Loading...
HomeMy WebLinkAboutTR-7372Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall, 53095 Main Rd. P.O. Box I 179 Southold, NY 11971 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 1st day of construction ½ constructed Project complete, compliance inspection. BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YO~ PERMIT NO. 7372 DATE: AUGUST 18~ 2010 ISSUED TO: MATT-A-MAR MARINA~ LLC PROPERTY ADDRESS: 2255 WICKHAM AVE, MATTITUCK SCTM#114-3-1 AUTHORIZATION Pursuant to the provisions of Chapter 275 and/or Chapter 111 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted atthe meeting h~ld on Aueust 18.2010 in consideration of application fee in the sum of $250.00 paid by Matt-A-Mar Marina. LLC and subject to the Terms and Conditions as stated in the Resolution, the Southold ToWn Board of Trustees authorizes and:permits the following: Wetland Permit to expand the existing boat storage building, demolish office and relocate office, replace the sanitary system and install a: drainage system, and depicted on the site plan prepared by East End Design Assoc., LLC 2006. IN WITNESS WHEREOF, the said Board of Trustees hereby causes it~ Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date, TERMS AND CONDITIONS The Permittee, Matt-A-Marina, LLC, 2255 Wickham Ave., Mattituck~ NY, as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for ~da:mages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Pennittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. That there will be no unreasonable interference with navigation as a result of the work herein authorized. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work ~l~all cause unreasonable obstruction to free navigation, the said Permittee will be requi~red, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. That the said Bo~yd will be notified by the Permittee of the completion of the work authorized. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hail Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 August18,2010 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Patricia (3. Moore, Esq. 51020 Main Rd. Southold, NY 11971 RE: MATT-A-MAR MARINA, LLC 2255 WICKHAM AVE., MATTITUCK SCTM#114-3-1 Dear Ms. Moore: The Board of Town Trustees took the following action during its regular meeting held on Wed., August 18, 2010 regarding the above matter: WHEREAS, Patricia C. Moore, Esq. on behalf of MATT-A-MAR MARINA, LLC applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance, application dated July 26, 2010, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Watedront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator issued a recommendation that the application be found Consistent with the Local Waterfront Revitalization Program policy standards, and, WHEREAS, a Public Headng was held by the Town Trustees with respect to said application on August 18, 2010, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted conceming this application, and, WHEREAS, the structure complies with the standards set for[h in Chapter 275 of the Southold Town Code, and, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, and, NOW THEREFORE BE IT, RESOLVED, that the Board of Trustees has found the application to be Consistent with the Local Waterfront Revitalization Program, and, RESOLVED, that the Board of Trustees APPROVES the application of MATT-A-MAR MARINA, LLC to expand the existing boat storage building, demolish the existing office and relocate office, replace the sanitary system and install a drainage system, and as depicted on the site plan prepared by East End Design Assoc., LLC last dated January 25, 2006. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50~00 per inspection. (See attached schedule.) Fees: None Very truly yours, Jill tv~D~herty, plesid~e BoarU of Trustees JMD/Ims Peter Young, Chairman Lauren Standish, Secretary Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (63 I) 765-1892 Fax (631) 765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., August 11,2010, the following recommendation was made: Moved by Doug Hardy, seconded by Greta Schiller, it was RESOLVED to SUPPORT the Wetland Permit application of MATT-A-MAR MARINA, LLC to expand the existing boat storage building, demolish the existing office and relocate office, replace the sanitary system and install drainage system. Located: 2255 Wickham Ave., Mattituck. SCTM#114-3-1 Inspected by: Peter Young The CAC Supports the application with the Condition the lighting complies with the new lighting code. Vote of Council: Ayes: All Motion Carried Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer P.O. Box 1179 Southold, NY 11971 Telephone(631)765-1892 Fax (631)765-6641 Southold Town Board of Trustees Field Inspection/Worksession Report Date/Time: MATT-A-MAR MARINA, LLC requests a Wetland Permit to expand the existing boat storage building, demolish the existing office and relocate office, replace the sanitary system and install drainage system. Located: 2255 Wickham Ave., Mattituck. SCTM#114-3-1 Type of area to be impacted: __Saltwater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of wetland Part of Town Code proposed work falls under: __Chapt.275 Chapt. 111 other Type of Application: __ Wetland __Coastal Erosion __Amendment __Administrative__Emergency Pre-Submission Violation Info needed: Modifications: Conditions: Present Were: __J.King __J.Doherty __J. Bredemeyer B.Ghosio, __ D. Dzenkowski __other Form filled out in the field by D. Bergen__ Mailed/Faxed to: Date: // OFFICE LOCATION: Town Hall Annex 54375 State Route 25 Main Rd. & Youngs Ave. Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD To: From: Date: Jim King, President Town of Southold Board of Trustees Scott Hilary, LWRP Coordinator July 16, 2008 Re: Proposed Permit to Wetland Permit for MATT-A-MAR MARINA, LLC SCTM#114-3-1 Patricia C. Moore, Esq. on behalf of MATT-A-MAR MARINA, LLC requests a Wetland Permit to expand the existing boat storage building, demolish existing office and relocate office, replace sanitary system, and install drainage system Located: 2255 Wickham Ave., Mattituck. SCTM# 114-3- l The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the following LWRP Policies and therefore is CONSISTENT with the LWRP. The proposed action is located in Mattituck Creelq recognized by the State as a Regional Maritime Center and zoned as Marine Zone H in the Town of Southold. The intent of policy 10 as referenced below is to protect existing water- dependent commercial~ industrial~ and recreational uses and to enhance the economic viability of water-dependent by ensuring adequate provision of infrastructure for water-dependent uses and their efficient operation. Policy 10 Protect Southold's water-dependent uses and promote siting of new waterdependent uses in suitable locations. Policy Standards 10.1 (b) Improve the economic viability of water-dependent uses by allowing for non-water dependent accessory and multiple uses, particularly water enhanced and maritime support services where sufficient upland exists. The term water-enhanced use means a use or activity which does not require a location adjacent to coastal waters, but whose location on the waterfront adds to the public use and enjoyment of the waters edge. Water-enhanced uses are primarily recreational, cultural, retail, or entertainment in nature. These uses may be necessary for the successful financial operation and viability of water-dependent uses. (Table # 1) The following water-dependent is permitted. Marine II Permitted Use: 5. Boat yard for building, storing, repairing, renting, selling or servicing boats which may include the following as an accessory use: office for the sale of marine equipment or products, dockside facilities for dispensing of fuel and where pumpout stations are provided, restroom and laundry facilities to serve overnight patrons. concentrated in th, h O Maritime activity in Southold traumunaily has been e arbors, inlc,s and creeks. As noted earlier in Policy 10, Policy I promotes a continuation of this traditional pattern of maritime activity, supporting the economic basen maintaining the maritime character of the Town, and avoiding disturbance of the remaining natural shoreline and water areas. It also recognized that Mattituck Inlet and Creelq identified by the state as a regional Maritime Center, Mill Creek and the Village of Grecnport are the primary focus of maritime activity within the Town of Southold. Policy 1 Foster a pattern of development in the Town of Southoid that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. The policy is intended to foster a development pattern that provides for beneficial use of the environmental, historical, and cultural coastal resources of the Town of Southold while maintaining and building on its traditional economic base. The primary components of the desired development pattern are: strengthening the hamlets as centers of activity, maintaining a clear sense of separation between hamlet centers and the countryside, encouraging waterdependent uses to concentrate in existing locations of maritime activity, enhancing stable residential areas, and preserving agriculture, open space and environmentally sensitive coastal resources. Development that does not reinforce the traditional land use pattern of the Town of Southold would result in a loss of the community and landscape character of Southold. If the action is approved the following best management practices (BMP's) are recommended: 1. Maximize a permeable buffer landward of the existing retaining wall, running parallel to the entire seaward side of the existing and proposed boat storage building. Currently there is a gravel road structure between the existing boat storage building and adiacent wetlands (the adiacent wetlands are approximately within 65 feet of the existin~ and proposed boat storage building). 2. The placement of erosion control structures during construction such as silt fence and hay bales. The site plan provided does not include any such erosion control measures. The BMP's as reference above will further advance Policy 5~ Protect and Improve water quality in the Town Southold and sub-policy 6.3 D and E as outlined below. 6.3 Protect and restore tidal and freshwater wetlands. In addition to protecting and improving the Town's wetlands, adjacent lands that provide buffers to wetlands must be maintained and enhanced, and where appropriate, reestablished. These buffers are necessary to ensure the long term viability of the Town's wetlands. Where these lands are in private ownership, educating residential owners as to the long-term benefits of compatible land use and landscaping techniques will be essential to maintaining the ecological health of wetland areas. D. Provide adequate buffers between wetlands and adjacent or nearby uses and activities in order to ensure protection of the wetland's character, quality, values, and functions. E. Maintain buffers to ensure that adverse effects of adjacent or nearby development are avoided. 1. Maintain buffers to achieve a high filtration efficiency of surface runoff. Office Use Only ~Weastal Erosion Permit Application tland Permit Application Administrative Permit Amendment/Transfer/Extension ~ece~vved Application: r~ ~_--Received Fee:$ t~ ~--~~ ---.~L~ompleted Application q __Incomplete __SEQRA Classification: Type I__Type 11 Unlisted __ __Coordination:(date sent) ~'LWILP Consistency Assessment F~.rrq ~AC Referral Sent:~q ~l~'i-c of Inspection: '~ } I ( ~Receipt of CAC Repom ~Lead Agency Dete~ination: ~chnical Review: blic Hearing Held: ~ ~Rcsolution: Name of Applicant Address (~__~oLc.~O~,~_ ~ l let Phone Number:( ) 2ff~'~ Suffolk County Tax Map Number: 1000 - Property Location: AGENT: (If applicable) (provide LILCO Pole #, distance to cross streets, and location) Address: ~'~"lO~.r> ~ C~ tt'h ~ N>/, I(q-ll Phone: of Trustees Applicat Land Area (in square feet): Area Zoning: P~ - T~ GENERAL DATA Previous use of property: Intended use of property: Covenants and Restrictions: If "Yes", please provide copy. Yes K. No Prior permits/approvals for site improvements: Agency Date __ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? X No Yes If yes, provide explanation: Project Description (use attachments if necessary):. ard of Trustees Applicati, WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: Area of wetlands on Iot:~,]~ll~square feet Percent coverage of lot: O<x Closest distance between nearest existing.structure and upland edge of wetlands: '~g- feet Closest distance between nearest proposed structure and upland edge of wetlands: 3,5' feet O~.L¥.&~ccct) Does the project involve excavation or filling? No x~ Yes If yes, how much material will be excavated? How much material will be filled.'? 2c:~ ~ cubic yards cubic yards Depth of which material will be removed or deposited: '-I'-~ feet Proposed slope throughout the area of operations: -xC-lrs_,,q- Manner in which material will be removed or deposited: Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): PA'I~:IA C. MOORE, ATTORNE~AT LAW 51020 Main Road, Southold, NY 11971 (631) 765-4330 DATE SUBJECT SIGNED BOARD OF TRUSTEES TOWN Of SOUTHOLD: NEW YORK In the Matter of the Application of MATT-A-MAR MARINA LLC AFFIDAVIT OF SIGN POSTING Regarding Posting of Sign Upon Applicant's Land Identified as 1000-114-03-01 COUNTY OF SUFFOLK) STATE OF NEW YORK) I, Patricia C. Moore, residing at 370 Terry Lane, Southold, New York being duly sworn, depose and say that: On the 6th day of AUGUST, 2010, I personally posted the property known as Wickham Avenue, Mattituck, New York 11952 by placing the board of Trustees official Poster where it can easily be seen, and that I have checked to be sure the post has remained in place for eight (8) days prior to the date of the public hearing. Date of Hearing to be held on Wednesday, August 18, 2010 on or about 6:00 p.m. PATRICIA C MOORE Sworn to before me this /"l day of Au/~st, 2010 I~ota~blic]/'~ ~oard of Trustees Applicati¢ County of Suffolk State of New York ~'~ tX~C~ C ~'}q OOr'~-- ~e-*~ BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE'~AVPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES 1N CONJUNCTION WITH REVIEW OF THIS APPLICATION. Signature SWORN TO BEFORE ME THIS DAY OF 3 Ll_(.~ ,20 l L~ AUTHORIZATION LETTER New York State Department of Environmental Conservation Building 40-S[/ADf Stony Brook, New York 11790-2356 Att: Regulatory Permits OWNER: name: Matt-A-Mar Marina, LLC by Member address: P.O.Box 952, Mattituck NY 11952 telephone number: c/o Patricia C. Moore PROPERTY: Wickham Avenue, MattituckNY ~ SCTM#: 1000-114-03-01 Michael R~or, 631-765-4330 AGENT: name: Patricia C. Moore Esq. address: 51020 Main Road, Southold NY 11971 telephone number: 631-765-4330 Dear Sir or Madam; I Michael Raynor, member of Matt-A-Mar Marina LLC authorize' my attorney, Patricia C. Moore to file any and all applications for a permit or determination 'of non- jurisdiction to the DEC, Town Trustees, Health Department, and any other regulatory agency. Very trul~ours, Michael Ray-nor Matt-A-Mar Marina, LLC BOARD OF TRUSTEES TOWN OF SOUTHOLD: NEW YORK In the Matter of the Application of MATT-A-MAR MARINA, LLC Applicant's Land Identified as 1000-114-3-1 COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF MAILING I, Betsy Perkins, residing at Mattituck, New York, being duly sworn, depose and say that: On the~ day of August, 2010, I personally mailed at the United States Post Office in Southold, New York, by CERTIFIED MAIL, RETURN RECEIPT REQUESTED, a true copy of the attached Legal Notice in prepaid envelopes addressed to the neighbors on the attached list. Attached hereto is the white receipt post-marked by the Southold Post Office on said date.  tsy Perkin,~/ ignaturk)~' Sworn to before me this~--.-'.'~ T~ day of August, 2010 (Notary Public) MARGARET C. RUTKOWSK~ Notary Public, State of New York No. 4982528 Qualified in Suffolk Court~ PLEASE list, on tl~l[F~r~i~°~e~,~avi~ a sheet of paper, the lot numbers next to the owner names and addresses for which notices were mailed. Thank you. MATT-A-MAR MARINA LLC NEIGHBOR LIST SCTM: 1000-114-3-1 ALI AGARAB1 REVOCABLE TRUST PO BOX 450 MATTITUCK NY 11952 SCTM: 1000-139-2-5 RICHARD B. TANDY PO BOX 788 MATTITUCK NY 11952 SCTM: 1000-139-3-9 CAROLL J. HARVEY 2000 WICKHAM AVE. PO BOX 351 MATTITUCK NY 11952 SCTM: 1000-139-3-25 JENNY T. SKIREL PO BOX 339 MATTITUCK NY 11952 SCTM: 1000-139-3-33.1 RECEIPT FROM: SEND TO: ALI AGARABI REVOCABLE TRU PO BOX 450 MATTITUCK NY 11952 FEES: poslage o 44 TOTAL $ 5.54 POSTMARK OR DATE RECEIPT FROM: SEND TO: RICHARD B. TANDY PO 80X 788 MATTITUCK NY 11952 FEES: TOTAL $ 5.54 POSTMARK OR DATE RECEIPT 7192 6463 3110 0ooo 7477 FROM: PATRICIA C MOORE RE: MATT-A4aAR TRUSTEES Hi SEND TO: CAROLL J HARVEY FEES: Postage 0 44 TOTAL $ 5.54 POSTMARK OR DATE RECEIPT 7192 6463 3110 oo00 7484 FROM: PATRICIA C. MOORE RE: MATi' ~,4~,IAR TRUSTEES HI SEND TO: JENNY T SKIR~:L PO BOX 339 MAT~ITUCK NY 11952 FEES: TOTAL $ 5.54 POSTMARK OR DATE PATRICIA C. MOORE Attorney at Law 51020 Main P, oad Southold, New York 11971 Tel: (631) 765-4330 Fax: (63 l) 765-4643 August 3, 2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED RE: MATT-A-MAR MARINA LLC PREMISES: WICKHAM AVE., MATTITUCK SCTM # 1000-114-3-1 Dear Neighbor: I represent the above with regard to property located on Wickham Avenue, Mattituck, New York. They have submitted an application to the Southold Town Board of Trustees to expand existing boat storage building, demolish and relocate existing office, replace sanitary system and install drainage system. A copy of the Hearing Notice is enclosed together with a copy of a portion of the site plan. The complete site plan is available for your review at the Trustees office during the hours of 8:00 a.m. to 4:00 p.m. The hearing on this matter has been scheduled for WEDNESDAY, August 18, 2010 on or about 6:00 p.m. at Southold Town Hall. If you have any questions, or you wish to support this application, please do not hesitate to contact me. Thank you. yours, Patricia C. Moore PCM/bp enclS. C: Matt-A-Mar Marina NOTIC OF HEARING NOTICE IS HEREBY GIVEN that a t~blic hearing will be hel.d bRYoat~le SOUTHOLD BOARD OF TRUSTEES at Town Hall, 53095 MaIn Southold, New York, concerning this property. ' OWNER(S) OF RECORD: If you have an interest in this project, you are invited to view the Town file(s) which are available for inspectionpnor to the day of the hearing during normal business days between the hours oF8 a.m and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631)765-1892 GAS PUMP TH O0 FOR ROOF DRAINAGE TO UOHT EXISTING FOR RO0~' DRAINAGE TO EXISTING BOAT STORAGE BUILDING WATr UNK RET. WALL APPROXIMATE SHORELINE HIGH WATER MARK PROPOSED LANDSCAPING: AU. DE/~D TREES ALONG THE $OLrFHERN PROPERTy UNE ARE TO BE REPLACED WITH 12'-15' RED CEDAR TREES. APPROXIMATELY 2' TO 4' IN C/~JJPER. ADOITIONAL 12' TO IN VAULT BELOW USE ( DRY V*EJ.L PROJECT ID NUMBER PART 1 · PROJECT INFORMATION APPLICANT I SPONSOR 617.20 APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only ( To be completed by Applicant or Project Sponsor) ]co.n, SEQR LPROJECT LOCATION: PRECISE LOCATION: Street Ad(tess and Road InterseclJons. Prominent landmarks etc -or prpvide mai) DESCRIBE PROJECT BRIEFLY: 7, AMOUNT OF LAND AFFECTED: Initially acres ~ Ultimately acres 8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? ~]Yes [] No If no, descripe 9, WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) [] Resl6enUal [] Indusbtal /[~Commerclal r~Agriculture [] Park/Forest/Open Space [] Other (deScdpe) 10. DOES ACTION iNVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal. Siam or Local) 11, DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? []Yes ['--~No II yes, list agency name and permit / approval: i 1 . AS A T OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE ;tEST OF MY KNOWLEDGE SI!~nature If the action la a Costal Area, and you are a state agency. complete the Coastal Assessment Form before proceeding with this assessment PART II - IMPACT ASSESSMENT (To be completed by Lead Agency) A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR. P~RT 6t 7.4? If yes, coordinate the review process and uae Ihs FULL FAF. i-iv- r-i.e B. WILLACTION RECEIVE COORDINATED REVlEWASPROVIDEDFORUNLISTEDACTIONSIN6NYCRR. PART617,67 IfNo. anagative declaration may be superseded by another Involved agency, C. COULD ACTION RESULT IN ANY ADVERSE EFFECT8 ASSOCIATED W~TH THE FOLLOWING: (Answers may be handwflttsn, if legible) C1. Exi~og air qnal~, suEace or groundwater quality Or quantity, no[se levels, ex~s~g traffic pattern, sol~ waste preductio~ or disposal, potential for erosion, dmlesge Or Itooding problems? Expleb~ briefly: C2. Anstheflc, ogdcutiurol, archaeolog!cali'hietodg, 'or other natural Or cultural reS°uroe~i ~-cor~munity or nalghoprh~ ~h~a~t~r? Explain bdefly: i ,, ,,,! ¥,~l:~M~, Or tspo~,, fish, shellfish Or wiktiIfe species, ~gnti!caM habitats, ~ thmatensd or endangered species*? Expiem bnaity I ! C4. A .~,,i .iu nlty';'exl~'t~g plans or goals aa officteliy adopted, Or e change In u~ ;r IntensJ~ of use of len<J o~l~ei' natural resources? ~'ih ~ri~lty: C5. Orowth, subsequent development, or re ated activities Ill,ely to be induced ~ ~ proposed :~h~'EXplain briefly: C7, Other ;,~,ac~, (includln~l chen~i'th us~ of either quanta/~- ~ ;f ena~ EXplain bhefl~: / I D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAl ENVIRONMENTAL AREA (CEA)? (If yes, explain bristly: E. IS THERE, OR IS THERE LIKELY TO SEt CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? If yes explain: PART III * DETERMINATION OF SIGNIFICANCE (To be completed by Agency) INSTRUC'rlON$: For each adverse effect identified above, detarmirte whether it Is substantial, Large, imbo~tent or otherwise sighificant. Each effect should be assessed in connection with Its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration: (d) irreversibility; (e) geographic scope; and ti) magnitude. If necessary, add attachments or reference supporting materials. Ensure thai explanations coniain sufficient detail fo show that all relevant adverse impacts have been identified and adequataly addressed, If quesiton d of part ti was checked yes, the detarminabon of significance mustevaluate the potential impactof the proposed aCtion on the environmental characteristics of the CEA. Check this box if you have Identified one or mom potentially large or slgniflceflt adverse impacts which MAY occur. Then proceed directly to the FULL EAF and/or prepare a positive declaration. Check this box If you have determined, based on the information and analysis above and any supporting documentation, thai the proposed achier W1LL NOT result in any significant adverse environmental Impacts AND provide, on attachments as necessary, the reasons supporting thi; petermlnatina. Nome of Lead Agency Date Title of Responsible Off~.~er Print Or Type Name ol Respo'~sibte Officer In Lea~ Agency Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from rasporrSlble officer) PART II - iMPACT ASSESSMENT (To be completed by Lead Agency), A. DOES ACTION EXC~cu ANY TYPE, 'I%'RESHOLD IN 6 NYCRR. PART 617.47 If Ye~. ceo~te the re~ ~ and una the FULL EAF. B. WILL ACTION RECEIVE COORDINATED REViEVVA~ PROVIDED FOR UNUSTED ACTIONS IN 6 NYCRR. PART 617.67 If No. a negative deciaradon may be supemeded by another tevolved agency. * C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED W(TH THE FOLLOiMNG: (Anawem may be haadWltttml, If isglbte) Cl. F-~dsting air quali~, ou~Mce or gro~ater quality or quar~ty, rk3ise teve~, e3dsting Imffic pattern, solid w~ ~ or d~l, POtonbel for eresten, dndnage or Iloodthg problems? F_qflaln bde~/:. C2. A4~;, .~uc. ngrteulturel,., ~ ,=~.aM,, ,~.~,,c, or other nalufal or ouaund resoumes; or cemnam#y ~ ne~hbedlond character? I=~nt~. bdelly:.. ' C5. Growth, subeeqcent de .~;v~,~t, or relotad aoth~eS like;y to be Ipa,,.~,~ by the pr'T'~'~ ~ _ _'~ed_ action? ~=~,~_ ~. briefly: po C6. Long tefra, short term. cumula6ve, or other effects not Id~,~;;',~ In Cl-C57 ;= .~T~-!,~ briefly: C7. Other ;,T~:~_.~ir, c;~, ~ c,'.~,~ in use of etthe~ ({uantit~ or D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL F.. IS T~, |-'-RC., OR IS THERE LIKELY TO BEI CONTROVERSY RELATED TO'POTENTIAL ADVERSE ENVI RC,': '.~ ,.~',"FAL IMPACTS? ff ~e~ ~1~;..;~. PART III - Dr: ~ t:rdJINA~ION OF 81GNIRCANCE (To be completed by Ageno/) iNSTRUCTIONS: F~eachadvemeeffectidenti~edab~ve.detorminewhetheritissubstantia~arge~imp~r~n~nL Each · - ~y, ~:nmems or mmrenoe supporting materials. Ensure that e.,q~naticms oontaln su~c~ent detail to show that a;I relevant adverse impacts have been identified and adequately addressed. If quesllcm d of part # was checked yes, the,delarmination ofs;gniticanoe must evaluate the polenlial impaot of the ~ ac0on on the environmental chara~erlstics of the CEA Check< this bex If you have ~,~, -;,'-,': ona or more potontlally Mrge or slgnlfl~mt advorse impaots wfdd~ MAY ocour. "l~en Pre<~ad dlreotly to the FUU EAF or,d/or prepare a positive.dec,aragon. Ched< this box If you have dotormlnad, based on the kfform~on and analysis above and any SUPlX~g dooumentaflo~, that the proposed ac~m detormlnatlon.WILL NOT result I~ any sigrdflcont adverse orwtronmental Impa~te AND provMe, on attach~ as nacessaf¥, the reasons supporting fl~ . Board of Trustees Name of Lead Agency Date ,Jill M. Doherb/ President Pdnt or Type Name of Responsible Officer irt Lead Agency TItle of Respon~ble Officer Signature of Responsible Officer In Lead Agency S;ai~a[u~u of Preparer (If different from responsible officer) 85/21/2818 11:34 7656641 BOARD OF TRUSTEES P~GE 82 Town of Southold .Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM I~OPE/~Y LOCAllOI~ S,C.?.M,~r ~HE FOL~NG ~O~ MAY ~UI~ ~E SUBMIMION OF A · ~WA~ G~i~ D~GE ~D ER~ION ~L"P~ scO~oFwo~ - PRO~S~ CONS~Uc'rION lrt'~ ~ / WO~S~S~ J Y. No · e S~pa of W~ ~r P~ E~ shall Incl~e ail P~ / ~ 9~ e~bn ~ sto~ ~r dl~a;ea. E~sfl~ Grade I~oMng ~ 5 ~1 ~b ~pll~en Require Land Di~ing A~ (5,000 S.F,) ~ua~ F~t of G~ ~7 6 Is ~re a NaOmi Wa~r ~ DEC ~ ~1~: ~ ~ln One Hund~ (1~') co~ o~ ....~.//.~ ................ ~ ~ ~~ .................... g ~ s~m, de~ses ~d says d~ h~shc m~e md ~e ~is appli~don; ~ ~ amtemeu~ c~ in 61is.~pU~fioxt ~ ~e m file ~t ~e ~rk will bc peffo~ed in ~e rammer ~t fo~ in the ~fi~on ~ h~th. Sworn to ~fo~ me Nota~ ~b~c: .... -i .... APPLICANT/AGENTfREPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the Dart of town officers and emt~lovees. The nuroose of this fon'n is to t>rovide information which can alert the town of oossible conflicts of interest and allow it to take whatever action is YOURNAME: /~0~--'2~ ~t~O,~L /~OL,t,,~Ct: ~....~,...~-- oc,~,~ ~o,.C (Last name, first name, middle initial, unles~ you are applying in the name of someone else or other entity, such as a company. If so, indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (lf"Other", name the activity.) Do you personally (or through your company, spouse, sibling, parent, or child) have a relationship with any officer or employee of the Town of Southold? "Relationship" includes by blood, marriage, or business interest. "Business interest" means a business, including a parmership, in which the town officer or employee has even a partial ownership of (or employment by) a corporation in which the town officer or employee owns more than 5% of the shares. YES NO ~ If you answered "YES", complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicent/agent/representative) and the town officer or employee. Either check the appropriate line A) through D) and/or describe in the space provided. The town officer or employee or his or her spouse, sibling, parent, or child is (check all that apply): __A) the owner of greater than 5% of the shares of the corporate stock &the applicant (when the applicant is a corporation); __B) the legal or beneficial owner &any interest in a non-corporate entity (when the applicant is not a corporation); __C) an officer, director, partner, or employee &the applicant: or __D) the actual applicant. DESCRIPTION OF RELATIONSHIP Form TS 1 LWRP LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of southold waterfront consistency Review Law. This assessment is intended to supplement other information used by a Town of southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within'the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area (which includes all of Southold Town). 3. If any question in Section C on this form is answered "yes", then the proposed action may affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of southold's website (southoldtown.northfork.net), the Board of Trustees office, the Planning Department, all local libraries and the Town Clerk's office. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM#_ll4_-_03__-_01 Matt-a-mar Marina, LLC The Application has been submitted to (check appropriate response): Town Board Planning Dept. Building Dept. Board of Trustees x Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) __ (c) Permit, approval, license, certification: Nature and extent of action: Expansion to existing Boat Storage Building, demolish existing office and reconstruct office attached to storage building, replace sanitary system, construct drainage all in accordance with site Plan Page 1 LWRP Location of action: wickham Avenue, Mattituck Site acreage:8.75 Present land use: BOat Yard and Marina Present zoning classification:MII If an application for the proposed action has been filed with the Town of southold agency, the following information shall be provided: (a) Name of applicant: Matt-A-Mar Marina, LLC (b) Mailing address: P.O.Box 1287 Cutchogue, NY 11935 (c) Telephone number: Area code (631)298-4739 (d) Application number, if any: will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes No X If yes, which state or federal agency: DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes dverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. Yes X No NOt Applicable The Marina use will be enhanced by expansion of the building and reconstruction of the old office Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria Yes NO Not Applicablex NO Historic or archeological resources additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria YesX NO Not Applicable Improvements include trees and plants to enhance the scenic resources (see site plan) attach Page 2 LWRP additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWBP Section III - Policies Pages 8 through 16 for evaluation criteria Yesx NO Not Applicable site plan includes drainage, landscaping and retaining walls to control all water runoff Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. see LWRP Section III - Policies Pages 16 through 21 for evaluation criteria Yesx NO Not Applicable New sanitary will directly improve water quality and prevent pathogens from entering water body. Drywells control storm water runoff which can carry inorganice materials into the waterbody. _Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of southold ecosystems including significant Coastal Fish and wildlife Habitats and wetlands. See LWRP section III - Policies; Pages 22 through 32 for evaluation criteria. Yes x NO Not Applicable Improvements to an existing water dependent use enhance the quality and function of the Town of southold ecosystem. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southo]d. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria. See section III Policies Pages; 34 through 38 for evaluation criteria. Yes No Not Applicablex Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. Yesx NO Not Applicable New sanitary system minimizes degredation of environment. PUBLIC COAST POLICIES Page 3 LWRP POliCy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. Yes No Not Applicable Marina is a private marina, however, it promotes access and use of public waterways. --Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria. Yes x NO Not Applicable Marina and Boat Yard are a water dependent use, the proposed plan was approved through zoning and planning. It is proportional in size to the property and continuation of the water dependent use. Attach additional sheets if necessary Attach Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. Yes No Not Applicable X additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. see LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. Yes No Not Applicable X Attach </div> additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. Yes NO Not Applicable x Page 4 PATRICIA C. MOORE Attorney at Law 51020 Main Road Southold, NewYork 11971 Tel: (631) 765.4330 Fax:: (631) 765.4643 July 23, 2010 Board of Trustees Town of Southold P.O. Box 1179 Southold, NY 11971 RE: MATT-A-MAR MARINA LLC PREMISES: WICKHAM AVE., SOUTHOLD SCTM # 1000-114-3-1 Dear Sir or Madam: Enclosed please find an original and copy of 1. Board of Trustees application 2 Short Environmental Assessment form the following: Transactional Disclosure form Prior Permit Storm-Water Run-off Assessment form LWRP form My check in the amount of $250.00 representing the filing fee. Please place this on the August calendar. Very truly yours, Patricia C. Moore PCM/bp Enclosures OR ~eE ~ NEW OR OR RELOCATED IELOCATED OR RELOCATED $ 0 APPROVED BY BOARD OF TRUSTEES TOWN OF SOUTHOLD SITE PLAN INFORMATION IS BASED ON LAND SURVEY PREPARED BY JOHN T. METZGER LICENSED LAND SURVEYOR (LS 49618) /// / ,! TRI GAS NEW OR TREE ~ NEW OR RELOCATED ROSE ~ EX NOTE. The npproved site development plan sbeU be NEW OR RELOCATED TREE~ , OR a period of thran (3) y~m from the d~te of q~gmval as per code s~-,ti, on 100-255. oOC~-S ADA NOTES /,,ND SIGNS, PARKING SPACES RAMPS ARE TO CONFORM ADA AND TO ICC/ANSI Al17.1-1998 PARKING NOTES PARKING TO BE OF 10'-0" WIDE 20'-0" LONG AND ,ITIFIED BY ADA )PER SIGNAGE RAMP DETAIL NOTE: ADA MIN. BY IDENTIFIED PROPER ADA ½" FIBERBOARD EXPANSION JOINT RAMP AT 1:12 L TRUNCATED DOME MAX. SLOPE · PROVIDE SMOOTH DETECTABLE , ,,----[---T TRANSITION WARNING RAMP MIN. WIDTH 5-0 '~ WITH NO LIP--~M~ ~:,,, , 4" MIN. COMPACTED \ GRAVEL BASE ~ 6 x 6 WWM AT MID DEPTH SITE PLAN FOR dATT - A- MAR MARINA, LLC. AT MATTITUCK TOWN OF SOUTHOLD SUFFOLK COUNTY, NEW YORK JAN ~" "30§ : N/O/F LAND OF BAKER N 65' 05' 40" E 215.03' 20 22 TRE 2O AGE DRY WELL 200 PROPOSi~D 200 WAl'r / lOO' + NOTE: JULY 22, 1992 PLANNING BOARD FOR RESTURANT EXPANSION AND PARKING. AT THIS TIME WAS DEEMED ADAQUATE. .20D WATT O0 WAlt LIGHT 200 WAif APPROVED SITE PI_Al EXISTING PARKING LANDSCA.P. ING BEYOND GRAVEL/RCA DRIVEWAY TO BE 6 HIGHER THAN DRIVEWAY ELEVATION ./- LANDSCAPING ~' PITCH TO DRIAN --DRAIN G RAVEL./RC.A.T sD R IVEWAY DETAIL LANDSCAPE LIGHTING LANDSCAPER LOUVER LIGHTS (THREE TIER) ARE TO BE USED FOR LANDSCAPE LIGHTING, INCANDESCENT, (MAX lOOw) BUILDING AND SECURITY LIGHTING (2~~ or)o WATT METAL-HALIDE LIGHTS ARE TO Bb PLACE AROUND THE NEW AND EXISTING BOAT STORAGE BUILDINGS AND OFFICE AS PER SITE PLAN LOCATION PARKING CAPACITY 50 EXIST]NC L.P. FOR ROOF STORAGE BUILD[NO 200 WAlt !XISTINO GRA~ Are4 EXIS31ND L,P. FOR ROOF DRAINAOE TO 8E FILLED IN RELOCATED DRY WELL EXISTING BOAT STORAGE BUILDING FIN, FlR, i 11,5 SITE OVER-FLOW PARKING 200 WA3'r ¸10 U Go o o GO / RET. WALL DOOR LIGHTING DOOR LIGHTING TO BE WALL INCANDESCENT, (MAX lOOw) APPROXIMATE SHORELINE HIGH WATER MARK PROPOSED LANDSCAPING: ALL DEAD TREES ALONG THE SOUTHERN PROPERTY LINE ARE TO BE REPLACED WITH 12'-15' RED CEDAR TREES. APPROXIMATELY 2" TO 4" IN CALIPER. ADDITIONAL 12' TO 15' RED CEDAR TREES WILL BE PLANTED IN A SINGLE ROW, STRNDHT UNE PATTERN AS REQUIRED TO INCREASE THE DENSITY Of THE SCREENING IN FRONT OF THE NEW BOAT STORAGE ShED MOUNTED, NON-POTABLE WASHING AND INSURE THERE NOTE: ALL WELLS ARE TO BE USED FOR USE ONLY SUCH AS BOAT FLUSHING WATER ONLY. IS NO MEANS TO CROSS- CONNECT NON-POTABLE WATER WITH PUBLIC WATER AT ANYTIME. ALL NON- POTABLE FAUCETS ARE TO BE LABELED. (NON-POTABLE WATER ONLY, NOT TO BE USED FOR DRINKING OR COOKING AS PER THE SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES.) NOTE: ALL LEACHING POOLS, SEPTIC TANKS, ELECTRIC LINES, WATER LINES AND GAS LINES ARE TO BE A MINIMUM OF 10 FEET APART. 'l HAY BAI_E FASTEN S~:DIMENT SCREEN TO 2X2 ~/ITH PLASTIC ZiP TIES OR ~PPROVED SE IMENT BARRIER DETAIL N.T,S. 2x2 STAKE /-(MIN. TWO PER BALE) BALE ,OMPACT FILL% FLOW . ~ GRADE NOTE: BAL~E TO BE SET IN MIN OF A 4" TRENCH ON TOP OF SEDIMENT SCREEN· SEDIMENT SCREEN I~, THEN TO BE WRAPPED OVER THE TOP OF I~&LE AND STAKED THROUGH WITH MIN. OF ~?-) 2x2 STAKES INTO THE GROUND MIN. 1'-0II. T'-SEDIME~¢T SOIL - COMPACT SOIL ~ BARRIER -SEDIi~ENT BARRIER ~ STAKE \ , ~-~EE BALE CONTRACTORS CERTIFICATION PRIOR TO COMMENCING ANY, WORK ON THE Site THE FOLLOWING CERTIFICATE IS TO BE SIGNED AND A COPY IS TO BE PROVIDED TO THE TOWN OF JUIDICTION. "1 THE CONTRACTOR or OWNER (If NO CONTRACTOR HAS BEEN PLACED UNDER CONTRACT) CERTIFY THAT UNDER THE PENALTY OF THE LAW THAT I UNDERSTAND, AND WILL COMPLY WITH ALL TERMS AND CONDITIONS OF THEE STORM WATER POLLUTION PROTECTION PLAN FOR THIS SITE, I WILL ALSO COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES INCLUDING THE NEW YORK STATE POLLUTION DISCHARGE ELIMINATION SYSTEM ("SPDES") I ALSO~ UNDERSTAND THAT IT IS UNLAWFUL FOR ANY ONE TO CONTRIBUTE TO A VIOLATION OF THE WATER QUALITY STANDARDS" SIGNATURE: DATE: PRINT NAME: TITLE: SIGNATURE OF TOWN OFFICIAL R~:CIEVING THIS DOCUMENT: TITLE: TEST HOLE DATA PREPARED BY McDONALD GEOSCIENOE BORING DONE ON 11/08/04 GRADE- 017.5' ASL MIXED SAND AND LOAMt 2'-0 15,5' ASL BROWN SILTY SAND 3.5'- ~ 14,0' ASL PALE BROWN FINE TO MEDIUM SAND SP 15.2'- ~ 2.5' ASL WATER IN PALE BROWN FINE TO MEDIUM SAND SP 17'- ~ 0.5' ASL COMMENTS: WATER ENCOUNTERED 15.2' BELOW SURFACE ASL - ABOVE SEA LEVEL TEST HOLE DATA N .T.S.. STORM WATER POLLUTION PROTECTION PLAN ,'SITE DESCRIPTION THE CONSTRUCTION THAT IS TO TAKE PLACE WILL INCLUDE THE FOLLOWING: (1) CLEARING /i~ND REGRADING OF SITE IN AREA OF CONSTRU~'I'ION. (2) REMOVAL Q'E EXISTING STRUCTURES THAT LOCATED IN THE SITE. (5) 4D RELOCATION OF DRY WELLS FOR ROOF RU~ OFF (4) REMOVAL WOOD RETAINING WALL (4) CONSTRU( OF A BOAT STORAGE BUILDING AND OFFl( (5) Of ADDITIONAL PARKING AREA (6) ON OF ADDITIONAL STORM DRAINAGE ~1 AND RETENTION SYSTEMS TO RECHARGE FF FROM A 2" RAINFALL. OF A STANDARD SANITARY SYSTEM. OF NECESSARY PUBLIC UTILITIES ION AND IMPROVEMENTS TO CONFORM TO' ~NTY AND LOCAL CODES. '.AL SEQUENCE OF SITE ACTIVITIES CONSTRUC'I COLLECTIC THE RUNC (7) INSTALLATII~ (8) INSTALLATIC ALL CONSTRUC, ALL STATE, COl GENE~ (1) HAY BALF-i~ WITH SILT BARRIERS ARE TO BE INSTALL AROUND THE PERIMETer OF THE SITE TO PROVIDE EROSION CONTROL. (2) CLEARINC. DEBRIS AND CONSTRUCTION, DEBRIS WILL BE REMOVED FROM S':'E IN AN EXPEDITIOUS MANNER (3) IADE WILL BE ESTABLISHED MAINTAINING ALL RUNOFF ON (4) ROUGH SITE ALL TOPS AWAY RUNOFF~ iNSTALLAT DURING IMMEDIA~ INSTALL INSTALL~ INSTALLA' (5) )IL AND BACK FILL MATERIAL IS TO BE S'FOCK PILED DM WATER AND COVERED WITH TARPS TO PREVENT ON OF DRYWELLS STORM DRAINS AND FRENCH DRAINS ;ONSTRUCTION OF BUILDINGS, THIS IS TO PROVIDE '- CONNECTION TO GUTrER SYSTEM ONCE ROOF IS } AND TO INSURE MAXIMUM CONTAINMENT· (6) ON Of ANY UTILITIES REQUIRED. (7) ON OF BASE COAT (PAVEMENT) AND CRUSHED STONE TO MINIMIZE SILT RUNOFF AND STORM DRAIN CONTAMINATION. (8) INSTALLA~IlON AND CONSTRUCTION OF ALL STRUCTURES WITH APPROVED PERMITS. (9) PROVIDE FINISH GRADE MAINTAINING ALL RUNOFF OIN SITE. (10) PROVIDE SF-~:DING AND RE-VEGETATION Of ALL LANDSCAPED AREAS (11) PROVIDE ALL SCREENING AND LANDSCAPE IMPROVEMENTS AS REQUIRED BY SITE PLAN. GENERAL POLLUTION CONTROL MEASURES AS PER TH~" PROVISION SET FORTH BY THE UNITED STATES ENVIRONMENTAL PROTECTION'~ACT GENERAL PERMIT. THE FOLLOWING ST'ORMWATER, EROSION MANAGEMEN~I AND SEDIMENT CONTROL MEASURES INCLUDING, BUT NOT LIMITED TO YHE FOLLOWING ARE TO BE STRICTLY ENFORCED DURING THE COARSE OF CONSTRUCTION AND LANDSCAPING, (1) ALL EXIST!~IG VEGETATION AND TREES THAT ARE TO REMAIN IN PLACE ARE TO BE PROTECTED BY THE MEANS OF CONSTRUCTIONt FENCE OR OTHER APPROVED MEANS TO INSURE THEY ARE NOT DISTURBED DURING CONSTRUCTION, (2) EXCAVATION AND ESTABLISHING A ROUGH GRADE iS TO BE DONE IN SUCH A MANNER AS TO MINIMIZE THE EXTENT AND LENGTH OF TIME SUCH ARF-.~S ARE EXPOSED AND UNSTABLE. ALL EXCAVATED AREAS TO BE LEFT FALLOW ARE TO BE SEEDED WITH A MIXTURE OF FAST GROWING SEED THAT IS SUITABLE FOR SOIL CONDITIONS. (~PE OF SEED TO BE USED IS TO BE IN ACCORDANCE WITH SOIL CONSERVATION SERVICE RECOMMENDATION. (5) ALL CLEARED AREAS SHALL INSURE THAT THE LENGTH AND ANGLE OF THE SLOPE IS MINIMIZED TO TO REDUCE RUNOFF VELOCITY AND CHANNELING. ALL RUNOFF IS TO BE DIRECTED AWAY FROM SLOPED AREAS THAT HAVE NOT BEEN STABILIZED WITH GROUND COVER. (4) ALL RUNOFF AND SEDIMENT IS TO BE CONTAINED ON SITE AND NOT ALLOWED TO RUN ONTO NEIGHBORING PROPERTIES OIR INTO PUBLIC ROADS AND DRAINAGE SYSTEMS. THE USE OF SEDIMENT BARRIERS IS REQUIRED ),LONG THE PERIMETER OF THE CONSTRUCITION SITE THROUGH OUT THE ~NTIRE PROJECT. (5) A CONSTRBCTION SITE ENTRANCE AND DEPARTURE AiREA IS TO BE CREATED TO PREVEI~T THE TRACKING OF SOIL AND DEBRIS ONITO PUBLIC ROADS. THIS IS TO REMAIN IN EFFECT UNTIL THE ENTIRE SITE HAS BEEN COMPLETELY LANDSCAPE3 AND ALL PARKING HAS BEEN EITHER PAVED OR COVERED WITH A 'diN, OF 5" OF CRUSHED STONE. (6) ALL RUNOF¢ IS TO BE RETAINED ON SITE IN ACCORIDANCE WITH ALL LOCAL REGULATIONS AND APPROVALS. /%L INLETS TO STORM DRAINS ARE TO BE PROTECTED FROM SEDIMENT BUILDUP THROUGH THE USE OF DAMMING AND SCREENING. (7) ALL MEANS ARE TO BE TAKEN TO MINIMIZE THE DUST DURING THE CONSTRUCTION. (B) ALL EROSION CONTROL AND SEDIMENT BARRIERS ARE TO REMAIN IN PLACE UNTIL ALL LAND HAS BEEN PERMANENTLY STABILIZED). ONCE LAND HAS BEEN PERMANENTLY STABIUZED STORM DRAIN SYSTEM IS "FO CLEANED AS NECESSARY. (9) MAINTENANCE OF EROSION CONTROL SYSTEM IS TO lEE CONSTANTLY MONITORED IN ORDER TO INSURE THAT THE INTEGRI3Y Of THIS SYSTEM IS MAINTAINED, ESPECIALLY AFTer HEAVY STORMS AND CONSTRUCTION BEING PERFORMED IN AREAS OF ,EROSION CONTROL. MAINTENANCE IS TO INCLUDE, BUT NOT LIMITED TO THE REPAIR OF SEDIMENT BARRIERS, CLEANING OF STORM DRAINS, REPLACEMENT OF HAY B~ES AND REGRADING AS NECESSARY TO PREVENT RUNOFF AND CHANNELING. (10) PROPER DISPOSAL OF ALL WASTE, DEBRIS, HAZARDOlUS AND TOXIC MATERIALS IS TO BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR OR THE OWNER OF THE PROPERTY (IF NO GENERAL CONTRACTOR HAS BEEN HIRED), DURING CONSTRUCTION TO INSURE THAT ALL ~OCAL, STATE, AND FEDERAL LAWS ARE COMPLIED WITH CONTINUOUSLY. THE GENERAL CONTRACTOR IS TO BE RESPONSIBLE FOR MAINTAINING ALL RECORDS OF THE CONSTRUCTION SITE ACTIVITIES, INCLUDING BUT NOT LIMITED TO ALL INSPECTION REPORTS, VIOLATIONS OF THE RELEASE OR ACCIDENTAL DISCHARGE OF POLLUTANTS TO THE PROPER AUTHORITIES, AS DEEMED WITH THE USEPA GENERAL PERMIT. ALL MODIFICATIONS TO THIS SWPPP THAT, HAS BEEN PROVIDED THAT IS DEEMED NECESSARY DUE TO SITE CONDITIONS OR SPECIAL CONSTRUCTION ARE TO BE REVIEWED BY THE ENGINEER AND APPROVED PRIOR TO INACTING ANY CHANGES TO THIS DOCUMENT. WESTERN TREES TO BE RELOCATED or PLANTED: TREES THAT ARE TO BE PLANTED ARE SOLELY FOR THE PURPOSE Or SCREENING THE NEW BUILDING FROM THE EAST SIDE OF THE CREEK, Atl,-L CONSIDERATIONS ARE TO BE TAKEN TO INSURE THE MAXIMUM SCREENING IS PROVIDED BY STRATEGICALLY PLACING ALL TREES, ANY TREE THAT IS lIN THE LAND BANKED AREA THAT IS CAPABLE Of BEING RELOCATED IS TO BE RELOCATED AT THIS TIME TO INSURE FUTURE SCREENING WILL BE N PLACE F MORE PARKING IS REOUIRED.i 1. TREES THAT ARE TO BE RELOCATED WILL BE RELOCATED BY A PROFESSIONAL ARBORlST. 2. NEW TREES TO BE PLANTED WILL MEET THE TOWN REOUlREMENTS; OF MIN, 2" CALIPER· .3. ALL TREES ARE TO BE S,TAB LZED AS REQUIRED TO INSURE TREE: WILL NOT UPROOT DUE TO A WIND STORM. 4. NEW TREES ARE TO HAVE.. THE TRUNKS PROTECTED AS NECESSARY AGAINST DEER, 5. ALL TREES WILL HAVE AVAILABILITY OF A CLEAN WATER SOURCE FOR WATERING. 6~ ALL TREES THAT DO NOT SURVIVE ARE TO BE REPLACED. EASTERN TREES ALe)NO WHICKHAM AVENUE: 1. TREES THAT ARE LOCATE[) IN THE BUFFER AREA ON THE EAST SIDE OF MARINA LOCATED ALONG WHICKHAM AVENUE ARE NOT TO BE DISTURBED EXCEPT FOR REMOVAL OF DEAD DEBRIS· 2. ANY TREE THAT DIES IS TO BE REPLACED WITH A TREE OF THE SAME SPECIES. ;3. ALL REPLACEMENT TREES~ MUST HAVE MIN. OF 2" CALIPER· (]') THIS CESSPOOL AND FILLED IN IN REQUIREMENTS IS TO BE PUMPED OUT ACCORDANCE WITH SCDHS 1,,500 GALLONCYLINDR E-PTIC TANK DETAIL LEACHINGPOOL DETAIL DEPTH OF LEACHING POOL IS BASED ON FURTHERMOST LEACHING POOl FROM SEPTIC TANK Ni.T.S. sum No: s.~-~ '~: ~m 01 - 25- 06 01- 18-04 02- 12-04 11- 50-04 12-06-04- 1 of 1 SITE PLAN 02-05-05 09- 09- 05 10-04-05 11-04-05 01-09-06 2' WEAR COURSE TO BE PITCHED TOWARDS DRAIN COVER, TRAFFIC COVER CAST IRON FRAME & GRAl~ CAMPBELL FOUNDRY -- 10' 1' UINIMUM f MINIMUM [] IDB [] IDB] IDB IDB IDB IDB IDB] lOB · ' · , -SAr', ~ / G,RaVEl. 3'-0" MIN. TO GROUND WAtER' ', N.T.S. 844-2004 T CMA ION ASSOCIATES, t SCALE: 1" = 600' TOTAL LOT SIZE: 8.75 ACRES (43,560 x 8,75 = 3S1,150 SQ. FT.) LOT COVERAGE VaTH NEW BUILDINGS & REMOVALS: 75,449 SQ FT or 1g.8~ (30~ allowoble) LANDSCAPE AREA ~M~ NEW AODI~ON & PARKING: 151,382 SQ FT or 39.72~ (20~ required) EXIBTING PROPERTY ZONE M-2 (Marine 2) PARKING EXISqND RESTAURANT - 120 SE~T 0 1 space / per 3 seats (40 EXISTING BOAT STORAGE BUILDING: 25,000 sq. ft. - 1 space / 1000 sq/ft (25 NEW BOAT STORAGE BUILDING: 28,4B0 sq. ft. - 1 .pace per' / 1000 sq/ft (29 NEW OFFICE FIRST FLOOR LEVEL: 3,389 sq. fl F~RST ri.OOR OFFICE S~ACE: 2000 sq/ft - 1 specs / 100 sq/ft (21 FIRST "LOOP STORAGE SPACE: 1389 sq/ft - ~ space / 1000 eq/ft ( SECOND FLOOR OFFICE SPACE: 1200 sq/ft - 1 .poce / 100 sq/f[ (1', SECOND FLOOR STORAGE SPACE: 1149 aq/ft - 1 space / 1000 lq/fi ( BOAT SALES & RENTALS: 3 spaces + Marina Requirements 91 SlIP MARINA: 91 0 1 spoce / per slip = 91 .paces + I space / pst employs(13) (10 SECURITY OFFICE BUILDING: 900 eq/ff - 1 spool / 100 sq/ft ;EOURITY OFFICE STORAGE: 336 ~q/ft - 1 .pa¢~ / 1000 ~q/f~ (' TOTAL MARINA PARKING SPACES REQUIRED = 107 'OTAL RESTAURANT pARKING SPACES REQUIRED = 40 TOTAL STORAGE PARKING SPACES REOUlREO = 59 TOTAL OFFICE PARKING SPACES REQUIRED = 41 TOTAL PARKING SPACES REQUIRED = 247* TOTAL PARKING SPACES PROVIDED - 153 HANDICAP PARKING SPACES PROVIDED = 8 SITE OVER-FLOW PARKING PROVIDED = 91 TOTAL SPACES PROVIDED = 282* PLUS (1) 15'x14'x45' TRNLER PARKING SPACE * AS OF THIS DATE HISTORY OF THE MARINA INDICATES THAT AT THE BUSIEST TIMES Of THE YE.~R THERE IS NO NEED FOR ANY MORE THAN 84 PARKING SPOTS FOR 1141S SITE. THIS iNCLUDES THE RESTAURANT, EXISTING STORAGE BUILDING, OFFICES, MARINA AND STORAGE AREAS. THEREFORE LAND BANKING OF DESIGNATED PARKING THAT EXCEEDS OUR EXPECTATIONS HAS BEEN NOTED FOR FUTURE PARKING IF REQUIRED. 1. OLD SEPTIC SYSTEMS SHALL BE FILLED IN AND CLOSED AS PER SCDHS REQUIREMENTS. 2. ADD STORM WATER RUN OFF DRY~LLS FOR NEW BUILDINGS· 3. NAY BAILS SHALL BE PROV1DED DURING CONSTRUCTION (AS REQUIRED BY TOWN OF SOUTHOLD 1RUSTEES & NEW YORK STATE D.E.C.) 4. NEW STORAGE BUILDING TO MAVE THE SAME FASlA HEIGHT AS 114E EXIS~NG BUILDING, 5, ALL DRAINAGE iS TO MEET STATE & LOCAL CODE. 6, ALl OFFICE BUILDINGS MUST HAVE A SOURCE OF FRESH DRINKING WATER RUN OFF FACTORS ASPHALT = 1,0 GRAVEL = 0.5 ROOF 1.0 7'-0" DEEP POOL x 10' DIA.= 479 CU./FT, BOAT STORAGE BUILDING ADDITION -- 2B,¢50 SQ./FT. = .156667 x (2B.480)(1.0) = 4.746.667 / 479 = 9.91 MIN. OF 10 POOLS REQUIRED OR EQUAL PROPOSED OFFICE = 5,389 SQ./FT. = .166667 x (3389)(1.0) = 564.8345 / ,~79 1.18 MIN. OF 2 POOLS REQUIRED ASPHALT PARKING AREA = 64-,764 SQ./FT. = .166667 x (64,764X1.0) = 10,794,02 / 479 22,55 MIN. OF 25 POOLS REQUIRED GRAVEL AREA = 28,652 SQ,/FT. (MARINA PARKING) = .166667 x (28,652X0.5) = 2,387.671 / 479 = 4.98 MIN. OF 5 POOLS REQUIRED OR EQUAL GRAVEL AREA (EX. MARINA PARKING) 22,56~ SQ./FT, .166667 x (22,564)(0.5) = 1,880.337 / 479 = 3.93 MIN, OF ~ POOLS REQUIRED EX. BOAT STORAGE BUILDING = 25,000 SQ./FT. = .166BB7 x (25,ooo)(1.o) = 4,166.675 / ¢79 8.7 MIN, OF 9 POOLS REQUIRED OR EQUAL NEW PARKING LOT AND ROOF RUN OFF POOLS 2' DEEP x t0' DIA. THESE POOLS ARE TO BE USED WHERE ELEVATION IS < 10', ~} NEW ROOF RUN OFF POOLS 7' DEEP x 10' DIA. WHERE ELEVATION IS > 13' {~ NEW PARKING LOT RUN OFF POOLS 7' DEEP x 10' DIA. WHERE ELEVATION IS > 13'. I~l NEW PARKING LOT AND ROOF RUN OFF POOLS 4' DEEP x 10' DIA. THESE POOLS ARE TO BE USED WHERE ELEVATION IS ~ 10' & ~ 13'. SITE ARea - 8,75 ACRES TOTAL BUILDING ARea: EXISTING: 75,449 SQ. FT, EXISTING PROPERTY ZONED, MARINE SCHOOL DISTRICT ~ 9 & ~ 11 USE NON-MEDICAL OFFICE ALLOWABLE SANITARY FLOW (DENSITY~: GROUNDWATER MANAGEMENT ZONE IV ALLOWABLE FOR SITE WITH PUBLIC WATER -- 600 G.P.D. / ACRE x 8.75 ACRES = 5250 SEWAGE DISPOSAL DESIGN CALCULATIONS: 6OO G.P.D. NEW OFFICE BUILDING 2-STORY FIRST FLOOR - 3389 SF x ,06 GAL/SF SECOND FLOOR - 2~49 SF x .06 GAL/SF pRQPO~ED BOAT STORAGE BUILDING WAReHOUBE - (NO WATER OR SANITARY) 2B,480 SF x .04 - 1139.2 DPD WAREROUSE - (NO WATER OR SANITARY) 25,000 SF x .04 - 1000 GPO EXISTING MIDDLE COTTAGE AND SECURITY BUILDING (NO WATER OR SANITARY) 1236 SF x .OS= 74.16 OPD 10 GAL/SUP x 91 SUPS = 910 GPD, 5 GAL/PERSON x 48 PERSON = 240 GPO. G.P,D. PER ACRE RESTU RANT/ MARINA 2D3.34 OPD. 140.94 OPD. 10 GAL/PERSON x 120 PERSONS - TOTAL FLOW = 12oo GPO 4907.64 DPD. ~;EWAGE DISPOSAL SYSTEM DESIGN: NEW OFFICE BUILDING / PROPOSED STORAGE BUILDING 1483,4-B GPO (USE MIR, SYSTEM) x 2 DAYS = 2966.9B GAL PROVIDE A 3000 GAL SEPTIC TANK (1) 10'-0' DIA x 6'-0' EFF. DEPTH SEPTIC TANK - 3000 GAL/DAY 1483.4B/1.5 988.99 BF. 10' DIA, NEEO ,3.1,52 VER,T?CAL feet PRO__VIDE (4) 10' 01~. x 8' Ef~ DEPTHs-32 VF__ =_ 104~4 SF._~. rFINISH ~ /--R= 1 - 1/2" ~~;':; GRAVEL BASE LEACHINGMATT BASIN. A DETAIL MAR^T o, MARIA I v' I ~ INC. 1000-114-03- 01 // SITE PLAN INFORMATION IS BASED ON LAND SURVEY PREPARED BY JOHN T. METZGER LICENSED LAND SURVEYOR (LS 49618) ADA NOTFS AND SPEC F CAI ONS NOTE: THIS BUILDING AND ALL ADA SIGNS, PARKING SPACES ADA AND RAMPS ARE TO CONFORM TO ICC/ANSI A117.1 - 1998 PARKING NOTES NOTE: ADA ADA PARKING TOw~DEE MIN. OF 10'-0" BY 20'-0" LONG AND IDENTIFIED BY ADA PROPER SIGNAGE RAMP DETAIL ,/ NEW NEW OR NEW OR TREE ~ NOTE: The Bpproved rite devdopmem plm ~l ~ ~d ~r a~of~(3) ~ ~e~af~ ~ code s~on 100-25~. SITE PLAN FOR 4Ar[T - A- MAR MARINA, LLC. AT MATTITUCK TOWN OF SOUTHOLD SUFFOLK COUNTY, NEW SCTM: 1000-114-03-0 SCALE: 1"=40' 0 0 mEE ~ OR RELOCATED TREE ~ NEW OR RELOCATED TRee ~ TREE TREE NEW OR ~.~ RELOCATED TREE ~ , OR :E O NEW OR RELOCATED N OR TRee NOTE: JULY 22, FOR RESTURANT AT THIS TIME WAS ½" FIBERBOARD EXPANSION JOINT/ RAMP AT 1:12 ~ .L TRUNCATED DOME MAX. SLOPE ~ ~ --~ PROVIDE SMOOTH DETECTABLE , ,,-'-L-'I-'-'-~ TRANSITION WARNING RAMP MIN. WIDTH 5-0 '~ '~ 4" MIN. COMPACTED \ GRAVEL BASE ~ 6 x 6 WWM AT MID DEPTH WOODED N/O/F LAND OF BAKER 2O N 65' 05' 40" E 215.03' NEW OR RELOCATED 20 22 ." % OT~EE OREE '" ~ TREE OR TEE 0 SUMMER ~ PL~rm0 PAI~(ING RRO~TY uNz GAS PUMP A H L DRY WELL 200 WATT¢ 200 WAI'r2 O0 WAIT LIGHT 200 WATI[ "SITE OVER-FLOW PARKING PARKING CAPACITY 50 NOW BOAT STORAGE BUILDING 200 WAIT FOR ROOF TO LIGHT EXISTING BOAT STORAGE BUILDING FIN. fLR. - 11.5 SITE OVER-FLOW P~RKING EXIS'RNO L.P. FOR ROOF DRAINAGE TO BE FILLED IN 'AND 200 WATT I RELOCATED TO BE PLACED IN VAULT BELOW GRADE. 200 WAIT ' ~XISTING GRA~ o. Go o o o 't% o.o o o o o o / RET. WALL 1992 PLANNING BOARD APPROVED SITE EXPANSION AND PARKING. EXISTING DEEMED ADAQUATE. LANDSCAPING BEYOND GRAVEL/RCA DRIVEWAY TO BE 6" HIGHER THAN DRIVEWAY ELEVATION ~__~ I_ANDSCAPING PITCH TO DRIAN ~DRAIN G RAVEL/RC~T.s.D RIVEWAY DETAIL LANDSCAPE LIGHTING LANDSCAPER LOUVER LIGHTS (THREE TIER) ARE TO BE USED FOR LANDSCAPE LIGHTING, INCANDESCENT, (MAX lOOw) BUILDING AND SECURITY LIGHTING (20] 200 WATI' METt'L-HALIBE LIGHTS ARE ~'~3-'BE PLACE AROUcdD I-HE NEW AND EXISTING BOAT STORA~GE BUILDINGS AND OFFICE AS PER SITE PLAN LOCATION DOOR LIGHTING BOOR LIGHTING TO BE WALL MOUNTED, INCANDESCENT. (MA))(lOOw) APPROXIMATE SHORELINE HiGH WATER MARK PROPOSED LANDSCAPING: ALL DEkD TREES ALONG THE SOUTHERN PROPERTY LINE ARE TO BE REPLACED WITH 12'-15' RED CEDAR TREED. APPROXIMATELY 2" TO 4' IN CAMPER. ADOITIONAL 12' TO 15' RED CEDAR TREES WILL BE PLANTED IN A SINGLE ROW, STRNBHT LINE pATtERN ~.~ REDUIRED TO INCREASE THE DENSITY OF THE SCREENING IN FRONT OF THE NEW BOAT STORAGE SHED PLA PARKING 'HAY' NOTE: ALL WELLS ARE TO BE USED FOR NON-POTABLE USE ONLY SUCH AS BOAT WASHING AND FLUSHING WATER ONLY. INSURE THERE IS NO MEANS TO CROSS- CONNECT NON-POTABLE WATER WITH PUBLIC WATER AT ANY-I-JME. ALL NON- POTABLE FAUCETS ARE TO BE LABELED. (NON-POTABLE WATER ONLY, NOT TO BE USED FOR DRINKING OR COOKING AS PER THE SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES.) NOTE: ALL LEACHING POOLS, SEPTIC TANKS, ELECTRIC LINES, WATER LINES AND GAS LINES ARE TO BE A MINIMUM OF 10 FEET APART. BALE DETAIL FASTEN ;EDIMENT SCREEN TO 2X2 WITH PLASTIC ZIP TIES OR ,IMENT BARRIER N.T.S. 2x2 STAKE (MIN. TWO PER HAY BALE BALE) OMPACT FILL% FLOW /-- GRADE NOTE: BAIZE TO BE SET IN MIN Of A 4" TRENCH ON TOP OF SEDIMENT SCREEN. SEDIMENT SCREEN I~. THEN TO BE WRAPPED OVER THE TOP OF E[-\LE AND STAKED THROUGH WITH MIN. OF ~;".) 2x2 STAKES INTO THE GROUND MIN. 1'-0'. ~ ~ "~ ,Ct SOIL ..... ~T SOIL -SEDIMEL~T 2 STAKE ~ww~w BARRIER x X 'SEDIMENT BARRIER :2 STAKE L' ; 'ER SECTION ; ~E ~ I SLOPEDARE I I I , I I I CONTRACTORS CERTIFICATION PRIOR TO COMMENCING ANY WORK ON THE SITE THE FOLLOWING CERTIFICATE IS TO BE SIGNED AND A COPY IS TO BE PROVIDED TO THE TOWN OF JUIDICTION. "1 THE CONTRACTOR OR OWNER (IF NO CONTRACTOR HAS BEEN PLACED UNDER CONTRACT) CERTIFY THAT UNDER THE PENALTY OF THE LAW THAT I UNDERSTAND, AND WILL COMPLY WITH ALL TERMS AND CONDITIONS OF THE STORM WATER POLLUTION PROTECTION PLAN FOR THIS SITE. I WILL ALSO COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES INCLUDING THE NEW YORK STATE POLLUTION DISCHARGE ELIMINATION SYSTEM ("SPDES") I ALSOI UNDERSTAND THAT IT IS UNLAWFUL FOR ANY ONE TO CONTRIBUTE TO A ~VIOLATION OF THE WATER GUALFFY STANDARDS" SIGNATURE: DATE: PRINT NAME: TITLE: SIGNATURE OF' TOWN OFFICIAL RCl IN THIS DOCUM T: ~ TEST HOLE DATA PREPARED BY McDONALD GEOSCIENCE BORING DONE ON 11/08/04 GRADE- ~17.5' ASL MIXED SAND AND LOAM 2'-0 15,5' ASL BROWN SILTY SAND SM 3,5'- ~ 14.0' ASL PALE BROWN FINE TO MEDIUM SAND SP 15.2'- ~ 2.3' ASL WATER IN PALE BROWN FINE TO MEDIUM SAND SiP 17'- ~ 0.5' ASL COMMENTS: WAT,ER ENCOUNTERED 15.2 BELOW SURFACE ASL - ABOVE SEA LEv'EL TEST HOLE DATA N.T.S. 20]0 STORM WATER POLLUTION PROTECTION PLAN SITE DESCRIPTION THE CONSTRUCTION THAT IS TO TAKE PLACE WILL iNCLUDE THE FOLLOWING: (1) CLEARING ~ND REGRADING OF SITE IN AREA OF CONSTRUdTION. (2) REMOVAL C'E EXISTING STRUCTURES THAT LOCATED IN THE C~NSTRUCTION SITE. (3) REMOVAL A~ND RELOCATION OF DRY WELLS FOR ROOF RUNOFF (4) REMOVAL C~F WOOD RETAINING WALL (4) CONSTRUC~JON OF A BOAT STORAGE BUILDING AND OFF!~E, , (5) CONSTRUCJON OF ADDITIONAL PARKING AREA (6) CONSTRUC~ON OF ADDITIONAL STORM DRAINAGE COLLECTION AND RETENTION SYSTEMS TO RECHARGE THE RUN~FF FROM A 2" RAINFALL, (7) INSTALLATIq[N OF A STANDARD SANITARY SYSTEM. (BI INSTALLATII~N OF NECESSARY PUBLIC UTILITIES ALL AND IMPROVEMENTS TO CONFORM TO ALL STATE, CO AND LOCAL CODES. GENE AL SEQUENCE OF SITE ACTIVITIES (1) HAY WITH SILT BARRIERS ARE TO BE INSTALL AROUND THE OF THE SITE TO PROVIDE EROSION CONTROL. (2) CLEARiNg AND CONSTRUCTION, DEBRIS WILL BE REMOVED FROM STE IN AN EXPEDITIOUS MANNER (3) ROUGH G~ADE WILL BE ESTABLISHED MAINTAINING ALL RUNOFF ON SITE I~ (4) ALL TOPSOIL AND BACK FILL MATER~AL iS TO BE STOCK PILED AWAY 3M WATER AND COVERED WITH TARPS TO IPREVENT (5) (BI (7) (BI (9) (10) (11) ON OF DRYWELLS STORM DRAINS AND FRENCH DRAINS DURING OF BUILDINGS. THIS IS TO PROVIDE I CONNECTION TO GU'FFER SYSTEM ONCE ROOF IS INSTALL AND TO INSURE MAXIMUM CONTAINMENT. OF ANY UTILITIES REQUIRED. ON OF BASE COAT (PAVEMENT) AND CRUSHED STONE TO MINI¥1ZE SILT RUNOFF AND STORM DRAIN CONTAMINATION. INSTALLA'~ON AND CONSTRUCTION OF ALL STRUCTURES WITH APPROVFrD PERMITS. PROVIDE FINISH GRADE MAINTAINING ALL RUNOFF ON SITE. PROVIDE SEEDING AND REVEGETATION OF ALL LANDSCAPED AREAS PROVIDE ALL SCREENING AND LANDSCAPE IMPROVEMENTS AS REQUIRED BY SITE PLAN. GENER/AL POLLUTION CONTROL MEASURES AS PER TH~ PROVISION SET FORTH BY THE UNITED STATES ENVIRONMENTAL PROTECTION~ACT GENERAL PERMIT, THE FOLLOWING STORMWATER, EROSION MANAGEMEN~ AND SEDIMENT CONTROL MEASURES INCLUD NC, BUT NOT LIMITED TO ~'HE FOLLOWING ARE TO BE STRICTLY ENFOIRCEO DURING THE COARSE OF CONSTRUCTION AND LANDSCAPING. (1) ALL EXIBTING VEGETATION AND TREES THAT ARe TO REMNN IN PLACE ARE TO BE PROTECTED BY THE MEANS OF CONSTRUCTION FENCE OR OTHER APPROVED MEANS TO INSURE THEY ARE NOT DISTURBED DURING CONSTRUCT*ON. (2) EXCAVATION AND ESTABLISHING A ROUGH GRADE IS TO BE DONE IN SUCH A MANNER AS TO MINIMIZE THE EXTENT AND LENGTH OF TIME SUCH ARE, AS ARE EXPOSED AND UNSTABLE. ALL EXCAVATED AREAS TO BE LEFT FALLOW ARE TO BE SEEDED WITH A MIXTURE OF FAST GROWING SEED THAT IS SUITABLE FOR SOIL CONDITIONS. (TYPE: OF SEED TO BE USED IS TO BE IN ACCORDANCE WITH SOIL CONSERVATION SERVICE RECOMMENDATION. (3) ALL CLEARED AREAS SHALL INSURE THAT THE LENGTH AND ANGLE OF THE SLOPE IS MINIMIZED TO TO REDUCE RUNOFF VELOCITY AND CHANNELING, ALL RUNOFF IS TO BE DIRECTED AWAY FROM SLOPED) AREAS THAT HAVE NOT BEEN STABILIZED WITH GROUND COVER. (4) ALL RUNOFF AND SEDIMENT IS TO BE CONTAINED ON~ SITE AND NOT ALLOWED TO RUN ONTO NEIGHBORING PROPERTIES OR INTO PUBLIC ROADS AND DRAINAGE SYSTEMS. THE USE OF SEDIMENT BARRIERS IS REQUIRED &LONG THE PERIMETER OF THE CONSTRUCTION SITE THROUGH OUT THE F4~TIRE PROJECT. (5) A CONSTRI~CTION SITE ENTRANCE AND DEPARTURE ARea IS TO BE CREATED TO PREVENf THE TRACKING OF SOIL AND DEBRIS ONTO PUBLIC ROADS. THIS IS TO REMAIN IN EFFECT UNTIL THE ENTIRE SITE HAS BEEN COMPLETELY LANDSCAPE3 AND ALL PARKING HAS BEEN EITHER PAVED OR COVERED WITH A MIN. OF 6" OF CRUSHED STONE. (6) ALL RUNOFF IS TO BE RETAINED ON SITE IN ACCORDANCE WITH ALL LOCAL REGULATIONS AND APPROVALS. ALL INLETS TO STORMI DRAINS ARE TO BE PROTECTED FROM SEDIMENT BUILDUP THROUGH THE USE OF DAMMING AND SCREENING (7) ALL MEANS ARE TO BE TAKEN TO MINIMIZE THE DUST DURING THE CONSTRUCTION, (8) ALL EROSION CONTROL AND SEDIMENT BARRIERS ARE TO REMAIN IN PLACE UNTIL ALL LAND HAS BEEN PERMANENTLY STABILIZED. ONCE LAND HAS BEEN PERMANENTLY STABILIZED STORM DRAIN SYSTEM IS TO CLEANED AS NECESSARY. (9) MAINTENANCE OF EROSION CONTROL SYSTEM IS TO BE CONSTANTLY MONITORED tN ORDER q'O INSURE THAT THE INTEGRITY OF THIS SYSTEM IS MAINTAINED, ESPECIALLY AFTER HEAVY STORMS AND CONSTRUCTIOIN BEING PERFORMED IN AREAS OF ,EROSION CONTROL. MAINTENANCE IS TO INICLUDE, BUT NOT LIMITED TO THE REPAIR OF SEDIMENT BARRIERS, CLEANING OF STORM DRAINS, REPLACEMENT OF HAY B~.LES AND REGRADING AS NECESSARY TO PREVENT RUNOFF AND CHANNELING. (10) PROPER DISPOSAL OF ALL WASTE, DEBRIS, HAZARDO[US AND TOXIC MATERIALS IS TO BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR OR THE OWNER OF THE PROPERTY (IF NO GENERAL CONTRACTOR HAS BEEN HIRED), DUIRiNG CONSTRUCTION TO INSURE THAT ALL [iOCAL, STATE, AND FEDERAL LAWS ARE CO)MPLIED WITH CONTINUOUSLY. THE GENERAL CONTRACTOR IS TO BE RESPONSIBLE FOR IMAiNTAINING ALL RECORDS OF THE CONSTRUCTION SITE ACTIVITIES, INCLUDING BUT NOT LIMITED TO ALL INSPECTION REPORTS, VIOLATIONS OF THE RELEASE OR ACCIDENTAL DISCHARGE IOF POLLUTANTS TO THE PROPER AUTHORITIES, AS DEEMED WITH THE USEPA GENERAL PER~IT. ALL MODIFICATIONS TO THIS SWPPP THAT HAS BEEN PROVIDED THAT IS OEEMED NECESSARY DUE TO Site CONDITIONS OR SPECIAL CONSTRUCTION ARE TO BE REVIEWED BY THE; ENGINEER AND APPROVED PRIOR TO INACTING ANY CHANGES TO TH~B DOCUMENT. WESTERN TREES TO BE RELOCATED OR PLANTE:D: TREES THAT ARE TO BE PLANTED ARE SOLELY FOR THE PURPOSE OF SCREENING THE NEW BUILDING FROM THE EAST SIDE OF THE CREEK· ALL CONSIDERATIONS ARE TO BE TAKEN TO INSURE THE MAXIMUM SCREENING IS PROVIDED BY STRATEGICALLY PLACING ALL TREES· ANY TREE THAT IS 1IN THE LAND BANKED AREA THAT IS CAPABLE OF BEING RELOCATED IS TO BE RELOCATED AT THIS TIME TO NSURE FUTURE SCREENING WILL BE IN PLACE IF MORE PARKING IS REQUIRED.; 1, TREES THAT ARE TO BE RELOCATED WILL BE RELOCATED BY A PRtOFESSIONAL ARBORIST. 2. NEW TREES TO BE PLANTED WILL MEET THE TOWN REQUIREMENTS, OF MIN. 2" CALIPER, 3. ALL TREES ARE TO BE STABLZED AS REQUIRED TO INSURE TREE WILL NOT UPROOT DUE TO A WIND STORM. 4. NEW TREES ARE TO HAVE. THE TRUNKS PROTECTED AS NECESSAR'Y AGAINST DEER. 5, ALL TREES WILL HAVE AVAILABIUTY OF A CLEAN WATER SOURCE FOR WATERING. 6. ALL TREES THAT DO NOT SURVIVE ARE TO BE REPLACED. EASTERN TREES ALONG WHICKHAM AVENUF' 1. TREES THAT ARE LOCATED IN THE BUFFER AREA ON THE EAST SIDE OF MARINA LOCATED ALONG WHICKHAM AVENUE ARE NOT TO BE DISTURBED EXCEPT FOR REMOVAL OF DEAD DEBRIS, ANY TREE THAT DIES IS TO BE REPLACED WITH A TREE OF THE SAME SPECIES. ALL REPLACEMENT TREE~, MUST HAVE MIN. OF 2" CALIPER. ,,1.,, THIS CESSPOOL IS TO BE PUMPED OUT AND FilleD IN IN ACCORDANCE WITH SCDHS REQUIREMENTS 2' W:AR COURSE TO BE PITCHED TOWARDS DRAIN COVER, ~AFFIC COVER CAST IRON FRAME Jr. GRAl[ CAMPSSLL FOUNDRY -- f MINIMUW 10' 1' MINIMUM ~ PARKING RUN OFF FACTORS ASPHALT = 1.0 GRAVEL = 0.5 ROOF 1.0 7'-0" DEEP POOL x 10' DiA,= 479 CU,/FT, BOAT STORAGE BUILDING ADDITION 25,480 SQ./FT. = .166667 x (28,480)(1.0) = 4,746,667 / 479 9.91 MIN. OF 10 POOLS REQUIRED OR EQUAL PROPOSED OFFICE = 3,389 SQ./FT. = .166667 x (3389X1.0) = 564.8,345 / 479 = 1.18 MIN. Of 2 POOLS REQUIRED OR EQUAL ASPHALT PARKING AREA 64,784 SQ./FT. = .166667 x (64,764)(I.0) = 10,794.02 / 479 = 22.53 MIN. OF 23 POOLS REQUIRED GRAVEL AREA = 28,652 SQ./FT. (MARINA PARKING) .166667 x (28,652)(0,5) = 2,387.671 / 479 = 4.98 MIN. Of 5 POOLS REQUIRED GRAVEL AREA = 22,564 SQ./FT. (EX. MARINA PARKING) = .166567 x (22,564)(0.5) = 1,880,337 / 479 = 3,93 MIN, OF 4 POOLS REGUIRED EX. BOAT STORAGE BUILDING = 25,000 SQ./FT. = .166667 x (25,000)(1.0) = 4,166.675 / 479 = 8.7 MIN. OF 9 POOLS REQUIRED OR EQUAL NEW PARKING LOT AND ROOF RUN OFF POOLS 2' DEEP x 10' DIA. THESE POOLS ARE TO BE USED WHERE ELEVATION IS < 10', I~ NEW ROOF RUN OFF POOLS 7' DEEP x 10' DIA. WHERE ELEVATION IS > 1.3' NEW PARKING LOT RUN OFF POOLS 7' DEEP x 10' DIA. WHERE ELEVATION IS > 1.3'. NEW ,PARKING LOT AND ROOF RUN OFF POOLS 4' DEEP x 10 DIA. THESE POOLS ARE TO BE USED WHERE ELEVATION IS A 10' & ~ 13'. SCHOOL DISTRICT ~ 9 · ~ 11 us[ ALLOWABLE SANITARY FLOW (DENSITY~: GROUNDWATER MANAGEMENT ZONE IV ALLOWABLE FOR SITE WITH PUBLIC WATER = 600 G.P.D. PER ACRE 600 G.P.D, / ACRE x 8.75 ACRES 5250 G.P.D. ~EWAGE DISPOSAL DESIGN CALCULATIONS: WAREHOUSE - (NO WATER OR SANITARY) EXISTING MIDDLE CO'WAGE AND ~ECURITY ~UlLDINO (NO WATER OR SANITARY) 1483,48 GPO (USE MIN. SYSTEM) x 2 DAYS = 2966.96 GAL 1483,48/1.5 = 988.9S sr. PROVIDE A 3000 GAL SEPTIC TANK (1) 10'-0' DIA x 6'-0" EFF, DEPTH SEPTIC TANK - 3000 GAL/DAY ~ 10' DIA. NEED 31.52 VERTICAL FEET 1 PROVIDE (4) 10' DIA. x B' EfF. DEPTH = 32 VF. = 104-4- SF, -FINISH A"MIN' GRADE ["--"--i 1 - 1/2" I ,o.-o',,,~,R .I . ....~_ W~AR,NG C U R B sAND, ~D ~Am. e' ~. RE~EmA~O" IN A'~IRaN S'ilRATAOF 2~ BASE COURSE [ SAND AND O~AVEL ,' ,~,. ~a !:~ F__~Vl~lVlbl' 1,500 GALLON CYLINDRICAL ,,,,, ~~i ',~,~" m~,,"v ur_"~'"~ ~,-- MIN. TO GROUND WATER ~ 5A-"~D AND / -- ~PTIC TANK DETAIL LEACHING POOL DETAIL 3'-0" GRAVEL BA~E DEPTH O~ ,~C.~.~ ,00~ ~S .AS~ O. rU.T.~,.OST LEACHING BASIN DETAIL i ~ - F~ L~CHING POOL FROM SEPTIC TANK N.T.S. N.T.S, _ ~ % .. ' MATT MAR MA A 02- 12-04 ,~ ~, ~ EAST~ ~ - ~ - · TO~ OF SO--OLD 1nt / SITE PLANo~-o~OSo1_1~o5 =<c,=~,--~ D~SlGN~,~.~...m.~ASSOC~S, ~ S~FO~KCO~.~WYO~ ~ * 02- 0~05 1~ O~ 05 m, m-~m ~ c~.~ 11-0~05 ~ 1" = 40' 1 01-09-06,