Loading...
HomeMy WebLinkAboutTR-7037 James F. King, President Jill M. Doherty, Vice-President Peggy A~ Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 63095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE __ Pre-construction, hay bale line __ 1st day of construction ¼ constructed Project complete, compliance inspection. BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK PERMIT NO. 7037 DATE: FEBRUARY 18~ 2009 ISSUED TO: GERALD DICUNZOLO PROPERTY ADDRESS: 1935 WESTVIEW DRIVE~ MATTITUCK SCTM# 107-7-5 AUTHORIZATION Pursuant to the provisions of Chapter 275 and/or Chapter l I 1 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on Februa~ 18~ 2009, and in consideration of appl~catig,n fee in the sum of $250.00 paid by Gerald DiCunzolo and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to remove 76' of existing bulkhead and construct new bulkhead in-place, provide a 10' wide non-turf buffer landward of the bulkhead, with the conditions that the two drains in the bulkhead be removed, install and maintain a 10' non-turf buffer landward of the bulkhead, and as depicted on the site plan prepared by Costello Marine Contracting Corp., last dated February 26, 2009, and received on March 3, 2009. IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. TERMS AND CONDITIONS 10. The Permittee Gerald DiCunzolo, residing at 1935 Westview Drive, Mattituck, New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third pa~ties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. That the work involved will be subject to tl~& inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. That there will be no unreasonable interference with navigation as a result of the Work herein authorized. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation, the said Permittee will be required, upOn due notice, to remove or alter this work project herein stated without expenses to .the Town of Southold. · The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffolk County Department of Real Properties Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety (90) calendar days of issuance of this permit. That the said Board will be notified by the Permittee of the completion of the work authorized. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall Annex 54375MainRoad P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 February 18, 2009 BOARD OFTOWNTRUSTEES TOWN OFSOUTHOLD Ms. Jane Costello Costello Marine Contracting Corp. P.O. Box 2124 Greenport, NY 11944 RE: GERALD DICUNZOLO 1935 WESTVIEW DRIVE, MATTITUCK SCTM# 107-7-5 Dear Ms. Costello: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, February 18, 2009 regarding the above matter: WHEREAS, Costello Marine Contracting Corp. on behalf of GERALD DICUNZOLO applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated January 28, 2009, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, in accordance with Chapter 268, said application was found to be Exempt from the Local Waterfront Revitalization Program policy standards, and, WHEREAS, a Public Headng was held by the Town Trustees with respect to said application on February 18, 2009, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT; RESOLVED, that the Board of Trustees approve the application of GERALD DICUNZOLO to remove 76' of existing bulkhead and construct new bulkhead in-place, provide a 10' wide non-turf buffer landward of the bulkhead, with the conditions that the two drains in the bulkhead be removed, install and maintain a 10' non-turf buffer landward of the bulkhead, and as depicted on the site plan prepared by Costello Marine Contracting Corp., last dated February 26, 2009, and received on Mamh 3, 2009. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) Fees: $50.00 Very truly yours, James F. King President, Board of Trustees JFK/eac James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghesio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: ~. e~cc~c~ Please be advised that your application dated ~"-o,~uto, r'~ c~,. c~OO(~ has been reviewed by this Board at the regular meeting of and your application has been approved pending the completion ~ the following items checked off below. v'/' Revised Plans for proposed project __ Pre-Construction Hay Bale Line Inspection Fee ($50.00) __ 1st Day of Construction ($50.00) __ ~ Constructed ($50.00) ~"/'Final Inspection Fee ($50.00) __ Dock Fees ($3.00 per sq. ft,) Permit fees are now due, Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary, You will receive your permit upon completion of the above, COMPUTATION OF PERMIT FEES: TOTAL FEES DUE: $: ~'"-0 ~ BY: James F. King, President Board of Trustees Donald Wilder, Chairman Lauren Standish, Secretary Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (631 ) 765-1892 Fax (631 ) 765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., February 11, 2009, the following recommendation was made: Moved by Don Wilder, seconded by Jack McGreevy, it was RESOLVED to SUPPORT the Wetland Permit application of GERALD DICUNZOLO to remove 76' of existing bulkhead and construct new bulkhead in-place. Provide 10' wide non-turf buffer landward of bulkhead. Install two 12" X 30' long mooring pilings on north side of existing floating dock. Located: 1935 Westview Dr., Mattituck. SCTM#107-7-5 Inspected by: Jack McGreevy, Don Wilder The CAC Supports the application with the Condition the roof drains running through the bulkhead are removed and a drainage plan is submitted, and no treated lumber is used. The CAC questions whether the additional pilings would interfere with the dock on the adjacent property. Vote of Council: Ayes: All Motion Carried James F. King, Pl~sident Jill M. Doher~y. Vice-President Peggy A Dickerson Dave Beqgen Bob Ghosio. Jr. P.O Box 1179 Southold. NY 11971 Telephone(631)765-1892 Fax (631)765-6641 Southold Town Board of Trustees Field Inspection/Worksession Report Costello Marine Contracting Corp. on behalf of GERALD DICUNZOLO requests a Wetland Permit to remove 76' of existing bulkhead and construct new bulkhead in- place. Provide 10' wide non-turf buffer landward of bulkhead. Install two 12" X 30' long mooring pilings on north side of existing floating dock. Located: 1935 Westview Dr., Mattituck. SCTM#107-7-5 T~aOf area to be impacted: Itwater Wetland Freshwater Wetland Sound __Bay Distance of proposed work to edge of wetland PaC,-df Town Code proposed work falls under: r/Chapt.275 Chapt. 111 other Type of Application: ~Wetland __Coastal Erosion ~Amendment __Administrative__Emergency Pre-Submission Violation Info needed: Modifications: Conditions: Present Were: ~.King ~JL~.Doherty__P~.Dickerson __ D. Dzenkowski Mark Terry~he~ Form filled out in the field by D. Bergen__ B.Ghosio, Mailed/Faxed to: Date: Environmental Technician Review- 0 Jerry DiCtmzolo Mattitack 9/9/08 Jerry DiCu~zoto Mattituck 9/9/08 Jerry DiCunzolo Mattituck 9/9/08 OFFICE LOCATION: Town Hall Annex 54375 State Route 25 Main Rd. & Youngs Ave. Southold, NY 11971 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 To: Jim King, President Town of Southold Board of Trustees From: Mark Terry, LWRP Coordinator Scott A. Hilary, LWRP Coordinator Date: February 10, 2009 Re: Chapter 268, WATERFRONT CONSISTENCY REVIEW Wetland Permit for GERALD DICUNZOLO SCTM#107-7-5 Costello Marine Contracting Corp. on behalf of GERALD DICUNZOLO requests a Wetland Permit to remove 76' of existing bulkhead and construct new bulkhead in-place. Provide 10' wide non-turf buffer landward of bulkhead. Install two 12" X 30' long mooring pilings on north side of existing floating dock. Located: 1935 Westview Dr., Mattituck. SCTM# 107-7-5 THE FOLLOWING SECTION ADDRESSES THE PROPOSED IN-PLACE BULKHEAD REPLACEMENT: The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to us, it is our recommendation that the proposed action is EXEMPT pursuant to § 268-3 GG. Bulkhead to replace existing bulkhead on the applicant's property in the same location with a silt curtain employed during construction. The following BMP's are recommended: l) The deployment of silt boom surrounding the immediate project area prior to and during all intertidal operations. 2) Establish a 20' non-turf vegetative buffer landward of the bulkhead. NOTE: That the exemption determination covers only the inkind-inplace replacement of the bulkhead and not the two 12' x 30' long mooring pilings. THE FOLLOWING SECTION ADDRESSES THE MOORING PILINGS: The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to us, it is our recommendation that the propo~action is the proposed action is INCON~ii~TENT with LWRP policy standards and therefore is INCONSIST~ with the LWRP. Policy 6 Protect and restore the quality and function of the Town of Southold ecosystem 6.3 Protect and restore tidal and freshwater wetlands. Comply with statutory and regulatory requirements of the SouthoM Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction 1. Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. The proposed action (two 12" X 30' long moorim, pilings) may cause the followim, impacts: 1) 2) 3) 4) Impair navigation of the water body. Interfere with the public's use of the waterway and bottomland. Impair views and view-sheds .important to the community. Establish a precedent contributing to the cumulative impacts caused by similar docking structures. Therefore the dock standards pursuant to § 275-11 have not been met; specifically dock standards [lb [21, [101 and [111. § 275-11 Construction and operation standards. (d) Review and approval of dock applications. Before issuing a permit for a dock structure, the Trustees shall consider whether the dock will have any of the following harmful effects: il[ [2] [3] [4] [5] [6] [7] [8] [9] IlO] [l~] [12] Whether the dock will impair navigation or be located in areas of high vessel traffic or vessel congestion; Whether the dock will unduly interfere with the public use of waterways for swimming, boating, fishing, shellfishing, waterskiing and other water-dependant activities; Whether the dock will unduly interfere with transit by the public along the public beaches or foreshore; Whether the dock will significantly impair the use or value of waterfront property adjacent to or near the dock; Whether the dock will cause degradation of surface water quality and natural resources; Whether the dock will cause habitat fragmentation and loss of significant coastal fish and wildlife habitats; Whether the dock will result in the destruction of or prevent the growth of vegetated wetlands, seagrasses including eelgrass (Zostera marina) and widgeon grass (Ruppia maritima) or shellfish; Whether the dock will unduly restrict tidal flow or water circulation; Whether the dock will be safe when constructed; Whether the dock will adversely affect views, viewsheds and vistas important to the community; Whether the cumulative impacts of a residential and commercial dock will change the waterway or the environment and whether alternate design, construction, and location of the dock will minimize cumulative impacts; and Whether adequate facilities are available to boat owners and/or operators for fueling, discharge of waste and rubbish, electrical service and water service. The following BMP is recommended as alternative to the proposed action (two 12" X 30' long mooring pilings): 1) The use of a mooring whip as alternative to pile mooring dolphins. If the Agency~ Board of Trustees makes a contrary determination of consistency~ the Agency shall elaborate in writing the basis for its disagreement with their recommendations Pursuant to Chapter 268 Waterfront Consistency Review. § 268-5. Review of actions. It In the event the LWRP Coordinator's recommendation is that the action is inconsistent with the LWRP, and the agency makes a contrary determination of consistency, the agency shall elaborate in writing the basis for its disagreement with the r~t~mmendation and state the manner and ext~ to which the action is consistent with the L WRP policy standard~ Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Office Use Only ~- ~,C.~astal Erosion Permit Application ~___.Wetland Permit Application Administrative Permit  Amendmenffrrans fer/Extension ece~ved Application: ~/c~q' eceived Fee:$fi:~ bY'f)~ ~Completed Application / ] ~ ~] O~ __Incomplete t __SEQRA Clarification: Type I Type I/ Unlisted __Coordination:(date sent) ~3'AC Referral Sent: ] ~ ~_.Date of Inspection: ' ~D~.l-I/Oq __Receipt of CAC Report: __Lead Agency Determination:__ Technical Review: /~blic Hearing Hel& ~, t ~/q3~ __Resolution: PhoneNumb¢~:( ) &3/. ,iSl. d~C~D' Suffolk County Tax Map Number: 1000- /t~ 7-- 7-~'{' P -ope,-VLoc.t o,.: (provide LILCO Pole #, distance to cross streets, and location) (If applicable) ' Phone: ~3l. Board of Trustees Application GENERAL DATA Land Area (in square feet): /,~ Area Zoning: Previous use of property: Intended use of property: Prior permits/approvals for site improvements: Agency Date __ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? ,~ No Yes If yes, provide explanation: Project Description (use attachments if necessary):~}~fiVE of Trustees Application County of Suffolk State of New York DEPOSES AND AFFIRMS THAT HIE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAiNED HEREiN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS AR/SING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. iN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. SWORN TO BEFORE ME THIS ,2otgq CYNTHIA M. CUSATI Notary Public, State of New York No. 0ZCU6!0050/ Qualified in Suffolk Ccunt,j Commissiml Expires Oct 20..~._ of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed opemtions: ~ ~_ ~f~l~it_Lf_~ ~at[&t'] Area of wetlands on lot: t~,fl~ square feet Percent coverage of lot: /, ~ % Closest distance between nearest existing structure and upland edge of wetlands: ~ feet Closest distance between nearest proposed structure and upland edge of wetlands: ~ feet Does the project involve excavation or filling? No .,~ Yes If yes, how much material will be excavated? ~:~ cubic yards How much material will be filled? ~2~ cubic yards Depth of which mater/al will be removed or deposited: t~ Proposed slope throughout the area of operations: Manner in which material will be removed or deposited: [ feet Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): 617.20 Appendix C State Environmental Quality Review SHORT ENVIRONMENTAL ASSESSMENT FORM For UNLISTED ACTIONS Only PART I - PROJECT INFORMATION (To be completed by AFplicant or Project Sponsor) 1. APPLICANT/SPONSOR mz PROJECT NAME COSTELLO MARINE CONTRACTING CORP. (CMCC) / GERALD DICUNZOLO 3. PROJECT LOCATION: Municipality MATTITUCK County SUFFOLK 4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map) 1935 WEST VIEW DRIVE, MATTITUCK, NY 11952 SCTM# 1000-107-7-5 5. PROPOSED ACTION IS: [] New [] Expansion [] Modification/alteration 6. DESCRIBE PROJECT BRIEFLY: REMOVE AND REPLACE EXISTING 76' OF BULKHEAD. PROVIDE 10' WIDE NON-TURF BUFFER LANDWARD OF BULKHEAD. INSTALL TWO 12" X 30' MOORING PILINGS ON THE NORTH SIDE OF THE EXISTING FLOATING DOCK. 7. AMOUNTOF LANDAFFECTED: Initially 0 acres Ultimately 0 acres 8. WiLL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? [] Yes [] No If No, descdbe briefly 9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? [] Residential [] Industrial [] Commercial [] Agdcuiture [] Par~JForest/Open Space [] Other Describe: PRIVATE RESIDENTIAL WATERFRONT 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL, STATE OR LOCAL)? [] Yes mi I No If Yes, list agency(s) name and permit/approvals: ACOE, NYSDEC, NYSDOS, SOUTHOLD TOWN 'I~USTEES 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? [] Yes [] No If Yes, list agency(s) name and permit/approvals: 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? DYes ~lNo I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor n~._JANE COSTEL,.,.~LO, z~PERMIT MANAGER FOR CMCC Oat,: //r~ I I~he action is in the Coastal Area, and you are. a state ag.ency, complete the Coastal Assessment Form before proceeding with this assessment OVER 1 Reset 'ART II - IMPACT AS$-~$$MENT (To be completed by Lead Agency) A. DOES ACTION EXCEED ANY TYPE I THRESHOLD tN 6 NYCRR, pART 617.4? If yes, coordinate the review process and use the FULL EAF. r-]Yes r--j No B. W~LLACT~NRECE~VEC~RD~NATEDREVIEWASPR~V~DEDF~RUNL~5~UACT~NS~N6NYCRR'PART617~6? IfNo, anagative declaration may be superseded by another involved agency. []Yes [].o C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten, if legible) C1. Existing air quality, sun'ace or groundwater quality or quantity, noise levels, existing traffic pattern, solid waste production or disposal, potential for erosion, drainage or flooding problems? Explain briefly: C2. ,4esthetic, agricultural, archaeological, historic, er other natural or cultural resources; or community or neighborhood character? Explain bhefly: C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered spocles? Explain briefly: C4. A community's e~sting plens or goals as offmially adopted, or a change ~n use o~ ~ntensit'/of use of land or other natural resources? Explain briefly C5. Growth, subsequent development, or related activities like~ to be induced by the proposed action? Explain briefly: C6. Long term, short term, cumulative, or other elfects not identified in C1-C57 Explain bdefly: C7. Other impacts (including changes in use of either quantity or [ype of energy)? Explain bhefiy: ). V~LL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL ENVIRONMENTAL AREA (CEA)? [] Yes [] No If Yes, explain bdefly: E. IS THERE, OR IS THERE LIKELY TO SE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? [] Yes [] NO If Yes, explain briefly: PANT III - DETERMINATION OF SIGNIFICANCE (To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above, determine whether i{ is substantial, large, important or otherwise significant. Each effect should be assessed in connect[on with its (a) setting (i.e. urban or rural); (b) probability of occordng; (c) duration; (d) irreversibilfly; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part II was checked yes, the determination of significance must ewh,mm the potential impact of the proposed action on the environmental characteristics of the CEA. ] Checkthisb~xify~uhaveidenti~ed~n~rm~repntenUai~y~ergeersigni~cantadverseimpactswhichMAY~ccor~ Thenp, uceeddirecfiytotheFUL[ EAF and/or prepare a positive declaration. [] Checkthis boxif You have determined, based °n the informati°n and enalysis ab°ye and eny supa°rUag d°cumenfatlen' that the pr°posed acti°n WILl NOT result in any significant adverse environmental impacts AND provide, on attachments as necesea~], the reasons supporting this determination Name of Lead Agency Date Print or Type Name of Responsible Officer in Lead Agency T~e of Responsible Officer Signature of Responsible offcor in Lead Agency Signature of preparer (If different fi.om responsible u~,~) Reset James F. King, President Jill M. Dohe~y, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD In the Matter of the Application of GERALD DICUNZOLO COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF POSTING , residing at ~/~) being duly swom, depose and say: That on t.he l l Lda.y of ,l _b ,200c], I p.er.sona!ly post~ed.th~e~prqperty known as by p'l~:ing the Board of Trustees ol~fici~l pos-ter wherl: it can easil~ be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held Wed.~ February 18~ 2009~ on or about 6:00 PM. Dated: c>c~am to b~fqre me this y of~J9 200 ~ ~I'~t"a~y Public ~ - - CYNTHIA M. CUSATI Notary Public, State of New yon{ No. 01CU6100507 Qualified in Suffolk County Commission Expires Oct 20j[.J._ II Gerald DiCunzolo Posting 2/11/09 Gerald DiCunzolo PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: Robert Ezzard Joseph & Barbara Isabella Anne Renganeschi Address: 1900 Westview Drive, Mattimck, NY 11952 49 Dartmouth Street, Rockville Centre, NY 11570-2414 2005 Westview Drive, Mattituck, NY 11952 STATE OF NEW YORK COUNTY OF SUFFOLK JANE COSTELLO , residing at 760 CHESTER ROAD, SAYVILLE,, NY 11782 , being duly sworn, deposes and says that on the 1 I'IH day of FEBROARY ,2009, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at GREENPORT, NY 11944 (certified) (registered) mail. VERONICA E CIDONE Notary Public. State of Now York No. 01CI4661406 Qualified in Suffolk County Commission Expires Dec. 31,2009 , that said Notices were mailed to each of said persons by 2005 Westview Drive Ma~tituck, NY 11952 0~44 O5 ' postmark Here ~ n~To Robert Ezzard r,-c~c~:: 1900 Westview Drive or,,=,oeox~o. Ma~dtuck, NY 11952 ~44 05 .13 Postage rtl Ceillfled Fee (~ '~ ~,~t:'~'- 3oseph & Barbara Isabella ~ ~-~-~,-~w~:~ 49 Dartmouth Street r~ ~ Rockville Centre, NY 11570-2414 NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES, TOWN OF SOUTHOLD In the matter of applicant: Gerald DiCunzolo SCTM# 1000-107-7-5 YOU ARE HEREBY GIVEN NOTICE: 1. That it is the intention of the undersigned to request a Permit from the Board of Trustees to: · Remove 76' of existing bulkhead and construct new bulkhead in-place. · Provide a 10' wide non-turf buffer landward of the bulkhead. · Install two mooring pilings on the north side of the existing floating dock. 2. That the property which is the subject of Environmental Review is located adjacent to your property and is described as follows: 1935 Westview Drive, Mattituck, NY 11952 3. That the project which is subject to Environmental Review under Chapters 32, 37, or 97 of the Town Code is open to public comment on February 18, 2009 at 6:00pm. You may contact the Trustees Office at 765-1892 or in writing. The above referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. OWNERS NAME: Gerald DiCunzolo MAILING ADDRESS: 2 Beach Drive Huntington, NY 11743 Enc.: Copy of sketch or plan showing proposal for your convenience. ~'=7',w/o=o -/oF-.;,. ~ '/ / / COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JETTIES · BULKHEADING · STEEL & WOOD PILING · FLOATS 423 FIFTH STREET ' P.O. BOX 2124' GREENPORT, NEW YORK 11944 · (631) 477-1199/477-1393 / 477-0682 ' FAX/63~) 477-0005 AUTHORIZATION FORM, (Name) (Business/Property Name) locatedat / ~ 3~~'-- [M~g~-V~'~.~) ' 6,z~. . /,,l~/~-~'z-c,'a.~, ,'~'F do hereby give CostellO Marine Contracting Corp. the au!hority to act as agent in my behalf in applying for all the necessary pennits for work to be completed at my above referenced property. Date - ture To~n of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS .3. All applicants for permits* including Town of Southold agencies, shall complete proposed actions that are subject to the Town ofSouthold Waterfi'ont Consistency Reviex, assessment is intended to supplement other information used by a Tov, m of Southold making a determination of consistency. *Except minor exempt actions including Building and other ministerial permits not located within the Coastal Erosion Hazard Area. Before answenng the questions in Section C, the preparer of tkis form should review tl~e e×cmpt minor action list, policies and explanations of each policy contained in the Town of Soutl~old Loca~i Waterfi'ont Revitalization Program. A proposed action will be evaluated as to irs beneficial and adverse effects upon the coastal area (which includes all of Southold If any question in Section C on th/s form is answered "yes", then the proposed action achievement of the LW-RP policy standards and conditions contained in the consistency Thus, the action should be analyzed in more detail and, if necessary, modified determination that it is consistent to the maximum extent practicable with the standards and conditions. If an action cannot be certified as consistent with the standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's x~ ct>sttr. (southoldtown.northfork.net), the Board of Trustees Office, the planmng Department, ail local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION scm . 7 The Application has been submitted to (check appropriate response): Town Board [~ Planning Dept. [-~ Building Dept. [--~ Board of Trustees 1. Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) FmanciaI assistance (e.g. grantl loan, subsidy) (c) Permit, approval, license, certification: Nature and extent of action: _ . . , Site acreage: Present land use: ' ~ zom~ ~1~¢~o~: If~ app~cation for ~e proP°s~ ~:0~ h~ be~ fii~ ~ ~e To~ of Sou~old agency, the following i~omafion sh~ be pm~ded: (c) Telephone nmb~r~ (d) Applica~n nmb~, iffy: Will the action be ~ectly ~de~e~ r~e ~g, or'approval by a state or federal agency? Yes ~ ..DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Pagei2 for evaluation criteria. Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria []- Attach additional sheet~ if necessary~ Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria Yes ot Applica Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8,through:16.f~r' evaluation Criteria ", ,., ': Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III -:Policies pages 16 through 21 f0r, eva!uationcriteria '[--~ Yes [-'] No otXPPli~a~ '~/LC~ Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. Yes ~/~ No ~-] Not Applicable, i ,~,: . ~.~:., Attach add/tional sheets if n~qCSSa~y Policy 7. Protect and improve aib quality in th'e T~wn of S0uthold. See LWRP Section II1 - Policies Pages 32 through 34 for evaluation criteria. [] Yes [] No~ Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. [] Yes [] No .~ Not Applicable~ PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lauds, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. [~ Yes [] No ~-] Not Applicable Attach additional sheets if necessary . WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III -Policies; Pages 47 through 56 for evaluation criteria. ~ Yes ~] No [] Not Applicable '-r-} . Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, ,the Pecooic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. [-~ Yes ~ 1No [] Not Applicable Attach additional sheets if necessary Policy 12 Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. [~ Yes ~ 1No[~ Not Applicable,~[f_0.,,q~' Atlach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. Created on 5/25/05 11:20 AM Data: To: Proposal: January 27, 2009 Southold Town Trustees and Mark Terry Remove 76' of existing bulkhead and construct new bulkhead in-place. Provide 10' wide non-turf buffer landward of bulkhead. Install two 12"x30' long mooring pilings on north side of existing floating dock. DEVELOPED COAST POLiCiES Policy I Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes effident use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. The existing bulkhead on this property is beginning to fail. The property owner is attempting to maintain his property by building a new bulkhead in its place. Policy 2 Preserve historic resources of the Town of Southold. This property has no significant historic resources. Policy 3 Enhance visual quality and protect scenic resour~s throughout the Town of Southold. The bulkhead at this location exists. The present condition of this bulkhead is becoming unstable threatening the integrity of the upland property. A new bulkhead is just an attempt of the upland property owner to maintain his property. There is an existing bulkhead and the surrounding area is bulkheaded so the visual quality and scenic resources will remain the same. NATURAL COAST POI.[CIES Policy 4 Minimize loss of lifev structuresv and natural resources from flooding and erosion. The existing bulkhead is needed to protect the upland property. The new bulkhead will not increase flooding or erosion in this area. Policy 5 Protect and improve watar quality and supply in the Town of Southoid. This proposal will not have any impact on the water quality and supply of the Town of Southold. Policy 6 Protect and restore the quality and function of the Town Of Southoid's ecosystam, This proposal will not have any impact on the Town of Southold's ecosystem. Policy 7 Protect and improve air quality in the Town Of Southold. This proposal will not have any impact on the air quality of the Town of Southold. Policy Minimize environmental degradation in the Town Of Southold from solid waste and hazardous substances and wastes. This proposal will not degrade the environment with solid waste or hazardous substances. PUBLIC COAST POL~C]~E~ Policy 9 Provide for public access to, and recreational use of~ coastal watars, public lands, and public resources of the Town of Southold. Our proposal will not limit public access to the coastal waters or public resources of the Town of Southold. There is a bulkhead presently existing and we are proposing to construct a new bulkhead in place. WORKZNG COAST POLtCIE~ Policy 10 Protect the Town of Southold's watar-dependent uses and promota siting of new watar- dependent uses in suitable locations. Policy 11 Policy 12 Policy 13 Our proposal is to reconstruct a failing bulkhead. The present condition of the bulkhead is poor and unsafe. This property is used by the upland property owners to engage in water dependent activities such as fishing, swimming and boating. These activities will continue at this site. Promote sustainable use of living marine resources in the Town of Southold. During the initial construction thero will be minimal disturbance to there area landward of the bulkhead, Our proposal includes a 10' non turf buffer behind the bulkhead a~er construction. Protect agricultural lands in the Town of Southold. This proposal has no impact on the agricultural lands in the Town of Southold. Promote appropriate use and development of energy and mineral resources, This proposal has no influence on the development of energy and mineral resources. V/¢/~,~/7'¥ ,A,4,4 .% SITUATE.. 1'4ATTITUC.,K. TOk',IN OF .5OUTHOI~ SUFFOLK 6_,01)N-I'1", N'I' ..SUR'CEYED 08 - Iq - OD P~OPOE~O A~DITIONS 12 - I,~ - 04 5gFPOL< GOUNTh* TAX # IOOO - IO-/ - -/ - 5 NOTES: · fqONtaVlENT FOUN~ At;(EA = 15304 5,.P. or' O.D5 AGt;~.E¢ ®RAPHIG SGALE I"= ~O' ?ROPOSF. D AC"~0NS NOTE A PW. OPO$ED 14'Xl4' THO 5TOt~.¥ A~DITION NOTE B Pt~OPOSED 12' X 24' SO;~EENEP PO~C.H NOTE G F:~.OPOC-_'_'_~D E~' X I~'...~' I STORY A~DITION ~05 .%0' 19"/.Off JOHN C. EHLERS LAND SURVEYOR N.Y.S. LIC. NO. 50202 6 EAST MAIN STKEET