HomeMy WebLinkAboutTR-7076A James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Diekerson
Dave Bergen
Bob Ghosio, Jr.
Town Hall, 53095 Main Rd.
P.O. Box 1179
$outhold, NY 11971
Telephone (631) 765-1892
Fax (63 I] 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION:
Ch. 275
Ch. 111
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt Curtain
1~t day of construction
½ constructed
Project complete, compliance inspection.
INSPECTED BY:
COMMENTS:
CERTIFICATE OF COMPLIANCE:
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio, Jr.
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 0458C
Date: September 1, 2009
THIS CERTIFIES that the installation of roof mounted solar photovoltaic system and
upgrade the electrical service
At 1600 Park Avenue, Mattituck, New York
Suffolk County Tax Map # 123-8-4
Conforms to the applications for a Trustees Permit heretofore filed in this office
Dated 4/1/09 pursuant to which Trustees Administrative Permit # 7076A
Dated 4/22/09 was Issued and conforms to all of the requirements and conditions of the
applicable provisions of law. The project for which this certificate is being
issued is for the installation of roof mounted solar photovoltaic system and upgrade the
electrical service
The certificate is issued to WILLIAM EDWARDS owner of the
aforesaid property.
Authorized Signature
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio, Jr.
Town Hall
53095 Route 25
P.O. Box 1179
Southeld, New York 11971-0959
Telephone (631] 765-1892
Fax (6311 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES
72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN
APPOINTMENT. FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO
SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE
PERMIT.
INSPECTION SCHEDULE
Pre-construction hay bale line
1st day of construction
/rconstructed
eject complete, compliance inspection.
James F. King, President
Jill M. Doherty, Vice-President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio, Jr.
Town H~lAnnex
54375Main Road
P.O. Box 1179
Southold, NewYork 11971-0959
Telephone (631) 765-1892
Fax (631) 765-6641
~BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Permit No.: 7076A
Date of Receipt of Application: April 1, 2009
Applicant: William Edwards
SCTM#: 123-8-4
Project Location: 1600 Park Avenue, Mattituck
Date of Resolution/Issuance: April 22, 2009
Date of Expiration: April 22, 2011
Reviewed by: Board of Trustees
Project Description: To install roof mounted solar photovoltaic system and
upgrade electrical service.
Findings: The project meets all the requirements for issuance of an
Administrative Permit set forth in Chapter 275 of the Southold Town Code. The
issuance of an Administrative Permit allows for the operations as indicated on the
site plan prepared by James A. Marx, Jr. P.E., last dated February 22, 2009, and
received on April 1, 2009.
Special Conditions: None.
Inspections: Final inspection.
If the proposed activities do not meet the requirements for issuance of an
Administrative Permit set forth in Chapter 275 of the Southold Town Code, a
Wetland Permit will be required.
This is not a determination from any other agency.
James F. King, President
Board of Trustees
JFK:eac
James F. King, President
Jill M. Doherty, Vice*President
Peggy A. Dickerson
Dave Bergen
Bob Ghosio~ Jr
P.O. Box [ 170
Southold, NY 11971
Telephone (631 ) 765-1892
Fax (631) 765~6641
Southold Town Board of Trustees
Field Inspection/Worksession Report
Date/Time:
WILLIAM EDWARDS requests an Administrative Permit to install roof
mounted solar photovoltaic system and upgrade electrical service.
Located: 1600 Park Ave., Mattituck. SCTM#123-8-4
Type of area to be impacted:
__Saltwater Wetland Freshwater Wetland
__Sound Bay
Distance of proposed work to edge of wetland
Part of Town Code proposed work falls under:
__Chapt.275 Chapt. 111 other
Type of Application: __ Wetland __Coastal Erosion __Amendment
~Administrative__Emergency Pre-Submission __Violation
Info needed:
Modifications:
Conditions:
Present Were: __&King __J.Doherty __P.Dickerson __
D. Dzenkowski Mark Terry__other
Form filled out in the field by
D. Bergen__ B.Ghosio,
Mailed/Faxed to:
Date:
Environmental Technician Review-
3000m & 4000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
The SunPower inverters 3000m and 4000m provide
exceptional reliability combined wilh supedor I:~rformance.
Innovative design and advanced testing have been brought
together to create a durable inverter that enables optimal
system performance over the long term. Both models come
with a standard lO-year warranty.
SPR-3OOOm and SPR-4OOOm
~v. sunpowercorp.com
3000m & 4000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
SPR-3OOOm SPR-4OOOm
3500 W ~* 208 V /
AC Power 3000 w
4000W@ 240V
AC
Maximum
Ou~ut Cun~llt 1 SA, 12,5A 17A, 16.6A
----,'--,,,, ,,,,,,,~m,,,,,~Ar~u"--JnalU'k-"~/°a'~' 183-229Ve20eVAC 183-229Ve2~VAC
211-264VO240VAC 211-264VO240VAC
AC Frequency / Range 60Hz/59.3Hz- 60 Hz / 59.3 Hz-
60.5 Hz 60.5 Hz
Power Factor 1 1
Pec~k Jrlvetter Efficieflcy 96.6% 96.8%
SPRm Efficiency Curves
100
~v~
~o
480 Vd¢
75
% of Ruted Output Power
Shipping Dimensiens W x H x D inches 23.$' x 1e.5' x 16.0'
Unit Dimensions W x H x D inches 17.8' x 13.8' x 9~3'
Inver~r
Weight ee lbs
CEC Weighl~d Efficiency 95.0 % · 208 v 95,5 % e 208 v
95.5 %Q 240v 96.0 %~ 240v
Recommended Anay Input 3coo W 4800 W
Power (DC C~ STCI
DC Input Vdtoge Range 200 - 500 V Q 208V 250 - 600 V @ 20~ VAC
200-500 V ~ 240V 250 -600 V ~ 240 VAC
Peak Power Tracking Vd~ge ~80-400VQ20eVAC 220-480VI~208VAC
200- 400 V O 240 VAC 250 -480 V ~ 240 VAC
DC Max. Jflput Current 17A 18A
DC Vollage Ripple ·
No. of Fused St~ng Inputs 4
Power Consump~ofl~ <7w/0.1 w
Slandby / Nighttime
Fused DC DJscofllle~ $1andarcl; Complies w NEC Standards
Grounding PoslUve Ground
Shipping Weight 94 lbs
Cooling Electonics Enclosure
SunPower designs, manufactures and delivers high-perfarmance solar electric technology worldwide. Our high-efficiency solar cells
generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers deliver
significancy more energy than competing systems.
www. sunpowercorp.com
500Om, 6000m & 7000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
The SunPower inverters 500Om, 6000m & 7000m
provide exceptional reliability and market-leading design
flexibility. The SPRm line of Solar Inverters can be easily
applied in residential or commercial installations. All
models come with a 10-year warranty.
SPR-5OOOm, SPR-6000m & SPR-7OOOm
w,~v. sun powercorp.com
5000m, 6000m & 7000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
SPR-5OOOm SPR-6OOOm SPR-7OOOm
An'ay Input Power 5300w 6400w 750ow
(Dc e sTc)
Input
Tracking Vollage
DC Voltnge <5% Rippki
No. d Fused
String Inpu~
S~andby / <zW/O.25w
Nigl~ime
SPRm Efficiency Curves
IO0
75
% of Ra~d Ou~ut I~
Sbipplng DimemJaes W x H x D inches 23.5' x 31.0' x 16.0'
Unff Dimeesions W x H x D inches 18.4~ x 24.1' x 9.5'
Inverter WeJgtd 143 lbs
Shipping Weight 154 lbs
Cooling Forced Air / Sealed Elect~o~ics
Enclosure
Endaeure NEMA 3R
Me.riling Wall Mout~t Bracket Standard
SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells
generate up to 50 percent more power than conventional solar ceils. Our high-performance solar panels, roof tiles and trackers
deliver significantly more energy than competing systems.
www. sunpowercorp.com
215 SOLAR PANEL
EXCEPTIONAL EFFICIENCY AND PERFORMANCE
The SunPower 215 Solar Panel provides industry
leading efficiency and performance. Utilizing 72 next
generation SunPower all-back contact solar cells and
an optimized panel design, the SunPower 215 delivers
an unprecedented total panel conversion efficiency of
17.3%. The 215 panel's reduced voltage-temperature
coefficient and exceptional low-light performance
altributes provide far higher energy delivery per peak
power than conventional panels.
Sunpower's High Efficiency Advantage - Up to Twice Ihe Power
SPR-215-WHT
215 SOLAR PANEL
EXCEPTIONAL EFFICIENCY AND PERFORMANCE
Peak Power (+/-5%) Prnax 215 W
Rated Current Imp 5.40 A
Open Circuit Voltage Voc 48.3 V
Sho~' Circuit Current Isc 5.80 A
Temperature Coefficienls
Power -0.38~%/°C
Voltage ~/oc) -136.8 mV/°C
Current (IR) 3.5 mA/~C
Series Fuse Ra~ng 15 A
IV Curve
7.0
6.0
5.0
4.0
2.O
1.0
0.0
1000 W/m~
800 w/n'.~ ~
0 I0 20 30 40
Peak Power per UnitArea 173 W/m2, 16.1 W/~ ~
CEC FTC Rating 198.5 W
Temperature - 40° C to +85° C ~,0° F to +185° F)
Max load 50 p~f (2400 Pascals) front and back
Impact Resistance Hail - 25mm (1 in) at 23 m/s {52 mph)
Solar Cells 72 SunPower allback ~nlact rnonoay~alline
Front Gbss 3.2mm (1/8 in.) lempered
Junc~on Box lPg5 raled wilh 3 bypa~ dJode~ Warranly 25 year limit~cl power warranly
Output Cabbs 900mm lenglh cable / Mul~i~ontact connectors 10 ~ar limiled product warranly
Frame ~ ~A~ ~1~ ized_~lu~i~n~_~m alloy type 6063 _ Certifications IEC 61215, Saf~y tesled IEC 61730;
Weight 15kg, 33lbs UL listed JUL 1703), Clms C Fire Rating
Dimensions
CAUTION: READ SAFETY AND INSTALLATION INS1RUCTIONS BEFORE USING 1HE PRODUCI'. Go to www.sunpowercorp.com/panels for details
SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high.efficiency solar cells
generat~ up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers deliver
significantly more energy than competing systems.
~'~ Printed on rewcled paper w~v. sunpowercorp.com
2 Strings of 8 SunPower 215 watt panels.
Each sting has 1720 watts
Array total of 3440 watts
All panels to be
grounded as per
NEC code
30 AMP two po~e DC
switch from panels to
inverter
SUNPOWER SPR 4000 INVERTER
240 VAC
~/~ ~ 30 AMP 3R
switch near
utility meter
240 VAC from inverter to a 30
4 Strings of 8 SunPower 216 W
panels,
Each string 1,720 watts
Array total of 6880 Watts
All panels to be
grounded as per
NEC code
2, 30 AMP two pole
DC switches from
panels to inverter
SUNPOWER SPR 7000 INVERTER
240 VAC
240 VAC from inverter to a 30
Amp switch near utility meter
Office Use Only
__Coastal Erosion Permit Application/
Wetland Permit Application ~/Administrative Permit
ReAmendment/Transfer/Extension
ce,v~d Application: ~/I /6 ~
eceived Fee:$ 5~ o.~o --
Completed Application
__Incomplete
__SEQRA Classification:
Type I Type II Unlisted
__Coordination:(date sent)
CAC Referral Sent:
~--Date of Inspection: 7[
~Receipt of CAC Report:
~Lead Agency Determination:
Technical Review:
~blic I~e~ng m~d: q/O.~ I O~]
~Resolution:
NameofApplicant ~'[[ I~;~ ~
Address
Suffolk County Tax Map Number: lO00-
Property Location: l(oC)O '-~k_
-'"'"'-~og;g . o~,'o d
(provide LILCO Pole #, distance to cross streets, and location)
AGENT: & lreOr~ LOOSE_.. L
(If applicable)
cbo.co._ e.,c4-, 117
Board of Trustees Application
Land Area (in square feet):.
Area Zoning:.
GENERAL DATA
Previous use ofproperty: (~)0t':' ~¢Y'~! ILl <E~t~C~t ttr't~
Intended use ofproperty: 0/~ ~'~l[~ C[t~e~ltH~
Prior permits/approvals for site improvements:
Agency Date
No prior permits/approvals for site improvemems.
Has any permit/approval ever been revoked or suspended by a governmental agency?
v/ No Yes
If yes, provide explanation:
Project Description (use attachments if necessary):
Board of Trustees Application
COASTAL EROSION APPLICATION DATA
Purposes of proposed activity: I FI
Are wetlands present within 100 feet of the proposed activity?
No Yes
Does the project involve excavation or filling?
V~ No Yes
If Yes, how much material will be excavated? .(cubic yards)
How much material will be filled? (cubic yards)
Manner in which material will be removed or deposited:
Describe the nature and extent of the environmental impacts reasonably anticipated resulting
from implementation of the project as proposed. (Use attachments if necessary)
Board of Trustees A~plic&tion
County of Suffolk
State of New York
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE
TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK
WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY
BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT
AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES
HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS
APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR
REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE
PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION.
SWORN TO BEFORE ME THIS
Signature
/ 5,r'- DAYOF
,20 del
Notary Publfc
BARBARA A.
Notary Public-State of New York
No 01-CA4894969
Qualified in Suffolk County
My Commission Expires May tl
~31, M~r. 1/1
, .. rN° 2198~P.
AI~TitO]II~ATION
(Whe~ tl~ applic~at is not thc owner)
I, '; ~,,~;a r~sidin$ et
(print owner of propettT) (mailing addrcss)'~-
~ rc¢ Lo $ c
do hereby amhorize
(Age-t)
L- L~ toapply forpennit(s)fi~nthe
Souihold [hm, d of Town Trustees on my belud£
(Own~'s s~m~)
,/.
/4,,,,>>', ',',,, ~ k
Board of Trustees Application
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations: I I~[I ~r..)~ ~Y~)l~t. vr-~
se tce
Area of wetlands on lot: .square feet
Percent coverage of lot: %
Closest distance between nearest existing structure and upland
edge of wetlands: feet
Closest distance between nearest proposed structure and upland
edge of wetlands: N//[ feet
Does the project involve excavation or filling?
v/ No Yes
If yes, how much material will be excavated?
How much material will be filled?
Depth of which material will be removed or deposited:
Proposed slope throughout the area of operations:
Manner in which material will be removed or deposited:
cubic yards
cubic yards
feet
Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by
reason of such proposed operations (use attachments if appropriate):
APPLICANT/AGENT/REPRESENTATIVE
TRANSACTIONAL DISCLOSURE FORM
The Town of Southold's Code of Ethig~ vrohibits conflicts of interest on the vart of town officers and emt>lovees. The vumose of
this form is to vrovide information which can alert the town of oossible conflicts of interest and allow it to take whatever action is
necessasv to avoid same.
(Last name, first name, middle initial, unless you are applying in the ~J~ran of
someone else or other entity, such as a company. If so, indicate the other
person's or company's name.)
NAME OF APPLICATION: (Check all that apply.)
Tax grievance Building
Variance Trustee
Change of Zone Coastal Erosion
Approval of plat Mooting
Exemption from plat or official map Planning
Other
(If "Other", name the activity.)
Do you personally (or through your company, spouse, sibling, parent, or child) have a relationship with any officer or employee
of the Town of Southold? "Relationship" includes by blood, marriage, or business interest. "Business interest" means a business,
including a partnership, in which the town officer or employee has even a partial ownership of(or employment by) a corporation
in which the town officer or employee owns more than 5% of the shares.
YES NO /
If you answered "YES", complete the balance of this form and date and sign where indicated.
Name of person employed by the Town of Southold
Title or position of that person
Describe the relationship between yourself (the applicantdagentdrepre sentative) and the town officer or employee. Either check
the appropriate line A) through D) and/or describe in the space provided.
The town officer or employee or his or her spouse, sibling, parent, or child is (check all that apply):
__A) the owner of greater than 5% of the shares of the corporate stock oftbe applicant
(when the applicant is a corporation);
B) the legal or beneficial owner of any interest in a non-corporate entity (when the
applicant is not a corporation);
__C) an officer, director, par~er, or employee of the applicant; or
__D) the actual applicant.
DESCRIPTION OF RELATIONSHIP
Form TS 1
IPROJECT ID NUMBER
PART 1 - P~OJECT INFORMATION
617.20
APPENDIX C
STATE ENVIRONMENTAL QUALITY REVIEW
SHORT ENVIRONMENTAL ASSESSMENT FORM
for UNESTED ACTIONS Only
( To be completed by Applicant or Project Sponsor)
2. PROJECT NAME
cou.
1, APPLICANT I SPONSOR
3,P~OJECT LOCATI :
PRECISE LOC~ON: ~rest ~ldesa and R~ Ingrains. Pm~nent te~ma~ e~ - or ~i~ mag
~RI~ ~OJE~ ~IEFLY:
8EQR
7. AIdOUNT OF LANO AFFECTED:
Initially auel Ultimately
8,1~ PROPOSED ACTION COMPLY WITH EXI~I'ING ZONING OR OTHER RESTRICTIONS?
I'lYes I~ No If no, descfibebrie6y:
RAT iS PRESENT LAND USE IN VICINITY OF PROJECT? (Choese es many es apply.)
esklential [~lndultrial I~lcomrnamlal I~"lAgriculture ~lPsrklForesl,OpenSpace r--lOIt~er (~escdbe)
10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL
AGENCY (Federal, ~ete or Local)
I~Yss r'~No If yes, list age;icy name arid pe~lti /
approval:
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
I~'lYes I'"-~o If y~s, list agency mime and permit / approval:
jt~SesA ~-~UN~LT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION?
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
Appli.nt ,$pl~l~orNam.NeSimAtb d re ccc)
If the action I~ I Costal Ares, and you are i stats agency,
complete the Coaltal ASlelsmsnt Form before proceedlRg with this aSlolsment
PART II - IMPACT A~E~SMENT ~To be completed by Lead Agency)
I:~OES AC'tlON F.~XCEED ANY TYPE I THRESHOLD IN E NYCRR, PART 617.47 If yea. coor~ll~e the reviev/proonos sud use Iha FULL EAF.
[--I Ye.
WILL ACTION RECEIVE COORDINATED I;~'VIEW A8 PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.67 If NO, a nsgetiva
declaration may I~ lupamaded by anofhar Involved ~gency.
[:~1 Yes [~No
C. COULD ACTION RESULT IN ANY' ADVERSE EFFECTS ASSOCIATED WI'i~-I THE FOLLOWING: (An~,~rs may he handwritten, if
C1.Exl~ng llr qu~, surface or groundwater qu~by or quantity, no[se levols, eyJst~ng traffic pattern, solid waste production or die~osal,
pofon~l for Orodon, drainage or ifcodlng pmbleros? Explgn Hefty:
C3. legeIAtlon ot fsun~, iflh, Ihall~lh °r wlHIIfo II'es, I~gniflcetlt hal~ltl, or if'4'estened or endaW Ipecl~? Explain b~fiy:
C4. mm rlltat Ky'i ~ltieg pll~ Or gosli es Oft~taly I~ted, ot I otilnge In uos or Intsnl~ of u~ Of ial~"o~'o~'h~ osturai msoun~l?' E.~in briefly:
ce. E "in i ' ...............................................
C7, O~lmpa~{~ih~'Chg~lh~s'ofe~h.~esm,/ort}?eofene~F/''' Explain b~¥;
D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL
.-.-- .......................................
E. IS THERE. OR IS THERE UKELY TO BE; CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? ff yes ex,)lain:
E3TM ! .......................
IN$?~UC~IO~$: For ~had¥®r~ffl'~tid~nt~l~l~t~,d~mthe~h~ther if ~ sube~nif~l,l~rg,, Im~t~rofl~i~$~lnif~nt.
effect should be .asessed In connection with ~m (a) salting (La. utl~an or ruml); (b) prot3ebility of occurring; (c) duration; (d) th~vemibiity: (e)
geographic scope; and (t~ magnitude. If nese~sary, add attacllments or re~erance supporting materials. Ensure that explanatldn~ contain
sufficient detail to shew ~hat ;dl rele~'ant adverse impac~ have been identified and adequately addressed. If question d of part ii was checked
yes. the cletatminalion of significance must evaluafo the potential impact of~te proposed action on the environmental charaofedsfJcs of the CEA.
Cheek this box if you have Idan6fled one o~ more potentially large or ~igniflosnt edveme impacts which MAY occur. Then proceed direly to ~e FULl
EAF and/or pmpm'e a po~ declaration.
Check this box If you have delormined, based on the information end mlalysi~ above and any ;uoporting documentation, that the proposed edict
WILL NOT result in any significant advema environmental impacts AND provide, on attachments as necessmy, the reasons ~pporting thil
doformlnsfion.
Name of Lead Agency Date
Print or Type Name of Rellxx'~ltile Offlosr I~1 Lead Agency
Tit~ of P~spooslb~ Officer
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard ~lrea.
Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its significant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law.
Thus, the action should be analyzed in mom detail and, if necessary, modified prior to making a
determination that it is consistent to the maximum extent practicable with the LWRP policy
standards and conditions. If an action cannot be certified as consistent with the LWRP policy
standards and conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's
website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
leV0
scm# Io ao 0 t
The Application has been submitted to (check appropriate response):
TownBoard ~ Planning Dept. [] Building Dept. ~ BoardofTrustees []
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital
construction, planning activity, agency regulation, land transaction)
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action:
Location of action:
Site acreage:
Present land use:
Present zoning classification:
If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
(a) Name of applicant:
(b) Mailing address:
(c) Telephone number: Area Code ( )_
(d) Application number, if any:_
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes [] No [] If yes, which state or federal agency?.
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation
criteria.
[] Yes ~'~ No ~ Not Applicable
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III - Policies Pages 3 through 6 for evaluation criteria
Yes ~ No [] Not Applicable
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section III - Policies Pages 6 through 7 for evaluation criteria
~-~ Yes [] No [] Not Applicable
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III - Policies Pages 8 through 16 for evaluation criteria
Yes No ~ Not Applicable
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southoid. See LWRP Section HI
- Policies Pages 16 through 21 for evaluation criteria
Yes ~-~ No ~Not Applicable
Attach additional sheets if necessmy
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria.
[] Yes ~-~ No [] Not Applicable
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section IH - Policies
Pages 32 through 34 for evaluation criteria.
[] Yes ~ No~/NotApplieable
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria.
Yes [] No Not Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria.
Attach additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria.
~-~ Yes ~-] No ~ Not Applicable
Atlach additional sheets if necessary
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria.
Yes No [~Not Applicable
Attach additional sheets if necessary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages
62 through 65 for evaluation criteria.
~-~ Yes [] No ~fNot Applicable
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section III - Policies; Pages 65 through 68 for evaluation criteria.
[] Yes [] No ~ Not Applicable
Created on 5/25/05 11.'20 AM
C GREENLOGIC
ENERGY
March 31, 2009
Town of Southold
Town Trustees
Town Hall
53095 Route 25
Southold, NY 11971
Dear Trustees:
Please find attached a building permit application on behalf of William Edwards who has
engaged us to install a roof-mounted (flat to the roof) solar photovoltaic (PV) electric system for
his home on 1600 Park Avenue, Mattituck, NY.
In connection with this application, please find the attached in duplicate:
· An application
· ATransactional Disclosure Form
· AShort Environmental Assessment Form
· A LWRP Consistency Assessment Form
· Surveyof Premises
· An engineer's report
· AOne Line Diagram
· A Visio Diagram of the proposed system
· Spec. sheets of the solar panels (SunPower SPR-230-Wht)
· Spec. sheets of the inverter (SunPower SPR $O00m)
· GreenLogic Suffolk County Home Improvement License
· GreenLogic Certificate of Liability Insurance
· GreenLogic Certificate of Worker's Compensation Insurance Coverage
· Installation Manager's Master Electrician's License
Please let us know if you need anything else in connection with this application.
Yours truly,
Barbara Casciotta
Account Manager
631-771-5152 ext. 117
SOUTHAMPTON/CORPORATE
425 County Rd. 39A, ¢101
Southampton, NY ]1968
Tel: 631,771,5152
Fax 631.7715156
SOUTHOLD
52875 Main Rd., Box 435
Southold, NY 11971
Tel: 631,765.0404
Fax: 631.771.5156
MANORVlLLE
40 Woodland Avenue
Manorville, NY 11949
Tel: 631.771.5152
Fax: 631.771.5156
ROSLYN HEIGHTS
200 $ Servioe Rd, #108
Rosyln Heights, NY 1157/
Tel: 516625 6880
Fax: 5166256881
4 Strings of 8 SunPower 215 W
panels,
Each string 1,720 watts
Array total of 6880 Watts
All panels to be
grounded as per
NEC code
2, 30 AMP two pole
DC switches from
panels to inverter
SUNPOWERSPR70001NVERTER
240 VAC I
240 VAC from inverter to a 30
Amp switch near utility meter
2 Strings of 8 SunPower 215 wart panels.
Each sting has 1720 warts
Array total of 3440 warts
All panets to be
grounded as per
NEC code
30 AMP two pole DC
switch from panels to
inverter
SUNPOWER SPR 4000 INVERTER
240
VAC
/ 30 AMP 3R
switch near
(~ (~ utility meter
240 VAC from inverter to a 30
215 SOLAR PANEL
EXCEPTIONAL EFFICIENCY AND PERFORMANCE
The SunPower 215 Solar Panel provides industry
leading efficiency and performance. Utilizing 72 next
generation SunPower all-back contact solar cells and
an optimized panel design, the SunPower 215 delivers
an unprecedented total panel conversion efficiency of
17.3%. The 215 panel's reduced voltage-temperature
coefficient and exceptional Iow-light performance
attributes provide far higher energy delivery per peak
power than conventional panels.
SunPower's High Efficiency Advantage - Up to Twice Ihe Power
E~icienc7 9.0%
SPR-215-WHT
215 SOLAR PANEL
EXCEPTIONAL EFFICIENCY AND PERFORMANCE
Peak Power (+/-5%) Pmax 215 W
__~R_.c~d~' Vo~ge V~p~ _ ~39.8.v~ ....
~R ~a~d~ Cu~re_nt Imp ...... ~.42_A
O~n Civil Vol~ge V~ 48.3 V
S~ Ci~uit Cu~nt I~ 5.80 A
~imum S~ Vol~ge IEC, UL J ~ V, 6~ V
Tem~m C~cien~
P~ ~.38%/~C
Vol~ ~) -136.8 mV/~
Cu~t (1~) 3.5 m~"C
~ri~ Fu~ Ra~ng 15 A ........ ~
C~ ~C Ra~~ 198.5 W
Solar Cells 72 SunPow~' all.back conlacl rnono~li~
Front Glass 3.2mm (1/8 in.) I~mpered
JundJon Box IP-65 raled wilh 3 bypass diode~
Ouiput Cables 9OOmm lenglft cable / Mul6Conlad connedm's
Frame Anodized aluminum alloy type 6063
V~Jght 15kg, 331b$
IV' Curve
7.0
6.0
5.0
4.0
~.0
1.0
0.0
leOOW/m~
0 10 20 30 40 50 60
- 40° CIo +85° C J.~lO~ F Io +185° F)
Max load 50 p~f (2400 Pa~:a!s) fTont and ba~k
Impact Resistance Hail - 25mm (I in) at 23 m/s (52 mph)
Warranty 25 year limil~d power wanranly
10 ~ar llmiled produd warranty
Ce~fications IEC 61215, Safely ~ IEC 61730;
UL lided gJL 1703), Class C Fire R~ng
Dimensions
CAUTION: READ SAFELY AND INSTALLATION INS11~UCTIONS BEFORE USING THE PRODUCT. Go to ~v~v.sunpowercorp.com/panels for details
SunPower designs, manufactures and delivers high-performance solar electric techno)ogy worldwide. Our high-efficiency solar cells
generate up to 50 percent more power than convenfional solar cells. Our high-performance solar panels, roof files and trackers deliver
significantly more energy than competing systems.
~ Printed on recycled paper www. sunpowercorp.com
3000m & 4000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
The SunPower inverters 3000m and 4000m provide
exceptional rdiability combined wilh superior performance.
Innovative design and advanced testing have been brought
tagether to create a durable inverter that enables optimaJ
system performance over the long term. Both modeJs come
with a standard 1 O-year warranty.
SPR-3000m and SPR-4OOOm
~w,.su npowercorp.com
3000m & 4000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
SPR-3OOOm SPR-4OOOm
3500 W O 208 V /
AC J~l' 3000W 4000 w @ 240 v
AC Maximum Ou~ut Current 1SA, 12.5A 17A, 16.6A ~ 80
(~ 208v, 240v~
A~.sa.,m;nalV, d~,.,~/e...~ ]83-22~ve20evAc 183-229Ve20~VAC : 70
2H-264V~240VAC 211-26~V~240VAC
AC Frequency / Range 60 Hz / $9,3 Hz- 60 Hz / $9,3 Hz-
60.5 Hz 60.5 Hz
SPRm Efficiency Curves
480 Vd~
% of Ra~d Ou~ut Power
Power Factor 1 ~
Unit Dimensions W x H x D inches 17.8' x 13.8' x 9,3'
Peak Im~rter Efficiency 96.6% 96.8% Im~'tar Weight 08 lbs
Shyplng Weight 94 lbs
Forced AJ~ / Sealed
CooJlng El.ctronics Er,cio.sure
EI1cJo~ure NEMA 3R :
Mounting
IX~ Input Voltage Range 200 - 500 V ~* 208V 250 - 600 V ~* 208 VAC
200-500 V ~ 240V 250 - 600 V ~ 240 VAC
Peak Power Tracking Vdtage 200-400ve~v~ 2~-4eOVe~OVAC
DC Max. Input Current ~TA
Am blent Temperatam Range -13 to+113 °F
DC VolJage Ripple
No. of Fused Sl~ng Inputs 4
Power Consumption: <7w/0.1 w
Standby / Nighlfime ,
FU~I ~C D'L~O~ StamJard; Complies w NEC Standards
Grouirld Jllg Positive Ground
SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells
generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and h'ackers deliver
significantly more energy I~an competing systems.
wv~v. su npowercorp.com
500Om, 6000m & 7000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
The SunPower inverters 500Om, 6000m & 7000m
provide exceptional reliability and market-leading design
flexibility. The SPRm line of $oJar Inverters can be easily
applied in residential or commercial installations. All
models come with a 10-year warranty.
SPR-5OOOm, SPR-6OOOm & SPR-7OOOm
www. sunpowercorp.com
5000m, 6000m & 7000m INVERTERS
EXCEPTIONAL RELIABILITY AND PERFORMANCE
SPRm Efficiency Curves
SPR-5OOOm St)R-6000m SPR-7000m ~oo
a~ 9o 3~ov
AC Max Oulput ~' 4so v6c
240Y, 277Y): ~ 8o
Power Faclor
S~pplng DhTmns~ons W x H x D inches
Efficiency Unit Dirnendons
CEC We~ted 95,5 %Q 240v 95.5 %Q 240v 96.0%@ 240v ~ip~ng Weight 154 lbs
IDC O Sl~) End.ute NS~3R
i Mo~nllng Wall Mount Bracket Standa~
DC Input 250-6OO V 250- 600 V 250-600V Ambient Tempeealure Range -13 to+113 OF
Tracking Veltage Warranly 10 year limited warranly
Input C~rent UL 1998, FCC Part 15 A & B
23.5' x 31.0' x 16.0'
No. d Fused
4
Sldn~ Inpub
Slan~ / < 7 W / O.25 W
N~
SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells
generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers
deliver significantly more energy than competing systems.
www. sunpowercorp.corn
'STATE DF NEW YORK
WORKEI~' COMPENSATION BOARD
CERTRqCATE OF NYS WORKERS' COMPENSATION INSURANCE COVERAGE
42S Coumy Rd 39A Su#e 101
Soatimmptou NY !1968
lb. Budm~ Tdqdto~ Number or Imured
631-771-SIS2
Id ltedwal tmpioy~ ~ Number oflnfured
or .~1 .~iLy Nudser
2038O1194
Po]ky Nnmher of entity limed Jn Imx"la~'
Tekldmn~ Nund~ of mllm~d mlm~nmafi~ ~ l~m~ml asmt of k.,_~.~ ~atrkg. 631-941-4113
Only tm~ ~ an~ #a~' ~ ~,~t~ ~,~ dUrAW~M M ~n~ F~w 0.105.2. lmm'm~ ~ m.~ NOT
Suffolk County Executive's Office of Consumer Affairs
VETERANS MEMORIAL HIGHWAY * HAUPPAUGE, NEW YORK 11788
SUFFOLK COUNTY
DATE ISSUED:,
12/10/2007
No. 43858-ME
Master Electrician License
This is to certify that ROBERT J SKYPALA
doing business as GREENLOGIC LLC
having given satisfactory evidence of competency, is hereby licensed as MASTER ELECTRICIAN in accordance
with and subject to the provisions of applicable laws, rules,and regulations of
.,,, , ~,,,,,, the County of Suffolk, State of New York.
"" ' ~, Additional Businesses
, No? VALm wrmovT
,'DEPARTMENTAL SEAL
Director
ACOP. D. CERTIFICATE OF LIABILITY INSURANCE o,,o ~ '~"~
~-9 ol/19/o9
t~OOUCER THIS C~ ~ ~ED ~ A ~1 ~ ~ ~ INFO. ON
ONLY ~D ~NF~ NO ~ U~N ~E CE~
365 ~8~S ~ D~ ~R~E~E~O~BY~E~L~
~D9~ ~ 11997
g~o~e: 516-799-8222 I~U~ ~FO~NG CO~E ~C ~
~ I~ ~ ~ ~ ~ ~ 14788
425Coa6~ ~d. 39~ S~i~ 101 ~:
~o~ ~=~ ~ 11968
CER'IIFtCATE HOLDER
TO~N OF 8OOT~OLD
53095 ROuz~ 25
SOUTHOLDNY 11971
ACORD 26 (2001~08)
CANCELLATION
TO~SOH
February 22, 2009
To: Building Department
From: James A. Marx, Jr. P.E.
Re: Engineer Statement for Edwards Residence, 1600 Park, Mattituck, NY
for Solar Roof Installation
I have verified the adequacy and structural integrity of the existing roof rafters for
mounting of SunPower solar panels and their installation will satisfy the structural roof
framing design-loading requirements of the New York State Residential Code - 2007
without the need for adding reinforcing to the existing rafter beams.
For the installation of the solar mounting, the mounting mils will be anchored to the
rafters with Unirac standoff supports located on the center of the rafters and will be
securely fastened to the rafters with lag screws that have been designed for wind speed
criteria of 120 mph Exposure C and snow ground criteria of 20 psf. Wind loads will
exceed seismic loads. Other climate and geo design criteria are not applicable to this solar
installation.
The Photovoltaic system and the mounting assembly shown on the submitted drawings
complies with the applicable sections of building code - "Solar Systems" and applied
loading conditions that will satisfy the building code requirements.
Thereby, I endorse the solar p~jl~ation and certify this design for mounting the
solar mounting assembly ~_..~ at~er beams to be slructm'ally adequate.
Sincerely, /~~:~ ~?'~
James A Marx, Jr P.E.
NY Professional Engineer L~
10 High Mountain Road
Ringwood, NJ 07456
¢c: GreenLogic, AshlecReiniget
GreenLogic, LLC Proposed
Edwards, Bill S2
7.31kW
34 SunPower 215
UniRac Sunframe
Azimuth = 168°
Pitch = 20°
Scale 3/16" = 1.0'
, UN1RAC SUNFRAME RAILING
EDWARDS RESIDENCE
1600 PARK
~,i-ll'I'UCK, NY 11952
ATTACHMENT:
4" TWO PC. FLAT TOP ~,
w/5/16"x4" SS LAG BOLTS
Panel Dimension = 61.39" x 31.~
Array Length = 439.88" ~
Array Height -- 188.67~
Surface Dimensions = 40'10" x 19'7
NOTE
THE SOLAR ROOF CON'~ACTOR IS RESPONSIBLE FOR ~
MAINTAINING THE WA~OOF INTEGRITY OF THE ROOF
INCLUDING SELECTION OF THE APPROPRIATE SEALANT.
Marx Jr.
NY Professional Engineer License f~467
SunPower 215w
! I 2"x8"RoughSawn
Douglas Fir Rafter 16"
on center
~ UniRacSunFrame Rail
· UniRac 4" 2 Piece
Flat Top Standoff
Stm£T s-2~-a~/out Created By: JPHS Date: 1/7/09
APR - 1 ,
$ot~hho{d
GreenLogic, LLC Proposed
Edwards, Bill S1
3.01 kW
14 Sunpower 215w
UniRac Sunframe
Azimuth -- 168°
Pitch = 20°
Scale 3/16" = 1.0'
EDWARDS RESIDENCE
1600 PARK
MATHTUCK, NY 11952
/UNIRAC SUNFRAME EABANG I
/
ATTAC~:
4" T~O PC. FLAT TOP STANDOFF
w/5/16"x4' SS LAG BOLTS
Panel Dimension = 61.39" x 31,4~2'~
Array Length = 439.88"
Array Height = 64.39"
Surface Dimensions = 40'9"x8'2"
NOTE
THE SOLAR ROOF CONTRACTOR IS RF~SI~ONSIBLE FOR I
~A. Marx Jr.
NY Professional Engineer Licea~e 56467
MA1NTAIFSHG THE WATERPROOF INTEGRITY OF THE ROOF
INCLUDING SELECTION OF THE APPROPRIATE SEALANT.
SHEET S-4
SunPower 215w
2"x8" Rough Sawn
I l...DouglasFirRafter16"
on center
-- UniRac SunFrame Rail
· UniRac 4" 2 Piece
Flat Top Standoff
Laybut Created By: JPHS Date: 1/7/09
LOGIC
GreenLogic, LLC Proposed
Edwards, Bill S1
3.01 kW
14 Sunpower 215w
UniRac Sunframe
Azimuth = 168°
Pitch = 20°
Scale 3/16" = 1.0'
JEDWARDS RESIDENCE
1600 PARK
MATITILICK, NY 11952
SUNPOWER 215w PANELS /
PLAN
,..-- .... ..._.._
Panel Dimension = 61.39"x ~l~f~2" ',i' [ . ' ]~& ~Jr.
Array Length = 439.88~~1
~ay Height = ~.39"
Su~ Dimensions = 40'9'~~~~'~"~ .
. I t~ ~~.-' ',
SunPower 215w
i i 2"x8" Rough Sawn
Douglas Fir Rafter 16"
on center
-- UniRac SunFrame Rail
· UniRac 4" 2 Piece
Flat Top Standoff
SHEET S-3 / Layout Created By: JPHS Date: 1/7/09
GreenLogic, LLC Proposed
Edwards, Bill S2
7.31 kW
34 SunPower 215
UniRac Sunframe
Azimuth = 168°
Pitch = 20°
Scale 3/16" = 1.0'
EDWARDS RESIDENCE
1600 PARK
MATiTI1JCK, NY 11952
SUNPOWER 215w PANELS ,
Panel Dimension -- 61.39" x 31
Array Length = 439.88" ·
Array Height = 188.67"
Surface Dimensions = 40'10" x 19'7"
ne6 A. Marx Jr.
H~h Moun~M RMM
NY Professional Engineer License 56467
SHEET S-I
II
SunPower 215w
2"x8" Rough Sawn
Douglas Fir Rafter 16"
on center
UniRac SunFrame Rail
UniRac 4" 2 Piece
Flat Top Standoff
),' Layout Created By: JPHS Date: 1/7/09
TIE: 396'
P,4 RK ,4 VE.
N 86° 57'E
TOP BROKEN
SURVEY OF
LOT /5
S / TUA TE
MAP OF MARRATOOKA PARK
MATTITUCK, TOWN OF SOUTHOLD
SUFFOLK COUNT Y, N Y.
SURVEYED FOR: WILLIAM EDWARDS
ond
AblE/ WALLACH
LOT /4
LOT
/6
FILE MAP~ 450
FILED NO~I, 1905
TAX MAP NO. 1000-123-0,9-04
SCALE: I":. ,50'
AREA -- 83,323.44 SE
or
I. 9128 Acres
SURVEYED 14 OCTOBER, 1995
GUARANTEED TO ·
WILLIAM EDWARDS
AME! WALLACH
FIDELITy NATIONAL TITLE INS CO
TOWN OF SOUTHOLO
Guaronte~$ Indicated here on shall I'm
NOTE:
STONE
S87°
BROKEN ~ONCRETE
WALL THIS AREA
( HIGH
STORY
(- N 06°28'15"W
~ 5.9'
PECON/C 8,4Y
WATER L/NE RUNS ALONG BULKHEAD)
APPROVED BY
BOARD OF TRUSTEES
TOWN OF SOUTHOLD
SURVEYED BY:
STANLEY d. ISAKSEN, JR.
PO. BOX 294
NEW SUFFOLK, N Y, 1/9,56
(516) 734 - 5835
,?J2%I,PVEY°R
95R578