HomeMy WebLinkAbout07/2010Department of Public Works
Monthly Report
Date: July 2010
??
On going trail maintenance on Laurel Lake, Downs Farm,
Arshamomaque, Arshamomaque Pond, Dam Pond and Mill Road
Preserves.
??
Coordinating the demolition of Southold Scavenger Waste Plant with
LK McLean Associates (Authorization to bid, bid package &
contractor’s site visit).
??
Removed a tree across the ROW at the Blocker Preserve.
??
Set up for two lacrosse camps and the “Greenfest” at the Strawberry
Fields Fairgrounds.
??
Cleaned up debris and mowed lawn at 4100 Young’s Road, Southold,
as per Town Board Resolution.
??
Meeting with Construction Consultants, in reference to the
renovations of the Peconic Community Center.
??
Preparing Subrecipient Agreements, with Not-for-Profit agencies, as
part of the 2010 Community Development Block Grant Program,
with Philip Beltz.
??
Proposed improvements to end of King Street, Orient were done by a
contractor doing work on a waterfront home and needing access
from the end of King Street. We have all of the permits, on file, if
work is needed on this road end, in the future.
??
Attended a meeting with the Army Corps of Engineers on potential
dredge spoil sites, in the Town of Southold.
??
Attended several meetings with representatives of FEMA in
reference to the March storm and damage to the Police Department.
??
Met with the contractor, in reference to the installation of the fencing
of the Impound Area at the Police Department.
??
Attended a pre-construction meeting and site mark out, in reference
to the basketball court at Cochran Park.
??
Prepared an RFP for the installation of carpet/tile at the Southold
Town Highway Department.
??
Prepared a RFP to install an epoxy floor at the Southold Police
Department to replace the carpet that was damaged and removed, as
a result of the March storm.
??
Installed a new gas 80 gallon hot water tank at the Human Resource
Center, in-house, with certification by a licensed plumber, for a
savings of several thousand dollars.
??
Prepared an RFP for repairs to the HVAC system in the vault and
awarded the bid to Kolb Mechanical, Mattituck.
??
Work on the 2011 Town Budget.
??
Prepared an RFP for repairs to the gazebo in Silversmith Corners,
Southold and awarded the bid to Boger Construction, Southold.
This project was funded by a gift from Charles Reichert, owner of
the Southold IGA.
??
The resurfacing and lining of the Roller Hockey Rink at Cochran
Park has been completed by JB Asphalt Sealcoating.
??
The concrete slabs have been poured for the Pine Neck Boat Ramp,
with the apron being poured in August.
??
Trimmed the path from the school to the Community Center on
Fishers Island. Wood chips will be spread out along the path this fall
to cover roots and rock, making the walkway safer. Additional work
was also done on the exercise trail.
??
Replaced the concrete shade shelter, which is used by the Beach
Attendant at Norman Klipp Park, with a wooded structure. This
shade shelter was destroyed by a vehicle in 2009