Loading...
HomeMy WebLinkAboutRoundabout @ CR 48 & Cox Neck RdSUFFOLK COUNTY LEGISLATURE EDWARD P. ROMAINE LEGISLATOR 1ST DISTRICT September 5, 2006 Honorable Scott A. Russell Supervisor, Southold Town P. O. Box 1179 Southold, NY 11971 Dear Supervisor Russell: Attached is correspondence from Charles Bartha, former Department of Public Works (DPW) Commissioner, regarding the status of a proposed roundabout for the CR 48 and Cox Neck Road intersection. I am following through to ensure that the RFP is issued and awarded before the end of this year. As you can see, Commissioner Bartha mentioned that as a temporary measure DPW was planning on installing a traffic signal at the intersection, until such time a decision is made concerning a roundabout. I will try to pin down DPW about when this traffic signal will become operational. Rest assured, I will keep you and the members of the Town Board apprised of any information regarding this matter. Sincerely, . ]~ Edward P. Romaine County Legislator, 1st District EPR:jml cc: Southold Town Board Members 423 GRIFFING AVENUE RIVERHEAD, NY 11901 PHONE (631)852-3200 FAX (631)B52-3203 COUNTY OF SUFFOLK STEVE LEVY SUFFOLK COUNTY EXECUTIVE GILBERT ANDERSON, P.E. CHIEF DEPUTY COMMISSIONER DEPARTMENT OF PUBLIC WORKS CHARLES J. BARTHA, P.E. COMMISSIONER LESLIE A. MITCHEL DEPUTY COMMISSIONER Augu~ 10,2006 Honorable Edward P. Romaine 1a Legislative District 423 Gfiffing Avenue, Suite 2 Riverhead, NY 11901 RE: CR 48, 2dd~ Road ~ Cox Neck Road Dear Legisl~aine: I am in receipt of 5'bur letter dated July 25, 2006 to William Hillman concerning the status of the above referenced location. Based on the study conducted by this Department in 2004, additional control is warranted at this location. We are issuing a RFP this summer to study the feasibility of coma'acting a roundabout within the existing fight-of-way. At present, the only funding available is for this feasibility study. The consultant will provide the following: · Determine if a roundabout can be constructed within the existing R.O.W. utilizing the design criteria that matches the existing design standards for CR 48. · A preliminary design. · An estimate of additional fight-of-way that may be needed. · A computer simulation of the traffic flow. · Preliminary cost estimate for future capital project. A contract will be awarded in the fall of this year and a determination should be available by the beginning of next summer. Upon completion of this study, DPW will propose a future capital project utilizing the cost estimate derived from the study. However, in order to provide more positive control at this location, we are going to install a temporary traffic signal until such time as the roundabout issue is resolved. This interim measure will improve the level of safety until the permanent solution is provided. If you have any questions or require additional information concerning this matter, contact either myself or William Hillman, P.E., Chief Engineer of Highways/Waterways at 852-4002. c~~ry truly yours, Charles J. Bartha, P.E. Commissioner CJB:RJB:dm Cc: Kevin Law, Chief Deputy County Executive/General Counsel William Hillman, P.E., Chief Engineer Daniel J. Dresch, Traffic Engineer III SUFFOLK COUNTy IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER (631) 852-4010 335 YAPHANK AVENUE · YAPHANK, N.Y. 11980 · FAX (631) 852-4150 SUFFOLK COUNTY LEGISLATURE AUG 0 1 2006 EDWARD P. ROMAINE LEGISLATOR 1 ST DISTRICT July 25, 2006 William Hillman, P.E. Chief Engineer Depa~tsnent of Public Works 335 Yaphank Avenue Yaphank, NY 11980 JUL 2 8 2006 DEPT. OF PUBLIC WORKS CHIEF ENGINEER' OF[=IC~E DOCUMENT NO. ~ Dear Mr. Hillman: Please provide me with the status and a history of the proposed roundabout at the intersection of Cox Neck Road and County Road 48 in Mattituck. Is this project included in the capital budget? If so, how much funding has been included and when is the project scheduled for design, land acquisition, and construction? Sincerely, ~ . Edward P. Romaine Suffolk County Legislator, First District EPR:bf