Loading...
HomeMy WebLinkAbout1000-18.-2-22.1PLANNING BOARD MEMBERS BENNETT ORLOWSKI, JR, Chairman RICHARD CAGGIANO WILLIAM J. CREMERS KENNETH L. EDWARDS MARTIN SIDOR P.O. Box 1179 Town Hall, 53095 State Route 25 Southold, New York 11971-0959 Telephone (631) 765-1938 Fax (631) 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD MEMORANDUM T: F: R: D: Gerard P. Goehringer, Chairman, Zoning Board of Appeals Scott Hughes, Senior Environmental Planner~.- Sprint at Orient Congregational Church Application # 5224 SCTM #1000-18-2-22.1 16 October 2002 The Planning Board discussed this project at the 15 OCT 2002 work session and is highly in favor of the proposed cellular installation at the Orient Congregational Church. It is felt that the concealment of these facilities is a most welcome alternative to putting antennae upon exposed poles. thank you. Architects/Planners October 9, 2002 Town of Southold Planning Board Southold Town Hall 53095 Main Road Southold, NY 11971 Re~ Sprint PCS - NY33-XC678b Orient Congregational Church 23045 Main Road Orient, NY 111957 To Whom It May Concern: We are the architects who designed the proposed Sprint installation at the above referenced address. All applicable codes and standards were used for the design including the Codes Rules and Regulation of the State of New York, the Telecommunications Industry Association's ANSI/TIA/EIA-222-F standards, and the American Institute of Steel Construction (AISC) code. Sprint is proposing the addition of six (6) new antennas within the existing steeple, three (3) at 62'-10" above ground level and three (3) at 59'-10" above ground level, all to the center of the antennas. Each antenna weighs nine (9) pounds and will be mounted individually with steel plates to the existing wood structure within the steeple. Because the antennas are mounted inside the steeple, wind loads will not play a factor in this installation. The coax cables, two (2) per antenna for a total of twelve (12) will be run across the attic space of the existing church upon a new plywood walkway. The coax cables weigh only .92 pounds per foot and will not be exposed to wind loading either. All mounting attachments will be made with screws in order to minimize damage and intrusiveness to the existing structure. The additional loads that will be generated by the Sprint antennas and coax cables will not affect the structural integrity of the existing structures. They will be relatively small and insignificant compared to the overall design of the existing church and steeple. The church attic and steeple will still be accessible. If you have any further_~u, estions, Sincerely, , ~ NY ~/g021~ please feel free to contact our office. OCT 0 9 ZOOZ S 5Proj_Files\S678Akstrucltr.doc IterbstoMusciano Architects/Planners September 26, 2002 Mr. Scott Hughes Town of Southold Environmental Planner Southold, NY Edward H. Herbst, RA, PP Gary Musciano, RA, PP Sprint PCS - NY33-XC678b Orient Congregational Church 23045 Main Road Orient, NY 111957 Dear Mr. Hughes: Sprint is proposing to locate their equipment cabinets in the basement of the Existing Accessory Structure and the only equipment outside will be a condenser unit, which is roughly the size of a residential air conditioning unit and it will sit on a 4'x4' concrete pad to the west of the Accessory Structure near where the cables will penetrate the building. The cables will run underground from the Accessory Structure to the Existing Church and will remain underground until inside the building itself. There is a small storage closet at the rear of the Church which we will use to run the cables up to the existing attic space. The cables will then run along the attic space and into the belfry below the existing steeple. Once inside the steeple, they will run to their respective antennas. The antennas and their cables will not be visible from outside the Church and all conduit penetrations will be properly sealed. However, the steeple will need to have a small portion of three panels replaced with fiberglass panels to allow for the antennas signals to pass through. The fiberglass panels will be fabricated to match the existing steeple and the entire steeple will be painted upon completion of the installation. Currently, we are working with an architectural fiberglass company that will reproduce the steeple to an amazingly exact degree and from outside, the Church will appear no differently than it does today. The Orient Congregational Church is listed on the National Historic Registry. We have worked closely with the NY State Historic Preservation Office in order to be certain that we disturb as little of the existing church as possible. We have satisfactorily met the requirements of the NY SHPO as well as the requirements of Sprint PCS with the design as indicated. Should you have any questions, do not hesitate to call our office. Sincerely, Joanne Slaman Project Manager 240 Cedar Knolls Road, Suite 209, Cedar Knolls, New Jersey 07927 973.538o3815 Fax 973.538o4095 MUNLEY~ MEADE~ NIELSEN & 1~I~ (631) 425-4100 (631) 425o4104 September 23, 2002 VIA UPS Mr. Scott Hughes Environmental Planner Town of Southold 53095 Main Road Southold, NY 11971 Sprint Spectrum L. P. Application for Special Exception Permit To the Zoning Board of Appeals Premises: Orient Congregational Church 23045 Main Road Orient, New York 11957 $outhold Town Planninfl Board Dear Mr. Hughes: As we discussed during our telephone conversation of September 18, 2002, the Town of Southold Office of Zoning Board of Appeals, in its Reply Form dated September 17, 2002, has responded to our submission of the captioned application with a request for correspondence from the Town Planning Board regarding review of the relevant site plan. Toward that end, we have scheduled a pre-application conference to take place at your office on October 1, 2002, at 11:00 a.m., and, pursuant to your request, enclose two (2) sets of Site Plan/Elevation drawings for your review prior to said meeting. Thanking you for your courtesies, we remain Very truly yours, MUNLEY, MEADE, NIELSEN & RI~ /db Enclosures Bernadette Castro Commissioner March 27, 2002 New York State Office of Parks, Recreation and Historic Preservation Historic Preservation Field Services Bureau Peebles Island, PO Box 189, Waterford, New York 12188-0189 Jeanne SJaman Herbst Musciano 240 Cedar Knolls Rd Suite 209 Cedar Knolls. NJ 07927 518-237-8643 RE: Sprint PCS - NY33XC678 Orient Congregational Church 23045 Main Rd Orient, i'~' 01 PR2571 Dear Ms. Slaman: Thank you for providing the State Historic Preservation Office (SHPO) with drawings illustrating your cellular collocation Orient Con~egational Chumh in Orient, NY. We have are reviewing the project in accordance with Section 106 of the National Historic Preservation Act of 1966 and relevant implementing regulations. The drawings appear to indicate that only a limited amount of historic fabric will be removed from the steeple, as was proposed in your last submission. While more detailed drawings that clearly indicate existing conditions and specified installation points am recommended to minimize the number on-site variables left to the discretion of the contractor, the SHPO believes that the project is moving in a positive direction. Based upon this review, it is the SHPO's opinion that the project will have No Adverse Effect upon cultural resources in or eligible for inclusion in the National Register of Historic Places, provided that the following conditions are met: 1) The contractor will ensure that removal of historic material will be kept to the minimum necessary to complete the installation. Adjacent materials will not be damaged as a result of the installation of the cellular antenna or related cables or equipment. To ensure compliance with this stipulation and to guide future restoration of the church steeple, the SHPO is requiring the following photographs: 1) 2) 2) General images of the church showing the bnilding and sleeple befnre work commences. Detail images of the existing historic steeple. A series of"work-in-progress" photographs showing the removal of shingles and sheathing and the installation of the replacement fiberglass material and any other related equipment, 3) The historic appearance of the steeple must be preserved. To ensure compliance with this stipulation, the SHPO requests that when the installation is in place, after-work photographs are taken from the same locations where the before work (Stipulation #1) images were taken. These images should enable a before- and after-work comparison. 4) All requested images will be true black and white photographs made with 35mm film (or larger format) printed in 5'X7' format on archival-quality black and white paper (not R/C paper). All images shall be clearly labeled (captioned) on the back. Two sets of images shall be prepared, An Equal Opportunity/Affirmative Action Agency One set will be given to the church for their records and to guide future restoration· The second set of photographs will be sent to the SHPO within 60 days of completion of the project. lffor whatever reason these stipulations can not be met, consultation with the SHOO must continue until both parties reach an agreement. Thank you again for your assistance. If you have any questions, feel free to call me at (518) 237-8643, ext. 3282. Please refer to the SHPO Project Review (PR) number in any future correspondences regarding this project. Greg Donofrio Historic Sites Restoration Coordinator (~eg.donofrio@oprhp.state.ny.us) CC: Daniel Abeyta, Federal Communications Commission (FCC) New York State Office of Parks, Recreation and Historic Preservation Historic Preservation Field Services Bureau Peebles island, PO Box 189, Waterford, New York 12188~0189 November 20, 2001 Joanne Slaman Herbst Musciano Axchitects~lanners 240 Cedar Knolls Road Suite 209 Cedar Knolls, NJ 07927 HERBST I ,u&;IANO 518-237-8643 Dear Ms. Slaman: Sprint PCS - NY33-XC678 Orient Congregational Church Orient, Suffolk County, NY 0 lPR2571 Thank you providing the State Historic Preservation Office (SFIPO) with a revised proposal for the cellular installation at the Orient Congregational Church on Long Island. We are continuing to review the project in accordance with Section 106 of the National Historic Preservation Act of 1966 and relevant implementing regulations. The SHPO is pleased with the most recent set of design concept drawings dated 5/9/01. These drawings appear to indicate that removal of historic wooden building fabric will be limited to the portions of the steeple directly adjacent to the proposed cellular panels. The SHPO feels that this approach will better meet the Secretary of the Interior Standards because the work will not only be inconspicuous, it will also be easily reversible. To insure full compliance with federal preservation laws, the SHPO requests that more complete construction and/or design drawings be provided for our review and comment. These documents can be sent our office as they are developed. Whether they are prepared by gJchitectural Fiberglass, the project architects or contractors, they should include details that indicate how the fiberglass will be fastened to the steeple and made weather tight. Again, from a preservation point of view, this collocation proposal is a vast improvement over the initial submission and the SHPO feels that the design is moving in a positive direction. Thank you for your cominued assistance. If you have any quesfions, feel fmetocall meat (518) 237-8643, ext, 3282. Please refer to the SHPO Project Review (PR) number in any futura correspondences regarding this project. Greg Donofrio ~ ~ ~ Historic Sites Restoration Coordinator (greg.donofrio @oprhp.state.ny.us) An Equal Oppodunity/Affirmative Action Agency Orient Fi e District September 2, 2001 Bennett Orlowski, Jr., Chairman Southold Town Planning Board PO Box 1179 Southold, NY 11971 Sir: ~- SEP 0 $ 20111 Southold Town Planning Board The Board of Fire Commissioners of the Oriem Fire District are calling your attemion to the enclosed letter concerning the installation ora cell phone transmitter within the Orient Congregational property. Sincerely, Board of Fire Commissioners Orient Fire District Edward G. Loper Secretary/Treasurer Oriem Fire District 23300 Main Road * Orient, NY 11957 * (631)323-2445 * Fax(631)323-9706 Orient Fire District September 2, 2001 Jerrold Koznesoff Atlantic Westem Consulting, Inc. 800 West Cummings Park Suite 4500 Mobum, MA 01801 Sir: The Board of Fire Commissioners of the Orient Fire District would like to address the issue of a cell tower in Orient. We were originally in discussion with you and your firm on the placement of a cell tower on the Orient Fire District property. During the discussion you stated that you would provide a copy of the specifications for the cell tower (flag pole). Having received these specifications, the copy was unreadable and we asked for another copy. Subsequently we have not received any communications from you regarding our request. However, we did find an article in the newspaper (The Suffolk Times) that the Orient Congregational Church is contemplating a deal with Sprint to install a cell phone transmitter in its steeple. Several years ago, the Board of Fire Commissioners had entertained an interest of placing a cell tower on the Orient Fire District property. But due to the objections from the residents of Orient this issue did not materialize. Our reason for a cell tower on the Orient Fire District property is twofold: · The revenue would then be shared equally by all taxpayers, in reducing the tax rate for the residents in the Orient Fire District. Secondly but equally as important our concern to eliminate the communication problems that now exist, by placing Fire and Police antennas in the cell tower (flag pole) for receiving and dispatching emergency calls. We are advising the Congregational Church, and the Southold Town Government of our objections stated within this letter. Please be advised that we are interested in cominuing negotiations with Sprint, for the replacemem of this cell tower (flag pole) on the Oriem Fire District property. The Board of Fire Commissioners would appreciate a reply f~om you so that we may determine our next course of action. Sincerely, Board of Fire Commissioners Oriem Fire District Edward Loper Secretary-Treasurer Orient Fire District Cc: Orient Congregational Church Southold Town Board Southold Town Zoning Board of Appeals 23300 Main Road * Orient, NY 11957 * (631) 323-2445 * Fax (631) 323-9706 ~ New York State Office of Parks, Recreation and Historic Preservation ~ Historic Preservation Field Services Bureau o~ nEWVo~r~T~ ~ Peebles Island, PO Box 189, Waterford, New York t2188-0189 Bernadette Castro Cornrnis$/oner August 6, 2001 Joanne Slaman Herbst Mnsciano Architects/Planners 240 Cedar Knolls Road Suite 209 Cedar Knolls, NJ 07927 Dear Ms. Slaman: 518-237-8643 Sprint PCS - NY33-XC678 Orient Congregational Church Orient, Suffolk County, NY 01 PR2571 Thank you for sending the State Historic Preservation Office (SHPO) additional product information related to the proposed cellular installation at the Orient Congregational Church on Long Island. We are continuing to review the project in accordance with Section 106 of the National Historic Preservation Act of 1966 and relevant implementing regulations. After reviewing the proposal to replace the entire steeple sheathing with fiberglass, the SHPO has determined that the project as designed does not meet the Secretary of the Interior's Standards Rehabilitation. Specifically, the complete loss of wood roofing materials on the steeple violates Standards number 2 and 5 (please see enclosed Standards). As I wrote in my last letter, we have reviewed and approved similar projects where only a small portion of the steeple was replaced with radio-transparent panels. The proposal m replace the existing historic wood sheathing with fiberglass for the entire height of the steeple is unacceptable because of the extent of historic building material loss. This project could be amended to address our concerns and comply with the Standards in the following ways: 1) 2) 3) Install the cellular panels inside the belt tower, behind the gothic arched, slatted vents. Flush mount the panels on the outside of the steeple, just above the base of the bell tower and behind the railing and pinnacles (please see enclosed drawing). The panels must be flush mounted and painted the color of the steeple. Mount panels on the inside (steeple side) of the four pinnacles located at each coreer of the bell tower (please see enclosed drawing). Any of these three options would enable the panels to be removed at some point in the future with little or no lasting impact to the church. I look forward to working together to find a creative solution for this project. Feel free to call me at (518) 237-8643, ext. 3282 so that we may discuss these two options. Please refer to the SHPO Project Review (PR) number in any future correspondences regarding this project. Greg Donofrio Historic Sites Restoration Coordinator ENC: Standards, drawing An Equal Opportunity/Affirmative Action Agency ~ New York State Office of Parks, Recreation and Historic Preservation .~ Historic Preservation Field Services Bureau o'K' .~w~om{sr^'m ~ Peebles island, PO Box 189, Waterford, New York 12188-0189 Bernadette Castro Commissioner ~ [ June 14, 2001 Jeanne Slaman j { Herbst Musciano ArchitectsfPlanhers ..... , . 240 Cedar Knolls Road .i:~ '.:'i 0 Suite 209 Cedar Knolls, NJ 07927 518-237-8643 Dear Ms. Slnman: Sprint PCS - NY33-XC678 Orient Congregational Church Orient, Suffolk County, NY 0 IPR2571 Thank you for requesting the comments of the State Historic Preservation Office (SHPO) for the proposed cellular installation at the Orient Congregational Church on Long Island. We are continuing to review the project in accordance with Section [06 of the National Historic Preservation Act of 1966 and relevant implementing regulations. It was a pleasure talking with you this afternoon about the technical challenges presented by this project. The SI-IPO does not object to collocating on this National Register listed church, provided the installation is executed in a way that minimizes or eliminates any aesthetic and physical impact on the historic resource. In the past, we have reviewed and approved similar projects where only a small portion of the steeple was replaced with radio-transparent panels. The proposal to replace the existing historic wood sheathing with fiberglass for the entire height of the steeple concerns us because of the extent of historic building material loss. At this time, we would request that you explore the feasibility of replacing only three of the eight sides of the steeple as we discussed over the telephone. If this is not feasible, we would like to understand why. Additionally, please provide product information for the proposed fiberglass sheathing, including details showing the physical connection to the steeple armature and the exterior finish of the fiberglass. Any alteration to the steeple must be entirely reversible in the future. I look forward to working together to find a creative solution for this project. Please send additional information as it becomes available, Thank you again for your assistance. If you have any questions, feel free to call me at (518) 237-8643, ext, 3282. Please refer to the SHPO Project Review (PR) number in any future correspondences regals project. Grog D on-'riffle Historic Sites Restoration Coordinator ( greg.donofi'io @oprhp.state.ny.us) An Equal Opportunity/Affirmative Action Agency LASER FICHE FORM Planning Board Site Plans and Amended Site Plans SPFile Type: Proiect Type: Site Plans Status: Incomplete Application - In Active SCTM #: 1000 - 18.-2-22.1 Project Name: Sprint ~ Orient Con.qre.qational Chu~ Address: 23045 Main Road, Orient Hamlet: Orient Applicant Name: Sprint Spectrum, LP Owner Name: Orient Con.qre.qational Church ZOne 1: Approval Date: OPTIONAL ADDITIONAL INFORMATION End SP Date: Zone 2: Location: SC FilinR Date: C and R's: Home Assoc: R and M A,qreement: A date indicates that we have received the related information Zone 3: SCAN Date SCANNED ~AR 16 2O09 Records Manag. ement PROPOSED ~ REPLACEMENT PANEL SECTION (FROM 6" ABOVE UPPER ANTENNA TO 6" BELOW LOWER ANTENNA) @ EACH SECTOR ANTENNAS (TYP, OF S) SEE DETAIL 3/Z5 PROPOSED SPRINT PCS SECTOR ANTENNAS TYP OF S SECTORS SEE DETAIL B/Z5 ~ QF ANTENNAS ~ OF ANTENNAS BASE OF STEEPLE BASE OF BELL TOWER ORIENT CONGREGATIONAL CHURCH SOUTH ELEVATION SCALE: 1/B"=1'-0" REAR VIEW TOP ViEW EMS WIRELESS OPTIFILL DUALPOL ANTENNA MODEL RR851500BPL2 NTH MECHANICAL DOWNTILT KIT MODEL MTG-DIO-IO ANTENNA DETAIL SCALE: 1/2"=1'-0" Herbst · Musclano Architects/Planners 240 CEDAR KNOLLS ROAD SUITE 209 CEDAR KNOLLS, NJ 07927 TELEPHONE 975-558-3815 FAX 975-558-4095 EDWARD H. NJ RA O-5177 NJ PP 3387 PA RA 011184--B HERBST, PA, PP DALE: C GAR' ~ Nd RA NJ PP 43 NY RA 02 CT RA 7547 VA RA 8254, MA RA 10131 PROPOSED SPRINT PCS SECTOR ANTENNAS TYP, OF S SECTORS SEE DETAIL 5/Z5 PROPOSED FIBERGLASS REPLACEMENT PANEL SECTION (FROM B" ABOVE UPPER ANTENNA TO 6" BELOW LOWER ANTENNAi @ EACH RECTOR ANTENNAS (TYP, OF 5) SEE DETAIL S/Z5 Cf_ OF ANTENNAS BASE OF STEEPLE ~ 57' 6"± A,O,L BASE OF BELL TOWER PROPOSED SPRINT PCS COAX CABLES ABOVE EXISTING CHURCH ATTIC PROPOSED SPRINT PCS COAX CABLES RUN UP IN EXISTING CLOSET EXISTING ORIENT % CONGREGATIONAL CHURCH PROPOSED SPRINT PCS UNDERGROUND COAX CABLES IN CONDUIT FROM EXISTING ACCESSORY STRUCTURE TO EXISTING CHURCH EXISTING ACCESSORY STRUCTURE 2 J I I r~ -- ---_J_ U ....... ~ - - Z _. 7_-~1 L!l EAST ELEVATION SCALE: 1/8"=1'-0" I SPRINT PCS COAX CABLES FROM EQUIPMENT SPACE TO UNDERGROUND CONDUIT ;ED SPRINT PCS EQUIPMENT SPACE GRADE (ISTING CROSS BRACING ABOVE 13' PROPOSED 2 1/2"¢ GALV,~ ~ STEEL PiPE 5'-8" LQNC~ TYP PROPOSED 1/2" TYP. OF 4 PER CONNECTION SPRINT PCS SECTOR ANTENNAS SEE DETAIL 5/Z5 ANTENNA WOOD STRUCTURE @ 15' O"ABOVE STEEPLE FLOOR MOUNTING DETAIL · SCALE: 1/4"=1'-0" PROPOSED 6"X4"X12"X1 BENT STEEL PLATE BOLTED TO EXISTING WOOD STRUCTURE WITH 1/2" LAD SCREWS ENLARGED ANTENNA MOUNTING DETAIL SCALE- 3/4"=1' 0" FIBERGLASS PANEL SECTION (FROM 6" ABOVE UPPER ANTENNA TO 6" BELOW LOWER ANTENNA) @ EACH ANTENNA LOCATION (TYP FOR 3 SECTORS) 1/2" LAG SCREWS TYP. OF 2 PER CONNECTION WOOD BLOCKING AT 1S'± ABOVE STEEPLE FLOOR BOLTS TO ALLOW ANTENNA MOUNTING BRACKET WOOD BEAM 2 1/2"¢ GALV STEEL PIPE FP I 9 2n02 % pp D^IE: tEXAS RA 15417 FL RA 14044 RI RA 2030 OHIO RA 10925 DC RA 6052 MD RA 11039 ORIENT CONG. CHURCH 25045 MAIN ROAD ORIENT, NY 11957 SECTION O18 BLOCK 02 LOT 022.001 Sprln t PCS INDOOR EQUIPMENT AND ANTENNAS SITE NO. NY33XC678B 3 08.22,02 FOR ZONING 2 02,26,02 FOR REVIEW NO,: 09.20.01 DATE: SCALE: AS NOTED FOR REVIEW REVISIONS CROSSROADS 1 INTERNATIONAL M AH WAH, CORPORATE CENTER BLVD. SUITE 800 NJ 07495 ELEVATIONS & DETAILS PROJECT MANAGER: JWS DRAWN BY: MA JOB No. S678A DRAWING NUMBER DATE: ! REVISION S678AZ05 09.12.01 0 EXISTING 1 FR. ?6,4' A 0 DRAIN L T EXISTING FR. CHURCH 10.6' BRICK 5,9~ SPRI PCS UNDERGROUND BAX CABLES TO SEE ANTENNAS SEE Z5 PROPOSED SPRINT PCS SECTOR ANTENNAS WITHIN EXIS~NG STEEPLE SEE SHEET Z4 N 87"58'20" W 57.69' S O pS?E./~POA/Ds U/V/OA/ Z-/~E- SCHooL D/S?fE/C? '~-~/'~~ ,~o2. Jo' SPRINT PCS ~ 0,2~' EQUIPMENT CABINET IN ~i 35.4-' EXISTING ~ 2 1/2 STY. ~ FR. HSE. 11.5' 11,5' CoV~OOD A CONCNETE SIDEWALK 87'54'50" ~W MAIN ROAD 174.25' (S.R. 25) S 84 59 10 W 41.27' · =MONUMENT · PIPE 1.6759 ACF ES NOTES: 1. THIS SITE PLAN IS BASED ON A SURVEY PROVIDED BY PECONIC SURVEYORS, PO BOX 909, 12;~0 TRAVELER STREET, BOUTHOLD, NY 11971 JOHN MATZGER, AS. LICENSE ~4,961B DATED SEPTEMBER 20, 2001, 2 THE PROPOSED FACILITY W~LL BE UNMANNED AND WILL ONLY BE SUBJECT TO PERIODIC MAINTENANCE VISIT 5, ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE ATTACHED SPECIFICATION NO, G-OD1 SPECIFICATION FOR CONSTRUCTION. IN CASE OF CONFLICT REQUIREMENTS SHOWN ON THE DRAWINGS SHALL TAKE PRECEDENCE, POWER & TELEPHONE UTILITY GENERAL NOTE: UTILITY POINTS OF SERVICE AND WORK/MATbRIAL SHOWN ARE BASED ON PRELIMINARY INFORMATION ONLY, PROVIDED BY THE UTILITY COMPANIES AND ARE FOR SID PURPOSES ONLY, 2 CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY FOR FIBAL AND EXACT WORK/MATERIALS REQUIREMENTS AND CONSTRUCT TO UTILITY COMPANY ENGINEERING PLANS AND SPECIFICATIONS CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT. PULL WIRES, CABLES, PULL BOXES, CONCRETE ENCASEMENT OF CONDUIT (iF REQUIRED), TRANSFORMER PAD, BARRIERS, POLE RISERS, TRENCHING BACKFILL, PAY ALL UTILITY COMPANY FEES AND INCLUDE ALL REQUIREMENTS IN SCOPE OF WORK SITE WORK GENERAL NOTES: 1, THE CONTRACTOR SHALL CALL UTILITIES PRIOR TO THE START OF CONSTRUCTION 2 ALL EXISTING ACTIVE SEWER, WATER, GAS. ELECTRIC, AND OTHER UITLITIES WHERE ENCOUNTERED IN THE WORK, SHALL BE PROTECTED AT ALL TIMES, AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS DIRECTED BY ENGINEERS, EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WNEB ~XCAVATING OR PIER DRILL]NO AROUND OR NEAR UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING CREW, TNIS WILL INCLUDE BUT IS NOT LIMITED TO A FALL PROTECTION B) CONFNED SPACE C) ELECTRICAL SAFETY D) TRENCHING & EXCAVATION B ALL SITE WORK SHALL BE AS INDICATED ON THE DRAWING AND STIPULATED IN THE SPECIFICATION PROJECT SUMMARY AS PROVIDED BY SPRINT 4. IF NECESSARY, RUBBISH, STUMPS, DEBRIS, STICKS, STONES AND OTHER REFUSE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF LEGALLY 5. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW AWAY FROM THE PCS EQUIPMENT AND TOWER AREAS, 6, NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT 7 THE SUBGRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH UNIFORM DRADE PRIOR TO FINISHED SURFACE APPLICATION B, THE AREAS OF THE OWNERS PROPERTY DISTURBED BM THE WORK AND NOT COVERED BY THE BUILDING OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE, FERTILIZED, SEEDED, AND COVERED WITH MULCH AS SPECIFIED IN THE SPECIFICATION LANDSCAPE WORK 9 CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING SITE DURING CONSTRUCTION, EROSION CONTROL MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH THE LOCAL GUIDELINES FOR EROSION AND SEDIMENT CONTROL. PROPERTY OWNER: ORIENT CONGREGA~ONAL CHURCH UNITED CHURCH OF CHRIST, NEW YORK C/O 3M FROST 617-216 9400 PO BOX 425, 23045 MAIN ROAD ORIENT, NY 11957 Southold Town Plannin~l Board NOTES: 1, CONTRACTOR MUST HAVE ALL THE UTILITIES MARKED OUT BY THE LOCAL "CALL BEFORE YOU DIG" AUTHORITY. 2, ALL SITE LAYOUT WORK SHALL BE PERFORMED BY A LICENSED SURVEYOR RETAINED BY THE GENERAL CONTRACTOR, EDWARD H. NJ RA C-5177 HERBST, RA, PP DATE: NJ RA C- NJ PP NY RA 021 CT RA 754-7 VA RA 8254 MA RA 101~1 pp DATE: RA 15417 RA 14044 RI RA 20~0 OHIO RA 10925 DC RA 6052 MD RA 110~9 CONG. CHURCH 25045 MAIN ROAD ORIENT, NY 11957 SECTION 018 BLOCK 02 LOT 022.001 Sprint PCS INDOOR EQUIPMENT AND ANTENNAS SITE NO. NY55XC678B 3 08.22.02 2 02.26.02 1 109.20.01 NO,: DATE: SCALE: AS NOTED FOR ZONING FOR REVIEW CROSSROADS 1 INTERNATIONAL MAHWAH, CORPORATE CENTER BLVD. SUITE 800 NJ O7495 FOR REVIEW REVISIONS PROJECT MANAGER' JWS SITE PLAN & NOTES DRAWN BY: MA JOB No. S678A DRAWING NUMBER DATE: S678AZ05 09.12.01 REVISION 0