HomeMy WebLinkAbout03/2010Department of Public Works
Monthly Report
Date: March 2010
??
On going trail maintenance on Laurel Lake, Downs Farm,
Arshamomaque, Arshamomaque Pond, Dam Pond and Mill Road
Preserves.
??
Installed a vehicle vacuum unit at the Police Department to clean the
interior of cars/trucks.
??
Pumping water and clean up at the Southold Police Department as a
result of the basement being flooded. DPW staff was pumping 24/7
from 3/30 to 4/4/2010.
??
Installed RPZ units at the Highway Department and the Recreation
Center, as per the SC Health Department.
??
Monitoring work at the Bittner Preserve. Sand has eroded from the
area in back of the old bulkhead and moved into the littoral zone.
??
Clean up after the March 13th storm at beaches, parks, road ends
and boat ramps.
??
Working on the restoration of Bay Avenue, East Marion that was
th
damaged in the March 13 storm. (Boardwalk was torn free and
later recovered by the Bay Constables several hundred yards down
the beach. Some of the rip rap at the road end was washed away).
??
Goldsmith Inlet had significant erosion along the area adjoining the
parking lot.
??
Working on the proposed demolition of the Southold Scavenger
Waste Plant.
??
Set up for the US Census at Downs Farm and the Annex
??
Attended a meeting of the Southold Town Recreation Committee.
??
Attended a meeting in reference to the MS4 Stormwater Program.
??
Meetings with Jamie Richter in reference to preparing applications
for permits for several proposed projects.
??
At McCabe’s Beach the beach grass planting by the Kenny’s &
McCabe’s Beach Association has been completed on dunes created
by DPW.
??
Installed steps at Horton’s Point that were damaged by the 3/13/10
storm.
??
Submitted a DPW “Stewardship Work Plan for 2010”.
??
Working on the “Punch List” at the Animal Shelter, with Jamie
Richter and contractors.