Loading...
HomeMy WebLinkAboutTR-7076A James F. King, President Jill M. Doherty, Vice-President Peggy A. Diekerson Dave Bergen Bob Ghosio, Jr. Town Hall, 53095 Main Rd. P.O. Box 1179 $outhold, NY 11971 Telephone (631) 765-1892 Fax (63 I] 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: Ch. 275 Ch. 111 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt Curtain 1~t day of construction ½ constructed Project complete, compliance inspection. INSPECTED BY: COMMENTS: CERTIFICATE OF COMPLIANCE: James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 0458C Date: September 1, 2009 THIS CERTIFIES that the installation of roof mounted solar photovoltaic system and upgrade the electrical service At 1600 Park Avenue, Mattituck, New York Suffolk County Tax Map # 123-8-4 Conforms to the applications for a Trustees Permit heretofore filed in this office Dated 4/1/09 pursuant to which Trustees Administrative Permit # 7076A Dated 4/22/09 was Issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the installation of roof mounted solar photovoltaic system and upgrade the electrical service The certificate is issued to WILLIAM EDWARDS owner of the aforesaid property. Authorized Signature James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southeld, New York 11971-0959 Telephone (631] 765-1892 Fax (6311 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT. FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction hay bale line 1st day of construction /rconstructed eject complete, compliance inspection. James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town H~lAnnex 54375Main Road P.O. Box 1179 Southold, NewYork 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 ~BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Permit No.: 7076A Date of Receipt of Application: April 1, 2009 Applicant: William Edwards SCTM#: 123-8-4 Project Location: 1600 Park Avenue, Mattituck Date of Resolution/Issuance: April 22, 2009 Date of Expiration: April 22, 2011 Reviewed by: Board of Trustees Project Description: To install roof mounted solar photovoltaic system and upgrade electrical service. Findings: The project meets all the requirements for issuance of an Administrative Permit set forth in Chapter 275 of the Southold Town Code. The issuance of an Administrative Permit allows for the operations as indicated on the site plan prepared by James A. Marx, Jr. P.E., last dated February 22, 2009, and received on April 1, 2009. Special Conditions: None. Inspections: Final inspection. If the proposed activities do not meet the requirements for issuance of an Administrative Permit set forth in Chapter 275 of the Southold Town Code, a Wetland Permit will be required. This is not a determination from any other agency. James F. King, President Board of Trustees JFK:eac James F. King, President Jill M. Doherty, Vice*President Peggy A. Dickerson Dave Bergen Bob Ghosio~ Jr P.O. Box [ 170 Southold, NY 11971 Telephone (631 ) 765-1892 Fax (631) 765~6641 Southold Town Board of Trustees Field Inspection/Worksession Report Date/Time: WILLIAM EDWARDS requests an Administrative Permit to install roof mounted solar photovoltaic system and upgrade electrical service. Located: 1600 Park Ave., Mattituck. SCTM#123-8-4 Type of area to be impacted: __Saltwater Wetland Freshwater Wetland __Sound Bay Distance of proposed work to edge of wetland Part of Town Code proposed work falls under: __Chapt.275 Chapt. 111 other Type of Application: __ Wetland __Coastal Erosion __Amendment ~Administrative__Emergency Pre-Submission __Violation Info needed: Modifications: Conditions: Present Were: __&King __J.Doherty __P.Dickerson __ D. Dzenkowski Mark Terry__other Form filled out in the field by D. Bergen__ B.Ghosio, Mailed/Faxed to: Date: Environmental Technician Review- 3000m & 4000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE The SunPower inverters 3000m and 4000m provide exceptional reliability combined wilh supedor I:~rformance. Innovative design and advanced testing have been brought together to create a durable inverter that enables optimal system performance over the long term. Both models come with a standard lO-year warranty. SPR-3OOOm and SPR-4OOOm ~v. sunpowercorp.com 3000m & 4000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE SPR-3OOOm SPR-4OOOm 3500 W ~* 208 V / AC Power 3000 w 4000W@ 240V AC Maximum Ou~ut Cun~llt 1 SA, 12,5A 17A, 16.6A ----,'--,,,, ,,,,,,,~m,,,,,~Ar~u"--JnalU'k-"~/°a'~' 183-229Ve20eVAC 183-229Ve2~VAC 211-264VO240VAC 211-264VO240VAC AC Frequency / Range 60Hz/59.3Hz- 60 Hz / 59.3 Hz- 60.5 Hz 60.5 Hz Power Factor 1 1 Pec~k Jrlvetter Efficieflcy 96.6% 96.8% SPRm Efficiency Curves 100 ~v~ ~o 480 Vd¢ 75 % of Ruted Output Power Shipping Dimensiens W x H x D inches 23.$' x 1e.5' x 16.0' Unit Dimensions W x H x D inches 17.8' x 13.8' x 9~3' Inver~r Weight ee lbs CEC Weighl~d Efficiency 95.0 % · 208 v 95,5 % e 208 v 95.5 %Q 240v 96.0 %~ 240v Recommended Anay Input 3coo W 4800 W Power (DC C~ STCI DC Input Vdtoge Range 200 - 500 V Q 208V 250 - 600 V @ 20~ VAC 200-500 V ~ 240V 250 -600 V ~ 240 VAC Peak Power Tracking Vd~ge ~80-400VQ20eVAC 220-480VI~208VAC 200- 400 V O 240 VAC 250 -480 V ~ 240 VAC DC Max. Jflput Current 17A 18A DC Vollage Ripple · No. of Fused St~ng Inputs 4 Power Consump~ofl~ <7w/0.1 w Slandby / Nighttime Fused DC DJscofllle~ $1andarcl; Complies w NEC Standards Grounding PoslUve Ground Shipping Weight 94 lbs Cooling Electonics Enclosure SunPower designs, manufactures and delivers high-perfarmance solar electric technology worldwide. Our high-efficiency solar cells generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers deliver significancy more energy than competing systems. www. sunpowercorp.com 500Om, 6000m & 7000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE The SunPower inverters 500Om, 6000m & 7000m provide exceptional reliability and market-leading design flexibility. The SPRm line of Solar Inverters can be easily applied in residential or commercial installations. All models come with a 10-year warranty. SPR-5OOOm, SPR-6000m & SPR-7OOOm w,~v. sun powercorp.com 5000m, 6000m & 7000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE SPR-5OOOm SPR-6OOOm SPR-7OOOm An'ay Input Power 5300w 6400w 750ow (Dc e sTc) Input Tracking Vollage DC Voltnge <5% Rippki No. d Fused String Inpu~ S~andby / <zW/O.25w Nigl~ime SPRm Efficiency Curves IO0 75 % of Ra~d Ou~ut I~ Sbipplng DimemJaes W x H x D inches 23.5' x 31.0' x 16.0' Unff Dimeesions W x H x D inches 18.4~ x 24.1' x 9.5' Inverter WeJgtd 143 lbs Shipping Weight 154 lbs Cooling Forced Air / Sealed Elect~o~ics Enclosure Endaeure NEMA 3R Me.riling Wall Mout~t Bracket Standard SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells generate up to 50 percent more power than conventional solar ceils. Our high-performance solar panels, roof tiles and trackers deliver significantly more energy than competing systems. www. sunpowercorp.com 215 SOLAR PANEL EXCEPTIONAL EFFICIENCY AND PERFORMANCE The SunPower 215 Solar Panel provides industry leading efficiency and performance. Utilizing 72 next generation SunPower all-back contact solar cells and an optimized panel design, the SunPower 215 delivers an unprecedented total panel conversion efficiency of 17.3%. The 215 panel's reduced voltage-temperature coefficient and exceptional low-light performance altributes provide far higher energy delivery per peak power than conventional panels. Sunpower's High Efficiency Advantage - Up to Twice Ihe Power SPR-215-WHT 215 SOLAR PANEL EXCEPTIONAL EFFICIENCY AND PERFORMANCE Peak Power (+/-5%) Prnax 215 W Rated Current Imp 5.40 A Open Circuit Voltage Voc 48.3 V Sho~' Circuit Current Isc 5.80 A Temperature Coefficienls Power -0.38~%/°C Voltage ~/oc) -136.8 mV/°C Current (IR) 3.5 mA/~C Series Fuse Ra~ng 15 A IV Curve 7.0 6.0 5.0 4.0 2.O 1.0 0.0 1000 W/m~ 800 w/n'.~ ~ 0 I0 20 30 40 Peak Power per UnitArea 173 W/m2, 16.1 W/~ ~ CEC FTC Rating 198.5 W Temperature - 40° C to +85° C ~,0° F to +185° F) Max load 50 p~f (2400 Pascals) front and back Impact Resistance Hail - 25mm (1 in) at 23 m/s {52 mph) Solar Cells 72 SunPower allback ~nlact rnonoay~alline Front Gbss 3.2mm (1/8 in.) lempered Junc~on Box lPg5 raled wilh 3 bypa~ dJode~ Warranly 25 year limit~cl power warranly Output Cabbs 900mm lenglh cable / Mul~i~ontact connectors 10 ~ar limiled product warranly Frame ~ ~A~ ~1~ ized_~lu~i~n~_~m alloy type 6063 _ Certifications IEC 61215, Saf~y tesled IEC 61730; Weight 15kg, 33lbs UL listed JUL 1703), Clms C Fire Rating Dimensions CAUTION: READ SAFETY AND INSTALLATION INS1RUCTIONS BEFORE USING 1HE PRODUCI'. Go to www.sunpowercorp.com/panels for details SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high.efficiency solar cells generat~ up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers deliver significantly more energy than competing systems. ~'~ Printed on rewcled paper w~v. sunpowercorp.com 2 Strings of 8 SunPower 215 watt panels. Each sting has 1720 watts Array total of 3440 watts All panels to be grounded as per NEC code 30 AMP two po~e DC switch from panels to inverter SUNPOWER SPR 4000 INVERTER 240 VAC ~/~ ~ 30 AMP 3R switch near utility meter 240 VAC from inverter to a 30 4 Strings of 8 SunPower 216 W panels, Each string 1,720 watts Array total of 6880 Watts All panels to be grounded as per NEC code 2, 30 AMP two pole DC switches from panels to inverter SUNPOWER SPR 7000 INVERTER 240 VAC 240 VAC from inverter to a 30 Amp switch near utility meter Office Use Only __Coastal Erosion Permit Application/ Wetland Permit Application ~/Administrative Permit ReAmendment/Transfer/Extension ce,v~d Application: ~/I /6 ~ eceived Fee:$ 5~ o.~o -- Completed Application __Incomplete __SEQRA Classification: Type I Type II Unlisted __Coordination:(date sent) CAC Referral Sent: ~--Date of Inspection: 7[ ~Receipt of CAC Report: ~Lead Agency Determination: Technical Review: ~blic I~e~ng m~d: q/O.~ I O~] ~Resolution: NameofApplicant ~'[[ I~;~ ~ Address Suffolk County Tax Map Number: lO00- Property Location: l(oC)O '-~k_ -'"'"'-~og;g . o~,'o d (provide LILCO Pole #, distance to cross streets, and location) AGENT: & lreOr~ LOOSE_.. L (If applicable) cbo.co._ e.,c4-, 117 Board of Trustees Application Land Area (in square feet):. Area Zoning:. GENERAL DATA Previous use ofproperty: (~)0t':' ~¢Y'~! ILl <E~t~C~t ttr't~ Intended use ofproperty: 0/~ ~'~l[~ C[t~e~ltH~ Prior permits/approvals for site improvements: Agency Date No prior permits/approvals for site improvemems. Has any permit/approval ever been revoked or suspended by a governmental agency? v/ No Yes If yes, provide explanation: Project Description (use attachments if necessary): Board of Trustees Application COASTAL EROSION APPLICATION DATA Purposes of proposed activity: I FI Are wetlands present within 100 feet of the proposed activity? No Yes Does the project involve excavation or filling? V~ No Yes If Yes, how much material will be excavated? .(cubic yards) How much material will be filled? (cubic yards) Manner in which material will be removed or deposited: Describe the nature and extent of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) Board of Trustees A~plic&tion County of Suffolk State of New York DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. SWORN TO BEFORE ME THIS Signature / 5,r'- DAYOF ,20 del Notary Publfc BARBARA A. Notary Public-State of New York No 01-CA4894969 Qualified in Suffolk County My Commission Expires May tl ~31, M~r. 1/1 , .. rN° 2198~P. AI~TitO]II~ATION (Whe~ tl~ applic~at is not thc owner) I, '; ~,,~;a r~sidin$ et (print owner of propettT) (mailing addrcss)'~- ~ rc¢ Lo $ c do hereby amhorize (Age-t) L- L~ toapply forpennit(s)fi~nthe Souihold [hm, d of Town Trustees on my belud£ (Own~'s s~m~) ,/. /4,,,,>>', ',',,, ~ k Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: I I~[I ~r..)~ ~Y~)l~t. vr-~ se tce Area of wetlands on lot: .square feet Percent coverage of lot: % Closest distance between nearest existing structure and upland edge of wetlands: feet Closest distance between nearest proposed structure and upland edge of wetlands: N//[ feet Does the project involve excavation or filling? v/ No Yes If yes, how much material will be excavated? How much material will be filled? Depth of which material will be removed or deposited: Proposed slope throughout the area of operations: Manner in which material will be removed or deposited: cubic yards cubic yards feet Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethig~ vrohibits conflicts of interest on the vart of town officers and emt>lovees. The vumose of this form is to vrovide information which can alert the town of oossible conflicts of interest and allow it to take whatever action is necessasv to avoid same. (Last name, first name, middle initial, unless you are applying in the ~J~ran of someone else or other entity, such as a company. If so, indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooting Exemption from plat or official map Planning Other (If "Other", name the activity.) Do you personally (or through your company, spouse, sibling, parent, or child) have a relationship with any officer or employee of the Town of Southold? "Relationship" includes by blood, marriage, or business interest. "Business interest" means a business, including a partnership, in which the town officer or employee has even a partial ownership of(or employment by) a corporation in which the town officer or employee owns more than 5% of the shares. YES NO / If you answered "YES", complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself (the applicantdagentdrepre sentative) and the town officer or employee. Either check the appropriate line A) through D) and/or describe in the space provided. The town officer or employee or his or her spouse, sibling, parent, or child is (check all that apply): __A) the owner of greater than 5% of the shares of the corporate stock oftbe applicant (when the applicant is a corporation); B) the legal or beneficial owner of any interest in a non-corporate entity (when the applicant is not a corporation); __C) an officer, director, par~er, or employee of the applicant; or __D) the actual applicant. DESCRIPTION OF RELATIONSHIP Form TS 1 IPROJECT ID NUMBER PART 1 - P~OJECT INFORMATION 617.20 APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNESTED ACTIONS Only ( To be completed by Applicant or Project Sponsor) 2. PROJECT NAME cou. 1, APPLICANT I SPONSOR 3,P~OJECT LOCATI : PRECISE LOC~ON: ~rest ~ldesa and R~ Ingrains. Pm~nent te~ma~ e~ - or ~i~ mag ~RI~ ~OJE~ ~IEFLY: 8EQR 7. AIdOUNT OF LANO AFFECTED: Initially auel Ultimately 8,1~ PROPOSED ACTION COMPLY WITH EXI~I'ING ZONING OR OTHER RESTRICTIONS? I'lYes I~ No If no, descfibebrie6y: RAT iS PRESENT LAND USE IN VICINITY OF PROJECT? (Choese es many es apply.) esklential [~lndultrial I~lcomrnamlal I~"lAgriculture ~lPsrklForesl,OpenSpace r--lOIt~er (~escdbe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, ~ete or Local) I~Yss r'~No If yes, list age;icy name arid pe~lti / approval: 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? I~'lYes I'"-~o If y~s, list agency mime and permit / approval: jt~SesA ~-~UN~LT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Appli.nt ,$pl~l~orNam.NeSimAtb d re ccc) If the action I~ I Costal Ares, and you are i stats agency, complete the Coaltal ASlelsmsnt Form before proceedlRg with this aSlolsment PART II - IMPACT A~E~SMENT ~To be completed by Lead Agency) I:~OES AC'tlON F.~XCEED ANY TYPE I THRESHOLD IN E NYCRR, PART 617.47 If yea. coor~ll~e the reviev/proonos sud use Iha FULL EAF. [--I Ye. WILL ACTION RECEIVE COORDINATED I;~'VIEW A8 PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.67 If NO, a nsgetiva declaration may I~ lupamaded by anofhar Involved ~gency. [:~1 Yes [~No C. COULD ACTION RESULT IN ANY' ADVERSE EFFECTS ASSOCIATED WI'i~-I THE FOLLOWING: (An~,~rs may he handwritten, if C1.Exl~ng llr qu~, surface or groundwater qu~by or quantity, no[se levols, eyJst~ng traffic pattern, solid waste production or die~osal, pofon~l for Orodon, drainage or ifcodlng pmbleros? Explgn Hefty: C3. legeIAtlon ot fsun~, iflh, Ihall~lh °r wlHIIfo II'es, I~gniflcetlt hal~ltl, or if'4'estened or endaW Ipecl~? Explain b~fiy: C4. mm rlltat Ky'i ~ltieg pll~ Or gosli es Oft~taly I~ted, ot I otilnge In uos or Intsnl~ of u~ Of ial~"o~'o~'h~ osturai msoun~l?' E.~in briefly: ce. E "in i ' ............................................... C7, O~lmpa~{~ih~'Chg~lh~s'ofe~h.~esm,/ort}?eofene~F/''' Explain b~¥; D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL .-.-- ....................................... E. IS THERE. OR IS THERE UKELY TO BE; CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? ff yes ex,)lain: E3TM ! ....................... IN$?~UC~IO~$: For ~had¥®r~ffl'~tid~nt~l~l~t~,d~mthe~h~ther if ~ sube~nif~l,l~rg,, Im~t~rofl~i~$~lnif~nt. effect should be .asessed In connection with ~m (a) salting (La. utl~an or ruml); (b) prot3ebility of occurring; (c) duration; (d) th~vemibiity: (e) geographic scope; and (t~ magnitude. If nese~sary, add attacllments or re~erance supporting materials. Ensure that explanatldn~ contain sufficient detail to shew ~hat ;dl rele~'ant adverse impac~ have been identified and adequately addressed. If question d of part ii was checked yes. the cletatminalion of significance must evaluafo the potential impact of~te proposed action on the environmental charaofedsfJcs of the CEA. Cheek this box if you have Idan6fled one o~ more potentially large or ~igniflosnt edveme impacts which MAY occur. Then proceed direly to ~e FULl EAF and/or pmpm'e a po~ declaration. Check this box If you have delormined, based on the information end mlalysi~ above and any ;uoporting documentation, that the proposed edict WILL NOT result in any significant advema environmental impacts AND provide, on attachments as necessmy, the reasons ~pporting thil doformlnsfion. Name of Lead Agency Date Print or Type Name of Rellxx'~ltile Offlosr I~1 Lead Agency Tit~ of P~spooslb~ Officer Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard ~lrea. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area (which includes all of Southold Town). If any question in Section C on this form is answered "yes", then the proposed action may affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action should be analyzed in mom detail and, if necessary, modified prior to making a determination that it is consistent to the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION leV0 scm# Io ao 0 t The Application has been submitted to (check appropriate response): TownBoard ~ Planning Dept. [] Building Dept. ~ BoardofTrustees [] Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) (c) Permit, approval, license, certification: Nature and extent of action: Location of action: Site acreage: Present land use: Present zoning classification: If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: (b) Mailing address: (c) Telephone number: Area Code ( )_ (d) Application number, if any:_ Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes [] No [] If yes, which state or federal agency?. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. [] Yes ~'~ No ~ Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria Yes ~ No [] Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria ~-~ Yes [] No [] Not Applicable Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8 through 16 for evaluation criteria Yes No ~ Not Applicable Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southoid. See LWRP Section HI - Policies Pages 16 through 21 for evaluation criteria Yes ~-~ No ~Not Applicable Attach additional sheets if necessmy Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. [] Yes ~-~ No [] Not Applicable Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section IH - Policies Pages 32 through 34 for evaluation criteria. [] Yes ~ No~/NotApplieable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. Yes [] No Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria. ~-~ Yes ~-] No ~ Not Applicable Atlach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. Yes No [~Not Applicable Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. ~-~ Yes [] No ~fNot Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. [] Yes [] No ~ Not Applicable Created on 5/25/05 11.'20 AM C GREENLOGIC ENERGY March 31, 2009 Town of Southold Town Trustees Town Hall 53095 Route 25 Southold, NY 11971 Dear Trustees: Please find attached a building permit application on behalf of William Edwards who has engaged us to install a roof-mounted (flat to the roof) solar photovoltaic (PV) electric system for his home on 1600 Park Avenue, Mattituck, NY. In connection with this application, please find the attached in duplicate: · An application · ATransactional Disclosure Form · AShort Environmental Assessment Form · A LWRP Consistency Assessment Form · Surveyof Premises · An engineer's report · AOne Line Diagram · A Visio Diagram of the proposed system · Spec. sheets of the solar panels (SunPower SPR-230-Wht) · Spec. sheets of the inverter (SunPower SPR $O00m) · GreenLogic Suffolk County Home Improvement License · GreenLogic Certificate of Liability Insurance · GreenLogic Certificate of Worker's Compensation Insurance Coverage · Installation Manager's Master Electrician's License Please let us know if you need anything else in connection with this application. Yours truly, Barbara Casciotta Account Manager 631-771-5152 ext. 117 SOUTHAMPTON/CORPORATE 425 County Rd. 39A, ¢101 Southampton, NY ]1968 Tel: 631,771,5152 Fax 631.7715156 SOUTHOLD 52875 Main Rd., Box 435 Southold, NY 11971 Tel: 631,765.0404 Fax: 631.771.5156 MANORVlLLE 40 Woodland Avenue Manorville, NY 11949 Tel: 631.771.5152 Fax: 631.771.5156 ROSLYN HEIGHTS 200 $ Servioe Rd, #108 Rosyln Heights, NY 1157/ Tel: 516625 6880 Fax: 5166256881 4 Strings of 8 SunPower 215 W panels, Each string 1,720 watts Array total of 6880 Watts All panels to be grounded as per NEC code 2, 30 AMP two pole DC switches from panels to inverter SUNPOWERSPR70001NVERTER 240 VAC I 240 VAC from inverter to a 30 Amp switch near utility meter 2 Strings of 8 SunPower 215 wart panels. Each sting has 1720 warts Array total of 3440 warts All panets to be grounded as per NEC code 30 AMP two pole DC switch from panels to inverter SUNPOWER SPR 4000 INVERTER 240 VAC / 30 AMP 3R switch near (~ (~ utility meter 240 VAC from inverter to a 30 215 SOLAR PANEL EXCEPTIONAL EFFICIENCY AND PERFORMANCE The SunPower 215 Solar Panel provides industry leading efficiency and performance. Utilizing 72 next generation SunPower all-back contact solar cells and an optimized panel design, the SunPower 215 delivers an unprecedented total panel conversion efficiency of 17.3%. The 215 panel's reduced voltage-temperature coefficient and exceptional Iow-light performance attributes provide far higher energy delivery per peak power than conventional panels. SunPower's High Efficiency Advantage - Up to Twice Ihe Power E~icienc7 9.0% SPR-215-WHT 215 SOLAR PANEL EXCEPTIONAL EFFICIENCY AND PERFORMANCE Peak Power (+/-5%) Pmax 215 W __~R_.c~d~' Vo~ge V~p~ _ ~39.8.v~ .... ~R ~a~d~ Cu~re_nt Imp ...... ~.42_A O~n Civil Vol~ge V~ 48.3 V S~ Ci~uit Cu~nt I~ 5.80 A ~imum S~ Vol~ge IEC, UL J ~ V, 6~ V Tem~m C~cien~ P~ ~.38%/~C Vol~ ~) -136.8 mV/~ Cu~t (1~) 3.5 m~"C ~ri~ Fu~ Ra~ng 15 A ........ ~ C~ ~C Ra~~ 198.5 W Solar Cells 72 SunPow~' all.back conlacl rnono~li~ Front Glass 3.2mm (1/8 in.) I~mpered JundJon Box IP-65 raled wilh 3 bypass diode~ Ouiput Cables 9OOmm lenglft cable / Mul6Conlad connedm's Frame Anodized aluminum alloy type 6063 V~Jght 15kg, 331b$ IV' Curve 7.0 6.0 5.0 4.0 ~.0 1.0 0.0 leOOW/m~ 0 10 20 30 40 50 60 - 40° CIo +85° C J.~lO~ F Io +185° F) Max load 50 p~f (2400 Pa~:a!s) fTont and ba~k Impact Resistance Hail - 25mm (I in) at 23 m/s (52 mph) Warranty 25 year limil~d power wanranly 10 ~ar llmiled produd warranty Ce~fications IEC 61215, Safely ~ IEC 61730; UL lided gJL 1703), Class C Fire R~ng Dimensions CAUTION: READ SAFELY AND INSTALLATION INS11~UCTIONS BEFORE USING THE PRODUCT. Go to ~v~v.sunpowercorp.com/panels for details SunPower designs, manufactures and delivers high-performance solar electric techno)ogy worldwide. Our high-efficiency solar cells generate up to 50 percent more power than convenfional solar cells. Our high-performance solar panels, roof files and trackers deliver significantly more energy than competing systems. ~ Printed on recycled paper www. sunpowercorp.com 3000m & 4000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE The SunPower inverters 3000m and 4000m provide exceptional rdiability combined wilh superior performance. Innovative design and advanced testing have been brought tagether to create a durable inverter that enables optimaJ system performance over the long term. Both modeJs come with a standard 1 O-year warranty. SPR-3000m and SPR-4OOOm ~w,.su npowercorp.com 3000m & 4000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE SPR-3OOOm SPR-4OOOm 3500 W O 208 V / AC J~l' 3000W 4000 w @ 240 v AC Maximum Ou~ut Current 1SA, 12.5A 17A, 16.6A ~ 80 (~ 208v, 240v~ A~.sa.,m;nalV, d~,.,~/e...~ ]83-22~ve20evAc 183-229Ve20~VAC : 70 2H-264V~240VAC 211-26~V~240VAC AC Frequency / Range 60 Hz / $9,3 Hz- 60 Hz / $9,3 Hz- 60.5 Hz 60.5 Hz SPRm Efficiency Curves 480 Vd~ % of Ra~d Ou~ut Power Power Factor 1 ~ Unit Dimensions W x H x D inches 17.8' x 13.8' x 9,3' Peak Im~rter Efficiency 96.6% 96.8% Im~'tar Weight 08 lbs Shyplng Weight 94 lbs Forced AJ~ / Sealed CooJlng El.ctronics Er,cio.sure EI1cJo~ure NEMA 3R : Mounting IX~ Input Voltage Range 200 - 500 V ~* 208V 250 - 600 V ~* 208 VAC 200-500 V ~ 240V 250 - 600 V ~ 240 VAC Peak Power Tracking Vdtage 200-400ve~v~ 2~-4eOVe~OVAC DC Max. Input Current ~TA Am blent Temperatam Range -13 to+113 °F DC VolJage Ripple No. of Fused Sl~ng Inputs 4 Power Consumption: <7w/0.1 w Standby / Nighlfime , FU~I ~C D'L~O~ StamJard; Complies w NEC Standards Grouirld Jllg Positive Ground SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and h'ackers deliver significantly more energy I~an competing systems. wv~v. su npowercorp.com 500Om, 6000m & 7000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE The SunPower inverters 500Om, 6000m & 7000m provide exceptional reliability and market-leading design flexibility. The SPRm line of $oJar Inverters can be easily applied in residential or commercial installations. All models come with a 10-year warranty. SPR-5OOOm, SPR-6OOOm & SPR-7OOOm www. sunpowercorp.com 5000m, 6000m & 7000m INVERTERS EXCEPTIONAL RELIABILITY AND PERFORMANCE SPRm Efficiency Curves SPR-5OOOm St)R-6000m SPR-7000m ~oo a~ 9o 3~ov AC Max Oulput ~' 4so v6c 240Y, 277Y): ~ 8o Power Faclor S~pplng DhTmns~ons W x H x D inches Efficiency Unit Dirnendons CEC We~ted 95,5 %Q 240v 95.5 %Q 240v 96.0%@ 240v ~ip~ng Weight 154 lbs IDC O Sl~) End.ute NS~3R i Mo~nllng Wall Mount Bracket Standa~ DC Input 250-6OO V 250- 600 V 250-600V Ambient Tempeealure Range -13 to+113 OF Tracking Veltage Warranly 10 year limited warranly Input C~rent UL 1998, FCC Part 15 A & B 23.5' x 31.0' x 16.0' No. d Fused 4 Sldn~ Inpub Slan~ / < 7 W / O.25 W N~ SunPower designs, manufactures and delivers high-performance solar electric technology worldwide. Our high-efficiency solar cells generate up to 50 percent more power than conventional solar cells. Our high-performance solar panels, roof tiles and trackers deliver significantly more energy than competing systems. www. sunpowercorp.corn 'STATE DF NEW YORK WORKEI~' COMPENSATION BOARD CERTRqCATE OF NYS WORKERS' COMPENSATION INSURANCE COVERAGE 42S Coumy Rd 39A Su#e 101 Soatimmptou NY !1968 lb. Budm~ Tdqdto~ Number or Imured 631-771-SIS2 Id ltedwal tmpioy~ ~ Number oflnfured or .~1 .~iLy Nudser 2038O1194 Po]ky Nnmher of entity limed Jn Imx"la~' Tekldmn~ Nund~ of mllm~d mlm~nmafi~ ~ l~m~ml asmt of k.,_~.~ ~atrkg. 631-941-4113 Only tm~ ~ an~ #a~' ~ ~,~t~ ~,~ dUrAW~M M ~n~ F~w 0.105.2. lmm'm~ ~ m.~ NOT Suffolk County Executive's Office of Consumer Affairs VETERANS MEMORIAL HIGHWAY * HAUPPAUGE, NEW YORK 11788 SUFFOLK COUNTY DATE ISSUED:, 12/10/2007 No. 43858-ME Master Electrician License This is to certify that ROBERT J SKYPALA doing business as GREENLOGIC LLC having given satisfactory evidence of competency, is hereby licensed as MASTER ELECTRICIAN in accordance with and subject to the provisions of applicable laws, rules,and regulations of .,,, , ~,,,,,, the County of Suffolk, State of New York. "" ' ~, Additional Businesses , No? VALm wrmovT ,'DEPARTMENTAL SEAL Director ACOP. D. CERTIFICATE OF LIABILITY INSURANCE o,,o ~ '~"~ ~-9 ol/19/o9 t~OOUCER THIS C~ ~ ~ED ~ A ~1 ~ ~ ~ INFO. ON ONLY ~D ~NF~ NO ~ U~N ~E CE~ 365 ~8~S ~ D~ ~R~E~E~O~BY~E~L~ ~D9~ ~ 11997 g~o~e: 516-799-8222 I~U~ ~FO~NG CO~E ~C ~ ~ I~ ~ ~ ~ ~ ~ 14788 425Coa6~ ~d. 39~ S~i~ 101 ~: ~o~ ~=~ ~ 11968 CER'IIFtCATE HOLDER TO~N OF 8OOT~OLD 53095 ROuz~ 25 SOUTHOLDNY 11971 ACORD 26 (2001~08) CANCELLATION TO~SOH February 22, 2009 To: Building Department From: James A. Marx, Jr. P.E. Re: Engineer Statement for Edwards Residence, 1600 Park, Mattituck, NY for Solar Roof Installation I have verified the adequacy and structural integrity of the existing roof rafters for mounting of SunPower solar panels and their installation will satisfy the structural roof framing design-loading requirements of the New York State Residential Code - 2007 without the need for adding reinforcing to the existing rafter beams. For the installation of the solar mounting, the mounting mils will be anchored to the rafters with Unirac standoff supports located on the center of the rafters and will be securely fastened to the rafters with lag screws that have been designed for wind speed criteria of 120 mph Exposure C and snow ground criteria of 20 psf. Wind loads will exceed seismic loads. Other climate and geo design criteria are not applicable to this solar installation. The Photovoltaic system and the mounting assembly shown on the submitted drawings complies with the applicable sections of building code - "Solar Systems" and applied loading conditions that will satisfy the building code requirements. Thereby, I endorse the solar p~jl~ation and certify this design for mounting the solar mounting assembly ~_..~ at~er beams to be slructm'ally adequate. Sincerely, /~~:~ ~?'~ James A Marx, Jr P.E. NY Professional Engineer L~ 10 High Mountain Road Ringwood, NJ 07456 ¢c: GreenLogic, AshlecReiniget GreenLogic, LLC Proposed Edwards, Bill S2 7.31kW 34 SunPower 215 UniRac Sunframe Azimuth = 168° Pitch = 20° Scale 3/16" = 1.0' , UN1RAC SUNFRAME RAILING EDWARDS RESIDENCE 1600 PARK ~,i-ll'I'UCK, NY 11952 ATTACHMENT: 4" TWO PC. FLAT TOP ~, w/5/16"x4" SS LAG BOLTS Panel Dimension = 61.39" x 31.~ Array Length = 439.88" ~ Array Height -- 188.67~ Surface Dimensions = 40'10" x 19'7 NOTE THE SOLAR ROOF CON'~ACTOR IS RESPONSIBLE FOR ~ MAINTAINING THE WA~OOF INTEGRITY OF THE ROOF INCLUDING SELECTION OF THE APPROPRIATE SEALANT. Marx Jr. NY Professional Engineer License f~467 SunPower 215w ! I 2"x8"RoughSawn Douglas Fir Rafter 16" on center ~ UniRacSunFrame Rail · UniRac 4" 2 Piece Flat Top Standoff Stm£T s-2~-a~/out Created By: JPHS Date: 1/7/09 APR - 1 , $ot~hho{d GreenLogic, LLC Proposed Edwards, Bill S1 3.01 kW 14 Sunpower 215w UniRac Sunframe Azimuth -- 168° Pitch = 20° Scale 3/16" = 1.0' EDWARDS RESIDENCE 1600 PARK MATHTUCK, NY 11952 /UNIRAC SUNFRAME EABANG I / ATTAC~: 4" T~O PC. FLAT TOP STANDOFF w/5/16"x4' SS LAG BOLTS Panel Dimension = 61.39" x 31,4~2'~ Array Length = 439.88" Array Height = 64.39" Surface Dimensions = 40'9"x8'2" NOTE THE SOLAR ROOF CONTRACTOR IS RF~SI~ONSIBLE FOR I ~A. Marx Jr. NY Professional Engineer Licea~e 56467 MA1NTAIFSHG THE WATERPROOF INTEGRITY OF THE ROOF INCLUDING SELECTION OF THE APPROPRIATE SEALANT. SHEET S-4 SunPower 215w 2"x8" Rough Sawn I l...DouglasFirRafter16" on center -- UniRac SunFrame Rail · UniRac 4" 2 Piece Flat Top Standoff Laybut Created By: JPHS Date: 1/7/09 LOGIC GreenLogic, LLC Proposed Edwards, Bill S1 3.01 kW 14 Sunpower 215w UniRac Sunframe Azimuth = 168° Pitch = 20° Scale 3/16" = 1.0' JEDWARDS RESIDENCE 1600 PARK MATITILICK, NY 11952 SUNPOWER 215w PANELS / PLAN ,..-- .... ..._.._ Panel Dimension = 61.39"x ~l~f~2" ',i' [ . ' ]~& ~Jr. Array Length = 439.88~~1 ~ay Height = ~.39" Su~ Dimensions = 40'9'~~~~'~"~ . . I t~ ~~.-' ', SunPower 215w i i 2"x8" Rough Sawn Douglas Fir Rafter 16" on center -- UniRac SunFrame Rail · UniRac 4" 2 Piece Flat Top Standoff SHEET S-3 / Layout Created By: JPHS Date: 1/7/09 GreenLogic, LLC Proposed Edwards, Bill S2 7.31 kW 34 SunPower 215 UniRac Sunframe Azimuth = 168° Pitch = 20° Scale 3/16" = 1.0' EDWARDS RESIDENCE 1600 PARK MATiTI1JCK, NY 11952 SUNPOWER 215w PANELS , Panel Dimension -- 61.39" x 31 Array Length = 439.88" · Array Height = 188.67" Surface Dimensions = 40'10" x 19'7" ne6 A. Marx Jr. H~h Moun~M RMM NY Professional Engineer License 56467 SHEET S-I II SunPower 215w 2"x8" Rough Sawn Douglas Fir Rafter 16" on center UniRac SunFrame Rail UniRac 4" 2 Piece Flat Top Standoff ),' Layout Created By: JPHS Date: 1/7/09 TIE: 396' P,4 RK ,4 VE. N 86° 57'E TOP BROKEN SURVEY OF LOT /5 S / TUA TE MAP OF MARRATOOKA PARK MATTITUCK, TOWN OF SOUTHOLD SUFFOLK COUNT Y, N Y. SURVEYED FOR: WILLIAM EDWARDS ond AblE/ WALLACH LOT /4 LOT /6 FILE MAP~ 450 FILED NO~I, 1905 TAX MAP NO. 1000-123-0,9-04 SCALE: I":. ,50' AREA -- 83,323.44 SE or I. 9128 Acres SURVEYED 14 OCTOBER, 1995 GUARANTEED TO · WILLIAM EDWARDS AME! WALLACH FIDELITy NATIONAL TITLE INS CO TOWN OF SOUTHOLO Guaronte~$ Indicated here on shall I'm NOTE: STONE S87° BROKEN ~ONCRETE WALL THIS AREA ( HIGH STORY (- N 06°28'15"W ~ 5.9' PECON/C 8,4Y WATER L/NE RUNS ALONG BULKHEAD) APPROVED BY BOARD OF TRUSTEES TOWN OF SOUTHOLD SURVEYED BY: STANLEY d. ISAKSEN, JR. PO. BOX 294 NEW SUFFOLK, N Y, 1/9,56 (516) 734 - 5835 ,?J2%I,PVEY°R 95R578