HomeMy WebLinkAboutRoute 25 Resurfacing - Highland Rd to Sixth StSUBIMAL CHAKRABORTI, P.E.
REGIONAL DIRECTOR
August 9, 2005
State of New York
Department of Transportation
State Office Building
250 Veterans Memorial Highway
Hauppauge, NY 11788
COPY
THOMAS MADISON, JR.
ACTING COMMISSIONER
Honorable Joshua Y. Horton
Supervisor, Town of Southold
Town Hall
53095 Route 25
P.O. Box 1179
Southold, New York 11971-0959
Dear Mr. Horton:
Contract D259518, PIN 0041.99.321
Route 25 Resurfacing, Restoration & Rehabilitation
Highland Road to Sixth Street
Village of Greenport
Suffolk County
After several meetings with different groups, and the input of the elected officials and emergency
services units, the raised median in Cutchogue was removed from the project and replaced with
the painted median which was originally at this location.
Since the project is scheduled for completion this fall, and there is no agreement with all parties,
we do not feel that changing the design can be done at this time.
Thank you for your continued interest in highway safety.
Very truly yours,
Odgina~ signed by
George Knips
GEORGE J. KNIPS, P.E.
Regional Construction Engineer
CC.*
Honorable Kenneth P. LaValle, Member, New York State Senate
Neboysha Brashish, Southold Town Transportation Commission
James Richter, Southold Town Engineering Depat h~ent