HomeMy WebLinkAbout1000-9.-12-8.1 OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southald, NY
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
Telephone: 631 765-1938
Fax: 631 765-3136
LOCAL WATERFRONT REVITALIZATION PROGRAM COORDINATOR
TOWN OF SOUTHOLD
MEMORANDUM
To: Jim King, President
Town of Southold Board of Trustees/
From: Mark Terry, LWRP Coordinator
Principal Planner
Date: February21, 2008
Re~
Wetland Permit for HAY HARBOR GOLF CLUB, INC.
SCTM# 9-12-8.1
,I.M.O. Environmental Consulting on behalf of HAY HARBOR GOLF CLUB, INC.
requests a Wetland Permit and Coastal Erosion Permit to restore approx. 550' of eroded
shoreline by installing a "boulder slope" consisting of 2-4 ton boulders which shall be
placed on filter fabric and a rock chip base. Any disturbed areas shall be replanted with
Rosa Rugosa and Bayberry. Located: Beach Ave., Fishers Island. SCTM#9-12-8.1
The property is subject to active erosion and a loss of upland property has occurred.
The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review
of the Town of Southold Town Code and the Local Waterfront Revitalization Program
(LWRP) Policy Standards. Based upon the information provided on the LWRP
Consistency Assessment Form submitted to this department, as well as the records
available to me, it is my recommendation that the proposed action is CONSISTENT
with the following Policy Standards and therefore is CONSISTENT with the
LWRP.
Policy Standards
4.1 Minimize losses of human life and structures from flooding and erosion hazards.
The following management measures to minimize losses of human life and structures
from flooding and erosion hazards are suggested:
There are reports of cliff swallows (Petrochelidon pFrrhonota) occurring in the area
and nesting within the bank. It is recommended that the design of the structure
minimize physical Ioss~ degradation or functional loss of the habitat area-
It is recommended that the Board apply seasonal construction restrictions relative
to the migration pattern of the species.
Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in
preparing its written determination regarding the consistency of the proposed action.
D. Use hard structural erosion protection measures for control of erosion
only where:
Construction of a hard structure is the only practical design
consideration and is essential to protecting the principal use.
Due to the exposure of the shoreline~ slope of the bank and
high energy due to wave and wind action~ the proposed rock
revetment is the only "natural" control structure available for
effective erosion control.
Practical vegetative methods have been included in the project
design and implementation.
The applicant meets this sub-policy through the planting of
disturbed areas Rosa Rugosa and Mvrica penswanica
landward of the rock structure.
Protect and restore ecological quality by adhering to the following
measures.
Maintain values associated with natural ecological communities.
Each natural ecological community has associated values which
contribute to the ecological quality of the Town of Southold. These
values should be assessed on a case-by-case basis.
Avoid fragmentation of ecological communities and maintain
corridors to facilitate the free exchange of biological resoumes
within and among communities.
a. Each individual resource area should be maintained as a
complete contiguous areas to protect the area's natural
resource values. Specifically, actions that would fragment
the ecological community into separate ecological islands
should be avoided.
b. Where fragmentation of ecological communities has
already occurred, the adverse effects of fragmentation can
be mitigated by maintaining or providing connecting
corridors to allow exchange of biological resources.
Maintain ecological integrity of particular locales by maintaining
structural and functional attributes, including normal variability, to
provide for self-sustaining systems.
5. Avoid permanent adverse change to ecological processes.
Town of Southoid
,
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
All applicants for permits* in¢ludinE Town of Southold agencies, shall complete ~hln CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consi~acy Review Law. This
asse~ment is intended to supplement other information used by a Town of Southold agency in
making a determination of co,.~i.~ncy. *Except minor exe~ot actions inclut~g Building Permits
aywl other ministerial permits not located within the Coastal Erosion Hazard Area.
Before answering the questions in Section C, the p~pmer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Wat~ont Revitalization Pto~ A proi~sed ac-lion will be evabmted as to its siEni~cant
beneficial and adverse effects upon the coastal area (which includes all of Southold Town).
;:ff~q~o~on C on this form is answered "yes", then the ~ a~ti. 'on may a.ffec[ the
should be analyzed in more ~ and, if necessary, modified prior to miring a
~ it is consist~t to thc mzximum extent practicable with the LWRP policy
_~_Ac_~y]ofth~LWRPisavailableinthe following places: onlim atthe/T_o~wnofSoutholds, --
PRopose0 ACnON dA, - 2 2005
~ 9 - 12 - 8.1
The Application has been submitted to (check appropriate response):
TownBo~rd [] PlsnningDept. ~-~ Building Dept. ~ BoardofTrustees
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital ~
conslmction, planning activity, agency regulation, land transaction) ~-~
Co) Financial assist,sam (e.g. grant, loan, subsidy)
(c)* Praadt, approval, license, ce~fication:
Natm'~andmaentofacfion:
Applicant proposes to r~store approximately ~0'
shoreline by installing a "boulder slope" consisting of 2-4
ton boulders which shall be placed on filter fabric and a rock
cnlp mase. any ~sturDed areas shall be replanted with Rosa
rugosa and bayberry.
Locationofaction: Beach Avenue, Fishers Island
Site azrcage: 44.6
Present land use: Golf course
Presont zoning classification:
~f an application for ~he proposed action has been filed with the Town of Southold agency, ~be following
(a) Nameofapplicant: Hay Harbor Golf Conr~: Tn~_
(b) Maili,gaddress:P.O. Box 477, Fishers Islande NY 06390
631-788-7323
(c) Telephone numbe~. Area Code ().
(d) Application number, if any: unknown
Will the action be directly undeataken, require funding, or approval by a state or federal agency?
Yes .~] NoD ffyes, which smte or federal agency? N.Y.S.D.E.C.
DEVELOPED COAST POLICY
Poficy 1. Fo~ter a ~a~ern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimi~ adverse effects of devciopmenL See LWRP Section m-ro. cies; 2 for evaluation
criteria.
Yes [] No [] Not Applicable
Policy 2.' Pro!_,~__ and preserve historic and archaeological resources of the Town of ~hold. See
LWRP Section m- Policies Pages 3 through 6 for evaluation criteria
[] Yes ~-~ NO ~-] Not Applicable
Atlach additional sheets if necessary
Policy 3./i~nhance visual quality and protect scenic ~ throughout the Town of Southold. See
LWRPf~ec~on IH - Policies Pages 6 through 7 for evaluation criteria
~ Yes [] No [] Not Applicable
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4._ [~A~inlmi~ IO~ of life, structures, and natural resources from flooding and erosion. See LWRP
S~t~ffl/[ll - Policies Pages 8 thr~o.ugh 16 for evaluation criteria
~ Yes ~-~ No ~-~ Not Applicable
Attach additional sheets if necessmy
Policy ~. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III
- Poli~ies Pages 16 through 21 for evaluation criteria
L_~ Yes ~-~ No ~-~ Not Applicable
Atlach additional sheets if necessary
Policy 6. Protect and restore the qu~!i~y and function of the Town of Southold ect~ydems illcJudino~
y2Coastal Fish and Wildlife Habitats and wetlands. See LWRP ~ctlon III - Policies; Pages 22
for evaluation criteria.
~-~ No ~-~ Not Applicable
Atlach additional ~ if necessa~
Policy 7. Protect and iml~rove air ~ in the Town of 8outhold. See LWRP Section III - Policies
Pages 32 through 34 for~aluation criterm-
[] Yes [-~ No [-~ Not Applicable
Attagh additional sh~ts if n~ssar,d
Policy 8./Minimize environmental degradation in Towa of Southold from solid waste and haT~rdous
s~sf_~d wa~es. See L .WRP Section IH - Policies; Pages 34 through 38 for evaluation criteria.
I-I so sot Appac,b
PUBLIC COAST POLICIF~
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
~ of the Town of/Soul,old. See LWRP Section 111 - Policies; Pages 38 through 46 for evaluation
criterim [~/ .
[] Ye~ Nol-~ Not Applicable
Attach additional sheets if necessary
WORKING COAST POLICIES
ylel0. Pro~_~ Southold's water-dependem uses and promote ~itln~ of new wa~.l~d .~..dent uses in
locations. See LWRP Section IH- Policies; Pages 47 through 56 for evaluation criterm.
es N No ~-~ Not Applicable
Attach additional sheets if necessary
~_~a~-y a~d Town waters. See LWRP Section llI- Poflcies; Pages 57 through 62 for evaluation criteria.
Yes [] No [] Not Applicable
Attach additionsl sheets if necessary
Policy 12. Protect . ' .agficu~. la~.ds
[] Yes [] No ~ Not Applicable
in the Town of Southold. See LWRP Section m- Policies; Pages
Attach additional sheets if n~ssary
Policy 13. Promote appropriate use and development of energy and mineral resources. See L~I~RP
Section HI - Policies; Pages 65 through 68 for evaluation criteria.
[] Ye~ [] NO ~/Not Applicable
Created on 5/25/05 11:20 AM
Responses to LWRP
Applicant: Hay Harbor Golf Club, Inc.
Location: Beach Avenue, Fishers Island, Town of Southold
S.C.T.M.No. 1000-9-12-8.1
The project consists of the applicant's proposal to restore approximately
550' of eroded shoreline by installing a "boulder slope" consisting of 2-4 ton
boulders which shall be placed on filter fabric and a rock chip base. Any
disturbed areas shall be replanted with Rosa mgosa and bayberry.
As part of my review of the Town's LWRP Consistency Form Section C,
I offer the following comments regarding the Local Waterfront
Revitalization Policies and this proposed project:
Policy 1. The project as proposed will not result in any negative impacts
whatsoever upon the development pattern desired by the Town of Southold
or shall it result in the loss of the community and landscape character of the
Town of Southold.
Policy 2. The project as proposed shall not result in the loss of any
archenlogical resources.
Policy 3. The project shall not impair the visual quality or the scenic
resources of Long Island Sound.
Policy 4. The proposed restoration of the existing shoreline has been based
on sound engineering practices and designed to minimum scale necessary to
manage flooding and erosion. The project shall not negatively impact
public lands or public trust lands.
Policy 5. The project does not involve any direct or indirect discharges that
would cause any negative impacts upon water quality standards. There shall
be no negative impacts upon water quality starldards. There shall be no
increase or decrease in the pH, the dissolved oxygen or nutrients in the
waterway and there should be no increase in negative health impacts such as
pathogens, chemical contaminants or toxicity nor shall there be any negative
aesthetic factors involved with the project. The project does not involve
watershed development or the quantity or quality of potable water.
Policy 6. The project shall have no impact upon the ecological quality of
fie Town of Southold. There shall be no direct or indirect disturbance to
any significant Coastal Fish or Wildlife Habitats.
Policy 7. I do not feel that this policy is applicable to this project since the
project does not involve any atmospheric deposition of pollutants.
Policy 8. I believe that the project is consistent with this policy. The project
shall not involve the disposal of solid wastes or debris. There are no
haT_ardous waste or toxic pollutants involved with the project.
Policy 9. I do not feel that this policy is applicable to this project. The
proposed project shall have no impact upon adequate physical public access
to coastal resources, shall not impact any public visual access to any lands
or waters, involve the public interest in and use of lands and waters held in
public trust or to public access of such areas. Nor will the project have
impacts upon the public's right of access along the shoreline.
Policy 10. I feel that the project is consistent with this policy. The project
shall have no negative impacts upon any existing water-dependent
commercial, industrial or recreational uses of the Peconic Bays. Nor is the
project located on Mill Creek of within the Village of Greenport and does
not involve water-dependent uses at those sites.
Policy 11. I feel that the project is consistent with this policy. The project
does not involve aqu~c, ulture or the removal of shellfish from uncertified
waters of the Town of Southold nor shall it have a negative impact upon the
long term maintenance and health of living resources.
Policy 12. I do not feel that this policy is applicable to the project because
no agricultural lands are involved.
Policy 13. I do not feel that this policy is applicable to the project since the
project does not involve energy or mineral resources.
EDDE OF
EDGE OF
f--FAIRWAY
0+80 0+100
APPROXIMATE
1WATER LEVEL
HAY NA~O~ ~OLF ~hU~
LOCATION MAP
SCALE 1"=400'
SECTION "A"
VERTICAL SCALE 1 "=5'
HORIZONTAL SCALE 1"=5'
OF EDGE Of~
FAIRWAY
O, O0
LEVEL
SECTION "B"
VERTICAL SCALE 1 "=5'
HORIZONTAL SCALE 1"--5'
UALITY CONTROL CERTiFICATiON
GROUP
2 2OOB
SHEET
20F3
NOTED
LOCATION MAP SCALE 1"=400'
I=%l~N~ Ncr' DIS1~RI~33
~ ~ISTING ~(~ ~ ~ ~
.~ ,~ ~ ~ z O
SECTION "C"
~RTICAL SCALE 1 "=5'
HORIZONTAL SCALE I "=5'
<
SCALE: AS NOTED
~ou~ ~,~w~ ~/ SHEET
20
~I~TN.L ulRM1 14CNJ
FLIER F~
O, O0
@
PHOTOGRAPH~
PHQTOGPAPH~)
// %
HAY' HARBOR GOLF CLUE5
SUFFOLK
EDGE 0£
.... - WATER _j
......... SANOY BEACH
ROCKS
5,) ONLY COPIES OF Tills SURVEY MARKED WI]B THE lC, ND SURVE'/OR'S
SIGNATURE A~D AN ORIGINAL EMBOSSED OR iNK BFAi ARE THE PRODUC'I OF
THE LAND SURVEYOR.
5) TOYAI AR~A, = 446:k ACRES
QUALFfb' CONTROL CERTIFICAflON
2B
PHOTOGRAPH
DATE: 12/14/2007
SCALE: 1" = 50 IW
SHEET
1 OF