Loading...
HomeMy WebLinkAbout1000-107.-9-2.1 (2)PLANNING BOARD MEMBERS JERILYN B. WOODHOUSE Chair WILLIAM J. CREMERS KENNETH L. EDWARDS MARTIN H. SIDOR GEORGED. SOLOMON ~42~I L~NG ADDRESS: P.O. Box 1179 Southold, NY 11971 OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY Telephone: 631 765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD To: Town of Southold Board of Trustees From: Mark Terry, Senior Environmental Planner LWRP Coordinator Date: July 18, 2005 Re~ Request for Permit for Dennis Hranitzky SCTM#1000-107-9-2.1 The proposed action involves the construction of a 4' x 25' fixed dock, 3' x 12' ramp and a 6' x 20' float with dolphin poles at each end. The proposed action is located within REACH 1. The proposed action has been reviewed to Chapter 95, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is generally CONSISTENT with the Policy Standards and therefore is CONSISTENT with the LWRP provided that the following outstanding items are submitted and standard best management practices are implemented to further the intent of the LWRP Policies 5, 6, 10 and 11. To further the intent of LWRP Policies 5, 6, and 8 and to protect water quality and the health of marine organisms no CCA treated wood~ oil based preservatives containing creosote (CRT) or pentachlorophenol (PCP)~ applied to the surface of wood materials shall be permitted in the construction materials of the bulkhead~ walkway, dock or ramp. The applicant shall use a decay resistant alternative. The proposed detailed construction practices and materials have not been identified and should be outlined in writing to the Board. Although the application states that the disturbed areas will be restored~ a restoration plan outlining species~ timing and specifications has not been submitted to the Board. Such a plan should be submitted to the Board. 4. During construction of the structure~ require the encirclement of the entire proiect area with a floating turbiditw screen to remain in place a sufficient number of days to allow the settling of the suspended solids. Pursuant to Chapter 95, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Please contact me at (631) 765-1938 if you have any questions regarding the above. Cc~ Conservation Advisory Council d' Heather Tetrault, Environmental Analyst