HomeMy WebLinkAboutTR-7055Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Brederaeyer
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 0598C
Date: November 5~ 2010
THIS CERTIFIES that the removal existing storage tank and install new above ground
storage tank with containment dike; install gutters to leaders to drywells to contain roof runoff
fi.om draining into creek; install new 21+/- ft. bulkhead behind existing bulkhead
At 6775 New Suffolk Road, New Suffolk, New York
Suffolk County Tax Map # 117-5-29. l
Conforms to the application for a Trustees Permit heretofore filed in this office
Dated 3/3/09 pursuant to which Trustees Wetland Permit #7055 Dated 4/22/09 was issued
and conforms to all of the requirements and conditions of the applicable provisions of law.
The project for which this certificate is being issued is for the removal existing storage tank
and install new above ground storage tank with containment dike; install gutters to leaders to
drywells to contain roof runoff fi.om drainine into creek; install new 21+/- i~. bulkhead behind
existing bulkhead
The certificate is issued to NEW SUFFOLK SHIPYARD, LLC owner of the
aforesaid property.
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Bredemeyer
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION:
/" Ch. 275
Ch. 111
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1st day of construction
~ constructed
Project complete, compliance inspection.
INSPECTED BY:
COMMENTS:
CERTIFICATE OF COMPLIANCE:
DEPARTMENT OF HEALTH SERVICES
COUNTY OF SUFFOLK
STEVE LEVY
SUFFOLK COUNTY EXECUTIVE
HUMAYUN J. CHAUDHRY, DO, MS
Commissioner
BUREAU OF ENVIRONMENTAL ENGINEERING
APPROVAL NOTICE
Hing Point Engineering
410 Jericho Turnpike, Suite 105
Jericho, NY 11753
Attn.: Chris M. Tartaglia
Re: SCDHS Job No. .'
SCDHS Fac. ID. No.:
SCDHS File Ref. No.:
Dear Mr. Tartaglia,
May 7, 2009
HM08-193R1
10-0048
13676
Your application for a permit to construct a project at New Suffolk Marina 6775 New Suffolk
Road, New Suffolk, NY 11956 has been reviewed for compliance with Paticle 12 of the Suffolk
County Sanitary Code. The application has been approved.
Enclosed you will find the Permit to Construct. This permit has to be posted at the construction
site during the construction.
If you have any questions regarding the review process or need assistance, feel free to contact
this office at (631) 854-2388.
Very truly yours,
Chris Wong
Assistant Public Health Engineer
Bureau of Environmental Engineering
Division of Environmental Quality - Office of Pollution Control - 15 Horseblock Place - Farmingville, NY 11738-1220
Phone (631) 854-2388 Fax (631) 854-2505
PERMIT TO CONSTRUCT
Toxic and/or Hazardous Material Storage Facility
Suffolk County Department of Health Services
Humayun J. Chaudhry, DO, MS Commissioner
SCHDS REFERENCE g 13676
SCHDS REGISTRATION g 10-0048
SCHDS PLAN # HM08-193RI
Date of Issuance: May 7, 2009
Permit Expiration Date: May 7, 2010
FACILITY NAME & ADDRESS:
New Suffolk Marina
6775 New Suffolk Road
New Suffolk, NY 11956
Your Application for Permit to Construct a Toxic or Hazardous Material Storage Facilities for the above
referenced site has been reviewed for compliance with Articles 7 & 12 of the Suffolk County Sanitary Code.
The application has been approved. The items listed below and on the back of this Permit are conditions of this
Permit and have to be observed during construction:
A copy of the approved plan must be kept at the construction site. A copy of this permit must be kept
on display at the facility during construction.
Safe construction practices must be followed during the installation of the storage facility(s).
The storage facility(s) must be constructed in accordance with the approved plan. Any changes in
design, materials or use requires prior written consent of both the design professional and the Office
of Pollution Control. The changes have to be submitted in a form that is acceptable to the Office of
Pollution Control. The contractor and/or design professional is required to inform the owner that the
changes are being made.
The Office of Pollution Control has the right to inspect this installation at any time to verify its being
constructed in compliance with this permit.
The Office of Pollution Control must be contacted at 854-2523 at least 2 business days prior to commencement
of any work to arrange for the required construction inspections.
Contact the local building department and/or fire safety enforcement office for any additional requirements that
may apply to your project.
The storage facility cannot be placed into service until the Office of Pollution Control performs all
required installation inspections and issues an interim permit to operate.
The Office of Pollution Control reserves the right to revoke this permit as allowable by law.
ISSUED. BY:
Chris ong ~'
Bureau of Environmental Engineering
O.ffi. c.e of Polluti. on Control .
THIS PERMIT IS VALID FOR THE FOLLOWING
STORAGE FACILITIES ONLY
SCDHS g LOCATION VOLUME CONTENTS NOTE
11 Above / Out 4,000 Gals. Gasoline
For up to 90 days at, er the Permit to Construct expires, the permit is renewable. The job file will remain
open for that period. If the Office of Pollution Control does not receive a renewal application with the
appropriate fees within the 90 days, the file will be closed and a new application for a Permit to Construct
will have to be filed if the job is to be re-opened. All applicable filing fees will once again become due and
payable.
Issuance of this permit does not supersede any existing agreements with, or mandates by,
the Office of Pollution Control or any other government agency. The construction period
does not supersede any existing compliance dates agreed to, or mandated by, the Office of
Pollution Control or any other government agency. Issuance of this permit does not
authorize the use of the storage facility(s) that are in violation of the Suffolk County
Sanitary Code or any other government code.
Special Conditions:
This aboveground tank can only be installed after the removal of underground 4,000 gals.
single wall tank.
*- Ol~Igr~tes c~thod~ protecllon',
II
New York State Department of Environmental Conservation
Division of Environmental Permits
SUNY @ Sto~y Brook, 50 Circle Road, Stony Brook, NY 11790-3409
Telephone (631) 444-0403
Facsimile (631 444-0360
Alexander B. Grannis
Commissioner
NeW Suffolk Shipyard LP
P.O. Box 276
New Suffolk, NY 11956
January7,20~
RE: 1-4738-00941/00009
Dear Permittee:
In conformance with the requirements of the State uniform Procedures Act (Article
70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing your
permit. If you are unable to comply with any conditions, please contact us at the above
address.
Also enclosed is a permit sign which is to be conspicuously posted at the project site
and protected from the weather.
Sincerely,
J Sherri L. Aicher
Environmental Analyst
SLA/ls
Enclosure
NEW YORK STATE DEPARTMEIN~I~ OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4735-00941
PERMIT
Under the Environmental Conservation Law (ECL)
Permittee and Facility Information
Permit Issued To:
NEW SUFFOLK SHIPYARD LP
PO BOX 276
NEW SUFFOLK, NY 11956
Facility:
NEW SUFFOLK SHIPYARD & MARINA
6775 NEW SUFFOLK RD [SCTM#1000-117-5-
29.1
NEW SUFFOLK, NY 11956
Facility Application Contact:
HIGH POINT ENGINEERING LLC
410 JERICHO TPKE STE 105
JERICHO, NY 11753
(516) 433 -4320
Facility Location: in SOUTHOLD in SUFFOLK COUNTY
Facility Principal Reference Point: NYTM-E: 712.3 NYTM-N: 4541.3
Latitude: 41059'43.0" Longitude: 72028'33.5"
Authorized Activity: Reconstruct 21 linear feet of existing, functional bulkheading landward of the
existing bulkhead and backfill. All authorized activities shall be done ~n strict conformance with the
attached plans stamped "NYSDEC Approved" on January 7, 2010. (,~f~o._~
Permit Authorizations
Tidal Wetlands - Under Article 25
Permit ID 1-4738-00941/00009
New Permit Effective Date: 1/7/2010 Expiration Date: 1/7/2015
Water Quality Certification - Under Section 401 - Clean Water Act
Permit ID 1-4738-00941/00010
New Permit Effective Date: 1/7/2010 Expiration Date: 1/7/2015
Page 1 of 7
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
NYSDEC Approval
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict
comPliance with the ECL, ali applicable regulations, and all conditions included as part of this
permit.
Date
Permit Administrator: SUSAN ACKERMAN, Deputy Regional Permit Administrator
Address: NYSDEC REGION 1 HEADQUARTERS
SU-NY ~ STONY BROOK[50 CIRCLE RD
Authorized Signature: STON~OO~-3409
/v
Distribution List I
HIGH POINT ENGINEERING LLC
SHERRI L AICHER
Permit Components
NATURAL RESOURCE PERMIT CONDITIONS
WATER QUALITY CERTIFICATION SPECIFIC CONDITION
GENERAL CONDITIONS, APPLY TO ALL AUTHORIZED PERMITS
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
NATURAL RESOURCE PERMIT CONDITIONS - Apply to the Following
Permits: TIDAL WETLANDS; WATER QUALITY CERTIFICATION
1. Regulated Activities Authorized By This Permit This permit ONLY authorizes those regulated
activities / structures identified under the section titled "SAPP Authorized Activity". The Department
does not issue after-the-fact or as-built permits. This permit does not authorize activities, or legitimize
thc existence of structures, which would have required a permit but for which no permit or other
authorization has been granted by thc Department.
2. Conformance With Plans All activities authorized by this permit must be in strict conformance
with the approved plans submitted by the applicant or applicant's agent as part of the permit application.
Such approved plans were prepared by Chris M. Tartaglia on November 18, 2009 and by Horst Elzer on
April 15, 2009. Both plans were stamped "NYSDEC Approved on January 7, 2010.
Page 2 of 7
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
3. Notice of Commencement At least 48 hours prior to commencement of the project, ~he permittee
and contractor shall sign and return the top portion of the enclosed notification form certifying that they
are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion
of project, the bottom portion of the form must also be signed and returned, along with photographs of
the completed work.
4. New Bulkhead Landward of Existing Structure The new bulkhead shall be constructed landward
of the existing structure. The existing sheathing shall not bc removed until thc landward sheathing is
securely in place. Once the new sheathing has been appropriately installed, the old sheathing shall be cut
to grade or removed in its cntirel~,.
5. Excavation for Bulkhead/Structure Prior to any construction or removal of bulkheads and other
shoreline stabilization structures all backfill shall be excavated landward of the structure and retained so
as not to enter the waterway, tidal wetland or protected buffer area:
6. Replacement Bulkhead Maximum Height The top elevation of the replacemem bulkhead shall be
no more than 18 inches higher than the existing bulkhead.
7. Jet-in Bulkhead Bulkheads constructed directly adjacent to vegetated tidal wetlands shall be hand
driven or jetted in with no disturbance to the tidal wetland. Trenching is strictly prohibited.
8. Backfilling The installation of the approved replacemem bulkhead shall be completed prior to the
placement of any fill material behind the structure.
9. Clean Fill Only All fill shall consist of clean sand, gravel, or soil (not asphalt, slag, flyash, broken
concrete or demolition debris).
· 10. No Beach Excavation For Fill No excavation of the beach is authorized for the purpose of
obtaining fill or stone materials.
11. No Dredging or Excavation No dredging, excavating or other alteration of shoreline or
underwater areas is authorized by this permit, nor shall issuance of this permit be construed to suggest
that the Departmem will issue a permit for such activities in the future.
12. No RunoffOver or Through Bulkhead or into Wetland Upon completion of the bulkhead
replacement authorized herein, there shall bc no discharge of runoff or other effluent over or through the
structure or into any tidal wetland or protected buffer area.
13. Use of Treated Wood The use of wood treated with creosote, pentachlorophenol or other wood
treatment not specifically approved by the Department for use in wetlands and/or marine waters, is
strictly prohibited in the construction of structures that will be in contact with tidal waters.
14. No Structures on Reconstructed Bulkhead or Pilings No structures, other than stmctares
specifically authorized by this permit, shall be constructed on the reconstructed bulkhead or pilings
without further authorization from thc Department (new permit, modified permit).
15. Storage of Equipment, Materials The storage of construction equipment and materials shall be
confined to the upland area landward of the bulkhead or on a barge.
Page 3 of 7
NEW YORK STATE DEPARTMEWOF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
16. No 'Disturbance to Vegetated Tidal Wetlands There shall be no disturbance to vegetated tidal
wetlands or protected buffer areas as a result of the permitted activities.
17. NO Construction Debris in Wetland or Adjacent Area Any debris or excess material from
construction of this project shall be completely removed from the adjacent area (upland) and removed to
an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas.
18. Seeding Disturbed Areas All areas of soil disturbance resulting from the approved project shall be
stabilized with appropriate vegetation (grasses, etc.) immediately following project completion or prior
to permit expiration, whichever comes first. If the project site remains inactive for mot? than 48 hours
or planting is impractical due to the season, then the area shall be stabilized with straw or hay mulch or
jute matting until weather conditions favor germination.
19. Temporary Mulch, Final Seeding If seeding is impracticable due to the time of year, a temporary
mulch shall be applied and final seeding shall be performed at the earliest opportunity when weather
conditions favor germination and growth but not more than six months after project completion.
20. State Not Liable for Damage The State of New York shall in no case be liable for any damage or
injury to the structure or work herein authorized which may be caused by or result from future operations
undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no
claim or right to compensation shall accrue from any such damage.
21. State May Order Removal or Alteration of Work If future operations by the State of New York
require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the
Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation
of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause
loss or destruction of the natural resources of the State, the owner may be ordered by the Department to
remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State,
and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other
modification of the watercourse hereby authorized shall not be completed, the owners, shall, without
expense to the State, and to such extent and in such time and manner as the Dgpartment of
Environmental Conservation may require, remove all Or any portion of the uncompleted structure or fill
and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall
be made against the State of New York on account of any such removal or alteration.
22. Precautions Against Contamination of Waters All necessary precautions shall be taken to
preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents,
lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials
associated with the project.
23. State May Require Site Restoration If upon the expiration or revocation of this permit, the
project hereby authorized has not been completed, the applicant shall, without expense to the State, and
to such extent and in such time and manner as the Department of Environmental Conservation may
require, remove all or any portion of the uncompleted structure or fill and restore the site to its former
condition. No claim shall be made against the State of New York on account of any such removal or
alteration.
Page 4 of 7
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
WATER QUALITY CERTIFICATION SPECIFIC CONDITIONS
1. Water Quality Certification The NYS Department of Environmental Conservation hereby certifies
that thc subject project will not contravene effluent limitations or other limitations or standards under
Sections 301,302, 303,306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the
conditions listed herein are met.
GENERAL CONDITIONS - Apply to ALL Authorized Permits:
I. Facility Inspection by The Department The permitted site or facility, including relevant records, is
subject to inspection at reasonable hours and intervals by an authorized representative of the Department
of Environmental. Conservation (the Department) to determine whether the permit-tee is complying with
this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71- 0301
and SAPA 401(3).
The permittee shall provide a person to accompany the Department's representative during an inspection
to the permit area when requested by the Department.
A copy of this permit, including all referenced maps, drawings and special conditions, must be available
for inspection by the Department at all times at the project site or facility. Failure to produce a copy of
the permit upon request by a Department representative is a violation of this permit.
2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly
provided for by thc Department, issuance of this permit does not modify, supersede or rescind any order
or determination previously issued by the Department or any of the terms, conditions or requirements
contained in such order or determination.
3. Applications For Permit Renewals, Modifications or Transfers The permi~tee must submit a
separate written application to the Department for permit renewal, modification or transfer of this
permit. Such application must include any forms or supplemental information the Department requires.
Any renewal, modification or transfer granted by the Department must be in writing. Submission of
applications for permit renewal, modification or transfer are to be submitted to:
Regional Permit Administrator
NYSDEC REGION 1 HEADQUARTERS
SUNY ~ STONY BROOK[50 CIRCLE RD
STONY BROOK, NYI 1790 -3409
4. Submission of Renewal Application The permittee must submit a renewal application at least 30
days before permit expiration for the following permit authorizations: Tidal Wetlands, Water Quality
Certification.
Page 5 of 7
NEW YORK STATE DEPARTME~rOF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
S. Permit Mo'difications, Suspensions and Revocations by the Department The Department
reserves the right to modify, suspend or revoke this permit. Thc grounds for modification, suspension or
revocation include:
a. materially false or inaccurate statements in the permit application or supporting papers;
b. failure by the permittee to comply with any terms or conditions of the permit;
c. exceeding the scope of the project as described in the permit application;
d. newly discovered material information or a material change in environmental conditions, relevant
technology or applicable law or regulations since the issuance of the existing permit;
noncompliance with previously issued permit conditions, orders of the commissioner, any
provisions of the Environmental Conservation Law or regulations of the Department related to
the permitted activity.
6. Permit Transfer Permits are transferrable unless specifically prohibited by statute, regulation or
another permit condition. Applications for permit transfer should be submitted prior to actual transfer of
ownership.
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification
Thc pcrmittee, excepting state or federal agencies, expressly agrees to indenmify and hold harmless the
Department of Environmental Conservation of the State of New York, its representatives, employees,
and agents ("DEC") for all claims, suits, actions, and damages, to the extent attributable to the
permittee's acts or omissions in connection with the pcrmittec's undertaking of activities in connection
with, or operation and maintenance of, thc facility or facilities authorized by the permit whether in
· compliance or not in compliance with the terms and conditions of thc permit. This indcnmification does
not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or
intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under
Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision
under federal or state laws.
Item B: Permittee's Contractors to Comply with Permit
Thc permittee is responsible for informing its independent contractors, employees, agents and assigns of
their responsibility to comply with this permit, including all special conditions while acting as the
permittce's agent with respect to the permitted activities, and such persons shall be subject to the same
sanctions for violations of the Environmental Conservation Law as those prescribed for thc permittee.
Item C: Permittee Responsible for Obtaining Other Required Permits
The permittcc is responsible for obtaining any other permits, approvals, lands, easements and rights-of-
way that may be required to carry out the activities that are authorized by this permit.
Page 6 of 7
NEW YORK STATE DEPARTMEI~T OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4738-00941
Item D: No Right to Trespass or Interfere with Riparian Rights
This permit docs not convey to thc permittec any right to trespass upon thc lands or interfere with the
riparian rights of others in Order to perform the permitted work nor does it authorize the impairment of
any fights, title, or interest in real or personal property held or vested in a person not a party to the
permit.
Page 7 of 7
NYSDEC
APPROVED AS PER TERMS
AND CONDITIONS OF
NYSDEC
APPROVED AS PER TERMS
AND CONDITIONS OF
James F. King~ President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghos±o, Jr.
Town Hall
53095 Route 25
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOVv'N OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES
72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN
APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO
SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE
PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
1st day of construction
~ constructed
~Proje~ complete, compliance inspection.
BOARD OF SOUTHOLD TOWN TRUSTEES
SOUTHOLD, NEW YORK
PERMIT NO. 7055 DATE: APRIL 22~ 2009
ISSUED TO: NEW SUFFOLK SHIPYARD~ LLC
PROPERTY ADDRESS: 6775 NEW SUFFOLK ROAD~ NEW SUFFOLK
SCTM# 117-5-29.1
AUTHORIZATION
Pursuant to the provisions of Chapter 275 and/or Chapter 111 ofthe Town Code of the Town of
Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on
April 22, 2009, and m consideration of applicatign fee in the sum of $250.00 paid by N~w Suffolk Shipyard,
LLC and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees
authorizes and permits the following:
Wetland Permit to remove the existing (1) 4K gallon single wall fiberglass
storage tank; install (1) 4K gallon double wall steel above ground storage tank and
containment dike; and install (2) 2 foot deep drywells and +/- 153 linear feet roof
gutters with downspouts to redirect roof run-off from draining into water beyond
bulkhead into drywells; and-to install a new 21+/- foot bulkhead using vinyl sheathing,
behind the existing bulkhead (to be left in place), and as depicted on the site plan
prepared by High Point Engineering, last dated April 15, 2009, and received on April
16,~ 2009, and as depicted on the bulkhead plan prepared by Horst Elzer Ret. Architect,
last dated April 15, 2009 and received on April 17, 2009.
IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed,
and these presents to be subscribed by a majority of the said Board as of this date.
TERMS AND CONDITIONS
The Permittee New Suffolk Shipyard, LLC, residin,~ at 6775 New Suffolk Road, New Suffolk,
New York as part of the consideratioa for the issuance of the Permit does understand and
prescribe to the following:
1. That the said Board of Trustees and the Town of Southold are released from any and all
damages, or claims for damages, of suits arising directly or indirectly as a result of any
operation performed pursuant to this permit, and the said Permittee will, at his or her own
expense, defend any and all such suits initiated by third pasties, and the said Permittee
assumes full liability with respect thereto, to the complete exclusion of the Board of
Trustees of the Town of Southold.
2. That this Permit is valid for a period of 24 months, which is considered to be the estimated
time required to complete the work involved, but should circumstances warrant, request for
an extension may be made to the Board at a later date.
3. That this permit should be retained indefinitely, or as long as the said Permittee wishes to
maintain the structure or project involved, to provide evidence to anyone concerned that
authorization was originally obtained.
4. That the work involved will be subject to the inspection and approval of the Board or its
agents, and non-compliance with the provisions of the originating application may be cause
for revocation of this Permit by resolution of the said Board.
That there will be no unreasonable interference with navigation as a result of the work
herein authorized.
That there shall be no interference with the right of the public to pass and repass along the
beach between high and low water marks.
That if future operations of the Town of Southold require the removal and/or alterations in
the location of the work herein authorized, or if, in the opinion of the Board of Trustees,
the work shall cause unreasonable obstruction to free navigation, the said Permittec will be
required, upon due notice, to remove or alter this work project herein ~tated without
expenses to the Town of Southold.
That the said Board will be notified by the Permittee of the completion of the work
authorized.
That the Pennittee will obtain all other permits and consents that may be required
supplemental to this permit, which may be subject to revoke upon failure to obtain same.
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio, Jr.
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
April 22, 2009
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Mr. Chris Tartaglia, P.E.
High Point Engineering
410 Jericho Turnpike, Suite 105
Jedcho, NY 11753
RE:
NEW SUFFOLK SHIPYARD, LLC
6775 NEW SUFFOLK ROAD, NEW SUFFOLK
SCTM# 117-5-29.1
Dear Mr. Tartaglia:
The Board of Town Trustees took the following action during its regular meeting held on
Wednesday, April 22, 2009 regarding the above matter:
WHEREAS, High Point Engineering on behalf of NEW SUFFOLK SHIPYARD, LLC
applied to the Southold Town Trustees for a permit under the provisions of Chapter 275
of the Southold Town Code, the Wetland Ordinance of the Town of Southold,
application dated Mamh 3, 2009, and,
WHEREAS, said application was referred to the Southold Town Conservation Advisory
Council and to the Local Waterfront Revitalization Program Coordinator for their findings
and recommendations, and,
WHEREAS, the LWRP Coordinator issued a recommendation that the application be
found Consistent with the Local Waterfront Revitalization Program policy standards,
and,
WHEREAS, a Public Hearing was held by the Town Trustees with respect to said
application on April 22, 2009, at which time all interested persons were given an
opportunity to be heard, and,
WHEREAS, the Board members have personally viewed and are familiar with the
premises in question and the surrounding area, and,
WHEREAS, the Board has considered all the testimony and documentation submitted
concerning this application, and,
WHEREAS, the structure complies with the Standards set forth in Chapter 275 of the
Southold Town Code,
WHEREAS, the Board has determined that the project as proposed will not affect the
~health, safety and general welfare of the peopJe of the town,
NOW THEREFORE BE IT,
RESOLVED, that the Board of Trustees have found the application tO be Consistent
with the Local Waterfront Revitalization Program, and,
RESOLVED, that the Board of Trustees approve the application of NEW SUFFOLK
SHIPYARD, LLC to remove the existing (1) 4K galloh single wall fiberglass storage
tank; install (1) 4K gallon double wall steel above ground storage tank and containment
dike; and install (2) 2 foot deep drywells and +/- 153 linear feet roof gutters with
downspouts to redirect roof run-off from draining into water beyond bulkhead into
drywells; and to install a new 21+/- foot bulkhead using vinyl sheathing, behind the
existing bulkhead (to be left in place), and as depicted on the site plan prepared by High
Point Engineering, last dated Apd115, 2009, and received on April 16, 2009, and as
depicted on the bulkhead plan prepared by Horst Elzer Ret. Architect, last dated Apdl
15, 2009 and received on April 17, 2009.
Permit to construct and corn plete project will expire two years from the date the permit
is signed. Fees must be paid, if applicable, and permit issued within six months of the
date of this notification.
Inspections are required at a fee of $50.00 per inspection. (See attached schedule.)
Fees: $50.00
Very truly yours,
James F. King
President, Board of Trustees
JFK/eac
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio. Jr.
Town Hall
53095 Route 25
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631~ 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Please be advised that your application dated /'~::~c~rh .3, ~:;~00°/ has
been reviewed by this Board at the regular meeting of J,~r-? I ~ ~ ~
and your app ication has been approved pending the cO~l~leti°n o~f the '
following items checked off below.
Revised Plans for proposed project
Pre-Construction Hay Bale Line Inspection Fee ($50.00)
__ 1st Day of Construction ($50.00)
__ ~ Constructed ($50.00)
/
v/ Final Inspection Fee ($50.00)
__ Dock Fees ($3.00 per sq. ft.)
Perm t fees are now due. Please make check or money order payable to Town
of Southold. The fee is computed below according to the schedule of rates as
set forth in Chapter 275 of the Southold Town Code.
The following fee must be paid within 90 days or re-application fees will be
necessary. You will receive your permit upon completion of the above.
COMPUTATION OF PERMIT FEES:
TOTAL FEES DUE:
BY: James F. King, President
Board of Trustees
April 2 i, 2009
w,.- James King
Suu'.hom ~ ow.q Trustees
54375 Route 25
:-.~. Box t ! 79
!anlthe Adt.., ................ etts- Fq,,-it¢ _tv _ . *a m__.~_..___
0 ..... ~ie!!g.~. .... ' .....' .....1~. h has
' ' ~' -S--~=~-" ..... " - .... lp:a d uacen
prope~y owner umy notched of an application by New Suflblk Shipyard
i '~'--w "~..-=' ', ' -" Ap ..........
.,=,ore the ~ t, ..n I rustees ..~,,~dulea,ora ~i ~,', .......
We lla?~ II0 ob!ectltm to tile proposal and ill ~Ct q' ¥~ ~ tlao ,w~.a,5*; ~
* '= appl
~=l. as ....... --~- .......the - ~ '~*== oeem appropriate.
Sincerely,
Donald Wilder, Chairman
Lauren Standish, Secretary
Town Hall, 53095 Main Rd.
P.O. Box 1179
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631 ) 765-6641
Conservation Advisory Council
Town of Southold
At the meeting of the Southold Town Conservation Advisory Council held Wed., April 15,
2009, the following recommendation was made:
Moved by James Eckert, seconded by Jack McGreevy, it was
RESOLVED to SUPPORT the Wetland Permit application of NEW SUFFOLK SHIPYARD,
LLC to remove the existing (1) 4K gallon single wall fiberglass storage tank; install (1) 4K
gallon double wall steel above ground storage tank; and install (2) 2' deep drywells and +/-
153 If. roof gutters with downspouts to redirect roof run-off from draining into water beyond
bulkhead into drywells.
Located: 6775 New Suffolk Rd., New Suffolk. SCTM#117-5-29.1
Inspected by: Jack McGreevy, James Eckert, Doug Hardy
Vote of Council: Ayes: All
Motion Carried
04/07/2009 07:46 FAX 631 765 2~
04/06/2009 10:41 FAX 65172723~I~
Spffi Inci~m~ Database Search '
SOUTItOLD POLICE
~001
Page 1 of 2
....._.DEPARTMENT OF
~ENVIRONMENTAL CONSERVATION
Spill Incidents Database Search Details
Spill Record
Administrative Information
DEC Region: 1 '~'~ ~ ~
Spill Number: 081415.7
Spill Date/Time
Spill Date: 03/31/2009 Spill Time: 02:20:00 PM
Call Received Dal~: 03/31/2009 Call Reoeived Time: 02:36:00 PM
Location
Spill Name: NEW SUFFOLK SHIPYARD
Address: 6775 NEW HIGHWAY
City: NEWSUFFOLK County; Suffolk
Spill Description
Material Spilled Amount Spilled Resoume Affeoted
UNKNOWN PETROLEUM UNKNOWN Soil
hltp ://www.dec,ny.gov/cfmydextapps/dcreXt~a,Wspills/details.cfin?pagcid_-2 4/6/'2009
James F. King. President
Jill M. Doherty. Vice-President
Peggy A. Dickerson
Dave Belgen
Bob Ghosio, Jr.
P,O. Box 1179
Southold~ NY 1197l
Telephone (631) 765-1892
Fax (631 ) 765-6641
Southold Town Board of Trustees
Field Inspection/Worksession Report
NEW SUFFOLK SHIPYARD, LLC requests a Wetland Permit to remove the existing
(1) 4K gallon single wall fiberglass storage tank; install (1) 4K gallon double wall
steel above ground storage tank; and install (2) 2' deep drywells and +/-153 If. roof
gutters with downspouts to redirect roof run-off from draining into water beyond
bulkhead into drywells. Located: 6775 New Suffolk Rd., New Suffolk. SCTM#117-5-
29.1
Type of area to be impacted:
__Saltwater Wetland __Freshwater Wetland
Sound Bay
Distance of proposed work to edge of wetland
P~'"~haf Town Code proposed work falls under:
pt.275 Chapt. 111 other
Type of Application: c~etland __Coastal Erosion ._.Amendment
Administrative Emergency Pre-Submission Violation
Info needed:
Modifications:
Conditions:
PresentWere:_~.King '~.DohertyV~..Dickerson L~D. Bergen ~hosio,
D. Dzenkowski I_~ other
Form filled out in the field by
Mailed/Faxed to:
Date:
Environmental Technician Review-
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
Main Rd. & Youngs Ave.
Southold, NY 11971
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
To:
From:
Date:
Re:
Jim King, President
Town of Southold Board of Trustees
Mark Terry, LWRP Coordinator
Scott A. Hilary, LWRP Coordinator
April 8, 2009
Chapter 268, WATERFRONT CONSISTENCY REVIEW
Wetland Permit for NEW SUFFOLK SHIPYARD, LLC
SCTM# 117-5-29.1
High Point Engineering on behalf of NEW SUFFOLK SHIPYARD, LLC requests a Wetland Permit to remove the
existing (1) 4K gallon single wall fiberglass storage tank; install (1) 4K gallon double wall steel above ground storage
tank; and install (2) 2' deep drywells and +/-153 If. roof gutters with downspouts to redirect roof run-off from draining
into water beyond bulkhead into drywells. Located: 6775 New Suffolk Rd., New Suffolk. SCTM#117-5-29.1
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town
Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided
on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to us, it is our
recommendation that the proposed action is CONSISTENT with LWRP policy standards and therefore is
CONSISTENT with the LWRP
The following Best Management Practices (BMP's) are recommended:
1)
Replacement of the bulkhead prior to the installation of the new 4k gallon double wall steel above ground
storage tank.
2)
The deployment of silt boom surrounding the immediate project area prior to and during all intertidal
operations.
The deployment of a silt boom is recommended (with or without) the bulkhead being replaced.
3)
Install a line of hay bales and silt fence between the bulkhead and the proposed action as an erosion
control measure to retain runoff sediments during construction.
The deployment of silt booms as a Best Management Practice will further advance LWRP Policy 5,
Protect and improve water quality in the Town of Southold and LWRP Policy 6 Protect and restore tidal
and fresh water wetlands.
Pursuant to § 275-11 all intertidal construction and excavation requires the installation of a silt boom that will
retain all suspended sediments within the immediate proiect area.
§ 275-11 Construction and operation standards.
A. General. The following standards are required for all operations within the jurisdiction of the Trustees:
(2) Erosion control. 'Installation of an erosion control structure is necessary during any building, grading,
landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation
ora silt fence, hay bales, wood chip berm and Mit booms. The placement of the erosion control structure(s) shah be
determined by the Trustees or their designee. Ail intertidal construction and excavation requires the installation of a
silt boom that will retain ail suspended sediments within the immediate project aret~
§ 275-2 Definitions; word usage.
SILT BOOM -- A structure deployed within the water column that is designed to prevent passage of suspended
sediments and contaminants from spreading from the immediate project area to surrounding waters. Properly installed,
silt booms completely surround the project area.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written
determination regarding the consistency of the proposed action.
High Point Engineering
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. High PointEngineerin g.com
Phone: (516) 433-4320
Fax: (516) 433-4364
email: in fo _(~hiehoointeneineerin e.com
TRANSMITTAL
Via: Hand Delivery []
U.S. Mail []
FedEx Standard Overnight []
Pick Up []
To:
Town of Southold Board of Trustees
54375 Route 25
Southold, NY 11971
Attention: Elizabeth Can~ell Re:
Date: April 15, 2009
New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY 11956
Project # NEWS08-01
Enclosures:
Quantity Date No__~. Description
3 4/15/09 SP-1 Site Plan (Rev. # 1)
Comments:
As per your request, enclosed please find the revised Site Plan for the above referenced project. Please note
that the proposed above ground tank specification has been amended to include a tank with a containment dike
as per Suffolk County Department of Health Services requirements.
Please contact our office with any questions or concerns you may have.
Signed: Chris Tart~-P.E.
Michael Irving, New Suffolk Shipyard, w/enclosures (via Federal Express)
\~Hpcsvr01 \public\lPROJECT DIRECTORY~Ncw Suffolk Shipyard~NEWS08-O 1 ~eRers, faxes, otc\Transmittal - TOS Board of Trustees&Irving_04.15.09.doc
Albert J. Krupski, President
James King, Vice-President
ArQe Foster
Ken Poliwoda
Peggy A. Dickerson
Town Hall
53095 Route 25
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
F~x (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Office Use Only
__Coastal Erosion Permit Application
__Wetland Permit Application Administrative Permit
Amendment/Transfer/Extension
,/Rece-'i'~-ved Application: ~L~]~
~------Completed Application~
__Incomplete
__SEQRA Classification:
Type I Type II Unlisted
__Coordinafion:(date sent)_ _
Consistency^sse m o m q 13Pq 4
,,,,CACReferral Sent: c~l.~
__Receipt of CAC Report:
__Lead Agency Determination:
Technical Review:
,TyuUio eU: q i
___Resolution:
Name of Apphcant New Suffolk Shipyard, LLC
Address 6775 New Suffolk Road, New Suffolk, NY 11956
631-734-6311
Phone Number:
Suffolk County Tax Map Number: 1000 -
Property Location: 6775 New Suffolk Road, New Suffolk, NY 11956
+/- 50' North of Fanning Road on New Suffolk Road
...... (pa'0¥id~ L[LC~Pa~e #~_distance to cross streets, and location)
AGENT: Chds Tartaglia, High Point Engineering
(If applicable)
Address:
410 Jericho Turnpike, Suite 105, Jedcho, NY 11753
Phone: (516)433-4320
Board of Trustees Application
Land Area (in square feet): 99,458
Zones M1 & M2
Area Zoning:
GENERAL DATA
Marina
Previous use of property:
Intended use of property: Marina
Prior permits/approvals for site improvements:
Agency Date
,t' No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a governmental agency?
g No Yes
If yes, provide explanation:
Project Description (use attachments if necessary):. Remove existing (1) 4K gallon
single wall fiberglass underground storage tank. Install (1) 4K gallon double wall steel-
above ground storage tank. Install (2) 2' deep drywells and +/- 153 LF roof gutters
with downspouts to redirect roof runoff from draining into the water beyond the
Board of Trustees Application
COASTAL EROSION APPLICATION DATA
To replace an existing underground single wall
Purposes of proposed activity:.
gasoline tank with a new double wall steel above ground gasoline tank.
Are wetlands present within 1 O0 feet of the proposed activity?
No Yes
Does the project involve excaVation or filling?
No / Yes
+/- 43
If Yes, how much material will be excavated?
+/- 63
How much material will be filled?
Manner in which material will be removed or deposited:
Mechanically via the use of a backhoe and excavator.
(cubic yards)
.(cubic yards)
Describe the nature and extent of the environmental impacts reasonably anticipated resulting
from implementation of the project as proposed. (Use attachments if necessary)
The proposed project shall impact the environment in a positive fashion. The proposed
above ground double wall steel gasoline tank with electronic monitoring system
provides increased security against tank leakage. It also satisfies SCDHS mandate
(effective by 2010) that all fuel storage tanks be double wall, where as the existing
tank is a single wall structure. In the event of a fuel spill, the fuel will no longer be
in direct contact with the soil and groundwater as it will be above ground on a concrete
pad.
617.20
Appendix C
State Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART I - PROJECT INFORMATION (To be completed by Applicant or Project Sponsor)
1. APPLICANT/SPONSOR ~2, PROJECT NAME
New Suffolk Marina / Tank Removal/Replacement ~:
3. PROJECT LOCATION:
Municipality Mattituck, Towu of Southold
County Suffolk
4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map)
6775 New Suffolk Road, New Suffolk, Town of Southold, NY
80u~
5. PROPOSEDACTION IS:
[] New [] Expansion [] Modification/alteration
6. DESCRIBE PROJECT BRIEFLY:
Remove (1) 4,000 gallon single wall fiberglass gasoline UST, Install (1) 4,000 gallon double wall steel UL # 2085 Fire Rated A.S.T.
'~/Dispenser,(2) J0' di .ameter drywells, type "K" roof gutters with downs,)outs, and storm drain piping.?
7. AMOUNT OF LAND AFFECTED:
initially 2.3 acres Ultimately 2.3 acres
8. VV~LL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
[] Yes ~r~ No If No, describe
briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
[] Residential [] Industrial [] Commercial
Describe:
Mixture of residential and commercial and industrial uses.
r--]Agriculture [] Park/Forest/Open Space [] Other
10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY
(FEDERAL, STATE OR LOCAL)?
[] Yes [] No If Yes, list agency(s) name ami permit/approvals:
- SCDHS - Permit to Construct
- Town of Southold - Wetland Permit
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? [] Yes [] No If Yes, list agency(s) name and permit/approvals:
12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
[-']Yes []No
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
Applicant/sponsor name: C]~-Js Tartaglia, P.E. Date: "~
Signature:
I If the action is in the Coastal Area, and you are a state agency, complete the I
Coastal Assessment Form before proceeding with this assessment
OVER
1
PART II - IMPACT ASSESSMENT (To be completed by Lead Agency)
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.47 If yes, coordinate the review process and use the FULL EAF.
~]Yes [~No
B. WILL ACTION RECEIVE COORDINATED REVIEVVAS PROVIDED FOR UNLISTED ACTIONS iN 6 NYCRR, PART 617.67 If No, a negative
declaration may be superseded by another involved agency.
[--1 Yes ~-'~ No
C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED VVITH THE FOLLOWING: (Answers may be handwritten, if legible)
C1. Existing air quality, sudace or groundwater quality or quantity, noise levels, existing traffic pattern, solid waste production or disposal,
potential for erosion, drainage or flooding problems? Explain briefly:
C2. Aesthetic, agricultural, archaeological, historic, or other natural or cultural resources; or community or neighborhood character? Explain briefly:
C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species? Explain briefly:
C4. A community's existing plans or goals as officially adopted, or a change in use or intensity of use of land or other natural resources? Ex~lain bdefly:
C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain briefly:
C6. Long term, shod term, cumulative, or other effects not identified in C1-C57 Explain briefly:
C7. Other impacts (including changes in use of either quantity or type of energy)? Explain briefly:
D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL
ENVIRONMENTAL AREA (CEA)?
[] Yes [] No If Yes, explain briefly:
E. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
[] Yes [] No If Yes,
explain
briefly:
PART III - DETERMINATION OF SIGNIFICANCE (To be completed by Agency)
INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important or otherwise significant. Each
effect should be assessed in connection with its (a) setting (i.e. u~ban or rural); (b) probability of occurring; (c) duration; (d) irreversibility; (e)
geographic scope; and (f} magnitude, If necessary, add attachments or reference supporting materials. Ensure that explanations contain
sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part II was checked
yes, the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA.
] Check this box if have identified one or more or adverse which MAY 'men to the FULt
you
potentially
large
significant
impacts
proceed
directly
EAF and/or prepare a positive declaration.
[] Checkthis box ifyou have determined, based on the information and analysis abeve and any supporting documentation, that the proposed action WILl.
NOT result in any significant adverse environmental impacts AND provide, on attachments as necessary, the reasons supporting this determination
Name of Lead Agency
Print or Ty~3e'Name of Responsible Officer in Lead Agency
Signature of Responsible Officer in Lead Agency
Date
.,. Tit~ ?f Responsible .Officer
Signature of Preparer (If different ttom responsible officer)
Board of Trustees Application
AUTHOR_I ZATION
~.~4~A,~/,tl;~ (where the applicant is not the owner)
:~-'_i ' ' '~ ,,~ New Suffolk Marina 6775 New Suffolk Road,
I, residing at
(print owner of property) (mailing address)
New Suffolk, NY 11965
do hereby authorize
High Point Engineering
(Agent)
to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
(Owner' s signature)
516'
High Point Engineering
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. HighPointEngineering.com
Phone: (516) 433-432o
Fax: (516) 433-4364
email: in fo~highpointengineerine.com
TRANSMITTAL
Via:
To:
Hand Delivery []
U.S. Mail []
FedEx Standard Overnight []
Pick Up []
Attention:
Enclosures:
Town of Southold Board of Trustees
54375 Route 25
Southold, NY 11971
Elizabeth Cantrell
Date: April 20, 2009
Re:
New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY 11956
Project # NEWS08-01
Quantity Date No._:.
Description
1 4/13/09 ---
1 4/17/09 ---
1 --- 7 Items
1 --- 6 Items
Notice to Adjacent Property Owner
Affidavit of Posting
Proof of Mailing
USPS Receipts of Certified Mailings
USPS Returned Signature Confirmations
Comments:
Enclosed please find the above referenced items for your use.
Please con~mct o~ office with any questions
Signed: X. ~
C~h-~Tartaglia, P.E.
or concerns you may have.
CCi
Michael Irving, New Suffolk Shipyard, w/Enclosures (via facsimile)
\~Hpesvd) 1 yublic\!PROJECT DIRECTORY~New Suffolk ShipyardkNEWS08-01 ~eilers, faxes, otc\Transmittal - TOS Board of Trustccs_04.20.09.doc
NOTICE TO ADJACENT PROPERTY OWNER
BOARD OF TRUSTEES. TOWN OF SOUTHOLD
In the matter of applicant:
New Suffolk Shipyard, LLC SCTM#
YOU ARE HEREBY GIVEN NOTICE:
1000-117-5-29.1
1. That it is the intention of the undersigned to request a Permit from the Board of Trustees
to:
Remove (1) sxisting 4,000 gallon single wall fibarglass underground storags tank; Inetall (1)
4,000 gallon double wall steel above ground storage tank; Install (2) 2' deep drywells; Install
153 linear feet of roof gutters with downspouts.
2. That the property which is the subject of Enviromental Review is located adjacent to
your property and is described as follows:
New Suffolk Shipyard at 6775 New Suffolk Road, New Suffolk, NY 11956
~hat the project which is subject to Environmental Review under Chapters 32, 37, and/or
97 of the Town Code is open to public comment on: Wed., April 22, 2009 . You
may contact the Trustees Office at 765-1892 or in writing.
The above-referenced proposal is under review of the Board of Trustees of the Town of Southold
and does not reference any other agency that might have to review same proposal.
Michael Irving
oWNERS NAME:
MAILING ADDRESS~ 6775 New Suffolk Road
New Suffolk, NY 11956
PHONE#: (6311 734-6311
Eno: Copy of sketch or plan showing proposal for your convenience.
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio, .Ir.
Town Hall, 53095 Main Rd.
P.O. Box 1179
Southold, NY 11971
Telephone (63 I) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
BOARD OF TRUSTEES: TOWN OF SOUTHOLD
In the Matter of the Application of
NEW SUFFOLK SHIPYARD~ LLC
COUNTY OF SUFFOLK)
STATE OF NEW YORK)
AFFIDAVIT OF POSTING
I,/~/'~/t-/~/~, residing at ~ /~~~~
Tha~onthe~ dayor~2~7,1p~ally~st~~)~~~ ~ /~/
by placing ~e Board of T~ o~ci~st~'wh~e it ~ ~y be seen, ~d ~at I have chewed / '
to be s~e ~e ~st~ h~ r~ain~ in pla~ for ei~t days prior to the date of ~e public being.
Date of he~ng not~ ~er~n to be held Wed. ~ PM.
Dated:
Sworn to before me this
day of.e,~ax 200~
Notary Public
No. OIW~lb3Ob4
Commissioa F.,xpkes $e~t 25. ~ \o
PROOF OF MAILING OF NOTICE
ATTACH CERTIFIED MAIL RECEIPTS
Name:
$CTM: Address:
Michael & Cella Withers 117-5-24
Roberta Cmpsey 117-5-27
Katherine Tuthill & Ors 117-5-49.1
Lawrence M. Tuthill 117-5-47
Marianne Collins 117-4-32
Mary Ekster 117-4-31
Anthony Meisel 117-4-30
6635 New Suffolk Road, P.O. Box 654, New Suffolk, NY 11956
6695 New Suffolk Road, P.O. Sox 265, New Suffolk, NY 11956
5 Timber Lane, Fairport, NY 14450
P.O. Box 162, Greenport, NY 11944
6660 New Suffolk Road, P.O. Box 134, New Suffolk, NY 11956
6750 New Suffolk Road, P.O. Box 64, New Suffolk, NY 11956
227 Park Avenue, Hoboken, NJ 07030.
STATE OF NEW YORK --..-_..~.~ .,~ ~.~, '*",',
COUNTY OF SUFFOLK ',~,.
410 Jericho Turnpike, Suite 105, Jericho, NY
Chris M. Tartaglia/High Point Engineering, residing at ~
11753 , being duly sworn, deposes and says that on the
8th day of April ,20 00, deponent mailed a true copy of the Notice
set forth in the Board of Trustees Application, directed to each of the above named
persons at the addresses set opposite there respective names; that the addresses set
opposite the names of said persons are the address of said persons as shown on the current
assessment roll of the Town of Southold; that said Notices were mailed at the United States Post
Office at 425 N. Broadway. Jericho, NY , that said Notices were mailed to each of said persons by
(certified) (registered) mail.
Sworn to before me this /'-~ ~
Day of. ~1~\ ,20(~22h
(~ Notary Public
MEGAN M1CHALSKI
NOTARY PUBdC, STA'r E ',.Y i~W fORK
No, 01MI60~2543
LA_iF[E~, ,k N .~AU COUNTY
r~Y COMIdISSION EXFIRE.~ MAY 2'~, 20 ~
Board of Trustees Application
County of Suffolk
State of New York
Michael Irving of New Suffolk Shipyard, LLC
BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELI~F, AND THAT ALL WORK
WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY
BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT
AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES
HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR BY VIRTUE OF SAID PERMIT(S), lY GRANTED. IN COMPLETING THIS
APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR
REPRESENTATIVES(S), TO ENTER ONTO~ OP~R Y~O INSPECT THE
PREMISES IN CONJUNCTIO~W OF THIS APPL-'IC~ATION.
SWORN TO BEFORE ME THIS 6~ ~ DAY OF '~'~'~""x ,20 ~%
Notary Public,
ALICIA WAL~R
~ Pubaic, State of New York
No. 01WA6t53064
Qualified in Suffolk Count'/
Commission Expires Sept. 25,
APPLICANT/AGENT/REPRESENTATIVE
TRANSACTIONAL DISCLOSURE FORM
The Town of Southold's Code of Ethics orohiblts conflicts of interest on the nert of town officers and emvlovnes. The vuroose of
this form is to umvide information which can alert the town of ~ossible conflicts of inter*st and allow it to take whatever action is
YOURNAME: New Suffolk Shipyard, LLC
(Last name, first namc,~iddl¢ initial, tmlcss you are applying-in th~'anmc of
someone else or other entity, such as a company. If so, indicate the other
person's or company's name.)
NAME OF APPLICATION: (Check all that apply.)
Tax grievsoee Building :,
Variance Trustee _ ~/
Change of Zone Coastal Erosion
Approval of plat Mooting
Exemption from plat or official map Planning
Other
(If "Other~, name the activity.)
Do you personally (or through yom' company~ spouse, sibling, parent, or child) have a r*lafionship ~vith any officer or employee
of the Town of Southpld? "Relationship" includes by blood, marriage, oy business interest "Businas~ interest" means a business,
including a partnership, in which the town officer or employee has even a partial ownership of{or employment by) a corporation
in which the town officer or employee owns more than 5% of the shares.
YES NO / ~
If you answered "YES", complete thc balance of this form and date and sign where indicated.
Name of person employed by the Toxin of Southold
Title br position of that person.
Desoribe thc relationship between yourself(the applicant/agent/represeatative) and the town officer or employee. Either check
the appropriate line A) through D) and/or describe in the space provided.
The town officer or employee or his or her spouse, sibling, parent, or ~hild is {check all that apply):
__A) the owner of greater than 5% oftbe shares of the corporate stock of the applicon!
(when the applicant is a corporation);
__B) the legal or beneficial owner of any interest in a non-corporate entity (when the
applicant is not a corporation);
C) so officer, director, partner, or employee of the applicant; or
D) the actual applicant.
DESCRIPTION OF RELATIONSHIP
Form TS I
Submi:tted this,~>._da~v
SignOre ~. r~/~
, PrintN~e Michael I~ing
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places:
website (southoldtown.northfork.net), the Board of Trustees
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
117 ~ ~'- ~!- o~9, /
SCTI~
Town of Southold's
The Application has been submitted to (check appropriate response):
Town Board O Planning Dept. [] Building Dept. ~ Board of Trustees []
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital
construction, planning activity, agency regulation, land transaction)
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action: The removal of an existing 4,000 gallon single wall fiberglass underground
gasoline storage tank. Installation of a 4,000 gallon double wall steel above ground gasoline storage
tank, (2) 2' deep drywells, and roof gutters/leaders.-
6775 New Suffolk Road, New Suffolk, NY 11956
Location of action:
2.287
Site acreage:.
Marina
Present land use:
MI & M2
Present zoning classification:
If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
New Suffolk Marina, LLC
(a) Name of applicant:
6775 New Suffolk Road, New Suffolk, NY 11956
(b) Mailing address:
(c) Telephone number: Area Code (631)734-6311
N/A
(d) Application number, if any:.
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes L~ No~] If yes, which state or federal agency~
Approval
NYSDEC/
by
SCDHS
DEVELOPED COAST ~)LICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section HI - Policies; Page 2 for evaluation
criteria.
[~Yes ~ No ~] Not Applicable
The current buildings and structures will remain intact and the use of the premises will not change. The
proposed items will not hinder nor enhance the Town of Southold LWRP Policy #1.
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Policies Pages 3 through 6 for evaluation criteria
Yes II No Pot Applicahle
The project has no impact to LWRP Policy #2 as it is not within the Long Island Sound, a historical site,
or an archeological site.
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section IH - Policies Pages 6 through 7 for evaluation criteria
~ Yes [] No D Not Applicable
Although the proposed action introduces an above ground fuel storage tank approximately 7 feet away
from the bulkhead, it is unlikely to be seen from New Suffolk Road as trailered boats parked adjacent to it
will largely block its view. Also, since the use remains a marina, appurtances such as a fuel tank are
justifiably expected to reside on the property and within view.
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III - Policies Pages 8 through 16 for evaluation criteria
[] Yes ~ No ~=] Not Applicable
The proPOsed work will not impact flooding or erosion conditions.
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section HI
-Policies Pages 16 through 21 for evaluation criteria
~ Yes[~No ~ Not Applicable
The proposed double wall tank will be located above ground with an electronic leak sensor monitoring the
secondary containment space for leaks. Any spill/leak will not directly infiltrate the soil/groundwater;
therefore, it is protecting and improving the quality of the surrounding groundwater. By contrast, the
existing single wall underground tank has no provisions for such leak monitoring and is in fact, directly in
contact with the ground water.
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria.
Yes [] No[~ Not Applicable
The proposed tank will provide greater protection of the ecosystem through the increased leak protection
methods previously stated. Also, the roof gutters and drywells will prevent roof run-off from from entering
the wetlands.
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section IH - Policies
Pages 32 through 34 for evaluation criteria.
[] Yes ~-~ No ~ Not Applicable
The project will have a positive effect on the air quality. The proposed tank will be fitted with current
Industry Standard vent-restrictor caps which do not allow venting of fumes into the atmosphere unless the
pressure within the tank builds to a level that requires venting to maintain safe conditions.
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section IH - Policies; Pages 34 through 38 for evaluation criteria.
Yes ~ No [] Not Applicuble
The proposed double wall above ground tank has superior leak detection/prevention compared to the
existing single wall underground tank therein protecting the environment from fuel oil spills and leaks.
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. See LWRP Section HI - Policies; Pages 38 through 46 for evaluation
criteria.
Yc~J-'] No [] Not Applicable
The project lies within an existing marina and is not proposing any changes to the marina itself. The
current operation and use of the marina shall remain the same.
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section HI - Policies; Pages 47 through 56 for evaluation criteria.
[~ Yes ~] No [] Not Applicable
The existing use will continue to operate as a water dependent business use,
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section HI - Policies; Pages 57 through 62 for evaluation criteria.
~ Yes [] No [] Not Applicable
The proposed work will have no effect on the living marine resources.
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section HI - Policies; Pages
62 through 65 for evaluation criteria.
~Yes ~-~ No[~ Not Applicable
The work scope takes place entirely on pdvate property which does not include areas defined as
agricultural land.
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section HI - Policies; Pages 65 through 68 for evaluation criteria.
[]Yes ~No [] Not Applicable
The proposed double wall above ground tank shall minimize the adverse impact of a fuel storage tank
through the electronic tank monitoring and improved leak detection.
Created on 5/25/05 11:20 AM
High Point Engineering
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. HighPoint Eneineerin e.com
Phone: (516) 4334320
Fax: (516) 4334364
email: in fo~,hiehoointeneineerin~.com
TRANSMITTAL
Via: Hand Delivery []
U.S. Mail []
FedEx Standard Overnight []
Pick Up []
To:
Town of Southold Board of Trustees
54375 Rotae 25
Southold, NY 11971
Date: March 2, 2009
Attention:
Elizabeth Cantrell
Re:
Proposed Above Ground Gasoline Tank
New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY 11956
Project # NEWS08-01
Enclosures:
Quantity Date No.
1 3/2/09
3 2/10/09 SP-1 of 1
3 10/28/08 1 of 1
1 11/5/08 ---
1 8/29/08 ---
3 --- lto 2 of 2
Description
$50.00 Check for Administrative Permit
Site Plan
Survey
Board of Town Trustees Application
LWRP Consistency Application Form
NYSDEC Transmittal
SCDHS Transmittal
Project Photos
Comments:
Enclosed please find eh above referenced documents for your review in issuing an administrative permit for the
proposed work outlined in the plans. As shown with the inluced tranmittals, submissions have been made to
NYSDEC & SCDHS and their approvals are pending.
Please contact our office with any questions or concems you may have.
Signed~.
Chris TartagliZ/P.E. ("~ ,~
cc: Michael Irving, New Suffolk Shipyard, w/Enclosures (via Federal Express)
\~-lpesvr01 \public\!PROJECT DIRECTORY~qew Suffolk Shipyard~IEWS08-01 ~Letters, faxes, etcWransmittal - TOS Board of Trustees_03.02.09.doc
High Point Engineering
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. HighPointEngineerin g.com
Phone: (516) 4334320
Fax: (516) 4434364
email: in fo(~_~highpointengineering.co~
Via: Hand Delivery __ U.S. Mail__ FedEx Standard Overnight X Pick Up__
To:
NYSDEC
SUNY at Stony Brook
50 Circle Road
Stony Brook, NY 11790
Attention: Sherri Aicher
Date: November 5, 2.008
Re: Proposed AST Installation
' New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY
Application ID: 1-4738-00941/00008
Project: ~
Enclosures:
Quantlt~ Date No~ Description
5 11/3/08 PT-1 to 3 of 3 Pump and Tank Plan Package
5 10/28/08 1 of 1 Survey
Comments:
Enclosed please f'md the above referenced items being submitted in response to your Notice of Incomplete
Application dated 9/17/08 as follows:
Apparent High Water, Wetlands Boundary and Apparent Low Water Lines have been indicated on the plan. We
have also provided copies of the survey document from which this data has been taken. Please note that the area
where the AST is proposed is located along the bulkhead, as such, these tidal related lines have no impact on the
proposed work area.
The plan has been updated to reflect the coverage data and area of the tank being proposed.
Please note that there is no dewatering proposed in conjunction with the referenced
Please contact our office with any questions or concerns you may have.
Signed:
Chris Tartaglia,
cc: Michael Irving, New Suffolk Shipyard - w/enclosures (via Federal Express)
x,~,Ilpes~rr0l~tpublic\!PRO.IECT DIREC'I'ORY~New SuflNk Ship)ard'~NEWg08-01\.Letler% ~axes. elc\Transmitta -S Aicl er,NYSDEC- ,4-08,doc
High Point Engineering
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. Hi~h PointEneineerine.com
Phone: (516) 433-4320
Fax: (516) 433-4364
email: in fo~hiehnointen eineeHn~.co~
Via: Hand Delive~ .
U.S. Mail
FedEx Standard Overnight X
Pick Up.
To.'
Attention:
Enclosures:
Suffolk County Department of Health Services
Bureau of Environmental Engineering
15 Horseblock Place
Furmingville, Ny 11738
Mr. Kenneth Clunie,
Assistant Public Health Engineer
Date:
Re:
August 29, 2008
New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY
HPE Job # NEWS08-01
.Quantity Date No.
4 1/24/08 PT-1 to 3 of 3
I 8/29/08 HMM001
I .... HMM003
1 8/26/08 6
1 2/01/08 - 1/31/11 0005220
Commenm:
Pump and Tank Plan Package
SCDHS Application for Permit to Construct Toxic/
Hazardous Materials Storage Facility
SCDHS Toxic Liquid Storage Registration Form
Check for $620.00 payable to SCDHS
NYS Certificate of Authorization
Enclosed please find the above referenced items for your Department's review.
Thank you in advance for your cooperation with this matter. Please contact our office with any questions or concerns
you may have.
Signed: ~, ~
Chri~-Tartaglia, P.E.
Michael Irving, New Suffolk Marina - w/enclosures (via Federal
Frank Rich, Island Pump & Tank - w/enclosures (via Federal Express)
\\Itpesvr0l\public/!PROJECT DIRECTORY\New Suffolk Shipyard\NEWS08-0 I\Letlers, faxes, cie\Transmittal <'Iunie-SCDHS -829 08.doc
High
410 Jericho Turnpike
Suite 105, Jericho, NY 11753
Website: www. HighPointEngineering.com
Phone: (516) 4334320
Fax: (516) 4334364
email: in fo~highpointengineering.com
TRANSMITTAL
Via: Hand Delivery []
u.s. []
To:
A~enfion:
Town of Southold Board of Trustees
54375 Route 25
Southold, NY 11971
Elizabeth Cantrell
Enclosures:
Ouanfitv Date No._.~.
1 3/7/09 13559
3 3/17/09 SP-1 of 1
3 3/17/09 617.20
FedEx Standard Overnight []
Date: March 17, 2009
Pick Up []
Re;
Proposed Above Ground Gasoline Tank
New Suffolk Shipyard
6775 New Suffolk Road
New Suffolk, NY 11956
Project # NEWS08-01
Descrintion
$200.00 Check for Full Wetland Permit
Site Plan (Rev. 1)
Owner Authorization Form
Short EAF
Comments:
Per your comments, enclosed please find the above referenced additional documents for your review of a
Wetland Permit for the proposed work outlined in the plans.
Please contact our office with any questions or concerns you may have.
C]~i~T-artaglia, P.EO
cc: Michael Irving, New Suffolk Shipyard, w/Enclosures (via Federal Express)
\~Hpesvr01 \public\!PROJECT D1RECTORY~New Suffolk Shipyard~NEWS08-01 ~Letters, faxes, etc\Transmitlal -TOS Board of Trustees_03.17.09,doc
'\,
.Il
I~) q ~ ~ ~ -- ~ N, 1 EXISTING CONDITIONS DEPICTED ON THIS DRAWING <INCLUDING MEAN AND LOW HIGH WATER/ WETLANDS ; : , , : lib ;
~ ' ~ ~ ~ N ~ ~N / ~ (PER REFERENCE SURVEY) INSIDE THE TANK THESE MARKINGS MUST BE CONSISTENT WITH THE COLOR AND SYMBOL CODE OF THE ' ~ ' ,, n,: ; ,
~ ~ '"%~ I : k;!,s; ~¢ ]f:[q~]J~:jJ ~[::: :~¢~J (516) 433-4320 F~ (516) 433-4364
' ~ ~ ............. ~¢ ~~' A HEXAGON ~OR DIESEL AND OTHER ~ISTIL~TES.
THE BORDER WILL fie B~CK AROUND A WRITE ~Y~BOL AND WHIT~ AROUND ALL OTHER COLORS. ~J
/ STO~ACE / ~ ~ ~ ~ / 7. THE INST~R MUST NOTI~ THE SCDHS OFFECE OF DATE WORK IS TO START AND SHALL CONFIRM ALL
10. EMERGENCY SHUTOFF SWITCHER SHALL BE CL~RLY MARKED AND E~DILY ACCESSIBLE ~D MRS CHRIS M TARTAGLIA
~ PROP. 10 ¢ DRYWELL ] / STALLS (~P.) ~ ~ ~ ~ REQUIREMENTS OF NFPA 50A-1 1.5.3 CONC CLEANOUT BOX
~ ~ SEE DETAIL THIS SHEET~ j / ' ' ~ ~ ~ ~ ~1. PER NYS DEC REGU~TIONS, CONTRACTOR TO PREPARE AS-BUILT SK~CH WITH DETAILED TANK PIPING W/ METAL FRAme AND COVER
7 X/ ~ 5 ~~ LOCATIONSINDICATEDANDPROVIDESK~CHTOENGINEEROF.ECORD. I
~ ~ 5~ PROFESSIONAL ENGINEER
/ / .Dot: oo
~~ , I , [~ /LINE ~ WOOD BULKHEAD ~ ~ ~ ~ VOLU"E REOURIEO : AR~x RUNOFF COEFFICIENT x 0.167 FEET
~~~ ~7 ] ~ ' X X ~ X REQUIRED OR'ELL DEPTH TOTAL VOLUME THE EDUCATION ~W OF THE STATE OF NEW
TEST HOLE /111 1111/I
SOLID COVER ~ ~ PROP, 15 LF 4"¢ 6PP
/-- ~ V REPUTED LOOATON CONC' P*O~ '; .
' N ~l ~PJTg~ED UJN, 1.0~ TO PROP. DRYWeLI l/ -- I x X~ ~ REFER TO DRAINAGE SCHEDULE fiDS - ~ --~ .... EXIS"NG CONTOUR
CORRESPONDING GRATE/COVER INFORMATION
..... W ..... ~*1 % ~/W/ MIN. 2' OF COVER r -- ~ ~ % 4" THICK CONC BLOCK OR
~ ~ ..... PROPOSm STORM ~,N PIP,N6
~ .... ~ .... ~ ..... ~ ~ ROO~ torcH I fi~EW SUF~ ROAD
~ ..... ql~ I~[W SUFFOLK, TOWN OF SOUTHOL¢
~ El B B I] B = EXIS~N6 SEPTIC L~CHING POOL J DISTRICT: 1000
AND W'AP A"OUND TOP COLOR 3' B fl fl rJ I] I ~ ~ ~ ~
~ ~CONNECTION TO I .~..~1~[ .' I ~/II / ~ = ROOF AR~ TO BE CAPTURED
~E m .................. LRoor GUTTERS (TYP.) . ~ HA~gWA"E SCHEDULE (ADS OR APPROVED LOCAL)
REELS ON CONC. MAT - TRANSITION FROM ABOVE h"/FOOT MIN, SLOPE FL ATIN FRAME & GRATE CAMPaELL FOUNDRY
TO BELOW GLADE I : CONTRACTOR TO USE THESE m~EUS O~ APPROVED EQUAL D
TEST HOLE
12/19/03
N/O/F
MICHAEL J.
WITHERS
KEY M,4P
.
. o./ S. ~7 5~ O0 ~. ~;~ ~o~ /~7.~6
A:-~' '~ ~. ',~ ,- ,'~ _. ~_ ,~: : 0"'~ .-
~ ~ .... ~'~ ,'":~,~,~,~' .~-~.~,~,,,..,, _,~,', -~'~' 4 ,
40.00' os' . i~' ~, ? _',,
~%~2.;-¢1>~ _ e,.~.. ,],, ~ :x .MARINA I SPACE PER BOA T SLIP
~W.'~&' ,~r -' ~,:;}c~ ' ', :z . : 'EXISTING .,
' ~ ' ~ '~~' 5 EMPL 0 YEES = 5 '
~ PROPOSED BOA T STORAGE RACKS
~~.:; I K o ~-_( Z.~Y~ . ~ STORAGE RACK "A '-= 2 TI~ . :' ' ..... ,
=. ,- o ., .~.., ~ : . ~.., ~'," - STORAGE .RACK ~' = 5 =.~ TIER = 15 BOA
.. j,~:~./.' ,~ : , ."''~.~' '' ~,.,. · ,..- 0 ALONG EXISTING BLD&
~ · ' ~ ? . '~ ~ . ~ ~. ~ ..... ~ ~6 NOA TS
---~ ~o,, ~ ~/o~v. -.', ,- ,,. / SPACE FOR. 2 BOA= 83TS SPACES= 18 SPACES
SURVEY OF
NEW SUFFOLK SHIPYARD
OR C/ IA RD S TREE 7'
2.51
I0' oiomeler .
AREA = 2287 Acres to tie line's
ZONING DIS TRIO TS- MI & Mil
LOT COVERAGE
EXISTING = t1~
PROPOSED CONSTRUCTION
A T NEW SUFFOLK
r cOmPLEtION or coNSm rION
. , TO WN OF SOUTHOLD
AREA TO REMAIN NATURAL 10,400 sq, ft.
L-ANDSCbP~D AREA = 6000 ~q. fl.
SUFFOLK COUNTY, N. Y.
1000 - 117 - 05 - 29.1
Sca/e: 1"=,20'
Doc.. 13, ,¢999
FEB. 22, 2002
JAN. 8~ 2003 PAR;~ING)
Mar. 8.2003 '
MAR, ~l, PO03 ( revlloo )
APRIL 30~ 2003 (reves/ons)
Nov.. D, 200~' tR~IStQNS)
OCT. 2¢~ 2008fML~ML '
REINPORCED
tC COVER- USE ~ 4 BAR
EACH RAY
EXISTING
SPACES = 82,
TYPICAL LEACHING
BA SIN I
tNST~LL LOftIER T~AN EXISTING GRADE
T'O ACCEPT RUNOFF'AND MITIGATE RUNOFF
iNTO IFETLANDS
'BUILD UP DRIVEIFA Y EI~TRANCE TO DIVERT RUNOFF
T
DRA INA GE
BUlL DINGS &
16260 ~0.17~ I = £76~tcu. fL
BLUESTONE AREA '.=
41700~0.17~0.6= 4,253cu.?t.
7'017, cu. fl.
?'017 cu./l,/68.4 = 102 VF.
PROVIDE 51 ,- I0'¢~ 2."Deep ,or
LIG'?-ITING (ex/sh'ng)
~ = FLOOD LIGHT
® ~ AREA LIGHT
CP/TER/A
CONCRETE PA VEMENT=I6260 sq. ft.
41, 700sq. ft.
eqool ,,
(
N.Y.S. L/C. NO. 49618
P.C,'
(6512 765 - 5020 FAX ( 631) 765 - 1797
,P. O. BOX 909
1230 TRAVELER STREET
SOUTHOLDf N.Y. 11971
O WNER/A PPL ICA N T'
NEW SUFFOLK MARINA LLC
6775 NEI¢ SUFFOLK ROAD
NEI¢ SUFFOLK~ N. Y.
ANY ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION
OF SECTION 7~09 OF THE NEW YORK STATE EDUCATION LAW.
EXCEPT AS PER SECTION 7~09 - SUBDIVISION ~. ALL CERTIFICATIONS
HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF
SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR
WHOSE SIGNATURE APPE, ARS HEREON.
ADDITIONALLY TO COMPLY WITH SAID LAW THE TERM "ALTERED BY'"
MUST BE USED BY ANY ,AND ALL SURVEYORS UT!,L, IZIN6 A C?PY
OF ANOTHER SURVEYORS MAP. TERMS SUCH AS INSPECTED AND
'BROUGHT-TO-DATE' ARE NOT' IN COMPLIANCE WITH 'THE LAW,
NOTES,