HomeMy WebLinkAbout1000-35.-6-30OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
Main Rd. & Youngs Ave.
Southold, NY 11971
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
Jim King, President
Town of Southold Board of Trustees
From: Mark Terry, LWRP Coordinator
Scott A. Hilary, LWRP Coordinator
Date: February 10, 2009
Chapter 268, WATERFRONT CONSISTENCY REVIEW
Coastal Erosion Permit for CLEAVES POINT PROPERTY OWNERS ASSOC.
SCTM#35-6-30
Proper-T Permit Services on behalf of CLEAVES POINT PROPERTY OWNERS ASSOC. requests a Coastal Erosion
Permit to re-sheath sections, totaling up to +/-32 If. maximum, of the landward side of the existing bulkhead using vinyl
T&G plank sheathing with filter fabric liner, and backfill with +/-20 cy. of clean sand from an upland source. Located:
345 Osprey Nest Rd., Greenport. SCTM#35-6-30
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town
Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided
on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to us, it is our
recommendation that the proposed action is CONSISTENT with LWRP policy standards and therefore is
CONSISTENT with the LWRP.
NOTE: LWRP Coordinator, Mark Terry completed review on March 17, 2008 (see attached copy of
completed review).
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written
determination regarding the consistency of the proposed action.
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
F~x~ 631 765-3136
LOCAL WATERFRONT REVITALTZATION PROGRAM COORDINATOR
TOWN OF SOUTHOLD
MEMORANDUM
To: James King, President
Town of Sonthold Board of Trustees//
From: Mark Terry, Principal Planner x.~
LWRP Coordinator
Date: March 17,2008
Re:
Request for Wetland Permit for Cleaves Property Owners Association
SCTM# 35-6-30
CLEAVES POINT POA requests a Wetland Permit to resheath sections, totaling up to 32+/-
linear fi. maximum, of the landward side of existing bulkhead using vinyl, T&G plank sheathing
with filter fabric liner, and backfill with 20+/- cy. of clean sand from an upland source. Located:
345 Osprey Nest Rd., Greenport. SCTM#35-6-30
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the
Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy
Standards. Based upon the information provided on the LWRP Consistency Assessment Form
submitted to this department, as well as the records available to me, it is my recommendation
that the proposed action is CONSISTENT with the Policy Standards and therefore is
CONSISTENT with the LWRP. It is recommended that the following be applied to further the
below listed policies.
Policy 5. Protect and improve water quality and supply in the Town of Southold.
1. Minimize the use ofchromated copper arsenate (CCA) treated wood in the construction of the
structure pursuant to § 275-11. B,1 (f) Construction and operation standards below.
In order to prevent the release of metals and other contaminants into the wetlands
and waters of Southold, the use of lumber treated with chromated copper arsenate (also
known as "CCA "), creosote, penta products or homemade wood preservatives is
prohibited for use in sheathing and decking. Preservatives of any type, including but not
limited to those listed above cannot be applied to any bulkheads, retaining walls or
revetments after installation. Encapsulated t~ilings or native nonchemically treated
(untreated) lumber only should be used in sensitive areas.
2. Require the installation of a silt boom (where feasible) pursuant to § 275-11. (2) Construction
and operation standards below.
2) Erosion control. Installation of an erosion control structure is necessary during
any building, grading, landscaping or site work activity within Trustee jurisdiction. This
structure may include, but is not limited to, installation of a silt fence, hay bales, wood
chip berm and silt booms. The placement of the erosion control structure(s) shall be
determined by the Trustees or their designee. All intertidal construction and excavation
requires the installation of a silt boom that will retain all suspended sediments within the
immediate project area.
In addition to further Policies 5, Protect and improve water quality in the Town of Southold and
6.3 Protect and restore tidal and freshwater wetlands, item D (below). It is recommended that a
non-turf buffer be required landward of the bulkhead.
Provide adequate buffers between wetlands and adjacent or nearby uses and activities in
order to ensure protection of the wetland's character, quality, values, and functions.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing
its written determination regarding the consistency of the proposed action.