HomeMy WebLinkAboutTR-7280 Michael J.Domino,President QF S0 Town Hall Annex
54375 Route
John M. Bredemeyer III,Vice-President � y�l
� O P.O. Box 11799
Glenn Goldsmith Jxt Southold,New York 11971
A.Nicholas Krupski G Telephone(631) 765-1892
Greg Williams �� Fax(631) 765-6641
Io4UNT`I,��
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
#-1575C Date: MU 29, 2019
THIS CERTIFIES that the replacement of the existing deteriorated and collapsing
foundation and the installation of two (2) 8'x2' deep drywells with the condition that the
existing_structure is not to be demolished and if there is a reason for the structure to have to be
demolished new permits must be applied for prior to demolition;
At Main Road& Sage Road, Southold ,
Suffolk County Tax Map #1000-53-5-12.6
Conforms to the application for a Trustees Permit heretofore filed in this
office Dated March 30, 2010 pursuant to which Trustees Wetland Permit#7280
Dated April 21, 2010,was issued and conforms to all of the
requirements and conditions of the applicable provisions of law. The project
for which this certificate is being issued is for replacement of the existing deteriorated and
collapsing_foundation and the installation of two (2) 8'x2' deep drMells, with the condition that
the existing structure is not to be demolished and if there is a reason for the structure to have to
be demolished new-permits must be applied for prior to demolition.
The certificate is issued to Hernan Michael Otano owner of the
aforesaid property.
0
l
Authorized gignature
5
Michael J.Domino,President ��0f SU(/r�o Town Hall Annex
John M. Bredemeyer III,Vice-President �� l0 54375 Route 25
P.O.Box 1179
Glenn Goldsmith Southold,New York 11971
A.Nicholas KrupskiG Q
� O Telephone(631) 765-1892
Greg Williams O Fax(631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
- J l
DATE OF INSPECTION:
Ch. 275 Ch. 111
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1St day of construction
% constructed
Project complete, compliance inspection.
INSPECTED BY: �. �d d jeyo el ev'-
COMMENTS: f _ to 0 ale//V,-
Ci twc
CERTIFICATE OF COMPLIANCE:
Jill M.Doherty,President �QF so�jy Town Hall Annex
James F.King,Vice-President ,`O l0 54375 Main Road
P.O.Box 1179
Dave Bergen
Southold,New York 11971-0959
Bob Ghosio,Jr. G
John Bredemeyer �� Telephone(631) 765-x.892
��',COU ,� Fax(631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE INSPECTION: Z R l Q
Ch. 275 Ch. 111
INSPECTION SCHEDULE
ZPre-construction, hay bale line/silt boom/silt curtain
1 st day of construction
Y2 constructed
Project complete, compliance inspection.
INSPECTED BY: �
COMMENTS:
C21R /A(0
Wks ,41,'
CERTIFICATE OF COMPLIANCE: o
Jill M. Doherty, President
James F. King, Vice-President
Dave: Bergen
Bob Ghosio, Jr.
John Bre~demcyer
Town Hall, 53095 Main Rd.
P.O. Box I 179
$outhold, NY 11971
Telephone (631) 765-1892
Fax (63 I) 76546641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72
HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT
FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE
CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
1st day of construction
~ constructed
V/ Project complete, compliance inspection.
BOARD OF SOUTHOLD TOWN TRUSTEES
SOUTHOLD, NEW YORK
PERMIT ~O. 7280
DATE: APRIL 21, 2010
ISSUED TO: HERNAN MICHAEL OTANO
PROPERTY ADDRESS: MAIN ROAD & SAGE ROAD~SOUTHOLD
SCTM# 53-5-12.3 & 12.4
AUTHORIZATION
Pursuant to the provisions of Chapter 275 and/or Chapter 1 ! 1 of the TOwn Code of the Town of
Southold and in accordance with the Resolution of the Board 0f Trustees adopted at the meeting held on
April 21, 2010, and in consideration of application fee in the sum of $250.00 paid by Hernan Michael Otano
and subject to the Terms and Conditions as stat~ in the p, es61Ufion the SoUthOld TOwn Board of Trustees
authorizes and permits the following:
Wetland Permit to replace the existing deteriorated ~nd collapsing foundation
and the'installation of two (2) 8'x2' deeP drywells, with the Condition that the existing
structure is not to be demolished and if there is a reason for the structure to have to be
demolished, new permits must be applied for prior to demolition, and as depicted on
the site plan prepared by Condon Engineering, P.C., last dated April 22, 2010, and
stamped approved on May 3, 2010.
IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed,
and thbse presents to be subscribed by a majority of the said Boardas of this date.
TERMS A~D CONDITIONS
The Permittee Heman Michael Otano, r~siding at Main Road & Sage Road, Southold, New
York as part of the consideration for the issuance of the Permit does understand and prescribe
to the following:
That the said Board of Trustees and the Town of Southold are released fxom any and all
damages, or claims for damages, of suits arising directly or indirectly as a result of any
operation performed pursuant to this permit, and the said Permittee will, at his or her own
expense, defend any and all such suits initiated by third parties, and the said Permittee
assumes full liability with respect thereto, to the complete exclusion of the Board of
Trustees of the Town of Southold.
That this Permit is valid for a period of 24 months, which is considered to be the estimated
time required to complete the work involved, but should circumstances warrant, request for
an extension may be made to the Board at a later date.
That this Permit should be retained indefinitely, or as long as the said Permittee wishes to
maintain the structure or project involved, to provide evidence to anyone concerned that
authorization was originally obtained.
That the work involved will be subject to the inspection and approval of the Board or its
agents, and non-compliance with the prOvisions of the originating application may be cause
for revocation of this Permit by resolution of the said Board.
That there will be no unreasonable interference with navigation as a result of the work
herein authorized.
That there shall be no interference with the right of the public to pass and repass along the
beach between high and low water marks.
That if future operations of the Town of Southold require the removal and/or alterations in
the location of the work herein authorized, or if, in the opinion of the Board of Trustees,
the work shall cause unreasonable obstruction to free navigation, the said Permittee will be
required, upon due notice, to remove or alter this work project herein stated without
expenses to the Town of Southold.
That the said Board will be notified by the Permittee of the completion of the work
authorized.
That the permittee will obtain all other permits and consents that may be required
supplemental tO this permit, which may be subject to revoke upon failure to obtain same.
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Bredemeyer
Town HallAnnex
54375MainRoad
P.O. Box 1179
Southold, NewYork 11971-0959
Telephone(631) 765-1892
Fax(631) 765-6641
April 21,2010
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Mr. John J. Condon, P.E.
Condon Engineedng, P.C.
1755 Sigsbee Road
Mattituck, NY 11952
RE:
HERNAN MICHAEL OTANO
MAIN ROAD & SAGE ROAD, SOUTHOLD
SCTM# 53-5-12.3 & 12.4
Dear Mr. Condon:
The Board of Town Trustees took the following action during its regular meeting held on
Wednesday, April 21,2010 regarding the above matter:
WHEREAS, Condon Engineering, P.C. on behalf of HERNAN MICHAEL OTANO
applied to the Southold Town Trustees for a permit under the provisions of Chapter 275
of the Southold Town Code, the Wetland Ordinance of the Town of Southold,
application dated March 30, 2010, and,
WHEREAS, said application was referred to the Southold Town Conservation Advisory
Council and to the Local Waterfront Revitalization Program Coordinator for their findings
and recommendations, and,
WHEREAS, the LWRP Coordinator issued a recommendation that the application be
found Consistent with the Local Waterfront Revitalization Program policy standards,
and,
WHEREAS, a Public Hearing was held by the Town Trustees with respect to said
application on Apdl 21, 2010, at which time all interested persons were given an
opportunity to be heard, and,
WHEREAS, the Board members have personally viewed and are familiar with the
premises in question and the surrounding area, and,
2
WHEREAS, the Board has considered all the testimony and documentation submitted
concerning this application, and,
WHEREAS, the structure complies with the standards set forth in Chapter 275 of the
Southold Town Code,
WHEREAS, the Board has determined that the project as proposed will not affect the
health, safety and general welfare of the people of the town,
NOW THEREFORE BE IT,
RESOLVED, that the Board of Trustees have found the application to be Consistent
with the Local Waterfront Revitalization Program, and,
RESOLVED, that the Board of Trustees approve the application of HERNAN MICHAEL
OTANO to replace the existing deteriorated and collapsing foundation and the
installation of two (2) 8'x2' deep drywells, with the condition that the existing structure is
not to be demolished and if there is a reason for the structure to have to be demolished,
new permits must be applied for prior to demolition, and as depicted on the site plan
prepared by Condon Engineering, P.C., last dated April 22, 2010, and stamped
approved on May 3, 2010.
Permit to construct and complete project will expire two years from the date the permit
is signed. Fees must be paid, if applicable, and permit issued within six months of the
date of this notification.
Inspections are required at a fee of $50.00 per inspection. (See attached schedule.)
Fees:$100.O0
Very truly yours,
President, Board of Trustees
JMD/eac
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghnsio, Jr.
John Bredameyer
Town Hall, 53095 Main Rd.
P.O. Box I 179
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Please be advised that your application dated O/'P~,a f-c~ ,2xO, r>OOIDhas been
reviewed by this Board at the regular meeting df [-J~F,') c2.~. ,-~OIrD and your
application has been approved pending the completion of'the following items checked
off below.
__ Revised Plans for proposed project
__ Pre-Construction Hay Bale Line Inspection Fee ($50.00)
__ 1at Day of Construction ($50.00)
__ ¼ Constructed ($50.00)
V/FinallnspectionFee($50.O0)~C),~oO~)I0
__ Dock Fees ($3.00 per sq. ft.)
Permit fees are now due. Please make check or money order payable to Town of
Southold. The fee is computed below according to the schedule of rates as set forth in
Chapter 275 of the Southold Town Code.
The following fee must be paid within 90 days or re-application fees will be necessary.
You will receive your permit upon completion of the above.
COMPUTATION OF PERMIT FEES:
TOTAL FEES DUE:
BY: Jill M. Doherty, President
Board of Trustees
Chairman
Lauren Standish, Secretary
Town Hall, 53095 Main Rd.
P.O. Box 1179
Southold, NY 11971
Telephone (631) 765-1892
Fax (631 ) 765-6641
Conservation Advisory Council
Town of Southold
At the meeting of the Southold Town Conservation Advisory Council held Wed., April 14,
2010, the following recommendation was made:
HERNAN MICHAEL OTANO to replace the existing deteriorated and collapsing
foundation and installation of six (6) 8'X 2' deep drywells.
Located: Main Rd. & Sage Rd., Southoid. SCTM#53-5-12.3&12.4
The CAC did not make an inspection, therefore no recommendation was made.
Jill M. Doheny. President
James F. King, Vice-President
P.O. Box 1179
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631 ) 765-6641
Southold Town Board of Trustees
Field Inspection/Worksession Report
Date/Time: /'] ' ILl" )0
HERNAN MICHAEL OTANO requests a Wetland Permit to replace the
existing deteriorated and collapsing foundation and installation of six (6)
8'X 2' deep drywells. Located: Main Rd. & Sage Rd., Southold. SCTM#53-5-
12.3&12.4
Typ/e of area to be impacted:
,,Saltwater Wetland Freshwater Wetland Sound p- Bay
Distance of proposed work to edge of wetland
P~cOf Town Code proposed work falls under:
hapt.275 Chapt. 111 other
Type of Application: V/Wetland __Coastal Erosion __Amendment
__Administrative__Emergency Pre-Submission __Violation
Info needed:
Conditions:
Present Were:,~/'J.King /'J.Doherty /J. Bredemeyer /D. Bergen__/
B.Ghosio, D. Dzenkowski ---other
Form filled out in the field/Dy _/
Mailed/Faxed to:
Date:
\
I
/
I
Condon Engineering, P.C.
New York Stat~ Licensed Professional Engineem
1755 Sigsbee Road
Mattituck, New York 11952
631-298-1986
Fax 631-298-265t
condonengineeHng.com
April 22, 2010
Ms. Elizebeth Cantrel, Clerk
Board of Trustees
Town Hall Annex Building
54375 Route 25
Southold, New York 11971
Ms. Cantrel:
Attached please find three revised copies of the plans for the work relative to a foundation
replacement for the Otano cottage on the Breezy Shores property. The changes made include
recalculation of the drainage structure requirements and the number of drainage structures
pursuant to last nights meeting
If you have any questions please call me at 298-1986.
Yours truly,
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cot. Main Rd. & Youngs Ave.)
Southold, NY 11971
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MEMORANDUM
To: Jill Doherty, President
Town of Southold Board of Trustees/2%/
From: Mark Terry, Principal Planner
LWRP Coordinator
Date: April 16, 2010
Re:
Proposed Wetland Permit for HERNAN MICHAEL OTANO
SCTM#1000-53-5-12.3&12.4
Condon Engineering, P.C. on behalf of HERNAN MICHAEL OTANO requests a
Wetland Permit to replace the existing deteriorated and collapsing foundation and
installation of six (6) 8'X 2' deep drywells. Located: Main Rd. & Sage Rd., Southold.
SCTM#53-5-12.3&12.4
The proposed action has been reviewed to Chapter 268, Waterfront Consistency
Review of the Town of Southold Town Code and the Local Waterfront Revitalization
Program (LWRP) Policy Standards. Based upon the information provided on the LWRP
Consistency Assessment Form submitted to this department, as well as the records
available to me, it is my recommendation that the proposed action is CONSISTENT
with the below Policy Standards and therefore is CONSISTENT with the LWRP.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in
preparing its written determination regarding the consistency of the proposed action.
Cc: Lori Hulse, Assistant Town Attorney
Office Use Only
~weaStal Erosion Permit Application
tland Permit Application Adminislrative Permit
Amendmenffl'rans[e~r~}~tension
eceived Application:
eceived Fee:$ e~<~"O ~
./~Completed Application ..T)i Incomplete
SEQRA Classification:
Type 1 Type Il Unlisted__
Coordination:(date sent)
~-~2WRP Consistency Assessment Form
-."C-AC Referral Sent: I~
~.~l~ate of Inspection: q~
~Receipt of CAC Report:
__Lead Agency Determination:
Techn ca Review:
~..P-ablic Hearing Held:
Resolution:
Name of Applicant .~f_~'/'d.O~O
Suffolk County Tax Map Number: lO00-
Prope~y Location:
(provide LILCO ~le ~, distance to cross streets, and location)
AGENT: ~aO
(lf applicable)
Address:
Phone:
of Trustees ApplicatioJ
Land Area (in square feet):
Area Zoning:
GENERAL DATA
Previous use of property:
Intended use of property:
Covenants and Restrictions: Yes No
If "Yes", please provide copy.
Prior permits/approvals for site improvements:
Agency Date
~' No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a governmental agency?
~ No__ Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
B~d of Trustees Application0
COASTAL EROSION APPLICATION DATA
Purposes of proposed activity: i~p/_,.,A~tl/l~',g.~ 01:'
Are wetlands present~,~hin 100 feet of the proposed activity?
No ~t Yes
Does the project invol~,~6xcavation or filling?
No ~e/ Yes
If Yes, how much material will be excavated? ~.~(cubic yards)
How much material will be filled? _'~,~_N--' ~ (cubic yards)
Manner in which material will be removed or deposited:
Describe the nature and extent of the environmental impacts reasonably anticipated resulting
from implementation of the project as proposed. (Use attachments if necessary)
Bid of Trustees Application
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purposeoftheproposedoperations: To ~"pz.A~
Area of wetlands on lot: //o ~'~-'~/~.~aa~-f~
Pement coverage of lot: _/.~0 C:) %
Closest distance between nearest existing structure and upland
edge of wetlands: .~._~,~' feet
Closest distance between nearest proposed structure and upland
edge of wetlands: feet
Does the project involve excavation or filling?
No / Yes
If yes, how much material will be excavated? ~2]~ubic yards
How much material will be filled? ~,~, cubic yards
Depth of which material will be removed or deposited:
Proposed slope throughout the area of operations: (~
Manner in which material will be removed or deposited:
feet
Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by
reason of such proposed operations (use attachments if appropriate):
Apr 05 10 05:07p J3hn Condon 631-298-2651 p,2
]~REEZY SHOR~S COMMUNITY, INC.
SAGE BOULEVARD
GREENPORT~ NEW YORK
AprilS, 201{)
To Whom It May Concert,
The Board of Ditn:raom of Bn~zy Shor~ Community, Inc. favorably supports tho f~m~oa
stabilization and reamvaticm of C. oltage//5 to be undetnakefl by share, holder Hemm~ Otto.
Mr. Otano has retained it~¢ services of John Condon of Condon Engineetin~ Matlituck, N~v
Yo~k to aid in all aspe~ of this pro'jest with the exception of house raising, which will be
performed by Dawn House Movers of Yap~n~ New York,
The l]oard gratefully acknowledges the continued support of the Trustees and Town of Southold
as we strive to maintain our property within this. woad~-q~l community.
$int~ly,
Presldeat, B~'d of Dire~ors
4/5/2010
Apr 05 10 05:07p John Condon 631-298-2651 p.1
Condon Engineering, P.C.
New York State Licensed Prc~msto.~ Engineer
t7~ SigsI~e Road
Maiii;-,ck, Nsw York 11952
Fax Cover Sheet
John 3. Condo~, P.E.
TIM~_:
PHONE:
PHONE:
Numb~'o~l~a~ includi~3 coversheet= ~
63¶-29B-1986
F'ax 631..298.,265t
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Bredemeyer
Town Hall, 53095 Main Rd.
P.O. Box I 179
Southold, NY 11971
Telephone (63 I) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
BOARD OF TRUSTEES: TOWN OF SOUTHOLD
In the Matter of the Application of
HERNAN MICHAEL OTANO
COUNTY OF SUFFOLK)
STATE OF NEW YORK)
AFFIDAVIT OF POSTING
I, ~"'~],~) ~ ~~residingat/dba~~~d~~
being duly sworn, depose and say:
That on the ~ day of ~/~ ,2010, I personally posted the property known as
by placing the Board of Tmste~'s official poster where it can easily be seen, and that I have checked
to be sure the poster has remained in place for eight days prior to the date of the public hearing.
Date of hearing noted thereon to be held Wed.~ April 21~ 2010 on or about 6:00 PM.
Dated:
Sworn to before me this
day of/~0rl ['2~0~ ~ to
BARBARA H. TANDY
Notary Public. Stata Of Ney/Yof~
No. 01TA6086001
Qualified In Suffolk Cou~ly
CommlsslOrl Expires 01113/20 II ,
Board of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
(print owner of property) (mailing address)
do hereby authorize
(Agent)
to apply for permit(s) from the
Southold Board of Town Trustees on my behalfi
r's signature)
Board of Trustees Application
County of Suffolk
State of New York
~,4'~AJAI~ /]4/~M~"Z. ~ffffl9 BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HEL~E 1S THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT AL[, STATEMENTS CONTAINED HERE1N ARE
TRUE TO THE BEST OF HIS/~I~R KNOWLEDGE AND BELIEF, AND THAT ALL WORK
WILL BE DONE iN THE MANNER SET FORTH IN TillS APPLICATION AND AS MAY
BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICAN]7
AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES
HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS
APPLICATION, 1 HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR
REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE
PREMISES IN CONJUNCTION WITH REV_fEW OF THIS APPLICATION.
Signature
SWORN TO BEFORE ME TillS
DAY OF //~/fl~w_~_ 20 r/~)
APPLICANT/AGENT/REPRESENTATIVE
TRANSACTIONAL DISCLOSURE FORM
The Town of S0gthold'$ C9d¢ of Ethics prohibits conflicts of interest on the uart of town officers and emalovees. The pttrpose of
this form is to provide information which On alert the town of oossible conflicts of interest and allow it to take whatever action is
necessary to avoid same.
(Last name, first name, middle initial, ~e~s you are applying in thc name of
someone else or other entity, such ms a company. If so, indicate the other
person's or company's name.)
NAME OF APPLICATION: (Check all that apply.)
Tax grievance Building J
Variance Trustee
Cba~ge of Zone Coastal Erosion
Approval of plat Mooring
Exemption from plat or official map Planning
Other
(If"Other", name the activity.)
Do you personally (or through your company, spouse, sibling, parent, or child) have a relationship with any officer or employee
oftba Town of Southold? "Relationship" includes by blood, manfage, or business interest. "Business interest" means a business,
including a partnership, in which the town officer or employee h~s even a partial ownership of(or employment by) a corporation
in winch the town officer or employee owns more than 5% oftba shares.
YES __ __ NO ~
If you answered "YES", complete the balance of this form and date and sign where indicate&
Name of person employed by the Town of Southold
Title or position of that person
Describe thc relationship between yourself(the applicant/ageat/representative) and the town officer or employee. Either check
the appropriate line A) through D) and/or describe in the space provided.
ltte town officer or employee or his or her spouse, sibling, p~rent, or child is (check all that apply):
A) the owner o[~greater than 5% oflhe ,~hares of the corporate stock of the applicant
(when the applicant is a corporation);
B) the legal or beneficial owner of any interest in a non-corporate entity (when the
applicant is not a corporation);
C) an officer, director, partner, or employee of the applicant; or
D) the actual applicant.
DESCRIPTION OF RELATIONSI
Form TS 1
Submitted this
Signature
Print Name
PROJECT ID NUMBER
PART 1 - PROJECT INFORMATION
1. APPLICANT / SPONSOR
3.PROJECT LOCATION:
PRECISE LOCATION: Street Addess and Road IntorseclJons. Prominent landrm~rks etc -or provide mm)
617.20 SEQR
APPENDIX C
STATE ENVIRONMENTAL QUALITY REVIEW
SHORT ENVIRONMENTAL ASSESSMENT FORM
for UNLISTED ACllONS Only
( To be completed by Applicant or Project Sponsor)
6. DESCRIBE PROJECT BRIEFLY:
~7. AMOUNT OF LAND AFFECTED:
IniUally m O1~ acres Ultimately ~. 0 i ~ acres
8. WILL PROPOSED ACTION COMPLY WITH EXIST,NG ZONING OR OTHER RESTRICTfONS?
9. WHAT tS PRESENT LAND USE tN VICINITY OF PROJECT? (Cttoona as many as apply.)
[~ OUter (dnac~be)
10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER C-OYERNMENTAL
AGENCY (Federal, State or Local)
,~Yes I---I No If yes, list agency name and perfrlil / approval:
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
---'lYes ~;:::~No If yes, list agency nan~ and permit / approval:
I~:~SesA ~T OF PROPOSED ACTION WiLL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION?
I CERTIFY THAT THE iNFORMATION PROVIDED ABOVE IS 'I~UE TO THE BEST OF MY KNOWLEDGE
Signature ~
~-...~te the Coastal Assessment Form before proceeding with this assessment
PART II - IMPACT ASSESSMENT (To be completed b~ Lead A~lenc~/).
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.47 ff yes. coordlnafa the mvlsw process and use the FULL EAF.
I::] ~. [].o
B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.67 If No, s nega6ve
de~laraG~o~ may be enpor;eded by snothor Involved agency.
C. (~OULD ACTION RE~JLT IN ANY ADVERSE EFFECTS ASSOCIATED WITH 11~ FOLLOWING: (Answors may be ham~dlfan, If legible)
C3. ;'~a~[a~k~, or fauna, fish, ~; ,~;;,',~h or .;~;;,'~ ~,, ~,~,,~r~.~.i habitats, or Ihmatenad or endangered ~? F"~ ~!'~ briefly:
C4. A 'u-,,-,-..'nlty's ~;~;.~ Ptsns ~' goals as o,T~r~y ~, or a cha~ge in use ~ ~ ~ uN ~ ~ or ~ ~ ~,~? ~ ~: I
I"°
C5. Growth, s~ba~4uent de~,~.i~i~, or related ack, es likely to be I~at,,'e~_ _ by lhe pmrr~'.~_ _ soften? r=v~.,j~l bltefly:
C6. Long fa~m, shorttmm, cumulaave, or other effects ent idenflfied in Cl.CS? Exp~alnbdetly:
'
D. WIbL I~IE PROJECT NAVE AN IMPACT ON I~IE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABUSHMENT OF ^ CRITICAL
ENVIRONMENTAL AREA (CEA)? (If yes, explain bdefl~:
fi. 18 T;{ERF.. OR ~$ 'FH~ LILLY 10 I~ CON'TRO'~t$¥ R~LATE~ TO'po~ .'~q~l~qfi E~I~,~I~',~',%'IAL M~AClS~ ff ~
PART Ill - Dr: a =t~MINA~I'ION OF SIGNIFICANCE (1'o be completed by AgancT)
IN~'IRUCTION$: Foreach adverse effect identified above, determine whether it ls substanUal, large, importentor othen,dse signifiCanL Each
eftrect should be assessed in connection with its (a) setting (i.e. Urban or rural); Co) probeblllty of occurring; (¢) duration: (d) Ineversibllity; (e)
geographi~ scope; and (t) magnitude, ff necessary, add attachments or reteren~e supporting materials. Ensure that explanations cor~ain
eufficlent detail ~o show that all relsveflt adverse impacts have been identified and adequately addmsuad. Ifquestk)n d of part llwas checked
yes, the,determination of significance must evaluate the potential impact oftha prolx~ anion on the emaronme~al chamcte~ of the CEA
Board of Trustees
Name of Lead Agency
gency
Check fids bex If you have k:km~"~ed one or mom pofef~aNylsrge or significant advorse impa<~fa which MAy ooour. Tben ixommd dimclly to tbe FUU
FAF and/or prepare a positive declsra~)e.
WILL NOT result In any significant adverse environmental Impacts AND prm/Me, on attachfftor~ ss na(=essary, the masorts suppmtlng tl~
Date
President
Title of Responsible Officer
Signature of Preparer (If dlfformd from responsible officer)
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's
website (southoldtown.northfork.net), the Board of Trustees Offiee, the Planning Department, all
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
The Application has been submitted to (check appropriate response):
TownBoard [-~ Planning Dept. [-~ Building Dept. [] BoardofTrustees
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital []
conslxuction, planning activity, agency regulation, land transaction) []
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action:
Location of action:
Site acreage:
Present land use:
Present zoning classification:
If ~ application for the pro~sed action h~ ~en filed wi~ tbe To~ of Sou~old agency, ~e following
info~ation shall be provide:
(a) N~e ofapplic~t: ~~ ~t ~ ~0
(b) Mailing address: ff/~ ~ /~ ~,~ ~/~0~
(c) Telephone number: AreaCode?l? ~/o -' Z°)~7
(d) Application number, if any:.
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes~ No~ If yes, which state or federal agency? ,~--~ ~7'C~ /f~.~
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation
criteria.
'~Yes [] No [] Not Applicable
~3~/_~ ?/zo.~[O- ~-~-r~
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Policies Pages 3 through 6 for evaluation criteria
~_, Yes [] No [] Not Applicable
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. Sec
LWRP Section III - Policies Pages 6 through 7 for evaluation criteria
~ Yes [] No [] Not Applicable
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III - Policies Pages 8 through 16 for evaluation criteria
~ Yes [] No [] Not Applicable
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section IH
- Policies Pages 16 through 21 for evaluation criteria
~[ Yes [] No ~ Not Applicable
Attach additional sheets if necessary
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria.
~ Yes ~ No [] Not Applicable
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southoid. See LWRP Section III - Policies
Pages 32 through 34 for evaluation criteria.
.'~ Yes [-~ No [] Not Applicable
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. Sec LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria.
RYes ~-~ No ~-~ Not Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. Sec LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria.
~ Yea[--] No[-~ Not Applicable
Attach additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria.
~es ~ No ~ Not Applicable
Attach additional sheets if necessary
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria.
~es [] No [] Not Applicable
Attach additional sheets if necessa~
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages
62 through 65 for evaluation criteria.
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energ3, and mineral resources. See LWRP
Section III - Policies; Pages 65 through 68 for evaluation criteria.
_1~ Yes [] No [] Not Applicable
Created on 5/25/05 11.'20 AM
Condon Engineering, P.C.
New York State Licensed Professional Engineers
755 Sigsbee Road
Mattituck, New York 11952
condonengineering.com
631-298-1986
Fax 631-298-2651
March 29, 2010
Ms. Elizebeth Cantrel, Clerk
Board of Trustees
Town Hall Annex Building
54375 Route 25
Southold, New York 11971
Ms. Cantrel:
Attached please find the following documents relative to a foundation replacement for the Otano
cottage on the Breezy Shores property:
· (3) sets of the Trustee Application, short EAF, LWRP, and Transactional Disclosure
Form.
· (3) sets of pictures of the site and building
· (3) sets of the site plans for the work
· (3) sets of the survey of the property showing contours and elevations
· A check for $250.00 application fee
The applicant proposes to replace the collapsing brick foundation below the existing building with
a poured concrete pier foundation.
If you have any questions please call me at 298-1986.
Yours truly,
'1
10"
Footing
2 2
10"
Footing
I ~,~ I
I
2½'x2½'x
10"
Footing
I
L__
xO
10" Footing
2 2
2½'X2~2'x
L 2
3'-3"x3'-3"x
1 O" Footing
2½'x2½'x_
10" Footing
2:2'x2½'x
10" Footing ~
2 ~'x22~'x
~/-10" Footing
2½'x2~'x
~[~ 10" Footing
ACQ -~
I I
3'-3" x 3'-3" x S'-S" x 3'-3" x ~ ~
_ _ fo" Ecogng ~ _ ~ 10" Ecoting ~, ~,
F I 22X22X
I 10" Footing
I 'T' 5 b5 x 9.5 Level 3~ ~ I L --
L _ J_ __ ~olman,zed p~r~l~m -- __ /
/
/
2 x2 x xO
I 2~'x2~'x ~ 10" Footing 'x2~'x
r---I--/'~/'-1 °" F°°ting r~7 r-I 10" Footing
L-----J 7.5 x 7.5 L__J ·
I ACQ I
I I
7.5 x 7.5 L----J L--I-~J
ACQ
~ , 10" Footing
2½'x2~2'x
10"
Foohng
Foundation and Floor Framing Support Details - Plan View
SCALE: 1/4"=1'
Foundation Notes:
The contractor ia to verify all measurements in the field and
any discrepancies are to be brought to the Engineer prior to
construction.
1 - All concrete 3,500 psi after 2fi days minimum.
2 - All rebar ASTM A-615 Grade 60.
3 - Footings am to be installed on undisturbed virgin soil.
The bottoms of all footings are to be installed a minimum of
3' below grade unless indicated sthenvise.
4 - Backfill around footings and pier is to be clean material
and is to be mechanically compacted in 6" lifts to 95% of
maximum dry density.
5 - The areas below the building are to be filled with clean
soil to grade level.
Framing Notes:
The contractor is to verify all measurements in the geld and
any discrepancies are to be brought to the attention of the
Engineer prior to construction.
1 - The 7 ½ by 7 -~ beams are to be ACQ No. 2 Southern
Yellow Pine.
2 - The 5.5 x 9.5 beams are to be Level 3 Wolmanized
parallam by iLevel Trus Joist.
3 - All straps, connectom, bolts, nails, etc. are to be
galvanized, ZMax coated or stainless steel. Designated
connectors, strap etc. on these drawings are made by
Simpson unless indicated othenvise. All connectors, straps
etc. are to be nailed/bolted in accordance with the
manufacturer's specifications.
Roof Drainage Calculations
Roof Area = 793 sf
2" Rainfall Event Volume = lZ2 x 793 = 132.17 cf
8'~ x 2' Deep Dr/well Pool Volume = 3.14 x 4'x4'x2' = 100.5 cf
Number of Pools Required = 132.17/100.5 = 1.3
Number of Pools Proposed -- 2
Design Loads:
- Roof-Live Load - 30 psf
Based on ASCE-7 and Pg = 20 psf
- Dead Load - 15 psf
- Attic Floor - Live Load - 20 psf
- Dead Load - 15 psf
- 1st Ftaor - Live Load - 40 psf
- Dead Load - 15 psf
Floor Elev.
Existing Floor Elev. 6.18'-- --
Base Flood Elev. 6'
Existing Grade Elev. 4.2'
Northern Elevation
SCALE: 1/4"=1'
Simpson H2.5 ZMax
les All FJ to All
Existing 2x6 fJ ~
5.25 x 9.5 Level 3
Wolmanized Parallam
18" ~ Sonotube Piem ~
No. 5 Rebar--~ ~1
2, x 2, x: 10. Footing.~'~ J
~- Simpson LOB66 for LVL
Beams and LCB88 for 7 2: x 7
~ Beams All are to be ZMax
Peitmeter Beam
Wood Blocking at Piers
~- 18" ~ Sonotube Piers
--No. 5 Rebar
~2' x 2' x 10" Footing
Foundation and Pier Section Detail
Scope of Work
* Secure the services of a surveyor to vedfy the existing
elevation of the grade around the buikfing and the first floor
of the building. Adjust the elevations shown on the drawing
as necessary to assure that the top of the finished floor is 2
feet above the Base Floor Elevation at the conclusion of the
*Install erosion control systems as shown in the plan.
* Pump standing water from areas below the building into
the dry wells.
* Install (2) 8' x 2' deep precast concrete dry wells in area of
lot shown in the site drawing on this page. Excavated soil is
to be mixed with clean sand and used to backfill area under
buildilng
*Install temporary shoring under existing building. The
buildilng is to be raised to an elevation at least I foot above
the filnal elevation to facilitate instaitation of the foundation
system.
* Remove existing bdck foundation and other debds from
areas below the building. All materia~ is to be removed from
the slite and properly disposed.
* Ex~*avate soil as necessary to install new poured concrete
footings and piers. Excavated soil is to retained below the
buildiing as much as possible.
* Inst~all new floor beams as shown in the plans.
EROSION CONTROL MEASURES
1. IN ACCORDANCE WITH THE PROVISIONS OF THE USEPA GENERAL PERMIT AND
THE NYSDEC, DURING THE COURSE OF CONSTRUCTION, CERTAIN EROSION AND
SEDIMENT CONTROL MEASURES MAY BECOME NECESSARY TO PREVENT THE
TRANSPORT OF SEDIMENT TO OFF-SITE AREAS, PONDS, WATER COURSES, DRAINAGE
INLETS, RECHARGE BASINS, ETC. ACTUAL EROSION CONTROL MEASURES WILL BE
DICTATED BY FIELD CONDITIONS AS CONSTRUCTION PROGRESSES, BUT THE
FOLLOWING GENERAL CONDITIONS SHALL BE OBSERVED:
EXISTING VEGETATION TO REMAIN SHALL BE PROTECTED AND REMAIN
UNDISTURBED.
CLEARING AND GRADING SHALL SE SCHEDULED SO AS TO MINIMIZE THE SIZE
OF EXPOSED AREAS AND THE LENGTH OF TIME THAT AREAS ARE EXPOSED.
THE LENGTH AND STEEPNESS OF CLEARED SLOPES SHALL BE MINIMIZED TO
REDUCE RUNOFF VELOCITIES.
- SEDIMENT SHALL SE RETAINED ON THE SITE,
* Set: existing stmcfure down onto new floor framing system
and ~secum all floor existing joists to the beams as indicated
in the drawing.
* Backfill the areas below the building to the existing grade
elevafion with clean sand mixed with soil excavated for the
dry wells and any matedal excavated in order to install the
footings.
* Install aluminum gutters and leaders along the front and
rear fcof edges. Install 3"0 drainage pipes underground
from the front and rear northern comers of the building to
the dry wells.
Regrade excavated areas and around building and plant
grass seed.
SCALE: 1/2"=1'
SPECIFIC METHODS AND MATERIALS EMPLOYED IN THE INSTALLATION AND
MAINTENANCE OF EROSION CONTROL MEASURES SHALL CONFORM TO THE "NEW
YORK GUIDELINES FOR EROSION AND SEDIMENT CONTROL".
2. SEDIMENT BARRIERS (SILT FENCE, HAY BALES OR APPROVED EQUAL) SHALL
BE INSTALLED AS REQUIRED ALONG THE LIMITS OF DISTURBANCE FOR THE DURATION
OF THE WORK. NO SEDIMENT FROM THE SITE SHALL BE PERMITTED TO WASH ONTO
ADJACENT PROPERTIES, WETLANDS OR ROADS.
3. GRADED AND STRIPPED AREAS AND STOCKPILES SMALL BE KEPT STABILIZED
THROUGH THE USE OF TEMPORARY SEEDING AS REQUIRED. SEED MIXTURES SHALL
BE IN ACCORDANCE WITH SOIL CONSERVATION SERVICE RECOMMENDATIONS.
4. DRAINAGE INLETS INSTALLED AS PART OF THE PROJECT SHALL BE PROTECTED
FROM SEDIMENT BUILDUP THROUGH THE USE OF SEDIMENT BARRIERS, SEDIMENT
TRAPS, ETC. AS REQUIRED.
5. INSPECTION AND MAINTENANCE OF EROSION CONTROL MEASURES IS TO BE
PERFORMED DAILY BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION
FOR THE DAY AND AFTER HEAVY OR PROLONGED STORMS, MAINTENANCE
MEASURES INCLUDE, BUT ARE NOT LIMITED TO, CLEANING AND/OR REPAIR OF
SEDIMENT BASINS OR TRAPS, SEDIMENT BARRIERS, BERMS, DIVERSIONS AND INLET
PROTECTION.
6. APPROPRIATE MEANS SHALL BE USED TO CONTROL DUST DURING
CONSTRUCTION.
7. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT
SOIL AND LOOSE DEBRIS FROM BEING TRACKED ONTO LOCAL ROADS. THE
CONSTRUCTION ENTRANCE SHALL BE MAINTAINED UNTIL THE SITE iS PERMANENTLY
STABILIZED.
8. SEDIMENT BARRIERS AND OTHER EROSION CONTROL MEASURES SHALL
REMAIN IN PLACE UNTIL UPLAND DISTURBED AREAS ARE PERMANENTLY STABILIZED.
AFTER PERMANENT STABILIZATION, PAVED AREAS SHALL BE CLEANED AND THE
DRAINAGE SYSTEM CLEANED AND FLUSHED AS NECESSARY.
? I
/
Otano Residence
Scale: 1/4" = 1'-0"
Drawn by: JJC
Date: 4-22-2010
STRAW BALE INLET PROTECTION DETAIL
NOTES:
1. BALES SHALL BE PLACED AT THE TOE OF A SLOPE OR ON THE CONTOUR
AND IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES
AND PLACED SO THE BINDINGS ARE HORIZONTAL.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER TWO STAKES
OR RE-BARS DRIVEN THROUGH THE BALE. THE FIRST STAKE IN EACH
BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE
TO FORCE THE BALES TOGETHER STAKES SHALL BE DRIVEN FLUSH
WITH THE BALE.
4. INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE
MADE PROMPTLY AS NEEDED.
5. BALES SHALL SE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS
SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE.
BOUND STRAW BALES
FLOW~
TWO REBARS, STEEL PICKETS,
OR 2"x2" STAKES DRIVEN ' ~'~'~'~/~'~~4"VERTICAL
2',NTO GROUND. FACE
STAKE DRIVEN AT ANGLE BEDDING DETAIL
TOWARDS PREVIOUSLY LAID
STRAW SALE. DRIVE STAKES
FLUSH WITH TOP OF BALE
ANGLE FIRST STAKE TOWARD
PREVIOUSLY
Flow
ANCHORING DETAIL
HA Y BALE&.,,,.
F~OW
2X2 WOOD
STAKES
(TYP.)
(SEE
BEDDING
DETAIL)
INLET
STRAW BALE DIKE DETAIL
APPROVED BY
BOARD OF TRUSTEES
TOWN OF SOUTHOLD
4-22-2010 Revision - Drywells
2-20-2010 Initial Dwg
Condon Engineenng, P.C.
1755 Sigsbee Road
Mattituck, New York 11952
(631) 298-1986
Otano Residence
Unit #5
Breezy Shores
Sage Blvd.
Southold, New Yonk
S-1
L. K.B. # 4022, 4,JS4
now
dames/:>os
~OpOsed SUbdivision
~Cres
X
X
6.5
Z.8
9,0
X
L
XS.0
2.1
X
S,O
X
z.e
x
2.5
x
IL6
X
X
X
X6.5
zex
5.9
X
8.2
X
e,o'~ ,~ 5e\~o
7.0 X
X
II
Rose
P
r/
9.9
X
X
X
6,9
X
6.6
X
7.1
X
//
SOUTHOL D
KID 0 I00 200 300
SCALE=I"=/O0'
CONTOUR INTERVAL: 2'
X
7,0
X
67
X
\ 7.0
BAY
SITE DATA
I. AREA OF ISLAND
2. AREA
'5. AREA OF MAIN PARCEL
4. TOTAL AREA: 83.1 IT ACRES
5. TOTAL NO. OF LOTS =
6. TOTAL LENGTH OF ROAD =
8.4
X
8.5
X
GENERAL NOTES=
LEGEND
SAND
3.0
X
PAVED ROAD
UNPAVED ROAD
TRAILS
BUILDING
WOODED AREA
INDIVIDUAL TREE
WATERLINE
CULVERT
MARSH
FENCE
LIGHT POLE
UTIL) TY POLE
POLE
MANHOLE
RETAiNG WALL
BULKHEAD
PIER OR DOCK
RAILROAD TRACKS
CONTOURS
SPOT ELEVATION
WATER ELEVATION
I 'm
X
OMH
V V V
--*20
AreO= L ,566
X 3.8
SUBI ;ION SKETCH PLAN
PREPARED FOR
HARBORVIEW LANDI
AT GREENPORT
TOWN
SUFFOLK
OF SOUTHOLD
COUNTY, N.Y.
LOCKWOOD, KESSLER & BARTLETT, INC,
89- 0155
__ now or formerly
John H. Mulhoilond
MAR 3 0 2010
OSTRANDE:R AVE., RIVERHE~ N.Y.