HomeMy WebLinkAboutTR-7359AJill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Bredemeyer
Town Hall, 53095 Main Rd.
P.O. Box I 179
Southold, NY 11971
Telephone (63 I) 765-1892
Fax (631 ) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72
HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT
FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE
CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
Ist day of construction
¼ constructed
Project complete, compliance inspection.
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Bredemeyer
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fsx (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Permit No.: 7359A
Date of Receipt of Application: July 1, 2010
Applicant: Gilda Principi
SCTM#: 74-1-35.53
Project Location: 4690 Blue Horizon Bluff, Peconic
Date of Resolution/Issuance: July 21, 2010
Date of Expiration: July 21, 2012
Reviewed by: Board of Trustees
Project Description: To replace the existing roof shingles, siding, windows and
doore on the existing one-story seasonal cottage.
Findings: The project meets all the requirements for issuance of an
Administrative Permit set forth in Chapter 275 of the Southold Town Code. The
issuance of an Administrative Permit allows for the operations as indicated on the
site plan prepared by John J. Condon last revised July 27, 2010 and stamped
approved on August 5, 2010.
Conditions: The installation of gutters and drywells to contain stormwater run-off.
If the proposed activities do not meet the requirements for issuance of an
Administrative Permit set forth in Chapter 275 of the Southold Town Code, a
Wetland Permit will be required.
This is not a determination from any other agency.
Jill IV~]Doherty, Presider~
Board of Trustees '
Jill M. Doherty~ President
James F. King. V/ce-President
Dave Bergen
Bob Ghosio.
John Bredemeyer
P.O. Box 1179
Southol& NY 11971
Telephone (631 ) 765-1892
Fax (631) 765-6641
Southold Town Board of Trustees
Field Inspection/Worksession Report
Date/Time: "-~J [ q~' [~'~
Richard J. Principi, Jr. on behalf of GILDA PRINCIPI requests an Administrative
Permit to replace the existing roof, siding, windows and doors and make in-kind
repairs to the existing framing as necessary to an existing one-story seasonal
cottage. Located: 4690 Blue Horizon Bluff, Peconic. SCTM#74-1-35.53
Type/of area to be impacted:
[~ltwater Wetland Freshwater Wetland
Sound __Bay
Distance of proposed work to edge of wetland
,~9aLa~OWn Code proposed work falls under:
t.275 Chapt. 111 other
Type of Application: ~_,/¢~land C~al Erosion __Amendment
._Administrative__Emergency Pre-Submission Violation
Info needed:
Modifications:
Conditions:
Present Were: __&King ~/r~Doherty __J. Bredemeyer 'b/D. Bergen__
B.Ghosio, __ D. Dzenkowski other
Form filled out in the field by,~
Mailed/Faxed to:
Date:
Town of Southold
Board of Trustees Application
Office Use Only
__Coastal Erosion Permit Application/.-
__Wetland Permit Application t/ Administrative Permit
Re AmendmentdTransfe/'/l~xtension
ceived Application:
ceived Fee:$ ~,~)o_~o / --
~4~ompleted Application Incomplete
SEQRA Classification:
Type 1 Type Il__Unlisted
__Coordination:(date sent)
~.L"WRP Consistency Assessment Form ~ ! _e~ [ ['~
CAC Referral Sent:
--~ate of Inspection:
Receipt of CAC Report:
__Lead Agency Determination:
Technical Review:
~,~ublic Hearing Held: "~
Resolution:
JUL - 1
$ou/hhold Town
Board of Trustees
NameofApplicant (nl/.._/),a. /9£,~007~
Address Z./t..~'"' ~::~O.Ig' ~4& ~~ ~*~
~/~ ~ ~Z Z Phone Number:(~ ~g ~/
Suffolk County Tax Map Number: 1000- 7~0/-~ ~
Pro~ Location: ffo'~C~ ~T~ ~Z ,~ ,~~ &:"~
(provide LILCO Pole ~, distance to cross s~eets, ~d l~ation) --
AGENT: ~lC-flA~~ ~ ~'~'~// ~A
(If applicable)
Principi Cottage Improvements
Project Description
June 29, 2010
The applicant proposes replace the existing roof, siding, windows and doors and
make in-kind repairs to the existing framing as necessary to an existing one-story
seasonal cottage.
B~oard of Trustees Application
GENERAL DATA
Land Area (in square feet): ~'t.~, ~'O~
Area Zoning: ~ ~/~qO
Previous use of property: t~A t~, t? _f , ~ ??xl 6,~ 4 .r-~, ~oW ~-
Intended use of property: ~D~
Covenants and Restrictions: Yes / No
lf"Yes", please provide copy.
Does this project require a variance from the Zoning Board of Appeals __
If"Yes", please provide copy of decision.
Prior permits/approvals for site improvements:
Agency Date
Yes
Y No
J No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspendf, d%y a governmental agency?
~' No Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
Bo~ard of Trustees Application
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations: D4~zt~',4, c.~
Area of wetlands on lot: ~/'~'- square feet
Percent coverage of lot: $ I't/Z %
Closest dis~ce between nearest existing stmctu~ and upland
edge of wetlands: ~3 feet
Closest dis~nce between nearest proposed structure and upland
edge of wetlands: ~ 3 feet
Does the project involve excavation or filling?
Yes
If yes, how much material will be excavated? ~ cubic yards
How much material will be filled? ~ cubic yards
Depth of which material will be removed or deposited: ~ feet
slope throughout the ama of operations:
Proposed
Manner in which material will be removed or de.sited:
Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by
reason of such proposed operations (use attachments if appropriate):
I 617.20 SEQR
PROJECT ID NUMBER APPENDIX C
STATE ENVIRONMENTAL QUALITY REVIEW
SHORT ENVIRONMENTAL ASSESSMENT FORM
for UNLISTED ACTIONS Only
PART 1 - PROJECT INFORMATION { To be completed by Applicant or Project Sponsor)
12. PROJECT NAME
1. APPLICANT I SPONSOR
3.PROJECT LOCATION:
4. PRECISE LOCATION: Street Addess and Road intersections. Prominent landmarks etc - or [~rovide mad
6. DESCRIBE PROJECT BRIEFLY:
7. AMOUNF.~JF LAND AFFECTED:
Initially//~ acres UIUmately acres
8. WIL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS?
[~Yels [] No If no, desCxibe bflefly:
esTtS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.)
~~--~klenUal [~,ndus~al ['"-]Commercial ----E~Agriculture .... E]ParklFore$l/ObenSpace E~other (describe)
]10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL
es(Federal, Stateor Local)
]No ff yes, list agency name and permil / appmve~:
11. DOES ANY~YA~fA PECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
E~]Yes [~o If yes, list agaricV name arid permit ! approval:
I , AS A R OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION?
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
Applicant ! S~
$i~lnature
/com'~ If the action Is a Costal Area, and you are, state agency,
pleta the Coastal Assessment Form be~re proceeding with this assessment
PART II - IMPACT ASSESSMENT (To be completed by Lead A~ency) *
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR. PART 617.47 If yes, coordinate the rel/~w ix~3cess and use the FUII EAF.
I-'1 Y,, rTl"o
B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNUSTED ACTIONS IN 6 NYCRR, PART 617.6? If No, a nngaflve
nY-171.o
C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ~TEO WITH THE FOLLOWING: (Answem may be handwlt~en, If legible) Cl. F_~st;ng air quality. ~urfaco or groundwater quality o~ quan6ty, t~lse levels, e~ tral~ pat~rn, solid waste ixodu~co or disposal,
I"° I
C3. V=~=[a;;on or fauna, tish, shaltitsh or wildlife species, slgnlticant habitats, ~' ~reatcoad or enclangemd spade? Explain txtefly:
C6. Long term, shert term, cumulative, or otha~' effects not identi~ad in Cl-C57 Expialn b~:
C7..~r ;,T,~a~inc~udil~l d~ry~s in use ofelthar cluanti
· I:o
D. WIU- THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL
ENVIRONMENTAL AREA (CEA)? (If yes, explain briefly:
E. IS THERE, OR IS THERE LIKELY TO BE~ CONTROVERSY RELATED TO'POTENTIAl. ADVERSE ENVIRONMENTAL IMPACTS? If),es explain:
PART III - Dc I r.~m~NATION OF SIGNIFICANCE (To be completed by Agency)
iNS'I~UCTION$: F~reachadvarsee~ectiden~adabeve~det~rm~new~nether~tissu~tanUa~arge~imp~rtant~r~therwisesigni~conL Each
efl~ct should be assessed in connection ~ its (a) setting (i.e. Unban or mini); (b) probability of occurring; (c) duration; (d) Inevemibili{y;, (e)
geographic scope; and (f) magnitude. If necsese~j, add attachments or referanco supporting mateltals. Ensure that explanations contain
suffictent deteff to show that all relevant adveme Impacts have been identifiad sad adequately addressed. If questicn d of pa~t fl was checked
)'es, the,determlnaticn of significance must evaluate the potential impact oflhe prol:x~ad action on the envlmnrnental cberactads6cs of the CEA
Check inls box ffycu have idenGfh~l one or mom potentially large or signiltcant adveme impacts wtdch MAY occur. The~ prom~M dh*ently to ine FUU
FAF and/or prepare a positive dedaretion.
Check thla box If you have detemlinad, based on the infonnaUon an~ analysis abeve snd any suppo~ docureentaflon, that the pro~ actlo~
WILL NOT result in any significant adverse envlroflmental Imps=ts AND provide, on attachments as nacessar/, the reasons SUPpo~ng INI
Board of Trustees
Name of Lead Agency
,Jill M. Doherty
Print or Type Naree of Responsible Officer in Lead Agency
-a[ure-of Respondbfe~Officer in L~,.gency
Date
President
Title of Responsible Officer
Signalure of Preparer (ff different from respor~ble officer)
Town of Southold
Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM
,~OPEK~ LOCATION: S*c-T.u*~ THE FOLLOWING ACTION8 MAY REQUIRE THE SUBMISSION OF A
~ ~'~ O/ *~ ~',~ STORM.~ATrd~ ~J~IN~ DRAINAGE AND E~OSION COk'YROL PLAN
Bk)c~ Lot CERTIFIED By A D~SIGN PROFE8SIONAL IN THE STATE OF NEW YOF~K.
¥¢S
a. WhatlstheT(~al^mac~lheF'ro)ectParc~s?' /~_ 'l WillthisPr'ojeclRet~in~lb-'tor~-WaterRufl-Off
the Scope ~ WO~ for Proposed Coastmc~on) (S.F./~) (33~S Item v~ll include all run-off created by.site
b. What is the T~al Ama of I.a~d Clearing cleating and/or coastruc/~on aclivlties as well as all
and/or Ground Disturbance for the proposed ~ ~" 4,~ ~1~ Site Improvements and ~e pem~3m~ creation of
~,°.e~ewious surfaces.)
constmcllon activity? (s~.,~',) 2 Does the Site Plan and/or
P.o=E ~.o~ ~)~'.oN ~.-.-.-~.-.-- o.~s~.,.~=~&Lo~o.?T~ ./I I
Item shad Include all Pro.sad Grade Chalges and
$:/D~k~t~ , ~&)//J~(aJ¢ /l~J.~ ~)~O~--.~ . ' 3 DoesffieSitePlanarld/orSuweydescHbetheeroskm
and sediment ~ontrol practices that will be used to
/ c~ntrol ~ erosion end strum w~er dlschmges.
/ Conslm~on Period.
~.{./',~/~ /,4/t /~ ~-~"7T,~I~-,~; ,~:':':':':':':':':~L~:~-~:~ 4 Will this ProJect Requim any Land FIIllag, Gladlngor
Excava~°n whem there Is a change t° 1he Natuml
/~"47/~ ~'~/3(./~----~ ~1~/'~. ExisfingOradelnvolvlngmomthan20OCubicYerds
5 Will this Applicalioa Req uire Land Dlstu~ Actlvffies
(5.(~0 S.F.) Square Feet of Ground Sun'ace?
6 Is Ihere a Natural Warm Comse Running through the
~ I~; ~: o* v~hln On® Hundred 0003 ~tot~ W~llend or
./
V
STATE OF NEW YORK,
COUNTY OF ........................................... SS
And that he/~he i~ the ~ '~'""~ ............................... ~ ~2 ......................
Owner md/or repre~entalive of the Owner or Owners, and is duly authorized to l~d'orm or have performed the ~id work and to
that the work will be peffolmed in the manner set [orth in the application filed h¢~'{~o'
Sworn to befo me tiffs; Qualified
.............. cLX,2......, ........ a~or.....~e¢~.,.~. ........................... ~-~ ' : - p% ' - - .
..............................
FORM - 06/10
of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
I, ~" ~f~ residing at ~ ~' ~'~
(print owner prope~y) (m~ling ad. ess)
~. ~-33z~ ~o ~ ~t~or~
( Agent
to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
Bo~ard of Trustees Application
County of Suffolk
State of New York
DEPOSES AND AFFIRMS THAT ~tE/S~'E~IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK
WILL BE DONE IN THE MANNER SET FORTH lN THIS APPLICATION AND AS MAY
BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT
AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES
HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS AR1SING
UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS
APPLICATION, l HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR
REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE
PREMISES IN CONJUNCTION WITH REVIEW OF TH1S APPLICATION.
SWORN TO BEFORE ME THIS
DAY OF o. Jp/~/ ,20 Jg>
Notary Public
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's
website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Deparanent, all
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
The Application has been submitted to (check appropriate response):
Town Board ~ Planning Dept. [] Building Dept. ~ Board of Trustees ~
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital
construction, planning activity, agency regulation, land transaction)
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action:
Location of action: ~C. Zo,~t ~
Site acreage: t//Z/arC~'~5
Present land use: ~4~ ~,~/ ~~
P~sent zoning cl~sification: ~/~ ~
lfan application for ~e proposed action has been filed with the Town of Sou~old agency, the following
info~ation shall ~ p~vided:
(a) N~eofapplic~t: ~/C~ ~/~Ct~i'
(b) Mailing address: ~ ~, ~ ~ ~ ~0~-~ ~x///~/
(c) Telephone number: Area Code ( ) 6 3 l- ~3ttt'--7 c.J / 0
(d) Application number, if any:
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes [~ No ~ If yes, which state or federal agency?
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. Sec LWRP Section II1 - Policies; Page 2 for evaluation
criteria.
[~es ~--] No I--] Not Applicable
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Policies Pages 3 through 6 for evaluation criteria
~ Yes [] No [~ Not Applicable
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section III - Policies Pages 6 through 7 for evaluation criteria
~'/Yes ~ No ~ Not Applicable
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III - Policies Pages 8 through 16 for evaluation criteria
~Yes [] No ~-~ Not Applicable
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III
- Policies Pages 16 through 21 for evaluation criteria
[~ Yes [] No ~ Not Applicable
Attach additional sheets if necessary
Policy 6. Protect and restore the qnality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria.
~'Yes ~-~ No [] Not Applicable
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies
Pages 32 through 34 for evaluation criteria.
~ Yes [] No [--~ot Applicable
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria.
Yes No [~Not Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria.
[] Yeti No ~Not Applicable
/4,oDF,
Attach additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria.
[] Yes [] No [~Not Applicable
Attach additional sheets if necessary
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria.
~],,Yes: No [---~Not Applicable
Attach additional sheets if necessary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages
62 through 65 for evaluation criteria.
[~ Yes [~ No ~Not Applicable
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section III - Policies; Pages 65 through 68 for evaluation criteria.
[~ Yes [~ No [~Not Applicable
Created on 5/25105 11:20 .dM
Principi Builders, Inc.
PO. Box 1 ;248
$outhok!, .NY 1197 !
June 17, 2010
Dear Board of Trustees Southold Town:
This !e.n. er .is to request knffo..rm..ation aJ~out what would be necessa~, to
demolish and reclaim the building envelope at cottage 3- Blue Horizons Bluff,
Peconic NY: Suffolk Courtly tax map # 1000-74 0135.53.
Thank you,
Richard J. Principi. Jr.
I would like to request an amendment of the already approved wetlands permit
in order to move the building envelope out of the Trustees jurisdiction. Please
let me know how I should proceed at your earliest possible convenience.
516-852-0651
For Gilda Principi
MEAN RLGH WATER MARK
AS OBSERVED
~ON NOVEMBER 2, 2009
REMOVE EXISTING WOOD PLATI-ORM
PROVIDE NEW GUTTERS AND
DRYWELL WITH 8"0 ADS PIPE
36' MiN, FENCE POST
SILT FENCE NOTES:
UNDISTURBED GROUND ~
1 WOVEN WIRE FENCE (MIN 14 1/2 GAUGE MAX 6" MESH SPACING)
WiTH FILTER CLOTH OVER FENCE
2 FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE
WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION
3 WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN F~,CH O~ER THEY
SHALL BE OVERLAPPED BY BIX INCHES AND FOLDED
4 MAINTERANCE SHALL SE PERFORMED AS NEEDED ARD MATERIAL
REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE
WOVEN WIRE FENCE (MIN, 14
GAUGE MAX 6' MESH SPACING}
POSTS(TYP)
POSTS-STEEL, TORUSHAPETYPE
/~OR2"HARDWOOD
FENCE WOVEN WIRE 14 5 GAUGE
/--S' MAX MESH OPENING
FILTER CLOTH - MIRAF1140N
~ORAPPROVEDEQUAL
FLOW
', ~ COMPACTED BACKFILL
'~'X6' TRENCH
EMBED FILTER
CLOTH 6' MIN
INTO GROUND
SECTION
3§"MINFENCEPOSTS
GROUND
GROUND
(SEE SECTION) ELEVATION
SILT FENCE DETAIL
NOT TO SCALE
FRAME
SILT PENCE AND
EXISTING BUILDINGTO REMAIN
EXISTING ROOF SHINGLES,
SIDING/,/WINDGWS AND DOORS
DRAINAGE CALCULATIONS:
THE PROPOSED ON SITE DRAINAGE SYSTEM TO PROVIDE STORAGE FOR A 2"
RAINFALL STORAGE TO BE PROVIDED IN PROPOSED 1~' DIAMETER DRYWELLB
PROVIDING §6 42 CF PER VERTICAL FOOT OF STORAGE THE DESIGN IS BASED
ON THE FOLLOWING RUNOFF COEFFICIENTS ROOF I 0, CONCRETE 1,0, AND
LARDSCAPING 0 30
DRAINAGE AREA
STORAGE REQUIRED
PAVEMENTAREA 196SFX1DOX2'N2- 33CF
ROOF AREA 676 SFX 1 00 X 2N12- 113 CF
LANDSCAPE AREA 4,493 SFX 0 30 X 2"/12 - 224 CF
370 CF
STORAGE REQUIRED
370 CF/6~ 42 DFNF - 5 4 VERTICAL FEET REQUIRED
STORAGE PROVIDEr~
USE 1 - 10' O X 6' DEEP DRYWELL
EXISTING SEPTIC
GENERAL NOTES
ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO ~HE STANDARDS AND
SPECIFICATIONS OF THE TOWN OF SOUTHOLD AND THE SOUTHOLD TRUSTEES AS REQUIRED
TOPOGRAPHIC AND EXISTING CONDITIONS SHOWN ON I~E PLANS FROM SURVEY DATED 3~24/10 BY HANDS
ON SURVEYING
COASTAL EROSION HAZARD LINE AS GEPICTEB ON THE COASTAL EROSION HAZARD AREA MAP TOWN OF
SOUTHOLD, SUFFOLK COUNTY, NEW YORK PHOTO NO 57-556~3 SHEET B OF 49
LOT AREA AS PER METES & BOUNDS 54,509 SQ FT - 1 251 ACRES
CURRENT ZONING RR & ~ 40 RR, 22,274 SQ FT RA0 32,235 SQ FT
THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO THE
COMMENCEMENT OF WORK THE CONTRACTOR IS ADVISED ALL SUBSURFACE INFORMWqON SHOWN ON
THESE PLANS IS CONCEPTUAL AND MUST BE CONFORMED ACCORDINGLY IN THE FIELD
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESEARY PERMITS BEFORE
COMMENDING WORK
ALL UNSUITABLE MATERIAL AND DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH TOWN, COON O',
STATE AND FEDERAL LAWS, CODES AND ORDINANCES CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSING OF ALL UNSUITABLE MATERIALS OFFSITE DEBRIS SHALL NOT BE BURIED ON-SITE
DURING CONSTRUCTION, EROSION AND SEDIMENT CONTROL MEASURES TO BE UTILIZED AS NECESSARY TO
PREVENT THE TRANSPORT OF SEDIMENT TO OFF-SITE AREAS, PONDS, DRAIRAGE INLETS, ETD ~E
METHODS AND MATERIALS EMPLOYED IN THE INSTALLATION AND MAINTENANCE OF EROSION CONTROL
MEASURES SHALL CONFORM TO 'THE NEW YORK GUIDELINES FOR EROSION AND SEDIMENT CONTROL"
10 ALL PRECAST STRUCTHRES SHALL BE CONSTRUCTED WITH SUFFICIENT STEEL REINFORCEMENT TO
WITHSTAND AASHTO H~O TRAFFIC LOADING ALONG WiTH TEMPERATURE AND SHRINKAGE, TRANSPORT TO
THE SITE AND SITE CONDITIONS AS SHOWN ON THE PLANS,
11 ALL PRECAST STRUCTURES SHALL BE MANUEACTURED WITH 4,000 PSI CONCRETE AND SHALL BE DESIGNED,
CONSTRUCTED AND INSTALLED TO SUPPORT A~SHTO H-20 TRAFFIC LOADING,
12 CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL PRECAST STRUCTURES DETAILING THE STEEL
REINFORCEMENT AND PROVIDE CERTIFICATION BY THE PRECAST MANUFACTURER ~HAT S~UCTURES ARE
DESIGNED TO SUPPORT H~0 TRAFFIC LOADING
13 MANUFARTURER TO CERTIFY THAT DRAINAGE AND SANITARY PRECABT STRUCTURES DELIVERED TO THE
SITE MEET ALL REQUIREMENTS OF THE TOWN OF SOUTHOLD AND THE SUFFOLK COUNTY DEPARTMENT OF
HEALTH SERVlCES,
2X2 WOOD
STAKES ~D'P )
{SEE BEDDING ]
DErAiL) ~
STRAW BALE INLET PROTECTION DETAIL
NOTES
1 BALES SHALL BE pLACED AT THE TOE OF A SLOPE OR ON THE CONTOUR
AND IN A ROW WiTH ENDS TIGHTLY ABUTTING THE ADJACENT BALES,
2 EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES
AND PLACED SO THE BINDINGS ARE HORIZONTAL
3 BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER T, NO STAKES
OR RE-BARS DRIVEN THROUGH THE DALE THE FIRST STAKE iN EACH
BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE
TO FORCE THE BALES TOGETHER STANES SHALL BE DRIVEN FLUSH
WITH THE BALE
4 INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE
MADE PROMPTLY AS NEEDED
5 BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS
SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR BRAIRAGE
TWO REBARS, STEEL PICKETS,
OR 2"x2" STANE8 MRIVEN
2' INTO GROUND~ FIRST
STAKE DRIVEN AT ANGLE
TOWARDS PREVIOUSLY LAID
STRAW BALE DRIVE STAKES
PLUSH WITH TOP OF BALE
ANGLE F~RST STAKE TOWARD
Flow
FLOW
BOUND S1
BEDDING DETAIL
ANCHORING DETAIL
FACE
STRAW BALE DIKE DETAIL
EROSION CONTROL MEASURES
IN ACCORDANCE WITH THE PROVISIONS OF THE USEPA GENERAL PERMIT AND THE NYSDEC, DURING THE
COURSE OF CONSTRUCTION, CERTAIN EROSION AND SEDIMENT CONTROL MEASURES MAY BECOME
NECESSARY TO PREVENT THE TRANSPORT OF SEDIMENT TO OFF SITE AREAS, PONDS, WATER COURSES,
DRAINAGE INLETS, RECHARGE BAS,NS, ETC, ACTUAL EROSION CONTROL MEASURES WILL BE DICTATED
BY FIELD CONDITIONS AS CONSTRUCTION PROGRESSES, BUT THE FOLLOWING GENERAL CONDITIONS
SHALL BE OBSERVED
EXISTING VEGETATION TO REMAIN SHALL BE PROTECTED AND REMAIN UNDISTURBED
CLEARING AND GRADING SHALL BE SCHEDULED SO AS TO MINIMIZE THE SIZE OF EXPOSED AREAS
AND THE LENGTH OF TIME THAT AREAS ARE EXPOSED
THE LENGTH AND STEEPNESS OF CLEARED SLOPES SHALL BE MINIMIZED TO REDUCE RUNOFF
VELOCITIES,
SEDIMENT SHALL BE RETAINED ON THE SITE
SPECIFIC METHODS AND MATERIALS EMPLOYED IN THE INSTALLATION AND MAINTENANCE OF EROSION
CONTROL MEASURES SHALL CONFORM TO THE 'NEW YORK GUIDELINES FOR EROSION AND SEDIMENT
CONTROL'
SEDIMENT BARRIERS (SILT FENCE, HAY BALES OR APPROVED EQUAL) SHALL BE INSTALLED AS REQUIRED
ALONG THE LIMITS OF DISTURBANCE FOR THE DURATION OF THE WORK NO SEDIMENT FROM THE SITE
SHALL BE PERMDTEB TO WASH ONTO ADJACENT PROPERTIES, WETLANDS OR ROADS
GRADED AND STRIPPED AREAS AND STOCKPILES SHALL BE KEPT SYABILIZED THROUGH THE USE OF
TEMPORARY SEEDING AB REQUIRED SEED MIXTURES SHALL BE INI ACCORDANCE WiTH SOIL
CONSERVATION SERVICE RECOMMENDATIONS
DRAIRAGE INLETS INSTALLED AR PART OF THE PROJECT SHALL BE PROTECTED FROM SEDIMENT BUILDUP
THROUGH THE USE OF SEDIMENT BARRIERS, SEDIMENT TRAPS, ETD AS REQUIRED
INSPECTION AND MAINTERANCE OF EROSION CONTROL MEASURES IS TO BE PERFORMED DAILY BY THE
CONTRACTOR PRIOR TO THE START OF CONSTRUCTION FOR THE DAY AND AFaR HEAVY OR PROLONGED
STORMS MAINTENANCE MEASURES INCLUDE, BUT ARE NOT LrMITED TO, CLEANING AND/OR REPAIR OF
SEDIMENT BASINS OR TRAPS, SEDIMENT BARRIERS, BERMS, DIVERSIONS AND INLET PROTECTION
APPROPRIATE MEANS SRALL SE UBED TO CONTROL DUST DURING CONSTRUCTION
A STABIUZED CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT SOIL AND LOOSE DEBRIS
FROM BEING TRACKED ONTO LOCAL ROADS THE CONSTRUCTION IENTRANCE SHALL BE MAINTAINED UNTIL
THE SITE IS PERMANENTLY STABILIZED
SEDIMENT BARRIERS AND OTHER EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL UPLARD
DrSTURBED AREAS ARE PERMANENTLY STABILIZED, AFTER PERMA~NENT STABILIZATION, PAVED AREAS
SHALL BE CLEANED AND THE DRAINAGE SYSTEM CLEANED AND FLUSHED AS NECESSARY
LONG ISLAND SOUND
SALT MARSH L~
PROJECT LOCATION
GOLDSMITH'S INLET
· - -' -. / .PP OVE
TOWN OF SOUTHO[,
MANUFACTUREDBY SUFFOLK PRECAST[NC OREQUI AL NT
DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 4,000 P 8 I IN 28 DAYS
. / / :, ,,
3 NOTRENCH, PITOROTHEREXCAVATIONSHALLBELE~OPENORUNA~ENDED, ~ ~ ~ ~ /~ ~ / ~ / ,, ,, , ,
EXCAVATIONS TO BE PROTECTED WITH PENCES, BARR CAGES AND OTHER APPROVED
7. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHEETING AND SHORING DURING
TRENCHING TO INSURE THE SAF~ OF WORKMEN AND ~E GENE~L PUBLIC EXPOSED TO '
THE H~RDS OF FALLING AND SLIDING MATERIAL IN CONFORMANCE WITH THE
/
SUFFOLK COUNTY STANDARD DRAIN MANHOLE FRAME AND
-- SLOTTED COVER PATTERN No 1363 AS MANUFACTURED BY
CAMBELL FOUNDRY OR AN APPROVED EQUAL
PRECAST
,THAFFIC BEARING
EXCAVATE A MINIMUM OF §' INTO VIRGIN STRATA
OF SAND AND GRAVEL OR TO BOSOM OF DRYWELL
WHICHEVER IS DEEPER.
DRYWELL DETAIL
NTB
7127110 TRUSTEE COMMENTS
REVISIONS
Scale 1" = 30'-0"
Drawn by: JJC
Date: 6/2512010
Condon Engmneenng, P.D.
1755 Sigsbee Road
Mal6tuck, New York 11952
(631) 298-1986 (631) 298-2651 Fax
w~w.condonengineering.com
COTTAGE IMPROVEMENTS
Country Route 48
Peconic, New York
SITE PLAN
S-1
OF
F SHINGLES
~REPLACE EXISTING WINDOWS AND DOORS (TYP.)
EAST ELEVATION
~/.~REPLACE EXISTING ROOF SHINGLES
WEST ELEVATION
SCOPE OF WORK:
EXISTING BUILDING TO REMAIN UNHEATED
2 REPLACE EXISTING ROOF SHINGLES, SIDING, WINDOWS AND DOORS
3 INSTALL NEW ROOF DRYWELL, GUTTERS, LEADERS AND ASSOCIATED PIPING
~.~.~ REPLACE EXISTING ROOF SHINGLES
REPLACE EXISTING WINDOWS AND DOORS (TYP)
REPLACE
EXISTING
SOUTH ELEVATION
REPLACE EXISTING ROOF SHINGLES
~/../..~ REPLACE EXISTING WINDOWS AND DOORS (TYP.)
NORTH ELEVATION
'~'""~'""~ R E P LA C E EXISTING WINDOW (TYP.)
REPLACE EXISTING DOOR (TYP)
SUNROOM
LIVINGROOM
BEDROOM
KITCHEN
BATHROOM
MASTER BEDROOM
II ~'~'"~REPLACE EXISTING WINDOW (TYP.)
FIRST FLOOR PLAN
7/27/10 TRUSTEE COMMENTS
REVISIONS
CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA
Ground Snow Load Wind Speed Seismic Weathering Frost Line Termite Decay Winter Design Ice Shield Flood Hazards
Dep~ Temp, Underlayment
Required
25 psf 120 mph B Severe 36 in. Moderate Slight to 11 °F Yes
to Heavy Moderate
Scale: 1/4" = 1'-0"
Drawn by: JJC
Date: 6/25/2010
Condon Eng,neenng, P.C.
1755 Sigsbee Road
Mafliluck, New York 11952
(631) 298-1986 (631) 298-2651 Fax
www.condeneaginee~ing.com
COTTAGE IMPROVEMENTS
Country Route 48
Peconic, New York
EXISTING
CONDITIONS PLAN
S-2
OF