Loading...
HomeMy WebLinkAboutTR-7419Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Br~terneyer Town Hall, 53095 Main Rd. P.O. Box I 179 $outhold, NY 11971 Telephone (631) 765-1892 l~ax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 1st day of construction ½ constructed ~/Project complete, compliance inspection. BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK pERMIT NO. 7419 DATE: OCTOBER 20~ 2010 ISSUED TO: ALBERTSON MARINA (WILLIAM WITZKE) PROPERTY ADDRESS: 61500 ROUTE 25~ SOUTHOLD SCTM# 56-6-2.2 AUTHORIZATION Pursuant to the provisions of Chapter 275 and/or Chapter 111 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on October 20, 2010, and in consideration of application fee in the sum of $250.00 paid by Albertson Marina (William Witzke) and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit for a 10 year maintenance dredge permit for an underwater area measuring 6,000 square feet +/- within the western/southwestern section of the marina to a navigable depth of -4.0%/- at low tide; approximately 400 cubic yards of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and replace/reconstruct the existing floating dock structure situated centrally within the marina; the current floating dock consists of the central floating dock 5'x195', eighteen (18) finger piers 2.5'x15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'x13.7' connecting the dock to the existing bulkhead; the overall structure is supported by typical billet floatS, and secured by ten (10) pilings 10' diameter situated on the ends of various finger piers; the entire structure iS to be replaced in-kind and in-place; and as depicted on the site plan prepared by Suffolk Environmental ConsUlting, Inc., last dated November 1, 2010, and stamped approved on November 8, 2010. IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. TERMS AND CONDITIONS The Permittee Albertson Marina (William Witzke), residing at 61025 Route 25, Southold, New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and ail such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. That this Permit is valid for a period of 24 months, wkich is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. That there will be no unreasonable interference with navigation as a result of the work herein authorized. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trnstees, the work shall cause unreasonable obstruction to free navigation, the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. That thc said Board will be notified by the Permittee of the completion of the work authorized. That thc Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 October 20, 2010 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Mr. Matt D. Ivans Suffolk Environmental Consulting, Inc. P.O. Box 2003 Bridgehampton, NY 11932 RE: ALBERTSON MARINA (WILLIAM WITZKE) 61500 ROUTE 25, SOUTHOLD SCTM# 56-6-2.2 Dear Mr. Ivans: The Board of Town Trustees took the following action dudng its regular meeting held on Wednesday, October 20, 2010 regarding the above matter: WHEREAS, Suffolk Environmental Consulting, Inc. on behalf of ALBERTSON MARINA (WILLIAM WlTZKE) applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated September 8, 2010, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator issued a recommendation that the application for a 10 year maintenance permit to dredge an underwater area measuring 6,000 square feet +/- within the western/southwestern section of the marina to a navigable depth of -4.0'+/- at Iow tide; approximately 400 cubic yards of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location be found Consistent with the Local Waterfront Revitalization Program policy standards, and, WHEREAS, in accordance with Chapter 268, said application to replace/reconstruct the existing floating dock structure situated centrally within the marina: the current floating dock consists of the central floating dock 5'x195', eighteen (18) finger piers 2.5'x15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'x13.7' connecting the dock to the existing bulkhead; the overall structure is supported by typical billet floats, and secured by ten (10) pilings 10" diameter situated on the ends of various finger piers; the entire structure is to be replaced in-kind and in- place was found to be Exempt from the Local Waterfront Revitalization Program policy standards, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on October 20, 2010, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that the Board of Trustees have found the application to be Consistent with the Local Waterfront Revitalization Program, and, RESOLVED, that the Board of Trustees approve the application of ALBERTSON MARINA (WILLIAM WlTZKE) for a 10 year maintenance dredge permit for an underwater area measuring 6,000 square feet +/- within the western/southwestern section of the marina to a navigable depth of -4.0'+/- at Iow tide; approximately 400 cubic yards of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and replace/reconstruct the existing floating dock structure situated centrally within the marina; the current floating dock consists of the central floating dock 5'x195', eighteen (18) finger piers 2.5'x15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'x13.7' connecting the dock to the existing bulkhead; the overall structure is supported by typical billet floats, and secured by ten (10) pilings 10" diameter situated on the ends of various finger piers; the entire structure is to be replaced in-kind and in-place; and as depicted on the site plan prepared by Suffolk Environmental Consulting, Inc., last dated November 1, 2010, and stamped approved on November 8, 2010. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) Fees: $50.00 Very truly yours, Jill I~oherty ~ President, Board of Trustees JMD/eac Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall, 53095 Main Rd. P.O. Box I 179 Southold, NY 11971 Telephone (631 ) 765 - 1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Please be advised that your application dated ~3C_~' ~ c=~O,/O has been reviewed by this Board at the regular meeting of~,~J-~Joe~o2D~c~::~/dD and your application has been approved pending the completion of th6 following items checked off below. V/Revised Plans for proposed project Pre-Construction Hay Bale Line Inspection Fee ($50.00) __ Ist Day of Construction ($50.00) ½ Constructed ($50.00) l///'Final Inspection Fee ($50.00) Dock Fees ($3.00 per sq. ft.) Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be Paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: BY: Jill M Doherty, President Board of Trustees Peter Young, Chairman Lauren Standish, Secretary Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY ll971 Telephone (63 I) 765-1892 Fax (631 ) 765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., October 13, 2010, the following recommendation was made: Moved by Audrey Horton, seconded by Peter Young, to TABLE the Wetland Permit application of ALBERTSON MARINA (WILLIAM WlTZKE) to maintenance dredge an underwater area measuring 15,000 sf. within the western/southwestern section of the marina to a navigable depth of -4.0'+/- at Iow tide. Approx. 400 cy. of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and replace/reconstruct the existing floating dock structure situated centrally within the marina. The current floating dock consists of the central floating dock 5'X 195', eighteen (18) finger piers 2.5'X 15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'X 13.7' connecting the dock to the existing bulkhead. The overall structure is supported by typical billet floats, and secured by ten (10) pilings 10" dia. situated on the ends of various finger piers. The entire structure is to be replaced in- kind and in-place. Located: 61025 Route 25, Southold. SCTM#56-6-2.2 Inspected by: Audrey Horton, Peter Young The CAC Tabled the application and requests accurate details are provided on the site plan with regard to the docks. Vote of Council: Ayes: All Motion Carried Jill M. Dohe~ty, President James F. King, Vice-President Dave Bergen Bob Ghosio. Jr. John Bredemeyer P.O. Box 1179 Southold. NY 11971 Telephone(631) 765-1892 Fax (631)765-6641 Southold Town Board of Trustees Field Inspection/Worksession Report Date/Time: ALBERTSON MARINA (WILLIAM WlTZKE) requests a Wetland Permit to maintenance dredge an underwater area measuring 15,000 sf. within the western/southwestern section of the marina to a navigable depth of -4,0'+/- at Iow tide. Approx. 400 cy. of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and replace/reconstruct the existing floating dock structure situated centrally within the marina. The current floating dock consists of the central floating dock 5'X 195', eighteen (18) finger piers 2.5'X 15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'X 13.7' connecting the dock to the existing bulkhead. The overall structure is supported by typical billet floats, and secured by ten (10) pilings 10" dia, situated on the ends of various finger piers. The entire structure is to be replaced in- kind and in-place. Located: 61025 Route 25, Southold. SCTM#56-6-2.2 T~altwf area to be impacted: ~Ba ater Wetland Freshwater Wetland Sound y Distance.of proposed work to edge of wetland PaK/C'C'own Code proposed work falls under: ,~;;hapt.275 Chapt. 111 other Type of Application: __ Wetland __Coastal Erosion __Amendment __Administrative__Emergency Pre-Submission __Violation Modifications: Conditions: Present Were: __/~J.J.King __/~J.Doherty __~J. Bredemeyer __ B.Ghosio, __ D. Dzenkowski __other Form filled out in the fiel¢ by Mailed/Faxed to: Date: / D. Bergen__ ALBER TSON MARINA ( c/ o Witzke) Property Situate: 61205 Route 25 (Main Road); Town of Southold, New York SCTM ~: 1000 - 056 - 06 - 002.2 ~P~oto ~aken on June 2, 2010) Photograph indicating the area proposed to be maintenance dredged within, and contiguous to, the southwestern section of subject property (rendering approximate). Photograph taken from the northerly dock structure, facing south towards Budd's Pond. ALBER TSON MARINA ( c/o Witzke) Property Situate: 61205 Route 25 (Main Road); Town of Southold, New York SCTM #: 1000 - 056 - 06 - 002.2 (Photo taken on June 2, 2010) Photograph indicating the area proposed to be maintenance dredged within, and contiguous to, the southwestern section of subject property (arrows approximate). Photograph taken from the central floating dock structure, facing northwest. ALBER TSON MARINA ( c/o Witzke) Property Situate: 61205 Route 25 (Main Road); Town of Southold, New York SCTM 4*: 1000 - 056 - 06 - 002.2 ~Photo ta]cen on June 2, 2010) Photograph of the existing central floating dock structure to be replaced "in- kind/in-place" within the central section of the marina. Photograph taken from the existing central floating dock, facing southwest. ALBERTSON MARINA (c/o Witzke) Property Situate: 61205 Route 25 (Main Road); Town of Southold, New York SCTM #: 1000 - 056 - 06 - 002.2 (~hoto taken on June 2, 2010) Photograph of the existing hinged ramp providing access to the existing central floating dock to be reconstructed "in-kind/in-placd'. Photograph taken from the existing central floating dock, facing northeast. ALBER TSON MARINA (c/o Witzke) Property Situate: 61205 Route 25 (Main Road); Town of Southold, New York SCTM #: 1000 - 056 - 06 - 002.2 Hammarth/ 2 Suffolk Environmental Consulting, Inc. Newman Village, Suite E. 2322 Main Street, P.O. Box 2003, 'd=e a pit , New York 11932-2003 (631 ) 537-5160 Fax: (631 ) 537-5291 Bruce Anderson, M.S., President November 1, ~2010 Ms. Jill Doherty, President Board of Trustees Town Hall P.O. Box 1179 Southold, NY 11971 Re: Situate: SCTM #: ALBERT$ON MARINE Application 61205 Route 25 (Main Road); Town of Southold, NY 1000 - 056 -- 06 -- 00~.~ Dear Ms. Doherty, Pursuant to the request by your Board concerning the above referenced application, please find enclosed: (t) Revised Proposed Maintenance Dredging Plan, prepared by SUFFOLK ENVIRONMENTAL CONSULTING, INC., last dated November 1, ~2010, indicating the shifting of the proposed dredging from the western shoreline, the maintenance of a 4~:1 slope along the shoreline and indication for a ten (10) year maintenance dredging approval (three [-~'] sets). Please review these items and arrange for the issuance of the requested permit at your earliest opportunity. Should you have any questions concerning this matter, please feel free to contact this office at any time. Thank you as always for your attention and consideration. Sincerely, Matt D. Ivans CBC, cc: W. Witzke Suffolk Environmental Consulting, Inc. Newman Village, Suite E, 2322 Main Street. P.O. Box 2003. Bridgehampton. New York 11932-2003 (631) 537-5160 Fax: (631) 537-5291 Bruce Anderson, M .S., President November 62, 62010 Ms. Jill Doherty, President Board of Trustees Town Hall P.O. Box 1 179 Southold, NY 11971 Re: Situate: SCTM #: ALBERT$ON MARINE Application 61205 Route 25 (Main Road); Town of Southold, NY 1000 -- 0/56 -- 06 -- 00t.~ Dear Ms. Doherty, In follow up to my correspondence of November 1, 62010, regarding the above referenced application, please find enclosed: (1) Check in the amount of $ 50.00 to cover the requested Final Inspection Fee. By way of this correspondence, and on behalf of the owner of the above ret~renced property, kindly issue the requested permit at your earliest opportunity. Should you have any questions concerning this matter, please feel free to contact this office at any time. Thank you as always for your attention and consideration. Sincerely, Matt D. Ivans enc. cc: W. Witzke OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Jill Doherty, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: October 18, 2010 Re: Proposed Wetland Permit for ALBERTSON MARINA (WILLIAM WITZKE) SCTM#1000-56-6-2.2 Suffolk Environmental Consulting, Inc. on behalf of ALBERTSON MARINA (WILLIAM WITZKE) requests a Wetland Permit to maintenance dredge an underwater area measuring 15,000 sr. within the western/southwestern section of the marina to a navigable depth of -4.0'+/- at Iow tide. Approx. 400 cy. of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and replace/reconstruct the existing floating dock structure situated centrally within the marina. The current floating dock consists of the central floating dock 5'X 195', eighteen (18) finger piers 2.5'X 15' situated perpendicular along the length of the floating dock (9 per side), and access ramp 3'X 13.7' connecting the dock to the existing bulkhead. The overall structure is supported by typical billet floats, and secured by ten (10) pilings 10" dia. situated on the ends of various finger piers. The entire structure is to be replaced in-kind and in-place. Located: 61025 Route 25, Southold. SCTM#56-6-2.2 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the Policy Standards and therefore is CONSISTENT with the LWRP provided the following best management practice is required pursuant to: § 275-11. Construction and operation standards. A. General. The following standards are required for all operations within the jurisdiction of the Trustees: (2) Erosion control. Installation of an erosion control structure is necessary during any building, grading, landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation of a silt fence, hay bales, wood chip berm and silt booms. The placement of the erosion control structure(s) shall be determined by the Trustees or their designee. All intertidal construction and excavation requires the installation of a silt boom that will retain all suspended sediments within the immediate project area. The replacement of the current floating dock is EXEMPT from LWRP review pursuant to: § 268-3. Definitions. MINOR ACTIONS item "B" which states: B. Replacement, rehabilitation or reconstruction of a structure or facility, in kind, on the same site (inplace), including upgrading buildings to meet building or fire codes, except for structures in areas designated by the Coastal Erosion Hazard Area (CEHA) law where structures may not be replaced, rehabilitated or reconstructed without a permit and shoreline erosion control structures (including, but not limited to, groins, jetties, bulkheads, filled piers) located within Great Peconic Bay, Cutchogue Harbor, Little Peconic Bay, Hog Neck Bay, Noyack Bay, Southold Bay, Shelter Island Sound, Pipes Cove, Orient Harbor, Gardiners Bay, Long Island Sound, Fishers Island Sound and Block Island Sound (excluding all creeks); Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Lori Hulse, Assistant Town Attorney Office Use Only __ Coastal Erosion Permit Application X Wetland Permit Application Amendmen',/Tr aris ~r/Extension J Received Application: ,C~]~[~ ~-Received Fee:$ 7Completed Application: C} t2 __Incomplete: ~ -" SEQRA Classification: Type 1 Type II Unlisted_ Coordination(date sent) ,7-LWRP Consistency Asse~isment Form: ~'-CAC Referral Sent: ID/.I u/ Date of Inspection: 10 !1.~! ~ __ Receipt of CAC Report: __ Lead Agency Determination Technical Review: t/'Public Hearing Held: Resolution: Administrative Permit Name of Applicant ALBERTSON MARINA ( William Witzke) Address P.O. Box 937; Southold, NY 11971 Phone Number: (631) 765 - 3232 Suffolk County Tax Map Number: 1000 - 056 - 06 - 002.2 Property Location: 61205 Route 25 (Main Road); Town of Southold, NY (provide LILCO Pole #, distance to cross streets, and location) AGENT: (If applicable) Address: MATT D. IVANS (D Suffolk Environmental Consulting, Inc. P.O. Box 2003; Bridgehampton, NY 11932 Phone: (631) 537 - 5160 Board of Trustees Applicatt GENERAl. DATA Land Area (in square feet):. 1.764 acres _+ Area Zoning: M - 2 Previous use of property: Intended use of property: Commercial Marina. Same (maintenance dredge and dock replacement/reconstruction). Covenants and Restrictions: Yes X No If "Yes", please provide a copy. Prior permits/approvals for site improvements: Agency Date Southold Trustees Permit (No. 5267) |anuarv 24, 2001 __ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? X No Yes If yes, provide explanation: Project Description (use attachments if necessary):_ Please refer to the attached Project Description. PROJECT DESCRIPTION for the ALBERTSON MARINA (c/o Witzke) Property Situate: 61 ~05 Route ~5 (Main Road); Town of Southold, New York SCTM #: 1000 - 056 - O6 - O0~.e Applicant proposes to perform the following activities within subject property: (1) Perform a Maintenance Dredge of an underwater area measuring 15,000 square feet +/- within the western/southwestern section of the marina, to a navigable depth of < 4.0' +/- (at low tide). Approximately 400 cubic yards of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and (2) Replace/Re-Construct the existing Floating Dock Structure situated centrally within the marina. The current Floating Dock consists of the central Floating Dock (5.0' wide x 195.0' long), eighteen (18) £iager Piers (2.5' wide x 15.0' long) situated perpendicular along the length of the Floating Dock (nine [9] per side), and an access Ramp (3.0' wide x 13.7' long) connecting the dock to the existing bulkhead. The overall structure is supported by typical billet floats, and secured by ten (10) pilings (10" ~) situated on the ends of various Finger Pier's. The entire structure is to be replaced "in-kind' and "in-place". Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purposes of proposed activity:. Please refer to the attached Project Description. Area of wetlands on lot: 58, 000 _+ square feet Percent coverage of lot: 75 _+ % Closest distance between nearest existing structures and upland edge of wetlands: 0.0 feet (existing docking) Closest distance between nearest proposed structures and upland edge of wetlands: 0.0' _+ feet (proposed reconstracted doclu'ng) Does the project involve excavation or filling? No X Yes If Yes, how much material will be excavated? ~oo.o +/- How much material will be filled? 0.0 Manner in which material will be removed or deposited: (cubic yards) (cubic yards) Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): No impact to the wetlands are anticipated from the maintenance dredge in that this activity. has been routinely approved by this Board and performed within this marina without any substantial impact to the immediate environment. Additionally, no impact to the wetlands are anticipated from the reconstruction of the floating dock in that the existing floating dock has existed harmoniously within this marina without any discernible impact to the surrounding environment. Board of Trustees Application COASTAL EROSION APPLICATION DATA Purposes of proposed activity:. Are wetlands present within 100 feet of the proposed activity? No Yes Does the project involve excavation or filling? No Yes If Yes, how much material will be excavated? How much material will be filled? Manner in which material will be removed or deposited: (cubic yards) (cubic yards) Describe the nature and extent of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) 14-16-4 (9/95)-Text 12 ~ PROJECTI.D. NUMBER 617.20 ' Appendix C i State Environmental Quality Review SHORT ENVIRONMENTAL ASSESSMENT FORM For UNLISTED ACTIONS Only SEQR PART 1- PROJECT INFORMATION (To be completed by Applicant or Project sponsor) 1. APPLICANT/SPONSOR I 2. PROJECT NAME Suffolk Environmental Consultinl~, Inc. [ ALBERTSONM,4RINA Property 3. PROJECT LOCATION: Municipality Town of Southold County Suffolk 4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc. or provide map) 61205 Route 25 (Main Road); Town of Southold, New York (SCTM #: 1000 056 06- 002.2) 5. IS PROPOSED ACTION: [] New [] Expansion [] Modification/alteration 6. DESCRIBE PROJECT BRIEFLY: Applicant proposes to maintenance dredge the ~vestern/southwestern section of the mm-ina, and replace/reconstruct an existing floating dock structure within the central portion of the marina. Please refer to the attached prqject plans for all specifications. 7. AMOUNT OF LAND EFFECTED: Initially 0.4acres Ultimately 0.4 acres 8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? [] Yes [] No If No, describe briefly 9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? []Residentia~ [-~lndustdal ~lCommercial I--IAgriculture [-]Park/Forest/Open space [~Other Describe: Commercial marina facilities of similar size and scope. 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENT AGENCY (FEDERAL, STATE OR LOCAL)? [] Yes [-~No If yes, list agency(s) and permit/approvals Army Corps of Engineers General Authorization; New York State Department of State General Concurrence; New York State Department of Environmental Conservation Wetlands Permit. 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? [] Yes [] No If yes, list agency(s) and permit/approvals 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? [] Yes [] No I CERTIFY THAT THE INFORMATION PROVIDED IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: Ma~ D. Iyans - Suffolk Environmental Consulting, [nc. Date: / September 3, 2010 If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment OVER PART II- ENVIRONMENTAL ASSESSMENT ~ be completed by Agency) A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.127 use the FULL EAF. [] Yes [] No If yes, coordinate the review process and B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.67 If No, a negative declaration may be superseded by another involved agency. [] Yes [] No COULD ACTION RESULT IN ANY ADVERSE I::I-PECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten, if legible) C1. Existing air quaifiy, surface or groundwater quality, noise levels, existing traffic patterns, solid waste production or disposal, potential for erosion, drainage or flooding problems? Explain briefly: C2. Aesthetic, agricultural, archeological, historical or other natural or cultural resources; or community or neighborhood character? Explain bdefly: C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitat, or threatened or endangered species? Explain bdefly: C4. A community's existing plans or goals as officially adopted or change in use or intensity of use of and or natural resources? Explain bdefiy: C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Exptain briefly: C6. Long term, short term, cumulative, or other effects not identified in C1-C57 Explain bdefly: C7. Other impacts (including changes in use of either quantity or type of energy)? Explain briefly: D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CEA? []Yes ~lNo IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? [] Yes [] No If yes, explain briefly PART itl - D~/~IINATION OF SIGNIFICANCE (To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important, or otherwise significant. Each effect should be assessed in connection with its (a) setting (i.e. u~ban or rural); (b) probability of occurring; (c) duration; (d) irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materiais. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part II was checked yes, the determination and significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA. [] Check this box if you have identified one or more potentially large or significant adverse impacts which MAy occur. Then proceed directly to the FULL EAF and/or prepare a positive decJaration. [] Check this box if you have determined, based on the infermation and analysis above and any supporting documentation, that the proposed action WILL NOT result in any significant adverse environmental impacts AND provide on attachments as necessary, the reasons supporting this determination: Name of Lead Agency Phnt or Type Name of Responsible Officer Title of Responsible Officer Signature of Responsible Officer in Lead Agency officer) Signature of Preparer (if different From responsible Date PART II - IMPACT ASSESSMENT (To be completed by re~d AgencT} · A. DOES AC¥iuN EX~t=cu ANy Type i THRE~ClOLD iN, Ny(~, pART 617.47 If Ye~. cooMinate the reMew process mid use Ihe FULL EAF. C. COULD ACTION RESULT IN ANY ADV~: t:J*l*t:[,q'8 ASSOCIATED WITH THE FOCLOWING: (Answem may be handmitte~, if legIMe) CO. ~ tram, sh~t tenn. cumulative, or o~ ~ ~ ~ ~ ~!~? ~ ~Y: I  o - D. ~ ~E PR~ECT ~ ~ I~A~ ON ~E ~R~ME~ ~IS~ ~T ~US~ ~ E~HM~ OF A ~ p~ m.u~~ ~ s~ fro ~ ~ ~) ' i ~~: F~e~a~.~~K~b~,~oro~s~n~nL ~ ........... r , w..~n ....... z,~~or~~~ ~~~n ~.. ,Board of Trustees Name of Lead Agency Jill M. Doherty ' ~Pl~n~ or Type Name/~ Res~fonsible OfFicer in Lead Agency ~ $i~re of'We~po~sibfe 0fli~1 Lead Agency President 'lille of Responsible Officer Signalure of Preparer (ffdlffemnt from responsible officer) Board of Trustees Application AUTHORIZATION (where the applicant is not the owner) I, WILLIAM WII-ZKE residing at (print owner of property) do hereby authorize Southold, NY 11971 Consultinq, Inc. Southold Board of Town Trustees on my behalf. (Owner's signature) ~ 61205 Route 25; (mailing address) Suffolk Environmental (Agent) to apply for permit(s) from the Board of Trustees Application County of Suffolk State of New York WILLIAM WITZKE (Albertson Marine~ Inc.) BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMELESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY BIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(SO, TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. Signature (] SWORN TO BEFORE ME THIS /2 '~ DAYOF ]~f~ ~/ Notary Public CA~O[- A. UILLER NO'IARY PUBLIC, ,STATE OF NEW YORK ilO, 011Vil6003086 QUALIFIED IN SUFFOLK COUNTY q^,, CONJBliI$SION EXPIRES FEBRUARY 23, ~'-"" Jill M. Doher~y, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (631 ) 765-1892 Fax (631 ) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD In the Matter of the Application of ALBERTSON MARINA (WILLIAM WITZKE) COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF POSTING I,?)tt2,~ /e'. ~.-4~3't£t' ,residing at/dba being ~luly sworn, depose and'say: That on the 7~day of O~ ,2010, I personally posted the property known as by placing the Board o~'Tru~stees official po~ter Whe/'e it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public heating. Date of hearing noted thereon to be held Wed. October 20~ 2010 on or about 6:00 PM. Dated: '(signature) Sworn to before me this ~ day o fO 0.7"/20~0 NotCPU~l(c Matthew Q Nan$ lq0tary p[;b~[c ¢ New Yo~ No 0~N6053859 Ooalifie~ iff Sgflo~k County Commiss~o~ Exp~es January 22, Suffolk Environmental Consulting, Inc. Newman Village, Suite E, 2322 Main Street, P.O. Box 2003, Bridgehampton, New York 11932-2003 (631) 537-5160 Fax: (63 I) 537-5291 Bruce Anderson, M.S., President October 8, 2010 Ms. Lauren Standish, Trustees Secretary Southold Board of Trustees Town Hall P.O. Box 1179 Southold, NY 11971 Re.' Situate: SCTM #: ALBERTSONMARINE Public Hearing 61205 Route 25 (Main Road); Town of Southold, NY 1000 - 056 - 06 - 002.2 Dear Ms. Standish, With respect to the above referenced application, please £md attached: (1) Original Affidavit of Mailing Notice (w/certified mall receipts), dated October 7, 2010. Kindly review and retain within your records. We will forward the green return cards as soon as we get them. Should you have any questions concerning this matter, please feel free to contact this office at any time. Thank you as always for your attention and consideration. Sincerely, · K asslck Encl Cc: Mr. Witzke Name: Patrioia Witzke Erich Haesche; Herman Haesche Diane Giardi County of Suffolk William & Patricia Witzke C&L Realty, Inc. Ned & Mary Harroun Philip O'Hara; Dalton Lawrence Address: 532 Laurel Avenue; Southold, NY 11971 320 Montgomery Avenue; Oceenside, ny 11572 507 Sterling Place; Greenport, NY 11944 300 Center Drive; Riverhead, NY 11901 532 Laurel Avenue; Southold, NY 11971 61600 Route 25; Southold, NY 11971 63745 Main Road; Southold, NY 11971 140 Remsen Street; Brooklyn, NY 11201 STATE OF NEW YORK COUNTY OF NEW YORK Diane K. Wassick residing at 2322 Main St.; Newman Village Suite E; P.O. Box 2003; Brid~eham~tonr NY 11932 r being duly sworn deposes and says that on the ~9~ day of J~ , 2010 , deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at Brid~eham~ton , that said Notices were mailed to each of said persons by (certified) (registered) mail. Sworn to before me this /r~ day of~/.~ , 2010 /' ' Notary Public I¥~atthaw D I,/~ns Ouaihed ir b~:Itcl, (sol, sty Commlssio~ Exp,res u~nuary 22, 20 I~ PostaGe (Endorsement Required) $5.88 $ $5.88 (Endorsement Required) (Endorsement Required) USE I C'- Poa~e Certified Fee .II Postage ._~ Cerlified Fee To~m Po~age & Fees Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area (which includes all of Southold Town). If any question in Section C on this form is answered "yes", then the proposed action may affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 056 06 002.2 The Application has been submitted to (check appropriate response): Town Board [] Planning Dept. [] Building Dept. [] Board of Trustees 1. Category of Town of Southold agency action (check appropriate response): (al Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) (c) Permit, approval, license, certification: Nature and extent of action: Applicant proposes to perform the following activities within subject property: (1) Perform a Ma/~tenance D~_e of an underwater area measuring 15,000 square feet +/- within the western/southwestern section of the marina, to a navigable depth of < 4.0' +/- (at low tide). Approximately 400 cubic yards of dredge spoil is anticipated to result from the proposed maintenance dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location; and (2) Re?ace.rRe-Con.stxuct the existing Floaling Dock Structure situated centraliv within the marina. The current Floating Dock consists of the central Floati~£ Dock (5.0' wide x 195.0' long), eighteen (18) Finger Piers 12.5' wide x 15.0' long) situated perpendicular along the length of the Floating Dock (nine [91 per side), and an access Ramp (3.0' wide x 13.7' long) connecting the dock to the existing bulkhead. The overall structure is supported by typical billet floats, and secured by ten (10) pilings Il0' qP/situated on the ends of various Finger Piers. The entire structure is to be replaced "in-kind' and "in-place'. Attach additional sheets if necessary Location of action: Site acreage: 61~O5 Route ~5 (Main Road); Town of Southold, New York 1.764 acres Present land use: Commercial Marina. Present zoning classification: M - 2 If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: ALBERTSON MARINA (c/o Witz, ke) Property (b) Mailing address: P.O. Box 9377 Southold~ NY 11971 (c) Telephone number: Area Code ( 631 ) 765 - 3232 (d) Application number, if any: N/A Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes [] No [] If yes, which state or federal agency? DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. [] Yes [] No [] Not Applicable The proposed project is for the maintenance dredging of an underwater area located within the western/ southwestern section of the marina to a depth of~.o' below apparent low water level. This proposal is situated within a commercial marina (i.e., beneficial use of a coastal location) and is for the routine maintenance of the navigability of the marina, and has been implemented previously without any form of substantial impact to the surrounding environment (i.e., minimizes adverse effects of development). Additionally, with the simple replacement of the existing floating dock structure (i.e., efficient use of infrastructure), which has existed harmoniously within this marina for many years, we do not anticipate any form of adverse impact to the immediate environment (i.e., minimizes adverse effects of development). Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section Ill - Policies Pages 3 through 6 for evaluation criteria [] Yes [] No [] Not Applicable This proposal is not applicable to this Policy. Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 5 through 7 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8 through 16 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III - Policies Pages 16 through 21 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. [] Yes [] No [] Not Applicable No change to the current visual qnality of this section of shoreline. This proposal is not applicable to this Policy. PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section lI1 - Policies; Pages 38 through 46 for evaluation criteria [] Yes [] No [] Not Applicable No change to the cnrrent visual quality of this section of shoreline. This proposal is not applicable to this Policy. WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependence uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria [] Yes [] No [] Not Applicable The proposed project will maintain/protect the navigability and ease of access for this commercial marina (i.e. water-dependent use in a suitable location). Consequently, this proposal is consistent with this Policy. Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town Waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy, Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. [] Yes [] No [] Not Applicable No change to the current visual quality of this section of shoreline. This proposal is not applicable to this Policy. Created on 5/25/05 ll:20 AM Suffolk Environmental Consulting, Inc. Newman Village, Suite E, 2322 Main Street, P.O. Box 2003, Bridgehampton. New York 11932-2003 (631 ) 537-5160 Bruce Anderson, M.S., President Fax: (631 ) 537-5291 September $, ~2010 Ms. Jill Doherty,Chairwoman Board of Trustees Town Hall P.O. Box 1179 Southold, NY 11971 Re: Situate: SCTM #: ALBERT$ON MARINE Property o12o5 Route 25 (Main Road); Town of Southold, NY 1000 -- 0.56 - 06 - 002.2 Dear Ms. Doherty, This Firm represents the owner of the commercial ~narina referenced above, who wishes to acquire all required regulatory approvals in order to ~naintenance dredge an underwater area and replace/reconstruct existing floating dockage, all within subject marina. Consequently, approval from your Board is required. Please find enclosed herewith for your review: (1) Town of Southold Trustees Wetlands Permit Application (original and two [*~23 copies); (~2) Short Environmental Assessment Form (original and two E~23 copies); (5) Local Waterfront Revitalization Program application (original and two [~2~ copies); (4) Location Map for reference (three ES~ copies); (5) Photographs of subject property, indicating the area of the proposed ~naintenance dredging, as well as the existing floating dockage to be replaced thereon (three ['S~ sets); (6) Proposed Plans, prepared by Suffolk Environmental Consulting, Inc., dated September 3, eOlO, indicating all project specifications (three ['3~] sets); (7) Survey of subject property, prepared by PECONIC SURVETOR& P.C., last dated May 19, ~2010, indicating the conditions thereon (three ['$3 prints); and Hammarth/ (8) Check made payable to the Town of Southold in the amount of $~250.00 covering the requisite application fee. By way of this correspondence, and on behalf of the marina owner, I request that you commence review of this application and schedule before the next available Trustees Board meeting for discussion and subsequent permit issuance. Should you have any questions regarding this matter, or require additional information, please feel free to contact this office at any time. Thank you in advance for your cooperation. Sincerely, Matt D. Ivans enc. cc: W. Witzke ALBER T$ON MARINA ((lo Witxke) Property SITE PLAN DETAIL Situate: 61~05 Route ~5 (Main Road); Town of Southold, New York ~ SCTM #: 1000 - 056 - 06 - 00e.~ (Maintenance Dredging) \/ PROIECT DESCRIPTION ~ ~' /' i227.0t U ~ ~ ~ ~ ~ / ~ ~ ~ ~ / Applicant proposes to perform the following activities within -~ ' ~ )/d" 5 ~ / ~ ~ ~- subject property: ~--~ .~} t~ ~ ~ ~ ~ ~T ~ ~ ~ ~ ~ ~[ ~ , ' (1) Maintenance Dredge of various underwater areas ~ [=~ '2 ~~~ ~ ~~ 3 ~ ~ measuring 6, 000 square feet +/- within the western/southwestern section of the marina, to a f~ _~ /I I1 ~' navigable depth of < ~.0' +/- (at low tide). P~ "'~ l¢~ ~t ~Jw-~ x =l ¢ - Approximately {oo cubic yards of dredge spoil is ~ [g ~ / ~ anticipated to result from the proposed maintenance ~ ?~ ~ ¢ dredge, which is to be transferred to onshore trucks and deposited within an approved, upland location, ~r'~:m~ ' ~ / ~ ~ ~ ~ ~ ~ ~, ~/ E to be issued via a Ten (10) Year Maintenance ~i t ~ ~ ~ ~ / ~ [78.0~, / Dredge Permit; and a : . . . t~ ~s~o /~ ~4[ (~) Replace/Re-Construct the existing Floating Dock ~ :~ ~ ~ ..~, p~r~ ~ ~/ ~ ~ , [ Structure situated centrally within the marina. The [ ~} -~ ~- ~ ~ ~ ~ - ~ ~ ~ current Floating Dock consists of the central Floating ~ ~/ ~, j, ~ ~ ~ ~ ~ ~4 Dock (5.0' wide x 195.o' long), eighteen (18) Finger ~ q~ /~1~, ~ ~ ~ ~~~~~~~~~, , Pzers (2.5' wide x 15.0' long)situated perpendicular , *q along the length of the Floating Dock (nine [~ per ,~ side), and an access Ramp (3.0 wide x l&7' long) ~ oe ~- ~ ~~~~-~ ~t~~ i[ - ~a~.~ t connecting the dock to the existing btflkhead. The ' / ~ . ~~ - ~~ ~ I / overall structure is supported by typic~ billet floats, 1~.~ '~ . ~- ~ooO~ p A R K I N 6 cam ~rr~u ,: andsecuredbyten(lO) pilings(lO"~)situatedonthe [ ~ . ~ ~ ~ ~ ~ ~ ends of various Fzng'~ Pzers. The entire structure is to ~ , I ~ be replaced "in-hind' and "in-place". ......... APPROVED NOTE: No dredging is to be proposed within sixteen feet = ~j ~ ~ P ~~~ . (16.0') of the shoreline. X NOTE: . ra e Low t rand  :~ -- , Wetlands Boundary) located along the existing bulkhead. - -~~i {~ ~) 80~ ~ ~ "~ NOTE: Please refer to the cross-sectional views ofthe ~ ~~ ..... { ~ ~/ ~O-.Q ~ ~ proposed maintenance dredge within Transect "A" and "~' ~/ .......... =~ ....... '~ ~ ~ / ~ / ' within page 2 of 6, and Transect "C' within page 3 of 6. Date: ~ ,~cFtem~cr5 201o '~ ~ ~010: ~0~. ~ ~o[~ ~: _ ,.o,,= :o.o,~ r' , SUFFOLK E~IRONME~AL CONSULTING, INC. , Dram by: P.O. BOX 2003. Bridgehampton · NY. 11932 / OF ~ Co~ents: MdaFted/romt~csu~cqo/st,O/ec¢m-%oe~qas?rqpa:ec/~q~L~O~/~-,5([j~V~-yO~,5 ~- (631) 537- 5160 (phone) - (631) 537- 5291 (facsimile) ALBEtI TSON MARINA (c/o Witzle) Property Situate: 61e05 Route e5 (Main Road); Town of Southold, New York - SCTM #: 1000- 056 - 06 - 00~.~ CROSS-ELEVATION TRANSECT VIE~rS (31aintenance Dredging) 'r TRANSECT "~t" ~ ~ALW . Levef e/ < - dh'+ Depth -- , ~4:1 slopel ~E~sting Underwater Grade "r "r TR~INSECT "B" ~x'""~ Bottomland to be Removed ~- Proposed Underwater Gradej ~ Bottomland to be Removed "ExistingUnderwater Grade -r Date: Scale: Drawn by: Comments: SUFFOLK ENVIRONMENTAL CONSULTING, INC. P.O. Box 2003 · Bridgehampton · NY · 11932 (631) 537 - 5160 (phone) ~ (631) 537 - 5291 (facsimile) OF ALBER T$ON MARINA (c/o Witzke) Property Situate: 61905 Route ~5 (Main Road); Town of Southold, New York - SCTM it: 10oo- 056 -o6 -oo~.~ CROSS-ELEVATION TRANSECT VIEWS (Maintenance Dredging) N 0 R T H TRANSECT "C" ~ Northern ~ .... ALW ALW_ - - Le ~e...I o/~ - 4.0'_~ Depth - "~-fiTting ;nderwater-Ora;e ' - -~ -B0tt0mhnd to be Removed TRANSECT "C" ~ Southern Half I_ere/o/< ~4 0' + Depth 0 U T H Date: Scale: Drawn by: Comments: 1.0~= 10.0'± SUFFOLK ENVIRONMENTAL CONSULTING, INC. P.O. Box 2003 · Bridgehampton · NY · 11932 (631) 537- 5160 (phone) ~ (631) 537- 5291 (facsimile) OF ALBEIt TSON MARINA (cio WitMce) Property Situate: 61eO5 Route e5 (Main Road); Town of Southold, New York - SCTM #: 1000 - 056- 06- 00~.~ SITE PLAN DETAIL (Dock Reconstruction) Existing Hnger Pier {2.5'W x 15.0'L - typicalJ [~0 be replaced 'ia kiad/ia - place'} Existing Floating Dock {5.0'W x 195.0'L +_ -- 20'+- 195.0'+ Existing Bulkhead .I Existing Timber Pilings 110'4} {to be replaced 'in kind/ia-place'} Existing Hinged Ramp (3.0'W x 13.7'L - to be replaced] Date: Drawn by: m~ NOTE: Average Low Water and High x~Vater (Tidal XXretlands Boundary) located along the existing bulkhead. SUFFOLK ENVIRONMENTAL CONSULTING, INC. P.O. Box 2003 · Bridgehampton · NY · 11932 (631) 537- 5160 (phone) ~ (631) 537- 5291 (facsimile) ALBER T$ON MARINA (c/o Witz e) Propertf Situate: 61~o5 Route ~5 (Main Road); Town of Southold, New York - SCTM ~: 1OOO -- 056 -- 06 -- 00~.~ SOUTH ELEVATION (Dock Reconstruction) A~W ¼ Existing Timber Pilings 195.ff_+ E~qsting I~tnger Pier 2.5'~/x 15.0 L - typical Existing Floating Dock [5.0'W x 195.0 L -+1 ~t0 be replaced 'i~ kine/ia place'] U Existing Grade -I g Hinged Ramp [3.0'~/x 13.7'L - to be replaced] tg Bulkhead NOTE: Average Low \Vater and High 'Water (Tidal W'etlands Boundary) located along the existing bulkhead. Scale: Drawn by: Comments: SUFFOLK ENVIRONMENTAL CONSULTING, INC. P.O. Box 2003 - Bridgehampton · NY · 11932 (631) 537- 5160 (phone) ~ (631) 537- 5291 (facsimile) ,~ OF ~ ALBER T$ON MARINA (c~o 14qtzke) Property TYPICAL DOCR DETAIL Situate: 61~05 Route ~5 (Main Road); Town of Southold, New York ~ SCTM ~: 1000 - 056 - 06 - 00~.~ (Dock Reconstruction) I ~im~er Sides [2"x 12"/ timber Sides ~2"x 12") , , SUFFOLK E~IRONMENTAL CONS~TING, INC. Dra--by: :n~, P.O, Box 2O03. Bridgehampton · NY · 11932 Co~en~: ~d~p~ed~.,~/~.~eeof~/~p~qFc~q~prep~.~d~4~/(].~[~V~,~, ~ (631) 537- 5160 (phone) - (631) 537- 5291 (facsimile) ANY AL TERA TION OR ADDITION TO THiS SURVEY IS A VIOLA TION OF SECTION 7B09 OF THE NEW YORK STATE EDUCATION LA~V EXCEPT AS PER SECTION 7EOB'SUBDIVISION S, ALL CERTIFICA ~IONB HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF SAiD MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR WHOSE SIDHA TURE APPEARS HEREON. ADDITIONALLY TO COMPLY WiTH SAID LA W THE TERM 'AL TERED BY' MUST SE USED BY ANY AND ALL SURVEYORS UTILIZING A COpY OF ANOTHER SURVEYOR'S MAP. TERMS SUCH AS "INSPECTED' AND 'BROUGHT'TO'DA TE' ARE NOT iN COMPLIANCE WiTH THE LAW. ' ROAD MAIN N. 58 ~UNWAYSANZ~ AREA = 1.764ACRES.t ~ ~ ~. $. 68"31'0(1" iV. ~'~ LITTORAL DRIFT - FROM SOUTHEAST TO NOR ",'dWEST tLEVATION OF MEAN LOI~ ~ATER = 1.2 EL -3.0 = BOTTOM ELEVATION ~-? = DEPTH AT MEAN LO~/ ~/ATER ELEVAT/ON$ ARE REFERENCED TO NA VDS8 MAP OF BUDD'S POND MARTNA, /NC. SHOWING SOU,'vDING$ A T SOUTHOLD TOWN OF SOUl,OLD SUFFOLK COUNTY, N Y. 7000 -' 56- OG- 2,2 Scde: 1' = 30' Jan. 2~ 2010 May /9, 2010 (r~v,'sions) (ESI] 765 - 5020 FAX ?ES - 17B7 P, O, BOX 909 '250 TRAVELER STREE?' SOUTROLD~ N.Y. //97/ 98- 270