Loading...
HomeMy WebLinkAbout1000-56.-7-1 OI~3~'ICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Jill Doherty, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: October 18, 2010 'Re: Proposed Wetland Permit for GOLDSMITH'S BOAT SHOP, INC. SCTM#1000-56-7-1 En-Consultants, Inc. on behalf of GOLDSMITH'S BOAT SHOP, INC. requests a Wetland Permit to maintenance dredge (for 10 years) approx. 450 cy. sand/silt spoil from +/-30'X +/-225' inlet channel to marina basin and place resultant spoil in adjacent upland boat storage area. Located: 64150 Main Rd., $outhold. SCTM#56-7-1 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the Policy Standards and therefore is CONSISTENT with the LWRP provided the following best management practice is required pursuant to: § 275-11. Construction and operation standards. A. General. The following standards are required for all operations within the jurisdiction of the Trustees: (2) Erosion control. Installation of an erosion control structure is necessary during any building, grading, landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation of a silt fence, hay bales, wood chip berm and silt booms. The placement of the erosion control structure(s) shall be determined by the Trustees or their designee. All intertidal construction and excavation requires the installation of a silt boom that will retain all ,suspended sediments within the immediate proiect area. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Lori Hulse, Assistant Town Attorney Town of Southold A. LWRP CONSISTENCY ASSESSMENT FORM INSTRUCTIONS 1, AIt applicants for perm its* in¢lnding T ow n of Southold agencies, shall cow plote this C C A F for proposed actions thn~ are subjoot to the Town of Southold Watcrfront Consistency Review Law, This nssesswcntisintendedtosupplemon~othnrinformationusedbyaTownof$ontholdagencyin m a k in g a d e te r m in ati0 n 0 f ¢ 0 n s is t e n c y. *Except minor exempt actions including Building Permits and other ministerial permits' not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will anted as to its significant beneficial and adverse effects upon the coastal area (which includes al If any question in Section C on this form is answered "yes" or then the proposed action will affect the achievement of the LWRP policy standards and contained in the consistency review law. Thus~ each answer must be explained both and non- suooorting facts. If an action cannot be certified as cons~ with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the (southoldtown.northfork.net), the Board libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED SCTM# 56 7 . I at the Town of Southotd's website thePlannktg Department, all local PROJECT NAME GOLDSMITH'S BOAT SHOP, INC. The Application has been submitted to (check appropriate response): TownBoard ~] Planning Board[---] Building Dept. ~] Board of Trustees [~ Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g~ capital .... [~] construction, planning activity, agency regUlation;land` transaction)' (b) Financial assistance (e.g. grant, loan, subsidy) ~] (c) Permit, approval, license, certification: Nature and extent of action: Maintenance dredge (for 10 years) approximately 450 cubic yards sand/silt spoil from +/-30' x +/-255' inlet channel to marina basin and place resultant spoil in adjacent upland boat storage area, all as depicted on the project plan prepared by En-Consultants, Inc., dated September 20, 2010. Location of action: 64150 MAIN ROAD, SOUTHOLD Site acreage:. 17.2 ACRES Present land use: COMMERCIAL MARINA Present zoning classification: MARINE - 11 If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: GOLDSMITH'S BOAT SHOP, INC. (b) Mailing address: c/o ALVAH B. GOLDSMITH, JR., P.O. BOX 1092 SOUTHOLD, NY 11971 (c) Telephone number: Area Code 631-765-1600 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes--[~ No [~] If yes, which state or federal agency? C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. ~]Yes ~] No [~ Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southoid. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria ["-] Yes -- No [~ Not Applicable Location of action: 64150 MAIN ROAD, SOUTHOLD Site acreage: 17.2 ACRES Present land use: COMMERCIAL MARINA Present zoning classification: MARINE - II If an application for the proposed action has been filed with the Town of $outhold agency, the following information shall be provided: (a) Name of applicant: GOLDSMITH'S BOAT SHOP, INC. (b) Mailing address: C/O ALVAH B. GOLDSMITH, JR., P.O. BOX 1092 SOUTHOLD, NY 11971 (c) Telephone number: Area Code 631-765-1700 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes ~] No [~ If yes, which state or federal agency~ C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form bc returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. ~Yes ~ No ~ Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria [~ Yes [---] No [~ Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria ~Yes ~ No E~ Not Applicable Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8 through 16 for evaluation criteria Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III - Policies Pages 16 through 21 for evaluation criteria ~ Yes ~ No E~ Not Applicable Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. ~]Yes ~ No [-~ Not Applicable To the exteht that it hpplies to the proposed maintenance dredging, the project will be consistent with Policy 6. Specifically, the dredging will be subject to State Tidal Wetlands approval from the NYS DEC, and dredging will be limited to time periods outside of when protected species such as ospreys and winter flounder are breeding or spawning, respectively. A silt curtain would be used to minimize the scope of epbemeral turbidity, and the proposed spoil site will be adequately buffered from the adjacent shoreline. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria. ~] Yes [--~No[~ Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. ~-] Yes ~ No ~ Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. Yes ~ No ~-~ Not Applicable To the extent that the project is designed to maintain navigable water depths and access to a marina that provides safe harbor and navigational access for the local community, the project is consistent with the Policy 9 goal of encouraging the recreational use of coastal waters. Attach additional sheets if necessary WORKING COAST POLICIES Policy Il)'. Prot6ct Southold's wat.e.r-dependen.t .uses and promote siting of new wat.er-depen.dent uses in suitable locations. See LWRP Section IH - Pohcles; Pages 47 through 56 for evaluation criteria. [~ Yes [--] No [--] Not Applicable The project is especially consistent with Policy 1 O's policy standards of protecting existing water-dependent uses and providing sufficient and adequate navigation infrastructure for water-dependent uses, particularly by maintenance dredging to protect and maintain an existing and previously permitted navigation channel that provides access to an existing water-dependent use. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the peeonic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. [-"] Yes ~] bio [~ Not Applicable Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. ~] Yes ~] No [~ Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. ~] Yes [--] No ~] Not Applicable PREPARED BY R~ ROBE ERRMANN TITLE COASTAL MGMT SPECIALIST DATE 9/23/10 Amended on 8/1/05 EX. STONE Brlck storage ~._b o a t s~W/?V~?~R_~_R.9,BER~T ?~X,.~s~-S..:. M ~RC~' ~mO .-~"x ....... ,, $ o u t h o ~ c~ ~... BoY '\ A~A TO BE DREDGED TO A MA~. DEPTH OF -4'ALW (APPROX. 4-50 CY SAND SPOIL) 1" =60' ~CTION A*^: THRLI PROPC~P MAINSNANCU ~l~ilN~ ~C1'ION THRLI FROPO~P ~OIL O~PCSITION .SIS