MEMORANDUM
T:
F:
R:
D:
Gerard P. Goehringer, Chairman, Zoning Board of Appeals
Scott Hughes, Senior Environmental Planner~.-
Sprint at Orient Congregational Church
Application # 5224
SCTM #1000-18-2-22.1
16 October 2002
The Planning Board discussed this project at the 15 OCT 2002 work session and
is highly in favor of the proposed cellular installation at the Orient Congregational
Church. It is felt that the concealment of these facilities is a most welcome
alternative to putting antennae upon exposed poles.
thank you.
Architects/Planners
October 9, 2002
Town of Southold Planning Board
Southold Town Hall
53095 Main Road
Southold, NY 11971
Re~
Sprint PCS - NY33-XC678b
Orient Congregational Church
23045 Main Road
Orient, NY 111957
To Whom It May Concern:
We are the architects who designed the proposed Sprint installation at the above referenced
address.
All applicable codes and standards were used for the design including the Codes Rules and
Regulation of the State of New York, the Telecommunications Industry Association's
ANSI/TIA/EIA-222-F standards, and the American Institute of Steel Construction (AISC)
code.
Sprint is proposing the addition of six (6) new antennas within the existing steeple, three (3)
at 62'-10" above ground level and three (3) at 59'-10" above ground level, all to the center of
the antennas. Each antenna weighs nine (9) pounds and will be mounted individually with
steel plates to the existing wood structure within the steeple. Because the antennas are
mounted inside the steeple, wind loads will not play a factor in this installation. The coax
cables, two (2) per antenna for a total of twelve (12) will be run across the attic space of the
existing church upon a new plywood walkway. The coax cables weigh only .92 pounds per
foot and will not be exposed to wind loading either. All mounting attachments will be made
with screws in order to minimize damage and intrusiveness to the existing structure.
The additional loads that will be generated by the Sprint antennas and coax cables will not
affect the structural integrity of the existing structures. They will be relatively small and
insignificant compared to the overall design of the existing church and steeple. The church
attic and steeple will still be accessible.
If you have any further_~u, estions,
Sincerely, , ~
NY ~/g021~
please feel free to contact our office.
OCT 0 9 ZOOZ
S 5Proj_Files\S678Akstrucltr.doc
IterbstoMusciano Architects/Planners
September 26, 2002
Mr. Scott Hughes
Town of Southold
Environmental Planner
Southold, NY
Edward H. Herbst, RA, PP
Gary Musciano, RA, PP
Sprint PCS - NY33-XC678b
Orient Congregational Church
23045 Main Road
Orient, NY 111957
Dear Mr. Hughes:
Sprint is proposing to locate their equipment cabinets in the basement of the Existing Accessory
Structure and the only equipment outside will be a condenser unit, which is roughly the size of a
residential air conditioning unit and it will sit on a 4'x4' concrete pad to the west of the
Accessory Structure near where the cables will penetrate the building. The cables will run
underground from the Accessory Structure to the Existing Church and will remain underground
until inside the building itself. There is a small storage closet at the rear of the Church which we
will use to run the cables up to the existing attic space. The cables will then run along the attic
space and into the belfry below the existing steeple. Once inside the steeple, they will run to their
respective antennas. The antennas and their cables will not be visible from outside the Church and
all conduit penetrations will be properly sealed. However, the steeple will need to have a small
portion of three panels replaced with fiberglass panels to allow for the antennas signals to pass
through. The fiberglass panels will be fabricated to match the existing steeple and the entire
steeple will be painted upon completion of the installation. Currently, we are working with an
architectural fiberglass company that will reproduce the steeple to an amazingly exact degree and
from outside, the Church will appear no differently than it does today.
The Orient Congregational Church is listed on the National Historic Registry. We have worked
closely with the NY State Historic Preservation Office in order to be certain that we disturb as
little of the existing church as possible. We have satisfactorily met the requirements of the NY
SHPO as well as the requirements of Sprint PCS with the design as indicated.
Should you have any questions, do not hesitate to call our office.
Sincerely,
Joanne Slaman
Project Manager
240 Cedar Knolls Road, Suite 209, Cedar Knolls, New Jersey 07927 973.538o3815 Fax 973.538o4095
MUNLEY~ MEADE~ NIELSEN & 1~I~
(631) 425-4100
(631) 425o4104
September 23, 2002
VIA UPS
Mr. Scott Hughes
Environmental Planner
Town of Southold
53095 Main Road
Southold, NY 11971
Sprint Spectrum L. P.
Application for Special Exception Permit
To the Zoning Board of Appeals
Premises: Orient Congregational Church
23045 Main Road
Orient, New York 11957
$outhold Town
Planninfl Board
Dear Mr. Hughes:
As we discussed during our telephone conversation of September 18, 2002, the Town of
Southold Office of Zoning Board of Appeals, in its Reply Form dated September 17,
2002, has responded to our submission of the captioned application with a request for
correspondence from the Town Planning Board regarding review of the relevant site plan.
Toward that end, we have scheduled a pre-application conference to take place at your
office on October 1, 2002, at 11:00 a.m., and, pursuant to your request, enclose two (2)
sets of Site Plan/Elevation drawings for your review prior to said meeting.
Thanking you for your courtesies, we remain
Very truly yours,
MUNLEY, MEADE, NIELSEN & RI~
/db
Enclosures
Bernadette Castro
Commissioner
March 27, 2002
New York State Office of Parks, Recreation and Historic Preservation
Historic Preservation Field Services Bureau
Peebles Island, PO Box 189, Waterford, New York 12188-0189
Jeanne SJaman
Herbst Musciano
240 Cedar Knolls Rd
Suite 209
Cedar Knolls. NJ 07927
518-237-8643
RE:
Sprint PCS - NY33XC678
Orient Congregational Church
23045 Main Rd
Orient, i'~'
01 PR2571
Dear Ms. Slaman:
Thank you for providing the State Historic Preservation Office (SHPO) with drawings illustrating your
cellular collocation Orient Con~egational Chumh in Orient, NY. We have are reviewing the project in
accordance with Section 106 of the National Historic Preservation Act of 1966 and relevant implementing
regulations.
The drawings appear to indicate that only a limited amount of historic fabric will be removed from the
steeple, as was proposed in your last submission. While more detailed drawings that clearly indicate
existing conditions and specified installation points am recommended to minimize the number on-site
variables left to the discretion of the contractor, the SHPO believes that the project is moving in a positive
direction. Based upon this review, it is the SHPO's opinion that the project will have No Adverse Effect
upon cultural resources in or eligible for inclusion in the National Register of Historic Places, provided that
the following conditions are met:
1) The contractor will ensure that removal of historic material will be kept to the minimum necessary to
complete the installation. Adjacent materials will not be damaged as a result of the installation of the
cellular antenna or related cables or equipment. To ensure compliance with this stipulation and to
guide future restoration of the church steeple, the SHPO is requiring the following photographs:
1)
2)
2)
General images of the church showing the bnilding and sleeple befnre work
commences.
Detail images of the existing historic steeple.
A series of"work-in-progress" photographs showing the removal of shingles
and sheathing and the installation of the replacement fiberglass material and any
other related equipment,
3)
The historic appearance of the steeple must be preserved. To ensure compliance with this
stipulation, the SHPO requests that when the installation is in place, after-work photographs are
taken from the same locations where the before work (Stipulation #1) images were taken. These
images should enable a before- and after-work comparison.
4)
All requested images will be true black and white photographs made with 35mm film (or larger
format) printed in 5'X7' format on archival-quality black and white paper (not R/C paper). All
images shall be clearly labeled (captioned) on the back. Two sets of images shall be prepared,
An Equal Opportunity/Affirmative Action Agency
One set will be given to the church for their records and to guide future restoration· The second
set of photographs will be sent to the SHPO within 60 days of completion of the project.
lffor whatever reason these stipulations can not be met, consultation with the SHOO must continue until
both parties reach an agreement. Thank you again for your assistance. If you have any questions, feel free
to call me at (518) 237-8643, ext. 3282. Please refer to the SHPO Project Review (PR) number in any
future correspondences regarding this project.
Greg Donofrio
Historic Sites Restoration Coordinator
(~eg.donofrio@oprhp.state.ny.us)
CC: Daniel Abeyta, Federal Communications Commission (FCC)
New York State Office of Parks, Recreation and Historic Preservation
Historic Preservation Field Services Bureau
Peebles island, PO Box 189, Waterford, New York 12188~0189
November 20, 2001
Joanne Slaman
Herbst Musciano Axchitects~lanners
240 Cedar Knolls Road
Suite 209
Cedar Knolls, NJ 07927
HERBST I ,u&;IANO
518-237-8643
Dear Ms. Slaman:
Sprint PCS - NY33-XC678
Orient Congregational Church
Orient, Suffolk County, NY
0 lPR2571
Thank you providing the State Historic Preservation Office (SFIPO) with a revised proposal for the cellular
installation at the Orient Congregational Church on Long Island. We are continuing to review the project
in accordance with Section 106 of the National Historic Preservation Act of 1966 and relevant
implementing regulations.
The SHPO is pleased with the most recent set of design concept drawings dated 5/9/01. These drawings
appear to indicate that removal of historic wooden building fabric will be limited to the portions of the
steeple directly adjacent to the proposed cellular panels. The SHPO feels that this approach will better
meet the Secretary of the Interior Standards because the work will not only be inconspicuous, it will also be
easily reversible.
To insure full compliance with federal preservation laws, the SHPO requests that more complete
construction and/or design drawings be provided for our review and comment. These documents can be
sent our office as they are developed. Whether they are prepared by gJchitectural Fiberglass, the project
architects or contractors, they should include details that indicate how the fiberglass will be fastened to the
steeple and made weather tight.
Again, from a preservation point of view, this collocation proposal is a vast improvement over the initial
submission and the SHPO feels that the design is moving in a positive direction. Thank you for your
cominued assistance. If you have any quesfions, feel fmetocall meat (518) 237-8643, ext, 3282. Please
refer to the SHPO Project Review (PR) number in any futura correspondences regarding this project.
Greg Donofrio ~ ~ ~
Historic Sites Restoration Coordinator
(greg.donofrio @oprhp.state.ny.us)
An Equal Oppodunity/Affirmative Action Agency
Orient Fi e District
September 2, 2001
Bennett Orlowski, Jr., Chairman
Southold Town Planning Board
PO Box 1179
Southold, NY 11971
Sir:
~- SEP 0 $ 20111
Southold Town
Planning Board
The Board of Fire Commissioners of the Oriem Fire District are calling your attemion to
the enclosed letter concerning the installation ora cell phone transmitter within the Orient
Congregational property.
Sincerely,
Board of Fire Commissioners
Orient Fire District
Edward G. Loper
Secretary/Treasurer
Oriem Fire District
23300 Main Road * Orient, NY 11957 * (631)323-2445 * Fax(631)323-9706
Orient Fire District
September 2, 2001
Jerrold Koznesoff
Atlantic Westem Consulting, Inc.
800 West Cummings Park
Suite 4500
Mobum, MA 01801
Sir:
The Board of Fire Commissioners of the Orient Fire District would like to address the
issue of a cell tower in Orient.
We were originally in discussion with you and your firm on the placement of a cell tower
on the Orient Fire District property. During the discussion you stated that you would
provide a copy of the specifications for the cell tower (flag pole).
Having received these specifications, the copy was unreadable and we asked for another
copy. Subsequently we have not received any communications from you regarding our
request.
However, we did find an article in the newspaper (The Suffolk Times) that the Orient
Congregational Church is contemplating a deal with Sprint to install a cell phone
transmitter in its steeple.
Several years ago, the Board of Fire Commissioners had entertained an interest of placing
a cell tower on the Orient Fire District property. But due to the objections from the
residents of Orient this issue did not materialize.
Our reason for a cell tower on the Orient Fire District property is twofold:
· The revenue would then be shared equally by all taxpayers, in reducing the tax
rate for the residents in the Orient Fire District.
Secondly but equally as important our concern to eliminate the communication
problems that now exist, by placing Fire and Police antennas in the cell tower
(flag pole) for receiving and dispatching emergency calls.
We are advising the Congregational Church, and the Southold Town Government of our
objections stated within this letter.
Please be advised that we are interested in cominuing negotiations with Sprint, for the
replacemem of this cell tower (flag pole) on the Oriem Fire District property.
The Board of Fire Commissioners would appreciate a reply f~om you so that we may
determine our next course of action.
Sincerely,
Board of Fire Commissioners
Oriem Fire District
Edward Loper
Secretary-Treasurer
Orient Fire District
Cc: Orient Congregational Church
Southold Town Board
Southold Town Zoning Board of Appeals
23300 Main Road * Orient, NY 11957 * (631) 323-2445 * Fax (631) 323-9706
~ New York State Office of Parks, Recreation and Historic Preservation
~ Historic Preservation Field Services Bureau
o~ nEWVo~r~T~ ~ Peebles Island, PO Box 189, Waterford, New York t2188-0189
Bernadette Castro
Cornrnis$/oner
August 6, 2001
Joanne Slaman
Herbst Mnsciano Architects/Planners
240 Cedar Knolls Road
Suite 209
Cedar Knolls, NJ 07927
Dear Ms. Slaman:
518-237-8643
Sprint PCS - NY33-XC678
Orient Congregational Church
Orient, Suffolk County, NY
01 PR2571
Thank you for sending the State Historic Preservation Office (SHPO) additional product information
related to the proposed cellular installation at the Orient Congregational Church on Long Island. We are
continuing to review the project in accordance with Section 106 of the National Historic Preservation Act
of 1966 and relevant implementing regulations.
After reviewing the proposal to replace the entire steeple sheathing with fiberglass, the SHPO has
determined that the project as designed does not meet the Secretary of the Interior's Standards
Rehabilitation. Specifically, the complete loss of wood roofing materials on the steeple violates Standards
number 2 and 5 (please see enclosed Standards).
As I wrote in my last letter, we have reviewed and approved similar projects where only a small portion of
the steeple was replaced with radio-transparent panels. The proposal m replace the existing historic wood
sheathing with fiberglass for the entire height of the steeple is unacceptable because of the extent of historic
building material loss.
This project could be amended to address our concerns and comply with the Standards in the following
ways:
1)
2)
3)
Install the cellular panels inside the belt tower, behind the gothic arched, slatted vents.
Flush mount the panels on the outside of the steeple, just above the base of the bell tower and
behind the railing and pinnacles (please see enclosed drawing). The panels must be flush mounted
and painted the color of the steeple.
Mount panels on the inside (steeple side) of the four pinnacles located at each coreer of the bell
tower (please see enclosed drawing).
Any of these three options would enable the panels to be removed at some point in the future with little or
no lasting impact to the church. I look forward to working together to find a creative solution for this
project. Feel free to call me at (518) 237-8643, ext. 3282 so that we may discuss these two options. Please
refer to the SHPO Project Review (PR) number in any future correspondences regarding this project.
Greg Donofrio
Historic Sites Restoration Coordinator
ENC: Standards, drawing
An Equal Opportunity/Affirmative Action Agency
~ New York State Office of Parks, Recreation and Historic Preservation
.~ Historic Preservation Field Services Bureau
o'K' .~w~om{sr^'m ~ Peebles island, PO Box 189, Waterford, New York 12188-0189
Bernadette Castro
Commissioner ~ [
June 14, 2001
Jeanne Slaman j {
Herbst Musciano ArchitectsfPlanhers ..... , .
240 Cedar Knolls Road .i:~ '.:'i 0
Suite 209
Cedar Knolls, NJ 07927
518-237-8643
Dear Ms. Slnman:
Sprint PCS - NY33-XC678
Orient Congregational Church
Orient, Suffolk County, NY
0 IPR2571
Thank you for requesting the comments of the State Historic Preservation Office (SHPO) for the proposed
cellular installation at the Orient Congregational Church on Long Island. We are continuing to review the
project in accordance with Section [06 of the National Historic Preservation Act of 1966 and relevant
implementing regulations.
It was a pleasure talking with you this afternoon about the technical challenges presented by this project.
The SI-IPO does not object to collocating on this National Register listed church, provided the installation is
executed in a way that minimizes or eliminates any aesthetic and physical impact on the historic resource.
In the past, we have reviewed and approved similar projects where only a small portion of the steeple was
replaced with radio-transparent panels. The proposal to replace the existing historic wood sheathing with
fiberglass for the entire height of the steeple concerns us because of the extent of historic building material
loss.
At this time, we would request that you explore the feasibility of replacing only three of the eight sides of
the steeple as we discussed over the telephone. If this is not feasible, we would like to understand why.
Additionally, please provide product information for the proposed fiberglass sheathing, including details
showing the physical connection to the steeple armature and the exterior finish of the fiberglass. Any
alteration to the steeple must be entirely reversible in the future.
I look forward to working together to find a creative solution for this project. Please send additional
information as it becomes available, Thank you again for your assistance. If you have any questions, feel
free to call me at (518) 237-8643, ext, 3282. Please refer to the SHPO Project Review (PR) number in any
future correspondences regals project.
Grog D on-'riffle
Historic Sites Restoration Coordinator
( greg.donofi'io @oprhp.state.ny.us)
An Equal Opportunity/Affirmative Action Agency
LASER FICHE FORM
Planning Board Site Plans and Amended Site Plans
SPFile Type:
Proiect Type: Site Plans
Status: Incomplete Application - In Active
SCTM #: 1000 - 18.-2-22.1
Project Name: Sprint ~ Orient Con.qre.qational Chu~
Address: 23045 Main Road, Orient
Hamlet: Orient
Applicant Name: Sprint Spectrum, LP
Owner Name: Orient Con.qre.qational Church
ZOne 1:
Approval Date:
OPTIONAL ADDITIONAL INFORMATION
End SP Date:
Zone 2:
Location:
SC FilinR Date:
C and R's:
Home Assoc:
R and M A,qreement:
A date indicates that we have received the related information
Zone 3:
SCAN Date
SCANNED
~AR 16 2O09
Records Manag. ement
PROPOSED ~
REPLACEMENT PANEL SECTION
(FROM 6" ABOVE UPPER ANTENNA
TO 6" BELOW LOWER ANTENNA) @
EACH SECTOR ANTENNAS
(TYP, OF S)
SEE DETAIL 3/Z5
PROPOSED SPRINT PCS
SECTOR ANTENNAS
TYP OF S SECTORS
SEE DETAIL B/Z5
~ QF ANTENNAS
~ OF ANTENNAS
BASE OF STEEPLE
BASE OF BELL TOWER
ORIENT
CONGREGATIONAL
CHURCH
SOUTH ELEVATION
SCALE: 1/B"=1'-0"
REAR VIEW
TOP ViEW
EMS WIRELESS OPTIFILL DUALPOL
ANTENNA MODEL RR851500BPL2
NTH MECHANICAL DOWNTILT KIT
MODEL MTG-DIO-IO
ANTENNA DETAIL
SCALE: 1/2"=1'-0"
Herbst · Musclano
Architects/Planners
240 CEDAR KNOLLS ROAD
SUITE 209
CEDAR KNOLLS, NJ 07927
TELEPHONE 975-558-3815
FAX 975-558-4095
EDWARD H.
NJ RA O-5177
NJ PP 3387
PA RA 011184--B
HERBST, PA, PP DALE:
C
GAR' ~
Nd RA
NJ PP 43
NY RA 02
CT RA 7547
VA RA 8254,
MA RA 10131
PROPOSED SPRINT PCS
SECTOR ANTENNAS
TYP, OF S SECTORS
SEE DETAIL 5/Z5
PROPOSED FIBERGLASS
REPLACEMENT PANEL SECTION
(FROM B" ABOVE UPPER ANTENNA
TO 6" BELOW LOWER ANTENNAi @
EACH RECTOR ANTENNAS
(TYP, OF 5)
SEE DETAIL S/Z5
Cf_ OF ANTENNAS
BASE OF STEEPLE
~ 57' 6"± A,O,L
BASE OF BELL TOWER
PROPOSED SPRINT PCS COAX CABLES
ABOVE EXISTING CHURCH ATTIC
PROPOSED SPRINT PCS COAX CABLES
RUN UP IN EXISTING CLOSET
EXISTING ORIENT %
CONGREGATIONAL CHURCH
PROPOSED SPRINT PCS UNDERGROUND
COAX CABLES IN CONDUIT FROM EXISTING
ACCESSORY STRUCTURE TO EXISTING
CHURCH
EXISTING ACCESSORY
STRUCTURE
2
J I I
r~ -- ---_J_ U ....... ~ - - Z _. 7_-~1 L!l
EAST ELEVATION
SCALE: 1/8"=1'-0"
I
SPRINT PCS COAX
CABLES FROM EQUIPMENT SPACE
TO UNDERGROUND CONDUIT
;ED SPRINT PCS
EQUIPMENT SPACE
GRADE
(ISTING CROSS
BRACING ABOVE 13'
PROPOSED 2 1/2"¢ GALV,~ ~
STEEL PiPE 5'-8" LQNC~
TYP
PROPOSED 1/2"
TYP. OF 4 PER CONNECTION
SPRINT PCS
SECTOR ANTENNAS
SEE DETAIL 5/Z5
ANTENNA
WOOD
STRUCTURE @
15' O"ABOVE STEEPLE
FLOOR
MOUNTING DETAIL
· SCALE: 1/4"=1'-0"
PROPOSED 6"X4"X12"X1
BENT STEEL PLATE BOLTED
TO EXISTING WOOD
STRUCTURE WITH 1/2" LAD
SCREWS
ENLARGED ANTENNA
MOUNTING DETAIL
SCALE- 3/4"=1' 0"
FIBERGLASS PANEL
SECTION (FROM 6" ABOVE UPPER
ANTENNA TO 6" BELOW LOWER
ANTENNA) @ EACH ANTENNA
LOCATION (TYP FOR 3 SECTORS)
1/2" LAG SCREWS
TYP. OF 2 PER CONNECTION
WOOD BLOCKING AT
1S'± ABOVE STEEPLE FLOOR
BOLTS TO ALLOW
ANTENNA MOUNTING
BRACKET
WOOD BEAM
2 1/2"¢
GALV STEEL PIPE
FP I 9 2n02
% pp D^IE:
tEXAS RA 15417
FL RA 14044
RI RA 2030
OHIO RA 10925
DC RA 6052
MD RA 11039
ORIENT CONG. CHURCH
25045 MAIN ROAD
ORIENT, NY 11957
SECTION O18 BLOCK 02
LOT 022.001
Sprln t PCS
INDOOR EQUIPMENT AND ANTENNAS
SITE NO. NY33XC678B
3 08.22,02 FOR ZONING
2 02,26,02 FOR REVIEW
NO,:
09.20.01
DATE:
SCALE:
AS NOTED
FOR REVIEW
REVISIONS
CROSSROADS
1 INTERNATIONAL
M AH WAH,
CORPORATE CENTER
BLVD. SUITE 800
NJ 07495
ELEVATIONS & DETAILS
PROJECT MANAGER:
JWS
DRAWN BY:
MA
JOB No.
S678A
DRAWING NUMBER DATE: ! REVISION
S678AZ05 09.12.01 0
EXISTING
1
FR.
?6,4'
A
0
DRAIN
L T
EXISTING
FR. CHURCH
10.6'
BRICK
5,9~
SPRI PCS
UNDERGROUND BAX
CABLES TO SEE
ANTENNAS SEE
Z5
PROPOSED SPRINT PCS
SECTOR ANTENNAS
WITHIN EXIS~NG
STEEPLE SEE SHEET Z4
N 87"58'20" W 57.69'
S
O pS?E./~POA/Ds U/V/OA/ Z-/~E- SCHooL D/S?fE/C?
'~-~/'~~ ,~o2. Jo'
SPRINT PCS ~ 0,2~'
EQUIPMENT CABINET IN ~i
35.4-'
EXISTING ~
2 1/2 STY. ~
FR. HSE.
11.5' 11,5'
CoV~OOD
A
CONCNETE SIDEWALK
87'54'50" ~W
MAIN ROAD
174.25'
(S.R. 25)
S 84 59 10 W
41.27'
· =MONUMENT
· PIPE
1.6759 ACF ES
NOTES:
1. THIS SITE PLAN IS BASED ON A SURVEY PROVIDED BY PECONIC
SURVEYORS, PO BOX 909, 12;~0 TRAVELER STREET, BOUTHOLD, NY 11971
JOHN MATZGER, AS. LICENSE ~4,961B DATED SEPTEMBER 20, 2001,
2 THE PROPOSED FACILITY W~LL BE UNMANNED AND WILL ONLY BE
SUBJECT TO PERIODIC MAINTENANCE VISIT
5, ALL MATERIAL SHALL BE FURNISHED AND WORK SHALL BE PERFORMED
IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE ATTACHED
SPECIFICATION NO, G-OD1 SPECIFICATION FOR CONSTRUCTION.
IN CASE OF CONFLICT REQUIREMENTS SHOWN ON THE DRAWINGS
SHALL TAKE PRECEDENCE,
POWER & TELEPHONE UTILITY GENERAL NOTE:
UTILITY POINTS OF SERVICE AND WORK/MATbRIAL SHOWN ARE
BASED ON PRELIMINARY INFORMATION ONLY, PROVIDED BY THE
UTILITY COMPANIES AND ARE FOR SID PURPOSES ONLY,
2 CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY FOR FIBAL
AND EXACT WORK/MATERIALS REQUIREMENTS AND CONSTRUCT TO
UTILITY COMPANY ENGINEERING PLANS AND SPECIFICATIONS
CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT. PULL
WIRES, CABLES, PULL BOXES, CONCRETE ENCASEMENT OF CONDUIT
(iF REQUIRED), TRANSFORMER PAD, BARRIERS, POLE RISERS, TRENCHING
BACKFILL, PAY ALL UTILITY COMPANY FEES AND INCLUDE ALL
REQUIREMENTS IN SCOPE OF WORK
SITE WORK GENERAL NOTES:
1, THE CONTRACTOR SHALL CALL UTILITIES PRIOR TO THE START OF
CONSTRUCTION
2 ALL EXISTING ACTIVE SEWER, WATER, GAS. ELECTRIC, AND OTHER
UITLITIES WHERE ENCOUNTERED IN THE WORK, SHALL BE PROTECTED
AT ALL TIMES, AND WHERE REQUIRED FOR THE PROPER EXECUTION OF
THE WORK, SHALL BE RELOCATED AS DIRECTED BY ENGINEERS,
EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WNEB
~XCAVATING OR PIER DRILL]NO AROUND OR NEAR UTILITIES.
CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING
CREW, TNIS WILL INCLUDE BUT IS NOT LIMITED TO A FALL PROTECTION
B) CONFNED SPACE C) ELECTRICAL SAFETY D) TRENCHING & EXCAVATION
B ALL SITE WORK SHALL BE AS INDICATED ON THE DRAWING AND
STIPULATED IN THE SPECIFICATION PROJECT SUMMARY
AS PROVIDED BY SPRINT
4. IF NECESSARY, RUBBISH, STUMPS, DEBRIS, STICKS, STONES AND OTHER
REFUSE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF LEGALLY
5. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW
AWAY FROM THE PCS EQUIPMENT AND TOWER AREAS,
6, NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN
GROUND. FROZEN MATERIALS, SNOW OR ICE SHALL NOT BE PLACED
IN ANY FILL OR EMBANKMENT
7 THE SUBGRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH
UNIFORM DRADE PRIOR TO FINISHED SURFACE APPLICATION
B, THE AREAS OF THE OWNERS PROPERTY DISTURBED BM THE WORK AND
NOT COVERED BY THE BUILDING OR DRIVEWAY, SHALL BE GRADED TO
A UNIFORM SLOPE, FERTILIZED, SEEDED, AND COVERED WITH MULCH
AS SPECIFIED IN THE SPECIFICATION LANDSCAPE WORK
9 CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING SITE DURING
CONSTRUCTION, EROSION CONTROL MEASURES, IF REQUIRED DURING
CONSTRUCTION, SHALL BE IN CONFORMANCE WITH THE LOCAL
GUIDELINES FOR EROSION AND SEDIMENT CONTROL.
PROPERTY OWNER:
ORIENT CONGREGA~ONAL CHURCH
UNITED CHURCH OF CHRIST, NEW YORK
C/O 3M FROST 617-216 9400
PO BOX 425, 23045 MAIN ROAD
ORIENT, NY 11957
Southold Town
Plannin~l Board
NOTES:
1, CONTRACTOR MUST HAVE ALL THE UTILITIES MARKED OUT
BY THE LOCAL "CALL BEFORE YOU DIG" AUTHORITY.
2, ALL SITE LAYOUT WORK SHALL BE PERFORMED BY A
LICENSED SURVEYOR RETAINED BY THE GENERAL
CONTRACTOR,
EDWARD H.
NJ RA C-5177
HERBST, RA, PP
DATE:
NJ RA C-
NJ PP
NY RA 021
CT RA 754-7
VA RA 8254
MA RA 101~1
pp DATE:
RA 15417
RA 14044
RI RA 20~0
OHIO RA 10925
DC RA 6052
MD RA 110~9
CONG. CHURCH
25045 MAIN ROAD
ORIENT, NY 11957
SECTION 018 BLOCK 02
LOT 022.001
Sprint PCS
INDOOR EQUIPMENT AND ANTENNAS
SITE NO. NY55XC678B
3 08.22.02
2 02.26.02
1 109.20.01
NO,: DATE:
SCALE:
AS NOTED
FOR ZONING
FOR REVIEW
CROSSROADS
1 INTERNATIONAL
MAHWAH,
CORPORATE CENTER
BLVD. SUITE 800
NJ O7495
FOR REVIEW
REVISIONS
PROJECT MANAGER'
JWS
SITE PLAN & NOTES
DRAWN BY:
MA
JOB No.
S678A
DRAWING NUMBER DATE:
S678AZ05 09.12.01
REVISION
0