Loading...
HomeMy WebLinkAbout07/2009PETER W. HARRIS Superintendent Highway Department Town of Southold 275 Peconi¢ Lane · P.O. Box I78 · Peconic, N.Y. 11958-0178 Tel. (631) 765-3140 (631) 734-5211 Fax (631) 765 1750 To: From: Town clerk / Betty Neville Highway Department / Peter Hams Re: July Monthly Report Date: July 20, 2009 The highway department has been engaged in the following operations: The mowing of our road side right-of-ways and the comers at many intersections throughout the town, to present a clean and inviting appearance to the traveling public as well for public safety in the event that an/reals or children should dart out in f~ont of vehicles. The continuous sweeping of our 400 miles of roads, however due to the fact that the sweeper fleets normal daily wear and tear and the ( AGE ) of the equipmem have been out of service do to mechanical problems on a regular basis. The cleaning and repair of the of the highway depamuents street drainage system, this includes the service of the department two vacuum trucks and the rebuilding of old drainage structures that are crumbling due to their age and installing new drainage. The department has been engaged in the removal of many dead or trees that are a public safety hazard. This has been caused by recent severe storms that have moved throughout the township. The tt/mming of trees and road side vegetation as well. The resurfacing of streets will begin either the end of this month or the beginning of August. The department has been encountering a significant mount of potholes this spring and summer, I realize that the budget has been cut for 2009, however this must be addressed in the 2010 budget before it costs this town even more money down the road. The board may want to seriously consider doing a Capital Projects Bond instead of budgeting for it in the operating budget. The street striping crew will be painting the center lines next month. They are currently painting stop bars and R x R crossing markings. cc: Supervisor Town Councilpersons