of the public to pass and repass along the
beach between high and low water marks.
That if future operations of the Town of Southold require the removal and/or alterations in
the location of the work herein authorized, or if, in the opinion of the Board of Trustees,
the work shall cause unreasonable obstruction to free navigation, the said Permittee will be
required, upon due notice, to remove or alter this work project herein stated without
expenses to the Town of Southold.
The Permittee is required to provide evidence that a copy of this Trustee permit has been
recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction
to the deed of the subject parcel. Such evidence shall be provided within ninety (90)
calendar days of issuance of this permit.
That the said Board will be notified by the Permittee of the completion of the work
authorized.
10.
That the Permittee will obtain all other permits and consents that may be required
supplemental to this permit, which may be subject to revoke upon' failure to obtain same.
Jill M. Doherty, President
Bob Ghosio, Jr., Vice-President
James F. King
Dave Bergen
John Bredemeyer
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
March 23,2011
BOARD OFTOWNTRUSTEES
TOWNOFSOUTHOLD
Mr. Matt D. Ivans
Suffolk Environmental Consulting, Inc.
P.O. Box 2003
Bddgehampton, NY 11932-2003
RE:
BARRY ROOT
$315 INDIAN NECK LANE, PECONIC
SCTM# 86-6-20
Dear Mr. Ivans:
The Board of Town Trustees took the following action during its regular meeting held on
Wednesday, March 23, 2011 regarding the above matter:
WHEREAS, Suffolk Environmental Consulting, Inc. on behalf of BARRY ROOT applied
to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the
Southold Town Code, the Wetland Ordinance of the Town of Southold, application
dated March 1,2011, and,
WHEREAS, said application was referred to the Southold Town Conservation Advisory
Council and to the Local Waterfront Revitalization Program Coordinator for their findings
and recommendations, and,
WHEREAS, the LWRP Coordinator issued a recommendation that the application be
found Consistent with the Local Waterfront Revitalization Program policy standards,
and,
WHEREAS, a Public Hearing was held by the Town Trustees with respect to said
application on March 23, 2011, at which time all interested persons were given an
opportunity to be heard, and,
WHEREAS, the Board members have personally viewed and are familiar with the
premises in question and the surrounding area, and,
WHEREAS, the Board has considered all the testimony and documentation submitted
concerning this application, and,
WHEREAS, the structure complies with the standards set forth in Chapter 275 of the
Southold Town Code,
WHEREAS, the Board has determined that the project as proposed will not affect the
health, safety and general welfare of the people of the town,
NOW THEREFORE BE IT,
RESOLVED, that the Board of Trustees have found the application to be Consistent
with the Local Waterfront Revitalization Program, and,
RESOLVED, that the Board of Trustees approve the application of BARRY ROOT to
reconstruct various sections of existing 53 linear foot timber-sheathed bulkhead and
returns with new vinyl-sheathed bulkhead and returns along the northern section of
property; remove various sections of 110 linear foot existing timber-sheathed bulkhead
and returns along the northem section of property; install various sections of 113 linear
foot new vinyl-sheathed bulkhead and returns along the northern section of property;
remove existing 100 square foot concrete/stone ramp within the northeastem section of
property; establish an area of beach and native beach plantings (1,350 square feet)
backed with a single-mw of rip-rap (200-500 lb. rock at 50' length) within northeastern
section of property; install a single-mw of rip-rap (200-500 lb. reck at 7' length) off
southern terminus of bulkhead return within the northwestern section of property; and
install a docking facility off the northwestern section of property consisting of a 4'x104'
fixed elevated catwalk, 3'x15' hinged ramp, 6'x20' floating dock and two (2) 8" diameter
tie-off pilings; with the conditions that the dock and float are made into a "T" or "L"
shape, and a 15' wide non-turf buffer is installed and maintained along the landward
side of the bulkhead; and as depicted on the site plan prepared by Suffolk
Environmental Consulting, Inc., last dated Mamh 25, 1011, and stamped approved on
April 4, 2011.
Permit to construct and complete project will expire two years from the date the permit
is signed. Fees must be paid, if applicable, and permit issued within six months of the
date of this notification.
Inspections are required at a fee of $50.00 per inspection. (See attached schedule.)
Fees: $1,793.00
Very truly yours,
Jil~/M. Doherty ~/
P~sident, Board of Trustees
JMD/eac
Jill M. Doherty, President
Bob Ghosio, Jr., Vice-President
James F. King
Dave Bergen
John Bredemeyer
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Please be advised that your application dated /'r~o, rc,~ I/ ~:~Ol~ has
been reviewed by this Board at the regular meeting of i~c~c,~
and your application has been approved pending the completion of the following items
checked off below.
__ Revised Plans for proposed project
__ Pre-Construction Hay Bale Line Inspection Fee ($50.00)
1st Day of Construction ($50.00)
__ ~ Constructed ($50.00)
"~ Final Inspection Fee ($50.00)
Dock Fees ($3.00 per sq. ft.)
Permit fees are now due. Please make check or money order payable to Town of
Southold. The fee is computed below according to the schedule of rates as set forth in
Chapter 275 of the Southold Town Code.
The following fee must be paid within 90 days or re-application fees will be necessary.
You will receive your permit upon completion of the above.
COMPUTATION OF PERMIT FEES: -~1 ~q~' ~
TOTAL FEES DUE: $ 7?3
BY:
Jill M. Doherty, President
Board of Trustees
Peter Young, Chairman
Lauren Standish, Secretary
Town Hall, 53095 Main Rd.
P.O. Box I 179
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631 ) 765-6641
Conservation Advisory Council
Town of Southold
At the meeting of the Southold Town Conservation Advisory Council held Wed., March 16,
2011, the following recommendation was made:
Moved by Jack McGreevy, seconded by Derek Bossen, it was
RESOLVED to SUPPORT the Wetland Permit application of BARRY ROOT to reconstruct
various sections of existing 53 If. timber-sheathed bulkhead and returns with new vinyl-
sheathed bulkhead and returns along the northern section of property; remove various
sections of 110 If. existing timber-sheathed bulkhead and returns along the northern
section of property; install various sections of 113 If. new vinyl-sheathed bulkhead and
returns along the northern section of property; remove existing 100 sq.ft, concrete/stone
ramp within the northeastem section of property; establish an area of beach and native
beach plantings (1,350 sr.) backed with a single-row of rip-rap (200-500 lb. rock at 50'
length) within northeastern section of property; install a single-row of rip-rap (200-500 lb.
rock at 7' length) off southern terminus of bulkhead return within the northwestern section
of property; and install a docking facility off the northwestern section of property consisting
of a 4'X 104' fixed elevated catwalk, 3'X 15 'hinged ramp, 6'X 20' floating dock and two (2)
8" dia. tie-off pilings.
Located: 6315 Indian Neck Lane, Peconic. SCTM#86-6-20
Inspected by: Meaghan Burke, Audrey Horton, Jack McGreevy
The CAC Supports the application with the Condition the length of the dock is consistent
with the pier line, the installation of a 10' non-turf buffer, and proper drainage for the
house.
Vote of Council: Ayes: Jack McGreevy, Derek Bossen, Meaghan Burke, Audrey Horton,
Doug Hardy. Recused: Peter Young
Motion Carried
Jill M Dohedy, President
Bob Ghosio, Jr., Vice-President
James F. King
Dave Bergen
John Bredellleyer
PO. Box 1179
Southold, NY 11971
Telephone (63 [ 765-1892
Fax (631) 765-6641
Southold Town Board of Trustees
Field Inspection/Worksession Report
Date/Time: ,~' & '- ///
BARRY ROOT requests a Wetland Permit to reconstruct various sections of existing 53 If. timber-sheathed
bulkhead and returns with new vinyl-sheathed bulkhead and returns along the northern section of property;
remove various sections of 110 If. existing timber-sheathed bulkhead and returns along the northern section of
property; install various sections of 113 If. new vinyl-sheathed bulkhead and returns along the northern section
of property; remove existing 100 sq.ft, concrete/stone ramp within the northeastern section of property; establish
an area of beach and native beach plantings (1,350 sf.) backed with a single-row of rip-rap (200-500 lb. rock at 50'
length) within northeastern section of property; install a single-row of rip-rap (200-500 lb. rock at 7' length) off
southern terminus of bulkhead return within the northwestern section of property; and install a docking facility
off the northwestern section of property consisting of a 4'X 104' fixed elevated catwalk, 3'X 15 'hinged ramp, 6'X
20' float~ock and two (2) 8" dia. tie-off pilings. Located: 6315 Indian Neck Lane, Peconic. SCTM#86-6-20
/
Ty~ of area to be impacted:
/~' Saltwater Wetland Freshwater Wetland Sound Bay
Distance of proposed work to edge of wetland
,Pay~f Town Code proposed work falls under:' ~,_/~hapt.275 __Chap~t 11 other
Type of Application:~/'~Wetland __Coastal Erosion ._Amendment
~Ad ministrative__Emergency Pre-Submission __Violation
info needed:
Modifications:
Conditions:
Present Were: __ . ing __J.Doherty__J. Bredemeyer
B.Ghosio, __ D. Dzenkowski other
Form filled out in the fie,~
Mailed/Faxed to:
Date:
V~D. Bergen~k-~'
ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM #: 1000 - O86 - 06 - o'2o
(Phot~raph take. o~t FebruaO' z 8, ~OZ I)
Photograph indicating the northwestern corner of the existing bulkheading
along the shoreline of subject property and Richmond Creek, as well as the
approximate location of the landward start of the proposed dock assembly
(blue arrow). Photograph taken off the northwestern corner of subject
property, facing east.
ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM#: 1ooo-o86-o6-oao
(Photograph Ial~e~ on t"ebruaO, I,~, .~o! 1)
Photograph indicating the existing boat ramp (to be removed & replaced
with a beach area/native plantings). Photograph taken from the
northeastern section of subject property, facing north, overlooking
Richmond Creek.
ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM #: 1000-086 -06 -0~20
[ SUBJECT
PROPERTY
Suffolk Environmental Consulting, Inc.
Newman Village, Suite E, 2322 Main Street, P.O. Box 2003, Bridgehampton, New York 11932-2003
(631 ) 537-5160 Fax: (631) 537-5291
Bruce Anderson. M.S., President
March 25, 2011
Ms. Jill Doherty, Chairwoman
Board of Trustees
Town Hall
P.O. Box 1179
Southold, NY 11971
Re.'
Situate:
SCTM #:
ROOT Application
15'otx~sed Bulkhead ReconstructioRfDock Construction
n/s Indian Neck Road; Town of Southold, NY
1000 - 086 - 06 - 020
Dear Ms. Doherty,
As discussed during the regularly scheduled Town of Southold Board of Trustees' public
hearing regarding the above referenced application, please find enclosed:
(1)
REVISED Proposed Bulkhead Reconstruction/Dock Construction Plans,
prepared by SUFFOLK ENVIRONMENTAL CONSUL TING, INC., last dated
March 25, 2011, indicating the reconfiguration of the proposed floating dock
by 90°, and the proposed establishment of a fifteen foot (15') wide Buffer along
the landward side of the bulkhead (three [3] prints).
Kindly review these items and issue the requested permit at your earliest opportunity.
Should you have any questions regarding this matter, or require additional information,
please feel free to contact this office at any time. Thank you in advance for your
cooperation.
Sincerely,
Matt D. Ivans
enc.
cc: B. Root
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY 11971
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MEMORANDUM
To:
Jill Doherty, President
Town of Southold Board of Trustees
From: Mark Terry, Principal Planner
LWRP Coordinator
L. ~e ;r~J of T~ust~s
Date: March 23, 2011
Re:
Proposed Wetland Permit for BARRY ROOT
Located: 6315 Indian Neck Lane, Peconic.
SCTM#1000-86-6-20
The proposed action is located within a New York State Department of State Significant Fish
and Wildlife Habitat Area, a New York State Critical Environmental Area and a Peconic Estuary
Critical Natural Resource Area.
Suffolk Environmental Consulting, Inc. on behalf of BARRY ROOT requests a Wetland Permit to
reconstruct various sections of existing 53 If. timber-sheathed bulkhead and returns with new vinyl-
sheathed bulkhead and returns along the northern section of property; remove various sections of 110
If. existing timber-sheathed bulkhead and returns along the northern section of property; install various
sections of 113 If. new vinyl-sheathed bulkhead and returns along the northern section of property;
remove existing 100 sq.ft, concrete/stone ramp within the northeastern section of property; establish an
area of beach and native beach plantings (1,350 sf.) backed with a single-row of rip-rap (200-500 lb.
rock at 50' length) within northeastern section of property;
The above listed proposed actions have been reviewed to Chapter 268, Waterfront Consistency
Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP)
Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form
submitted to this department, as well as the records available to me, it is my recommendation that the
above proposed actions are CONSISTENT with the LWRP policies and therefore CONSISTENT
with the LWRP.
The proposed installation of a dockinR facility off the northwestern section of property
consisting of a 4'X '104' fixed elevated catwalk, 3'X 15 'hinged ramp, 6'X 20' floating dock and
two (2) 8" dia. tie-off pilings.
The proposed '138' docking facility has been reviewed to Chapter 268, Waterfront Consistency
Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP)
Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form
submitted to this department, as well as the records available to me, it is my recommendation that the
proposed action is INCONSISTENT with the LWRP and listed policy standards provided below.
Figure 1. Subject parcel.
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystem
6,3 Protect and restore tidal and freshwater wetlands.
A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees
laws and regulations for all Andros Patent and other lands under their jurisdiction
1. Comply with Trustee regulations and recommendations as set forth in Trustee permit
conditions
The applicant fails to prove that the action meets the following requirements § 275-11
Construction and operation standards C. 2 (d) of the Southold Town Code:
(d) Review and approval of dock applications. Before issuing a permit for a dock structure,
the Trustees shall consider whether the dock will have any of the following harmful effects:
[2] Whether the dock will unduly interfere with the public use of wate~vays for
swimming, boating, fishing, shellfishing, waterskiing and other water-dependant
activities;
A net loss in public use of waterways is expected as a result of the construction of such
a structure in/on public waterways.
[5] Whether the dock will cause degradation of surface water quality and natural
resources;
As indicated above, the proposed action is located within a New York State Department
of State Siqnificant Fish and Wildlife Habitat Area, a New York State Critical
Environmental Area and a Peconic Estuary Critical Natural Resource Area. It is
recommended that the Board assess the proposed action to the below dock structure
Best Mana.qement Practices. Dock structure should:
2. allow a minimum of fifty percent (50%) irradiance to the substrate; and
[6] Whetherthe dock wi//cause habitat fragmentation and loss of significant coastal fish
and wildlife habitats;
The proposed action is located within a New York State Critical Environmental Area. At
the discretion of the Board of Trustees, any operations proposed in critical environmental
areas (§ 275-2) may be subject to more stringent requirements than detailed in this
section. Such requirements may include, but are not limited to, denial of certain
operations, shortening or reducing the size of structures, and increasing the width of
non-disturbance buffers. It is recommended that in the event the action is approved, that
the Board require the establishment of a ve,qetative buffer (unspecified width) to mitiqate
the local impacts from the dock structure.
[7] Whether the dock will result in the destruction of or prevent the growth of vegetated
wet/ands, seagrasses including eelgrass (Zostera marina) and widgeon grass (Ruppia
mafitima) or shellfish;
There is a hi,qh probability that commercially valuable shellfish species occur in the
proposed location of the dock structure.
[11] Whether the cumulative impacts of a residential and commercial dock will change
the waterway or the environment and whether alternate design, construction, and
location of the dock will minimize cumulative impacts; and
The construction method has not been identified. § 275-11 Construction and operation
standards requires that all intertidal construction and excavation employ the installation
of a silt boom that will retain all suspended sediments within the immediate project area.
[12] Whether adequate facilities are available to boat owners and/or operators for
fueling, discharge of waste and rubbish, electrical sen/ice and water sen/ice.
The answer to this question has not been provided.
9.3
Preserve the public interest in and use of lands and waters held in public trust by the
state and the Town of Southold.
Limit grants, leases, easements, permits or lesser interest in lands underwater in
accordance with an assessment of potential adverse impacts of the proposed use, structure,
or facility on public interest in public lands under water.
The placement of a private residential dock structure in public trust lands and/or waters
results in a net loss of public use of such lands and water.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its
written determination regarding the consistency of the proposed action.
Cc: Lori Hulse, Assistant Town Attorney
Office UseOnly
__Coastal Erosion Permit Application
X Wetland Permit Application
Amendment/Transfer/Extension
~ Received Application: ,F/t/ti
X Received Fee:$ r~5'~
,/'~ Completed Applicati;n: .~]l
__ Incomplete:
SEQRA Classification:
Type I_ Type II Unlisted_
__ Coordination(date sent)
~ LWRP Consistency Assessment Form:. lql t!
7CAC Referral Sent: z2,/q/It '
· ~ Date of Inspection:
__ Receipt of CAC Report:
__Lead Agency Determination
Technical Review:
.~ Public Hearing Held:
Resolution:
Administrative Permit
Name of Applicant
Address
Dr. BARRY ROOT
16 Horse Hollow Road; Lattington, NY 11560
Suffolk County Tax Map Number:
Property Location: n/s Indian Neck Road; Town of Southold, NY
Phone Number: (516) 674 - 5147
1000 - 086 - 06 - 020
(393' +_ west of Parkers Landing Road)
(provide LILCO Pole #, distance to cross streets, and location)
AGENT:
(If applicable)
MATT D. IVANS ¢~ Suffolk Environmental Consulting, Inc.
P.O. Box 2003; Bridgehampton, NY 11932
Phone: (631) 537 - 5160
Address:
OBoard of Trustees Application~
GENERAL DATA
Land Area (in square feet): 75,441.6 square feet ±
Area Zoning: R-40
Previous use of property:
Intended use of property:
and
Residential.
Residential with proposed dockinff facility
reconstructed/reconfigured bulkheading.
Covenants and Restrictions: Yes X No
If "Yes", please provide a copy.
Prior permits/approvals for site improvements:
Agency Date
X No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a governmental agency?
X No Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
Please refer to the attached project description and plans for all project
specifications.
PROJECT DESCRIPTION
regarding the ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM #: 1000 - O86 - 06 - 0~0
Applicant proposes to perform the following activities within
subject property:
Applicant proposes to Reconstruct various sections of existing
Timber-Sheathed Bulkheading & Returns (55.0' L +) with new
Vinyl-Sheathed Bulkheading & Returns ("in-placd'), all along the
northern section of subject property;
Applicant proposes to Remove various sections of existing Timber-
Sheathed Bulkheading & Returns (110.0' L _+), all along the northern
section of subject property;
(s)
Applicant proposes to Install various sections of new Vinyl-Sheathed
Bulkheading & Returns (118.o' L +), all along the northern section of
subject property;
Applicant proposes to Remove the existing Concrete/Stone Ramp
(10o.0 square feet +) within the northeastern section of subject
property;
(5)
Applicant proposes to Establish an area of beach & native beach
plantings (1,850 square feet +_), backed with a single-row of Rip-Rap
(~2oo-5oolb _+/rock ~ 50.0' L _+), within the northeastern section of
subject property;
(6)
Applicant proposes to Install a single-row of Rip-Rap (~200-5001b
_+/rock ~ 7.0' L _+) offthe southern terminus of the Bulkhead Return
within the northwestern section of subject property; and
(7)
Applicant proposes to Install a Docking Assembly off the
northwestern section of property consisting of a Fixed, Elevated
Catwalk (4.0' W x lO4.O' L), a Hinged Ramp (8.0' W x 15.0' L), a
Floating Dock (6.0' W x ~20.0' L) and two (~) "Tie-Off' Pilings (8.0"
dia.).
Board of Trustees Application
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purposes of proposed activity:
Please refer to the attached project description and plans for all project specifications.
Area of wetlands on lot: 100 +_ square feet
Percent coverage of lot: 0.13 _+ %
Closest distance between nearest existing structures and upland
edge of wetlands: 0.0 feet (existing bulkheaa)
Closest distance between nearest proposed structures and upland
edge of wetlands: 0.0' _+ feet (proposed new dock)
Does the project involve excavation or filling?
X No Yes
If Yes, how much material will be excavated? 0.0
How much material will be filled? 0.0
Manner in which material will be removed or deposited:
(cubic yards)
(cubic yards)
Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by
reason of such proposed operations (use attachments if appropriate):
No impact to the wetlands are anticipated due to the project meeting all typical
environmental regulatory, requirements (i.e., dock elevation over wetlands~ adequate water
depth for the dockl use of non-treated materials in both dock & bulkhead~ reconstruction of
an existing structure - i.e., bulkhead, etc...). Additionally, review of the surrounding
shoreline indicates a substantial number of existing dock structures and bulkheading that
have existed harmoniously within this creek without any discernible impact to the
surrounding environment.
Board of Trustees Application
COASTAL EROSION APPLICATION DATA
Purposes of proposed activity:.
Are wetlands present within 100 feet of the proposed activity?
No Yes
Does the project involve excavation or filling?
No Yes
If Yes, how much material will be excavated?
How much material will be filled?
Manner in which material will be removed or deposited:
.(cubic yards)
.(cubic yards)
Describe the nature and extent of the environmental impacts reasonably anticipated resulting
from implementation of the project as proposed. (Use attachments if necessary)
14-16-4 (9/95)-Text 12
PROJECTLD. NUMBER
617.20
Appendix C
State Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
SEQR
PART 1- PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
I. APPLICANT/SPONSOR 2. PROJECT NAME
Suffolk Environmental Consulting, lnc. ROOT Property
3. PROJECT LOCATION:
Municipality Town of Southold County Suffolk
4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc. or provide map)
n/s Indian Neck Road; Town of Southold, New York (SCTM #: 1000-086-06-020)
5. IS PROPOSED ACTION:
[] New [] Expansion
(3. DESCRIBE PROJECT BRIEFLY:
[] Modification/alteration
Please retbr to tile attar hed prqiect description and plans tin- all specifications.
7. AMOUNTOF LAND EFFECTED:
Initially 0.~acres Ultimately 0.~] acres
8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
[] Yes [] No If No, describe briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
[]Residential [-hndustdal [-~Commercial [--~Agriculture []Park/Forest/Open space r-]other
Describe:
Single family residential dwellings with related appurtenances, including dock structures and bulkheading.
10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENT
AGENCY (FEDERAL, STATE OR LOCAL)?
[] Yes [--~No If yes, list agency(s) and permit/approvals
Army Corps of Engineers General Authorization; New York State Department of' State General Concurrence; New York
State Department of Environmental Conservation Wetlands Permit
Il. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? [] Yes [] No If yes, list agency(s) and permit/approvals
[2. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? [] Yes [] No
I CERTIFY THAT THE INFORMATION PROVIDED IS TRUE TO THE BEST OF MY KNOWLEDGE
Applicant/sponsor name: Matt D. ans- Suffolk Environmental Consulting,
Signature ~~
Inc. Date: February 27, 2011
If the action is in the Coastal Area, and you are a state agency, complete the Coastal
Assessment Form before proceeding with this assessment
OVER
PART II- ENVIRONMENTAL ASSESSMENT ITc be completed by A~enc¥)
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.127
use the FULL EAF.
[] Yes [] No
If yes, coordinate the review process and
B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.67 If
No, a negative declaration may be superseded by another involved agency.
[] Yes [] NO
C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be
handwdtten, if legible)
Cl. Existing air quality, sufface or groundwater quality, noise levels, existing traffic patterns, solid waste production or disposal,
potential for erosion, drainage or flooding problems? Explain briefly:
C2. Aesthetic, agricultural, archeological, historical or other natural or cultural resources; or community or neighborhood
character? Explain briefly:
C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitat, or threatened or endangered species? Explain
briefly:
C4. A community's existing plans or goals as officially adopted, or change in use or intensity of use of land or natural resources?
Explain briefly:
C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain briefly:
C6. Long term, short term, cumulative, or other effects not identified in C1-C57 Explain briefly:
C7. Other impacts (including changes in use of either quantity or type of energy)? Explain briefly:
D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CEA?
[]Yes •No
D. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
[] Yes [] No If yes, explain briefly
PART III - DETERMINATION OF SIGNIFICANCE (To be completed by Agency)
INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important, or otherwise significant.
Each effect should be assessed in connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d)
irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that
explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D
of Part II was checked yes, the determination and significance must evaluate the potential impact of the proposed action on the
environmental characteristics of the CEA.
[] Check this box if you have identified one or more potentially large or significant adverse impacts which MAY occur. Then proceed
directly to the FULL EAF and/or prepare a positive declaration.
[] Check this box if you have determined, based on the information and analysis above and any supporting documentation, that the
proposed action WILL NOT result in any significant adverse environmental impacts AND provide on attachments as necessary, the
reasons supporting this determination:
Name of Lead Agency
Print or Type Name of Responsible Officer
Title of Responsible Officer
Signature of Responsible Officer in Lead Agency
officer)
Signature of Preparer (if different From responsible
Date
PART II - IMPACT ASSESSMENT (To be completed by Lead AgenCy)·
A. OOE8 ACTION EXc;ccu ANY TYPE I 'I~RESHOCD IN 6 NYCRR~ PART 617.47 If Yes, cooecllnate the r~i~v process and use ~be FUU. EAF.
B. WILL ACTION I~*CPJVE COORDINA'IED REVIEW AS PROVIDED FOR UMJST~.D ACtiONS IN 6 NYCRR, PART 617.6? If No, a negalive
C. COUCD ACT1ON RESUCT IN ANY ADV~-.P~b u.l-I~Ec1'S ASSOCIATED Wi1H THE FOLLOWNG: (Atlswem may be ~ If ~)
I,"° I
No
Board of Trustees
Name of Lead Agency
Jill M; Doherty -
Signature of Respon~ble Officer in Lead Agency
President
Title of Responsib~ O~cer
S~gna~ure of P~:p,,,,~r (If dllfemn~ from responsible officer
PROJECT DESCRIPTION
regarding the ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM #: 1000 - 086 - 06 - 0~0
Applicant proposes to perform the following activities within
subject property:
Applicant proposes to Reconstruct various sections of existing
Timber-Sheathed Bulkheading & Returns (55.o' L ±) with new
Vinyl-Sheathed Bulkheading & Returns ("in-placg'), all along the
northern section of subject property;
¢2)
Applicant proposes to Remove various sections of existing Timber-
Sheathed Bulkheading & Returns '110.0' L ±), all along the northern
section of subject property;
(s)
Applicant proposes to Install various sections of new Vinyl-Sheathed
Bulkheading & Returns (1 l&0' L ±), all along the northern section of
subject property;
Applicant proposes to Remove the existing Concrete/Stone Ramp
(1o0.0 square feet ±) within the northeastern section of subject
property;
(5)
Applicant proposes to Establish an area of beach & native beach
plantings (1, SSo square feet ±), backed with a single-row of Rip-Rap
(~2oo-5oolb _+/rock (~ 50.0' L ±), within the northeastern section of
subject property;
Applicant proposes to Install a single-row of Rip-Rap (~200-50olb
±/rock ~ 7.0' L ±) offthe southern terminus of the Bulkhead Return
within the northwestern section of subject property; and
(7)
Applicant proposes to Install a Docking Assembly off the
northwestern section of property consisting of a Fixed, Elevated
Catwalk (~,.0' W x 10~.0' L), a Hinged Ramp ($.0' W x 15.0' L), a
Floating Dock (6.0' W x ~20.0' L) and two (~2) "Tie-Off' Pilings (8.0"
dia.).
Town of Southold
; Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM
I)R(~ERTY LOCATION: S~C.TM. I: THE FOLLOWING ACTIONS MAY REQUIRE THE SIJIIMISSION OF A
1000- 086 - 06 - 020 G
$COPE OF WORK - PROPOSED CONbOIRUL'I'ION ITIS~# / WOP~A~.2.~]~
Yes
No
.. wbet is tbe To~al Ama ~ the Project Pamets? I Wa th~ I='r~tect R~a~ ~ St°~-W' ~'O~
(Include Total Area of nil Pa~ce~ k)cated wl~n 1.7319 acres Gene~ted by a Two (2') Inch Ralr~I m Side?
the ,~:o~e of Wo~ for Prolx~ed Constructor) ;SF/~,.)
b. Whal Is the To~l Ama of Lan~ Cleering
anWorGmund Omur~arx:e fo~the i~opos~ 0.0 sq. ft. Site Improvemeflt~ a~ld Ih~ pemlammlcma~ of
~s~.,,~) 2 oo. ~e s~ P~n ~n~or s~,~ st~,,~ ~ /,.---,
I~OVI])[ i~iUF..Y PRO. IF-~T DE2tCRIFZ'I. ON ma,a~e,~,~ DmlnageStmctures indicating Size &Loca~o~? This
¢1-1
Applicant proposes to reconstruct/reconfigure the Slopes C(xeMing Surface Water ~
existing bulkheading and install a proposed docking 3 Oo~tbe,S~P~anand~rStxvayaasc~ae~he~
assembly thereon. Please refer to the attached Project
Description and Plans for all specifications. ~m must be malraalned ~cx~nout the
4 Will this Pr°ject Require 'nY Last Fiaing' C':':':':':':':':'~ng °~
Excavelkm where Ittere is a cflange to Ihe Natural
F_xlsli~g Grade Involving mo~ Iha~ 200 Cubic Yards
of Matedal within any Pamel?
5 Will "'s A~ica~ Require La~d Otstuf°in9 ActOr's
Encompassing an Ama in Exc~s o~ Five Tho~oand
(5.000 S.F.) Square Fee~ o/~ Su~:e?
6 Is th~ a Nature~ Warm Course Ru~ning Ihr~gh Ibe
Site? Is Ibis Pmi/ect wN/n Itte Trustees ju~a~f~
I 1-
~ OEC ~ R~dr~m~: orwlthtn O~e Humlred (100') fe~o~aWellendoe
am pa~ M m le~e~, commm pM~ e'm~ we uli~ dl~o me ~' m~ra .cms ~' I~.~d; which Exceed Fifteen (15) fee~ of Ver~cal Rise to [ [
V
ffI'ATE OF NEW YORK, SUFFOLK
COUIffl~f OF ........................................... SS
re^sE K. w^ss~cK ~ SUF~OL~
AGENT
And that hedshe is the ....................................................................................................................................................................
Owner and/or representative of the Owner or Owners, and is duly authorized to perform or have performed the said ~x~rk and to
make and file lifts application; that all s~atements contained in this application are true to the best of his knowledge and belief; and
that the work will be performed in the manne~ set forth in the application filed herewith.
Sworn to before me this;
FORM - 06/10
Comm~ss~or Expires January 22, 2
02-
PROJECT DESCRIPTION
regarding the ROOTProperty
Situate: n/s Indian Neck Road; Town of Southold, New York
SCTM #: 1000 - O86 - O6 - 0~0
Applicant proposes to perform the following activities within
subject property:
(1)
Applicant proposes to Reconstruct various sections of existing
Timber-Sheathed Bulkheading & Returns (6s.O' L _+) with new
Vinyl-Sheathed Bulkheading & Returns ("in-placd'), all along the
northern section of subject property;
(e)
Applicant proposes to Remove various sections of existing Timber-
Sheathed Bulkheading & Returns (110.0' L +), all along the northern
section of subject property;
Applicant proposes to Install various sections of new Vinyl-Sheathed
Bulkheading & Returns (1 IS.O' L +), all along the northern section of
subject property;
Applicant proposes to Remove the existing Concrete/Stone Ramp
(100.0 square feet _+) within the northeastern section of subject
property;
(5)
Applicant proposes to Establish an area of beach & native beach
plantings (1,350 square feet _+), backed with a single-row of Rip-Rap
(~200-5001b _+/rock ~ 50.0' L _+), within the northeastern section of
subject property;
Applicant proposes to Install a single-row of Rip-Rap (~2oo-50olb
_+/rock ~ 7.0' L _+) offthe southern terminus of the Bulkhead Return
within the northwestern section of subject property; and
(7)
Applicant proposes to Install a Docking Assembly off the
northwestern section of property consisting of a Fixed, Elevated
Catwalk ({.0' W x 10~.0' L), a Hinged Ramp (S.0' W x 15.0' L), a
Floating Dock (6.0' W x ~20.0' L) and two (~2) "Tie-Off' Pilings (8.0"
dia.).
Board of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
I, Dr. BARRY ROOT residing at
(print owner of property)
do hereby authorize
Lattinqtown, New York
Consulting, Inc.
Southold Board of Town Trustees on my behalf.
16 Horse Hollow Road;
(mailing address)
Suffolk Environmental
(Agent)
to apply for permit(s) from the
Board of Trustees Application
County of Suffolk
State of New York
BRUCE A. ANDERSON- Suffolk Environ. Consulting~ Inc. BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK
WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY
BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT
AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES
HARMELESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR BY BIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS
APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR
REPRESENTATIVES(SO, TO ENTER ONTO MY PROPERTY TO INSPECT THE
PREMISES IN CONJUNCTION WIT~W 7S 7/~N'
~ Signature ~ ,/
SWORN TO BEFORE ME THIS f~'/~ DAY OF4~ ,20 ! I
6ommiss;o, E)p~c'~ dEhUaly 22, 20
7
Suffolk Environmental Consulting, Inc.
Newman Village, Suite E, 2322 Main StreeL P.O. Box 201)3, Bridgehampton, New York 11932-2003
(631) 537 5160 Fax: (631)537 5291
Bruce Anderson, M.S., President
March 21,2011
Ms. Lauren Standish
Board of Trustees
Town Hall
P.O. Box 1179
Southold, NY 11971
Re:
Situate:
SCTM #:
ROOT Property
Proposed Bulkhead Reconstruction/Doc& Construction
n/s Indian Neck Road; Town of Sonthold, NY
1000 - 086 - 06 - 020
Dear Ms. Standish,
As you know this Firm represents the owner of the property referenced above
who is seeking to improve thereon. As per the hearing requirements of the
Southold Board of Trustees I enclose herewith:
Affidavits of Mailing dated March 16, 2011, with certified
receipts attached to all abutting property owners.
Please be advised that we will forward to you the green receipts cards as
we receive them. Should you have any questions concerning this matter, please
feel free to contact this office at any time. Thank you in advance for your
attention and consideration.
Sincerely,
Diane K. Wassick
enc.
cc: Mr. Roof
Jill M. Doherty, President
Bob Ghosio, Jr. , Vicc-Prcsident
James F. King
Dave Bergen
John Bredemeyer
Town Hall, 53095 Main Rd.
P.O. Box I 179
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631 ) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
BOARD OF TRUSTEES: TOWN OF SOUTHOLD
In the Matter of the Application of
BARRY ROOT
COUNTY OF SUFFOLK)
STATE OF NEW YORK)
AFFIDAVIT OF POSTING
1, /_~l~to.-- ~ /.,bg~5~'? ~5/d'-, residing at/dba
b$ing duly sworn', depose and s~y: ""' '
That on the/~"~:ay of .gd.4~eq' ,201 l 1 personally posted the property known as
by placing the Board of Trustee~-o'fI~ci~_l poster wher'-e it / ' '
can easily be seen, and that I have checked
to be sure the poster has remained in place Ibr eight days prior to the date of the public hearing.
Date of hearing noted thereon to be held Wed~ March 23~ 2011 on or about 6:00 PM.
Dated: Mlk~d,~ ~.~, '~ ~,
S~om to before me this
Z~--/'r day o f//~O il
N~a/r~ Public
Ma?'hCw D, fvans
Notgr Puo, c o! Hew York
/,o 01lv6053859
Oualili~d in Su~Joik County
Expires January 22, 20~
Commission
Name:
PROOF OF MAILING OF NOTICE
ATTACH CERTIFIED MAIL RECEIPTS
Address:
Eleanor Bodenstein Rev. Trust
]000-86-6-19
Ellsworth Baylis, Jr.
1000-86-6-23
1000-86-6-21
Gerald & Dorothy Lemmon
1000-86-6-22
Sue O'Dell
1000-86-7-3.1
Ruth Miller Res. Trust
1000-86-7-2.2
6135 Indian Neck Ln; Peconic, NY 11958
P.O. Box 168; Peconic, NY 11958
333 East 43td Street- Apt. 611; New York, NY 10017
3746 Lake Street; Houston, TX 77098
6400 Indian Neck Lane; Peconic, NY 11958
STATE OF NEW YORK
COUNTY OF NEW YORK
Diane K. Wassick c/o Suffolk Environmental Consultin~t Inc.,
residing at 2322 Main St.; New~n Village Suite E; P.O. Box
2003; Bri~eham~ton~ NY 11932 ,being duly sworn deposes and
says that on the /~e Noti e"set'fday°fc~/~/ , 2011, deponent
mailed a true copy of th orth in the Board of
Trustees Application, directed to each of the above named persons
at the addresses set opposite their respective names; that the
addresses set opposite the names of said persons are the address
of said persons as shown on the current assessment roll of the
Town of Southold; that
States Post Office at
were mailed to each of
mail.
said Notices were mailed at the United
Bridgeham~ton , that said Notices
said persons by (certified) (registered)
Sworn to before me this
day of , 2011
Public
$5.71 ~, 9%'-
%.~..:..._;~..~..__../.~.i-. ......................... t
J
TOtal Pos age & P.es $5.71 O i 11
Postage
(Endorsement Required)
(Endorsement Required)
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's website
(southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local
libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
SCTM# 086 06 020
The Application has been submitted to (check appropriate response):
Town Board [] Planning Dept. [] Building Dept. [] Board of Trustees []
1. Category of Town of Southold agency action (check appropriate response):
(a)
Action undertaken directly by Town agency (e.g. capital
construction, planning activity, agency regulation, land transaction)
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action:
Applicant proposes to reconstruct/reconfigure the existing bulkhead and construct a
docking facility off the northern section of sub, iect property and the shoreline of
Richmond Creek.
Attach additional sheets if necessary
Location of action:
Site acreage:.
n/s Indian Neck Road (393' west of Parkers l,andino. Road; Town of Southold~ NY
1.7319 acre +
Present land use: Improved w/single family dwelling and related appurtenances.
Present zoning classification: R - 40
If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
(a) Name of applicant: Dr. BARRY ROOT
(b) Mailing address: 16 Horse Hollow Road; Lattington, NY 11560
(c) Telephone number: Area Code ( 516 ) 674 - 5147
(d) Application number, if any: N/A
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes [] No [] If yes, which state or federal agency?
DEVELOPED COASTPOLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation
criteria.
[] Yes [] No [] Not Applicable
Subiect proposal is consistent with the policy in that the siting and utilization of the proposed dock assembly and
siting/utilization of the proposed reconstructed/reconfigured bulkhead will maintain the character of the
surrounding neighborhood, which currently consists of many similarly-improved residential lots with similar
accessory structures (i.e. dock assemblies and bulkheading along Richmond Creek). In addition, subject proposal
will be in harmony with the "...beneficial use of a coastal location..." in that the legally created residential
waterfront (i.e. coastal) lot will be enhanced by the inclusion of the proposed dock assembly in order to access the
contiguous surface waters and the maintenance of existing erosion control structure (i.e., bulkheading).
Accordingly, we believe that this prelect is consistent with this policy.
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Policies Pages 3 through 6 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject oroposal is not applicable to this policy in that it will have no impact to any potential historic and/or
archaeoloclical resources within the surrounding area.
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section III - Policies Pages 5 through 7 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject proposal will not adverselv imoact the visual oualitv of the surroundino area in that the surrounding
area is currently comprised of properties tint, roved with similar aoourtenances (i.e. dock assemblies and bulkheadsl
of equal, if not qreater, size and scope. Scenic resources, assumedly views of Richmond Creek, are not at risk due to
the proposed dock assemblv and bulkheading beino typical of the character of this section of waterfront.
Accordinolv. this proposal will comply with Policy 3.
Attach addilional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III - Policies Pages 8 through 16 for evaluation criteria
[] Yes [] No [] Not Applicable
Subiect ~roDosal will fully comolv with Dolicv 4 in that the proposed bulkheadino and dock assembly is desioned
to be comparable in design and scope as that of the surrounding bulkheading and dock assemblies, which have
not resulted in loss of life. structures, and natural resources within this area. Accordinolv. this Drooosal will com~lv
with Policy 4.
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III
- Policies Pages 16 through 21 for evaluation criteria
[] Yes [] No [] Not Applicable
Subiect ~ro[~osal is not a~Dlicable to this policy in that it will have no effect to the water quality/supply within the
surrounding area.
Attach additional sheets if necessary
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject proposal will maintain the quality of the surrounding ecosystem in that the proposal is typical of this
section of Richmond Creek, which has not resulted in significant effects to the surroundinq ecosystem. Accordingly,
this proposal will comply with Policy 6.
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies
Pages 32 through 34 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject oroposal is not applicable in that the proposal is simply to maintain the existing shoreline protection
(i.e., bulkheadino) and install a dock assembly which will not result in any form of adverse effects to air quality.
Accordingly. this proposal is not applicable with this policy.
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria.
[] Yes [] No [] Not Applicable
Subject I~roDosal is not applicable in that the proposal does not involve disposal and/or transportation of solid
waste, hazardous waste, toxic pollutants, petroleum products.
Attach additional sheets if necessary
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria
[] Yes [] No [] Not Applicable
Subject oroposal is not applicable to this policy in that the proposal is attendant to a private dwelling. Regardless,
this I~roject will not impede any access to the surface waters in and around subject property and/or become
detrimental to the recreational use of the surroundinq resources.
Attach additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southoid's water-dependent uses and promote siting of new water-dependence uses in
suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject prooosal is applicable in that a water-dependent use (i.e. access to surface waters; boating) is beinq sited
onto a waterfront parcel, however, with reqards to this Policy's concerns with marinas, aquaculture, etc..., this
proposal is not applicable due to this proposal involving only a private docking assembly.
Attach additional sheets if necessary
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town Waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria
[] Yes [] No [] Not Applicable
Subject proposal is not applicable in that the proposal does not involve any form of marine resource manaclement
/i.e. commercial fisheries, recreational fisheries, aquaculture, etc...).
Attach additional sheets if necessary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages
62 through 65 for evaluation criteria.
[] Yes [] No [] Not Applicable
Subiect proposal is not applicable in that the proposal does not involve a{]ricultural lands (i.e. the conversion of
farmland, the establishment and/or maintenance of new coastal aclricultural production, etc. D
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section III - Policies; Pages 65 through 68 for evaluation criteria.
[] Yes [] No [] Not Applicable
Subject proposal is not applicable in that the proposal does not involve the conservation of enerov resources on a
commercial level and/or the promotion of alternative energy sources, proper maintenance of fuel storage facilities
and/or the extraction of mineral extraction
Attach additional sheets if necessary
Created on 5/25/05 11.'20 AM
Suffolk Environmental Consulting, Inc.
Newman Village, Suite E, 2322 Main Street. P.O. Box 2003. Bridgchampton. New York 11932-2003
(631) 537 5161) Fax: (631) 537-5291
Bruce Anderson, M.S., President
March 1,2011
Ms. Jill Doherty, Chairwoman
Board of Trustees
Town Hall
P.O. Box 1179
Southold, NY 11971
Hand Delivered
Re:
Situate:
SCTM #:
ROOT Property
Proposed B~dlrl~ead Recon,~ruction/Dock Construction
n/s Indian Neck Road; Town of Southold, NY
1000 - 086 - 06 - 020
Dear Ms. Doherty,
This Firm represents the owner of the above referenced property, who is seeking
approval to reconstruct the existing timber bulkhead and construct a dock assembly
thereon. In order to do so, a wetlands permit from your Board is required. Please find
attached:
(1) Town of Southold Trustees Wetlands Permit Application (original and two [2]
copies);
(2) Short Environmental Assessment Form (original and two [2] copies);
(3) Local Waterfront Revitalization Program application (original and two [2]
copies);
(4) Erosion, Sedimentation & Storm-Water Rtm-OffAssessment Form (original
and two [2] copies);
(5) Photographs of the current condition of the shoreline (three [3] sets);
(6) Location Map for reference (three [3] copies);
Hammarth/ 2
(7)
Survey of subject property, prepared by PECONICSUR VEYORS, P.C., last
dated February 8, 2011, indicating the proposed conditions thereon (three [3]
prints);
(8)
Proposed Bulkhead Reconstruction/Dock Construction Plans, prepared by
SUFFOLK ENVIRONMENTAL CONSUL TING, INC., dated March 1, 2011,
indicating all project specifications (three [3] prints);
(9) Check made payable to the Town of Southold in the mount of $250.00
covering the requisite application fee.
Kindly review these items and schedule for the regularly scheduled Trustees' meeting of
March 23, 2011. Should you have any questions regarding this matter, or require
additional information, please feel free to contact this office at any time. Thank you in
advance for your cooperation.
Sincerely,
Matt D. Ivans
enc.
cc: B. Root
ROOT Property ~ Proposed Bullchead Reconstruction/Doc1~ Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of South@Id, New York
SCTM#: 1000-086-06-0~0
SITE PI,AN DETAIL
. daptedfi'om the ~Survq oJ subje, tproper{v, asprepared
PECONIC ?;URITZ YOR& P.C
EXISTING CONDITIONS
Existing Bulkhead it0 be removed
~ Existing Bulkhead (t0 be)strueted , 40.0._+
/
APPROVED BY
BOARD OF TRUSTEES
TOWN OF SOUTHOLD
DATE
NOTE: Apparent High Water mark
is located along the seaward face of
both the existing and proposed
bulkhead, and is equal to the Tidal
Wetlands Boundary.
Date:
Scale:
Drawn by: mdi
Existing Bul ead/to be removed @ fl&0'_+ L]
I
t /
1
I
I
I
I
1
I
1
I
I
!
,/
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P,O. Box 2003 · Bridgehampton · NY · 11932
(631) 537 - 5160 (phone)
(631) 537 - 5291 (facsimile)
I!
OF
ROOT Property -~ Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTMa: 1000-086-06-0e0
PROPOSED CONDITIONS
NOTE: Apparent High Water mark
is located along the seaward face of
both the existing and proposed
bulkhead, and is equal to the Tidal
\Vetlands Boundary.
Date:
Proposed "'Pie Off" Pai~gs [8.o"~)
Propo-:ed Float Pilings
124.0'
Rec0nstr ucte~Bulk head (4.0U+]
]
Pr°p°sedtulkhead Be/ur~/25.0'L
t
Rec0nstr ted (40.0'±1
/
/
Prt°sed
New Bulkhead
Scale: I o" = zo.o' ±
Drawn by: mdi
Comments:
t
SITE PLAN DETAIL
/tdapted from the SurvO of subject proper{% as prepared
PE CONIC S UR gE, 2~ORS, p C
6¢3,0': ~
Establish an area of beach &
native beach plantings (1, :35o
square f~et _+), backed with a
single-row of Rip-Rap (~0o-
6Oolb +/rock ~ ~o.o' L _+ ).
)posed Rip-Rap (7.0'L]
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P,O. Box 2003 · Bridgehampton · NY · 11932
(631) 537 - 5160 (phone)
(631) 537 - 5291 (facsimile)
OF
ROOT Propertf ~ Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTM#: 1000-086-06-0~0
PROPOSED DOCK
West Ele va tion Vie w
Proposed Floating Dock,,,i~
AHW
AL W
Proposed Hinged Ramp
124.0'
104.0'_+
)'-+ _ [ Elevated Catwalk
Proposed Ca~ralk Ihlings 16'~1 AL W -
AHW
Existing Bulkhead
Date:
Scale:
Drawn by:
Comments:
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P.O, Box 2003 · Bridgehampton · NY · 11932
(631) 537 - 5160 (phone)
(631) 537 - 5291 (facsimile)
NOTE: Apparent High X,Vater mark
is located along the seaward face of
both the existing and proposed
bulkhead, and is equaJ to the Tidal
Wetlands Boundary
ROOT Property Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTM #: 1000 - O86 - O6 - 0ao
EXISTING CONDITIONS
63.0'+_
Corner of Dwelling
Existing }or Cap [T x
Existing T mber Sheathing {2" x 9" x 10'- ~2'_+1~
PROPOSED BULKHEAD
RECONSTRUCTION
CR OSS-S£CTION VIE W
Existing Tie-Rods ffie-Back Features uf
Date:
Scale:
Drawn by:
Comments:
,..._ AHW ~
Timber Wales {4" x
NOTE: Apparent High \Vater mark
is located along the seaward face of
both the existing and proposed
bul!d~ead, and is equal to the Tidal
Wetlands Boundary.
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P,O, Box 2003 · Bridgehampton · NY · ]1932
(63]) 537- 5160 (phone)
(631) 537 - 5291 (facsimile)
ROOT Property ~ Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTM#: 1000 - 086 - 06 - 030
PROPOSED CONDITIONS
PROPOSED BULKHEAD
RECONSTRUCTION
CROSS-SECTION VIEW
54.0' NE Corner of Dwellin~
Proposed Tie-Rods
't
-- Proposedi?op Cap {T x 18"1
Date:
Scale:
Drawn by:
Comments:
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P.O, Box 2003 · Bridgehampton · NY · 11932
(631) 537 - 5160 (phone)
(631 ) 537 - 5291 (facsimile)
NOTE: Apparent High V~'ater mark
is located along the seaward fhce of
both the existing and proposed
bttlkhead, and is equal to the Tidal
Wetlands Boundary.
ls'l
ROOT Property -~ Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTM#: 1000-086-06-0~0
EXISTING CONDITIONS
PROPOSED BULKHEAD
RECONSTRUCTION
TOP VIEW DETAIL
Existing Top xCap {2" x 18"1
\
\
Existing Timber Waler (4" x 6~]
/
Existing Tim,~er Sheathing [2' x 9" -+]
Existing Timber Piling [lO"~b _+]
\
~ 7~ "~
'\
Date:
Drawn by:
Comments:
tach
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
P,O, Box 2003 · Bridgehampton · NY · 11932
(631) 537- 5160 (phone)
(631) 537 - 5291 (facsimile)
NOTE: Apparent High Water mark
is located along the seaward face of
both the existing and proposed
btdkhead, and is equal to the Tidal
\¥etlands Boundary
OF
ROOT Property -- Proposed Bulkhead Reconstruction/Dock Construction
Situate: s/s Indian Neck Road; Indian Neck; Town of Southold, New York
SCTM~: 1ooo-o86-o6-0~o
PROPOSED BULKHEAD
RECONSTRUCTION
TOP VIE~V DETAIL
PROPOSED CONDITIONS
Proposed Timber Piling{lo"~b -+l ~
Proposed Waler {6" x 6"1
\
\
\\
>osed Vinyl Sheathing {i.e,. C-Loc}
Proposed Top Cap {2"x 15"]
NOTE: Apparent High \Vater mark
is located along the sea'~xard fiace of
both the existing and proposed
bulkhead, and is equal to the Tidal
Wetlands Boundary.
Date:
Scale:
Drawn by:
Comments:
SUFFOLK ENVIRONMENTAL CONSULTING, INC.
PO, Box 2003 · Bridgehampton · NY · 11932
(631) 537- 5160 (phone)
(63~) 537 - 5291 (facsimile)
' I~ICFtMOND
SURVEY OF PROPERTY
AT INDIAN,NECK
TOWN OF SOUTHOLD
SUFFOLK COUNTY, N.Y.
1000-88-06-£0
$CAL~: 1'=~0'
JULY 12. 2010
DECEMBER 2, 2010 (SOUNDINGS ~e TOPO.)
~
POrn
o'~ RoAD
iNoiAN NEcK
ELEVATIONS REFERENCED TO NA, VD. '88
ANY ALTERATION OR ADDITION TO THIS SURVEY IS A WOLATION
OF SECTION 7209 OF THE NEW YORK STATE EOUCATION LAW.
EXCEPT AS PER SECTION 7209-SUBDIWSION 2, ALL CERTIFICATIONS
HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF
SAID MAP OR COPIES HEAR THE IMPRESSED SEAL OF THE SURI.~TYOR
~,HOSE SIGNA THRE APPEARS HEREON.
393'
AREA= 1.7319
[]=DEPTH OF WATER AT LOW WATER
· = MONUMENT
P.O. ~OX 909
1230 TRAVELER STREET
SQUTHOLD, N.K 11971
-1797
10-165