Loading...
HomeMy WebLinkAbout33230-ZFORM NO. 4 TOWN OF SOLVfHOLD BUILDING DEPARTMENT Office of the Building Inspector Town Hall Southold, N.Y. CERTIFICATE OF OCCUPANCY No: Z-33400 Date: 11/19/08 T~IS CERTIFIES that the building ADDITIONS & ALTER3ITIONS Location of Property: 305 MILL CREEK DR SOUTHOLD (HOUSE NO.) (STREET) (HAMLET) County Tax ~ap No. 473889 Section 135 Block 3 Lot 28.1 subdivision Filed Map NO. __ Lot No. __ conforms substantially to the Application for Building Permit heretofore filed in this office dated JUNE 29, 2007 pursu~t to which Building Permit No. 33230-Z dated JULY 9, 2007 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is ALTERATIONS AMD ADDITIONS, INCLUDING FRONT ENTRY DECK AND REAR DECK, TO AN EXISTING ONE FAMILY DWELLING AS APPLIED FOR. The certificate is issued to JULIE A HAERR of the aforesaid building. (OWNER) S~3FFOLK COI~FI"f DEPART~NT OF ~AL~{ ~PPBO~-~J~ N/A EIJ~t-rKICJ%L CERTIFICATE NO. 126630 02/20/08 PLIERS CERTIFIC~%TION DATED 09 / 27 / 08 PARISI PLUMBING & HEATING /or~ed Signature Rev. 1/81 Form No. 6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765~1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to tile Building Depamnent with A. For new building or new use: 1. bllowin Final survey of property with accurate location of all buildiogs, propm%, lines, streets, and unusual natural or topographic features. 2. Final Approval frmn Health Dept. of water supply and sexverage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used ill system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate of Code Compliance fi'om architect or engineer responsible for the buildiug. 6. Submit Planning Board Approxal of completed site plao requircmeuts. B. For existing buildings (prior to AIn'il 9, 1957) non-confornfing uses, or buildings and "pre-existing" land uses: 1. Accurate survey of properly showiug all property lines, streets, building and unusoal natural or topographic features. 2. A properly completed application and conseut tu inspect s~gmcd b5 the applicaut. If a Certificate of Occupancy is deoied, thc Building Inspector shall state the reasons therefor in xx ~iling to tilt applicaut C. Fees I. Certificate of Occupancy New dwelliug $25.00, Additions lo dwelling $25.00. Alterations to dwelling $25.00, SwimJning pool $25.00, Acccssory building $25.00, Addilious to accessory building $25.00, Businesses $50.00. 2 Certificate of Occupancy on Ih'e-existing Builcling $10000 3 Copy of Cetlificate of Occupancy - $.25 4 Ulxlated Certificate of Occupancy - $50.00 5. Temporary Ce~q. ificale of'Occupancy - Residential $15.00, Comnmicial $15.00 New Conslm,,ction: Location of Property: Owner o~ Owners of Prope~y: ,.J~.2 t.. / Suffblk County Tax Map No 1000, Section Subdivision Pemm Nc). '~3~0..3~D Health Dept. Approval: Harming Board Approval: , / Old or Pre-existing Building: (check one) House No. / Street Hanflet Filed Map. Lot: l)ate of Permit. _ Applicant: Unde~vriters Approval: Request for: Temporary Certificate Fee Submitted: $ Final Certificate: (check one) Applicant Signature James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD # 0383C CERTIFICATE OF COMPLIANCI~ Date: November 7, 2008 THIS CERTIFIES that the construction of first and second floor additions to existing dwellin~, two-car attached garage, remove/replace rear patio At 305 .Mill Creek Drive, Southold, New York Suffolk County Tax Map # 135-3-28.1 Conforms to the application for a Trustees Permit heretofore ~ed in this office Dated 12/30/05 pursuant to which Trustees Permit # 6296 Dated 2/15/06 and was issued, and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the construction of first and second floor additions to existing dwelling, two-car attached garage, remove/replace rear patio The certificate is issued to JULIE ANNE HAERR owner of the aforesaid property. Authorized Signature ~ X'-lnll, $3095 ~nin Rond $outhold, New York ! ! ~? 1-0959 'Fax (631) 765-9502 Teleph6ne (631) 765-180 BUILDING DEPARTMENT TOWN Ol~ 8OUTHOLD CERTIFICATION Date: (Please print) Plumber: I~i *i' P/I/D/~itTa" "~ ~/1'/'"/~.o (Please i~fi/nt) .... I certify that the solder used in the water supply system contains less than 2/10 of 1% lead. le, AYHt. EEN ~I'OLOMEO Notary Publio, 8tat® of New ~ Ou ~' al fled In Suffolk County Sworn to Before me this o2 7 dayof ,.~C'-p~e~,,~,,o,-' 20 33' Notary Public, ,_J-o ~'-1~/Z2 County LONG ISLAND ELECTRICAL INSPECTION SERVICES, INC. 670 MIDDLE COUNTRY ROAD ST. JAMES, NEW YORK 11780 {631) 265-~075 Fax (631) 265-6057 Application No.: 126630 Perm~ #umb~. 33230 Block: Lot: Owner:. Mr. Haerr Address: 305 Mill Creek Dr. Municipality: Southotd OwnerPhone NY North Countny Electric Corp 275 Main Street East Setauket NY 11733 ~ ~Resldence ~ F~al ~1~ FORM NO. 3 TOWN OF SOUTHOLD BUILDING DEPARTMENT Town Hall Southold, N.Y. (THIS BUILDING PERMIT PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) PERMIT NO. 33230 Z Date JULY 9, 2007 Permission is hereby granted to: JULIE ANNE HAERR 5 CLINTON STREET MOUNT SINAI,NY 11766 for : ADDITIONS & ALTERATION TO AN EXISTING SINGLE FAMILY DWELLING PER ZBA DECISION #5845 & TRUSTEES & DEC AS APPLIED FOR; FLD PMT INCLUDED at premises located at County Tax Map No. 473889 Section 135 Block pursuant to application dated JUNE 29, 2007 Building Inspector to expire on JANUARY 9, Fee $ 751.60 305 MILL CREEK DR SOUTHOLD 0003 Lot No. 028.001 and approved by the 2009. Authorized Signature ORIGINAL Rev. 5/8/02 TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] IN/,Si~ATION [ ] FRAMING / STRAPPING [ ,~ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: ~ 33 3o - TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] IN~,ILATION [ ] FRAMING / STRAPPING [y~NA~ [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTAI~I' PENETRATION REMARKS:.~~/~y :~~ ~:~"~ ~ DATE TOWN OF SOnG DEPT. INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INS~ULA~I.O.,~I []FRAMING/STRAPPING [ ;~FI~~ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETTINSPECTION ] FIRE RESISTANT PENETRATION R TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INS..ULATION []FRAMING/STRAPPING [ ~1NAL~"-~ [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ]RRERESI~CONS~UCTION [ ]FIRF~RESISTANTPENETRATION REMARKS: ~'~--~/t /~ /~ '~ DATE~INSPECTOR:~,./ / , .... ~/~~/~~/~ TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ]FOUNDATION 1ST [ ]ROUGH PLBG. [ ]FOUNDATION 2ND [~NSULATION [ ] FINAL [ ] FIRE SAFETY INSPECTION ] FIRE RESISTANT PENETRATION [ ]FRAMING / STRAPPING [ ]FIREPLACE & CHIMNEY [ ]FIRE RESISTANT CONSTRUCTION ok, DATE TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] FOUNDATION 2ND STRAPPING ] FIREPLACE & CHIMNEY [ ] ROUGH PLBG. ~'~INSULATION [ ] FINAL [ ] FIRE SAFETY INSPECTION ] RRE RESISTANT CONSTRUCTION [ ] RRE RESISTANT PENETRATION REMARKS: TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST ~/ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: ~//~~ ~ DATE /~) "' TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] FOUNDATION 2ND ~.ROUGH PLBG. [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: DATE //~ ~/~- '~ ~' INSPECTOR TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ]~IDATI~ID--~ [ ]INSULATION [ ,,,']~FRAMIN~ [ ] FINAL [ ] FIREPLACE & CHIMNEY [ [ ] FIRE RESISTANT CONSTRUCTION [ REMARKS: ~."~ ~);~) ~ ] FIRE SAFETY INSPECTION ] FIRE RESISTANT PENETRATION DATE INSPECTOR TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ]~FOUNDATION 1ST [ [ ]FOUNDATION 2ND [ [ ]FRAMING / STRAPPING [ ]FIREPLACE & CHIMNEY [ ]RRB RESISTANT CONSTRUCTION REMARKS: /~-~a:~ ~-//~. ~ ] ROUGH PLBG. ] INSULATION [ ] FINAL [ ] FIRE SAFETY INSPECTION [ ] RRE RESISTANT PENETRATION DATE ~ INSPECTOR /~~/~ TOWN OF SOUTIIOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following, before applying? TOWN HALL Board of Health SOUTItOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Bo~hpproval FAX: (631) 765-9502 Survey ~/ www. northfork.net/Southold/ PERMIT NO. ~ 3c~ ~0.,~ Check ~: 3 0O I Septic Form N.Y.S.D.E.C./~ Tmstees ~ Examined .fa,~;[)~, 20 07 Contact: Approved ""~;~ [~, 20 0'7 Mail to: Disapproved a/c ///,O/~, ~ 20 ( Building Inspector APPLICATION FOR BUILDING PERMIT - "~ _';-7 .... . Date ~. ~ , !~t ~ ~Xoa , '~ INSTRUCTIONS a. This:'applioai~o~Vl~$T be cor~ple~tely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of olans, accurate plot PP'~k~ scale. Fee according to schedule. b. ?lo, t plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, md w '~terways; ~-~p ~wc~ aovered by this application may not be commenced before issuance of Building Permit. ~ pon approval of tiffs application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be Kept on the premises available for inspection throughout the work. e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the propertyj;ave been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an additi~--l!ix months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building ~5one Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. Searles. Stromski~ Associates (Si~amreofapplicantormme, ifaco~orafio~ Architects Planners P.C. 131 Route 25A Suite 3 Rocky Point,NY (Mail~gad~essofapplicant) 11778 State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Architect Name of owner of premises Julie Anne Haerr (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corp'orate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on which proposed work will be done: 305 Mill Creek Drive House Number Street Sonkhnl d Hamlet County Tax Map No. 1000 Subdivision (Name) Section 135 Block 03 Filed Map No. Lot 028.1 Lot 2. State existing use and occupancy of premises and intended use and occupancy of propo~M construction: a. Existing use and occupancy Sinqle-Famil¥ Residence b. Intended use and occupancy si nqla-Farai ly Ro_.qi clonaa 3. Nature of work (check which applicable): New Building. Repair Removal Demolition Estimated Cost If dwelling, number of dwelling units If garage, number of cars two Addition x Alteration Other Work Fee (Description) (To be paid on filing this application) Number of dwelling units on each floor If business, commercial or mixed occupancy, specify nature and extent of each type of use. Rem 46.4' Dimensions of existing structures, if any: Front 46.4 ' Height 1 6.1 +/- Number of Stories one Dep~ 24,3' Rear 76.4' Dimensions of same structure with alterations or additions: Front 7 6.4 ' Height 23.3'+/- Number of Stories two Depth 24.3' 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories Rear 167,77' D~th ' ' lar 9. Size of lot: Front 1 O0.0 ' 10. Date of Purchase t~o,ro~, ~-z- ! '~0 Name of Former Owner ,~L_ . .'1~ ~,~., 4 11. Zone or use district in which premises are situated R- 4 0 12. Does proposed construction violate any zoning law, ordinance or regulation? YES × NO 13. Will lot be re-graded? YES X NO__ Will excess fill be removed from premises? YES __ NO X Phone No.( 631 ) 473-1~68 PhoneNo(631) 744-~852 Phone No. NO 14. Names ofOwnerofpremisesJulie A. Haerr Address5 Clinton St, Name of ArchitectSSA Architects Planner~iddress 131 Route25A Name of Contractor Address 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES x * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES__ NO __ * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. STATE OF NEW YORK) SS: COUN ), / ,lz , ~...~.,.,~r )~,/~_.~,~...~ b~eing duly swom, deposes and says that (s)he is the applicant (I~an~e o-~individualtsi-gn~n~ contract) above named, (S)He is the b¢~:~k~T ~ t~tO~ (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are tree to the best of his knowledge ahd belief; and that the work will be performed in the manner set forth in the application filed therewith. REG. ~2GR6073756 MY COMMISSION EXPIRES APRIL 25, 2006 20 f APPEALS BOARD MEMBERS Ruth D. Oliva, Chairwoman Gerard P. Goehringer James Dinizio, Jr. Michael A. Simon Leslie Kanes Weism~ http://southoldtown.north fork.net ZONING BOARD OF APPEALS TOWN OF SOUTHOLD .... ~.~ Tel. (631) 765-1809 · Fax (631) 765-9064 Mailing Address: Southold Town Hall 53095 Main Road · P.O. Box 1179 Southold, NY 11971-0959 Office Location: Town Annex/First Floor, North Fork Bank 54375 Main Road (at Youngs Avenue) Southold, NY 11971 FINDINGS, DELIBERATIONS AND DETERMINATION MEETING OF APRIL 13, 2006 ZB File No. 5845 - JULIE ANNE HAERR Property Location: 305 Mill Creek Drive, Southold CTM 135-3-28.2 SEQRA DETERMINATION: The Zoning Board of Appeals has visited the property under consideration in this application and determines that this review falls under the Type II category of the State's List of Actions, without an adverse effect on the environment if the project is implemented as planned. PROPERTY FACTS/DESCRIPTION: The applicant's property consists of 19,760 square feet with 100 feet along Mill Creek Drive. The property is improved with a single-family, one-story dwelling and accessory flame shed, as shown on the survey prepared October 31, 2005 by Stanley J. Isaksen, Jr. BASIS OF APPLICATION: Zoning Code Chapter 100, Sections 100-242 and 100-244, based on the Building Inspector's January 10, 2006 Notice of Disapproval, concerning a request to build additions. The roasons stated for denying the application is that the new construction will increase the degree of nonconformance when located less than 40 feet from the front lot and less than 15 feet from the side lot line. FINDINGS OF FACT The Zoning Board of Appeals held a public hearing on this application on March 30, 2006, at which time written and oral evidence were presented. Based upon all testimony, documentation, personal inspection of the property, and other evidence, the Zoning Board finds the following facts to be true and relevant: AREA VARIANCE RELIEF REQUESTED: The new construction areas which are the subject of the disapproval by the Building Inspector include an addition to the first floor, a two-car garage addition, and addition over the existing first floor footprint, as shown on the plan prepared by Robert Stromski, R.A. dated 1/23/06 (project No. 0526). REASONS FOR BOARD ACTION: On the basis of testimony presented, materials submitted and personal inspections, the Board makes the following findings: 1. Grant of alternative relief will not produce an undesirable change in the character of the neighborhood or a detriment to nearby properties. The applicant proposes to add a second-story addition over the existing footprint of the dwelling, and to add additions on the first floor which includes a 22' x 24' garage connected to the dwelling by an 8 ft. wide addition. The setback is proposed at eight feet instead of the code requirement of 15 feet. Also proposed is an increase of nonconformity (applied under the Walz Interpretation No. 5039 for nonconforming buildings), utilizing the same 36.3 setback of the dwelling for the extensions/additions. All of the reasons were addressed, as well as further reviews and visits to the area homes in this vicinity. An Page 2 - April 13, 2006 ZB File No. 5845 - Julie A. Haerr CTM No. 135-3-28.2 increased setback from 8 feet to 10 feet on the easterly side yard is the minimum that the Board is willing to grant. 2. The benefit sought by the applicant can be achieved by some method, feasible for the applicant to pursue, other than an area variance, based on the nonconforming setback that exists for the applicant's dwelling. 3. The difficulty was created with plans to increase the size of a dwelling in a nonconforming location. 4. No evidence has been submitted to suggest that a variance in this residential community will have an adverse impact on the physical or environmental conditions in the neighborhood. The applicant has furnished copies of Permit No. 6296 issued February 15, 2006 under the Town Wetlands Ordinance. 5. Grant of the requested relief is the minimum action necessary and adequate to enable the applicant to enjoy the benefit of additions, while preserving and protecting the character of the neighborhood and the health, safety and welfare of the community. RESOLUTION OF THE BOARD: In considering all of the above factors and applying the balancing test under New York Town Law 267-B, motion was offered by Member Goehringer, seconded by Chairwoman Oliva, and duly carried, to DENY the variance as applied for with resp~e side yard; and to GRANT alternate relief for a minimum ten,~(10_~.) f~ setback from the easterly side lot line (instead of 8 feet); and to GRANT the variance as applied for with respect to the front yard setback, as shown on the plan prepared by Robert Stromski, R.A. dated 1/23/06 (project No. 0526) (plans to be modified to comply with the above requirement of alternative relief). Any deviation from the variance given such as extensions, or demolitions which are not shown on the applicant's diagrams or survey site maps, are not authorized under this application when involving nonconformities under the zoning code. This action does not authorize or condone any current or future use, setback or other feature of the subject property that may violate the Zoning Code, other than such uses, setbacks and other features as are expressly addressed in this action. Vote of the Board: Ayes: Members Oliva (Changer, D_.j~zh3~i~d.~Weisman. This James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen John Holzapfel Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD February 15, 2006 Searles, Stromski Associates Architects Planners, P.C. 131 Route 25 A Suite 3 Rocky Point, New York 11778 Re: JULIE ANNE HAERR 305 MILL CREEK DRIVE, SOUTHOLD SCTM# 135-3-28.1 Dear Mr. Stromski: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, February 15, 2006 regarding the above matter: WHEREAS, Searles, Stromski, Associates as agent for JULIE ANNE HAERR applied to the Southold Town Trustees for a permit under the provisions of Chapter 97 of the Southold Town Cede, the Wetland Ordinance of the Town of Southold, application dated December 30, 2005, and WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on February 15, 2006 at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the proposal complies with the standards set forth in Chapter 97 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and' general welfare of the people of the town, RESOLVED, that the Board of Trustees approve the application of JULIE ANNE HAERR to construct first and second floor additions to the existing dwelling, two-car attached garage, and concrete patio, with the conditions that a haybale line be placed 15' seaward of the patio, gutters and drywells to contain roof runoff, and the vegetated buffer along the shoreline be maintained with no turf, and all as depicted on the plan drawn by Searles, Stmmski, Associates last dated 1/06 and stamped by the Trustees on 2/15/06. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) This is not a determination from any other agency. Fees: $100.00 Very Truly Yours, ames F. Kin~ President, Board of Trustees JFK/hkc Board Of $outhold Town Trustees SOUTHOLD, NEW YORK PERMIT NO....G...~- DATE: Feb. 15, 2006 JULIE ANNE HAERR ISSUED TO ...................... , Pursuant to tim provisions o{ C~apfer 615 oJ ~e ~wJ the 5fa~ oJ New Yor[, 1893~ and ~apter ~ o~ the ~ws OJthe - slate o~ New Yor~ 19~2~ and t~e S°u/hold To~n Ordinance /~led 7'RE~U~TIN~ AND .~E..P~CI~. OF: IN AND ON TOWN WATERS AND PUBLIC ~NDS and'*t~ RE~OVAL OF SAND, GRAVEL*OR OTHER MATERIALS~M ~NDS .UNDER TOWN WA~RS:[.~. and in a~dan~ wd~ ResoJ~ion o~ T~e Board adopted at a meeting held o~ ._~b..L.~J;: ....... 20~6 ....... and in consideration o{ the sum o{ $250,..00. .......pald by ......... .~.!~...6g~.~. q.~.~.~ ................................................................ ~ ........... : ........ of Southold /....~ ................... N. Y. and su~t Io: of Southold Town' Tr~ees authorizes and p~rmlh the following: garage, ~ --"-~ · - .-~ ~ ~ venerated buffer along the shoreline be maintained gut er~ d~aln rool [un~., ~.~..~. m~nmski Assodates last dated1/06 and no tud, and all as de~cted on the plan arawn oy s~mped by ~e Trustees on ~1~06. a~ in accordance with the aelai~ ip~icaiJon~ as p~nie~ · ~e oRglaaflng app~fJ~. IN WITNESS WHERE', ~e iai~ ~oar~ ~[ Tmdees ~re- by ~u~s iii ~r~raJ~ Seal to be a~xed and ~ese prese~h to be ,ub~ed b~ ~'m~l~ of the ~id ~rd as of t~k ' ~eg D~ck~rso~.(abse~t) TERIdS and CONDITIONS NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION DEC PERMIT NUMBER 1-4738-03565/00001 FACILITY/PROGRAM NUMBER(S) PERMIT Under the Environmental Conservation Law IEFFECTIVE DATE May 4, 2006 EXPIRATION DATE(S) May 3, 2011 TYPE OF PERMIT · New [] Renewal [] Modification [] Permit to Construct [] Permit to Operate [] Article 15, Title 5: Protection of Waters [] Article 15, Title 15: Water Supply [] Article 15, Title 15: Water Trensport [] Article 15, Title 15: Long Island Wells [] Adicle 15. Title 27: Wild. Scenic and Reomational Rivem [] 6NYCRR 608: Water Quality Certifica- tion [] Article 17, Titles 7, 8: SPDES [] Article 19: Air Pollution Control [] Adicle 23, Title 27: Mined Land Reclamation [] Adicle 24: Freshwater Wetlands · Article 25: Tidal Wetlands [] Article 27, Title 7; 6NYCRR 360: Solid Waste Mana~lement [] Article 27, Title 9; 6NYCRR 373: Hazardous Waste Management [] Articte 34: Coastal Erosion Management [] Article 36: Floodplain Management [] Articles 1, 3, 17, 19, 27, 37; 6NYCRR 380: Radiation Control PERMIT ISSUED TO TELEPHONE NUMBER Karl & Julie Haerr (631) 473-1668 ADDRESS OF PERMITTEE 5 Clinton Street, Mount Sinai, NY 11766 CONTACT PERSON FOR PERMITTED WORK TELEPHONE NUMBER NAME AND ADDRESS OF PROJECT/FACILITY Haerr property, 305 Mill Creek Drive~ Southold COUNTY I TOWN Suffolk Southold DESCRIPTION OF AUTHORIZED ACTIVITY: WATERCOURSE Arshamomoque Pond NYTM COORDINATES Construct a first floor addition and a second story to the existing single family dwelling, a garage, deck, stairway, asphalt driveway and drywells. Remove existing driveway, concrete patio and wood ramp. Att work must be done in accordance with the attached plans prepared by Robert Stromski on 3/14/06 and stamped NYSDEC approved on 5/4/06. By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, the General Conditions specified (see page 2 & 3) and any Special Conditions included as part of this permit. PERMIT ADMINISTRATOR: I ADDRESS George W. Hammarth (DMG) I Region 1 Headquarters, Bid9. #40, SUNY, Stony Brook, NY 11790-2356 May 8, 2006 Page 1 of 4 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION SPECIAL CONDITIONS 1. During construction, concrete or leachate shall not escape or be discharged, nor shall washings from transit mix trucks, mixers, or other devices enter tidal wetlands and/or protected buffer areas. 2. Any debris or excess material from construction of this project shall be completely removed from the adjacent area and removed to an approved upland area for disposal. No debris is permitted in tidal wetlands or protected buffer areas 3. There shall be no disturbance to vegetated tidal wetlands or protected buffer areas as a result of the permitted activities. 4. All areas of soil disturbance resulting from the approved project shall be stabilized with appropriate vegetation (grasses, etc.) immediately following project completion or prior to permit expiration, whichever comes first. If the project site remains inactive for more than 48 hours or planting is impractical due to the season, then the area shall be stabilized with straw or hay mulch or jute matting until weather conditions favor germination. 5. The storage of construction equipment and materials shall be confined within the project work area and/or upland areae greater than 75 linear feet from the tidal wetland boundary. 6. All disturbed areas where soil will be temporarily exposed or stockpiled for longer than 48 hours shall be contained by a continuous line of staked haybales / silt curtains (or other NYSDEC approved devices) placed on the seaward side between the fill and the wetland or protected buffer area. Tarps are authorized to supplement these approved methods. 7. If seeding is impracticable due to the time of year, a temporary mulch shall be applied and final seeding performed at the earliest opportunity when weather favors germination and growth, but not more than six months after project completion. 8. All erosion control devices shall be maintained in good and functional condition until the project has been completed and the area has been stabilized. 9. All fill shall consist of"clean" sand, gravel or soil (not asphalt, slag, flyash, broken concrete or demolition debris). 10. The Department retains jurisdiction of all regulated lands where fill has been permitted. Placement of fill shall not be used to alter the Department's Tidal Wetland jurisdictional area at the project site. The area remains a regulated area subject to Tidal Wetland Land Use restrictions of Part 661 (NYCRR). 11. Disturbance to natural vegetation or topography greater than 25 feet seaward of the approved structure is prohibited. 12. Necessary erosion control measures e.g., staked haybales, silt fencing, etc. are to be placed on the downslope edge of any disturbed areas. This sediment barrier is to be put in place before any disturbance of the ground occurs and is to be maintained in good and functional condition until thick vegetative cover is established. 13. Roof runoff shall be directed into dry wells a minimum of 75 linear feet landward of the tidal wetland boundary for immediate on-site recharge. 14. Roads, driveways and parking areas shall be graded to direct runoff away from tidal wetlands and protected buffer areas. 15. This permit does not authorize any alteration expansion, or replacement of existing septic systems. DEC PERMIT NUMBER 1-4738-03565/00001 PAGE 2 of 4 NEW YORK STATE DEPAR~IENT OF ENVIRONMENTAL CONSERVATION ADDITIONAL GENERAL CONDITIONS FOR ARTICLES '15 (TITLE 5), 24, 25, 34 AND 6NYCRR PART 608 ( TIDAL WETLANDS) If futura operations by the State of New York require an alteration in the position of the structure or work herain authorized, or if, in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destruction of the natural rasoumes of the State, the owner may be orderad by the Department to remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State, and if, upon the expiration or ravocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owners, shall, without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may require, ramove all or any portion of the uncompleted structura or fill and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such ramoval or alteration. The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for tbe conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project. Any material dredged in the conduct of the work herein permitted shall be removed evenly, without leaving large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to cause damage to navigable channels or to the banks of a waterway. There shall be no unreasonable interference with navigation by the work herein authorized. If upon the expiration or revocation of this permit, the project heraby authorized has not been completed, the applicant shall, without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may raquira, remove all or any podion of the uncompleted structura or fill and restora the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. If granted under 6NYCRR Part 608, the NYS Department of Environmental Conservation hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301,302, 303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the conditions listed herein are met. At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they ara fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work and, if required, a survey. All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or his agent as part of the permit application. Such approved plans were prepared by Robert Stromski on 3/14/06 and stamped NYSDEC approved on 5/4/06. DEC PERMIT NUMBER PAGE 3 of 4 1-4738-03565/00001 · · NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies, expressly agrees to indemnity and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, and agents ("DEC") for all claims, suits, actions, and damages, to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with, or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those proscribed for the permittee. rem C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trospass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interost in real or 3ersonal property held or vested in a person not a party to the permit. GENERAL CONDITIONS General Condition 1: Facility Inspection by the Department The permitted site or facility, including relevant rocords, is subject to inspection at reasonable hours and intervals by an authorized roprosentative of the Department of Environmental Conservation (the Department) to determine whether the permittee is complying with this permit and the ECL. Such ropresentative may order the work suspended pursuant to ECL 71-0301 and SAPA 401(3). The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon roquest by a Department representative is a violation of this permit. General Condition 2: Relationship of this Permit to Other Department Orders and Determinations Unless exprossly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requiroments contained in such order or determination. General Condition 3: Applications for Permit Renewals or Modifications The permittee must submit a separate written application to the Department for renewal, modification or transfer of this )ermit. Such application must include any forms or supplemental information the Department roquires. Any renewal, modification or transfer granted by the Department must be in writing. The permittee must submit a renewal application at least: a) 180 days before expiration of permits for State Pollutant Discharge Elimination System (SPDES), Hazardous Waste Management Facilities (HWMF), major Air Pollution Control (APC) and Solid Waste Management Facilities (SWMF); and b) 30 days before expiration of all other permit types. Submission of applications for permit renewal or modification aro to be submitted to: NYSDEC Regional Permit Administrator, Region 1, SUNY Bldg #40, Stony Brook NY 11790-2356 General Condition 4: Permit Modifications, Suspensions and Revocations by the Department The Depadment reserves the right to modify, suspend or revoke this permit in accordance with 6 NYCRR Part 621. The grounds for modification, suspension or revocation include: a) materially false or inaccurate statements in the permit application or supporting papers; b) failure by the permittee to comply with any terms or conditions of the permit; c) exceeding the scope of the project as described in the permit application; d) newly discovered material information or a material change in environmental conditions, relevant technology or applicable law or regulations since the issuance of the existing permit; e) noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity. DEC PERMIT NUMBER I I PAGE 4 OF 4 I 1-4738-03565/00001 -'tom: Gelarah AJaimo. C~C At: Seigerman Murvey FaxlD: To: tn~Jrance Date: 7/26r2007 01:01 PM Page: 2 of 3 ACORD. CERTIFICATE OF LIABILITY INSURANCE Coast Line Design 49 Ta~a~ak Road COVERAGES L'I~ ~/~ ~t~E OF IN~UR,~NCE P0(.IC~ NUMB~ DATE ~M/OI~ DA'T~ tl~/Ol~f~ ~ G,~rm.,u. LUgs.m,' ~ OCCU~ENCE 1000000 A ~ CC~W,E~C~C~N~.L~LITY 3C8631~ 09/23/06 09/23/07 u~,u~.,:u 50000 ~&~w~v 1000000 ~ A~ $ 2000000 GE~L ~E~ LIM(T ~PLIES ~R P~CTS~P~ ~ ~ 1000000 CERTIFICATE HOLDER '~ CANCELLATION Karl Haerr 5 Clinton Street SoutholdN~ 11971 0000000 ACORD 25 (2001/08) O ACORD CORPORATION 07-26-2007 12:07 SOUTHOLD BUILDING DEPT 16317659502 PAGE2 RESCh ck Software Version 3.7 Release lb Compliance Certificate Permit # Permit Date Project Title: Mr. & Mrs. Haer Repor~ Date: 06/12/06 Energy Code: Location: Co~sb'~'tton Type: Heating Type: Glazing Area Percentage: Heating Degree Days: New York State Energy Conservation Cons~ctten Code Suffolk County, New York Detached 1 or 2 Family Non-Electric 19% 5750 Construction Site: 305 Mill Cresk Dr So~thold, NY 11971 Owner/Agent: Mr. & Mrs. ~ad Haer 305 Mill Creek Dr Southold, NY 11971 Designer/Contractor; RicA Seades Seafles. Stroms.kJ, Associates 131 Route 25A Rocky Point, NY 11778 (631)744-2852 Ceiling 1: Flat Ceiling or Sds.~x Truss: Ceiling 2: Cathedral Ceiling (no attic): Skylight 1: Wood Frame:Double Pane with Low-E: Wall 1: Wood Frame. 16" o.c.: Window 1: Wo(xl Frame:Double Pane with Low*E: Window 2: Wood Frame:Double Pane with Low-E: Door 1: Sutld: Deor 2: Glass: ~ 1: ~Jl-Wond Joist/Truss:Over Uflcnodiit(med Space: 784 30.0 19.0 16 552 21.0 0.0 26 9 0.330 3 208O 15.0 0.0 125 217 0.330 72 58 0.300 17 56 0.220 12 123 0,330 41 1265 21.0 0.0 56 Statement of Cemp//anoe: 33~e proposed building represented in this document is consistent with the building plans, speciflcaitnos. and other ce~culait(~s sulxnittad with ~.s pemdt application. Ti3e pmpoesd systems have been desig~nd to meet the New yo~k State Ene~ Con~l~ction Code mquimmenta. When a Registered Design Professional has stamped and signed ~is page, th/d~a m~stlng./th~;t/W'/,l~e best ~f his/her ~ge, belief, and professional judgment, such plans or speclf, catinos are in Mr. & Mrs. Haer Page 1 of 4 REScheck Software Version 3.7 Release 1 b Inspection Checklist Date: 06J12J06 Ceilings: [~ Ceiling 1: Flat Ceiling or Sdss~ Tress. R-30.0 cavity + R-19.0 continuous insulation r-i ceiling 2: Cathedral Ceiling (no attic), fl-21.0 cavity ir--=ulation Comrns~ls: Above-Grade Walls: r~ Wall 1: Wood Frame, 16" o.c., R-15.0 cavityinsulatJon Window 1: Wood Freme:Douele Pane with Low-E, U-factor: 0.330 For windows without labeled U-factors, dsscdbe features: #Panes Frame Type 'rnern~l Break? __ Yes Comments: No Window 2: Wood Frame:Double Pane with Low-E, U-fa~x~: 0.300 For windows without labeled U-factors, descdbe features: #Panss Frame Type Thermal Break? __ Yes No Skylights: Skylight 1: Wood Frame:Double Pane with Low-E, U4actor: 0.330 #Panes Frame Type Thermal Break? Comments: Yes No I-1 Door 1: Solid, U-factor: 0.220 Cornments: r-i Door 2: Glass, U-facts~ 0.330 Comments: I-1 Floor 1: Ati-Wnud Joist/Truss:Over Unconditioned Space, R-21.0 cavity les~lation Camment~. Air Joints, penetrations, and all other such openings in the building envelope that are s~,~rces of air leakage must be ssaJed. Recas~-~l lights must be 1) Type lC rated, or 2) installed inside an appropriate air-tJght assembly with a 0.5" clearance from combustible materiels. If non-lC rated, the fixture must be installed with a 3' clearance from insulation. Vapor Required on the warm-in-winter side of all non-vented framed ceilings, walls, and floors. Materials and equipment must be installed in accordance with the manufacturer's installation inst~ctions, Materials and equipment must be identified so that compliance can be determined. Mr. & Mrs. Haer Page 2 of 4 Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. Insalatiee R-values and glazing U-fantom must he clearly mad(ed on the building plans or specifications. Duct Insul~on: [-I Supply ducts in unconditioned attics or outside the building must be insulated to R-8. I-I Return ducts in uncondltioneq atttes or outside the building must he insulated to R-4. I-t Supply ducts in uncond~ spaces must he insulated to R-8. [-I Return ducts in unconditioned spaces (except basements) must be insulated to R- [~ Return ducts in uncon~ltionad spaces (except basements) must he insulated to R-2. . Insula~,3n is not required on tatum ducts in basements. Duct Cor~ctlea: I~1 Ail joints, seams, and connections must he securely fastened with welds, gaskets, mastics (adhesives), meetic~us-embedded.4abdc, or tapes. Tapes and rnastJcs must be mteq UL 181A o~ UL 181B. Exception: Continuously welded and locking-type longitudinal joints and seams on ducts operating at tess than 2 in. w.g. (500 Pa). I~ '~e HVAC system must provide a means for balancing air and water systems. Temper~um Co~rols: Each dwelling unit has at lesat one thermostat capable of automatically adjusting the space temperature set point of the largest ZQi3e. I--I Sepamta elec~c meters am required for each dwelling uniL Fireplaces: Fireplaces must be installed with tight tiffing non-combustible fireplace doom. Flrepiaces must be provided with a source of combua~3n air. as required by the Fireplace construction p~wsions of the Buil~ng Code of New York State, the ResidenUal Code of New York Stats or the New Y~#( CKy Bcd/ding Code, as abplicabte. ~ervlce Wate~ Heating: Water heaters with vertical pipe ~isers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is pert of a ciroulating system. Insulate circulating hot water pipes to the levels in Table 1. ClmulMIng Hot Water ~ystems: Insulate circulating hot water pipes to ffie levels in Table 1. ~,damlng Poole: I-I All heated swimming pools must have an on/off heatar switch and require a cover unless over 20% of the heating enemy is from nee-depletable sources. Po~ pumps m(~uim a time clock. Heating and CoolJng Piping Insulation: i-'1 HVAC piping corn, eying fluids above 105 degrees F or chilled fluids belew 55 degrees F must he insulated to the levels in Tabte 2. Mr. & Mm. Haer Page 3 of 4 Table 1: Minimum Insulation Thickness for C;rculatlng Hot Water Pipes Heated Water Temperature I°F) Insulation Thlckneea in inchns by Pipe SIz~ Non-Clrculafln~ Runouts Circulating Mains and Runouts Up to 1' Up to 1.25" 1.5" to 2.0' Over 2' 1~-1~ 0.5 1.0 1.5 2.0 140-1~ 0.5 0.5 1.0 1.5 100-1~ 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thlclmess for HVAC Pipes Fluid Temp. Insulation 'lllinfo~.~ in inchea by ~pe Sizes Piping System Types Range(°F) 2" Runouts 1" and Less 1.25" to 2.0" 2.5" to 4" Low PresaureJTempemture 201-250 1.0 1.5 1.5 2.0 Lmv Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate (for feed water) Any 1.0 1.0 1.5 2.0 Cooling Sy~ Chilled Water, Refrigerant and 40-55 0.5 0.5 0.75 1.0 Brine Below 40 1.0 1.0 1.5 1.5 NOTE~ TO FIELD: (Beiiding Department Use O~ly) Mr. & Mrs. Hear Page 4 of 4 SEARLES, STROMSKI, ASSOCIATES ARCHITECTS PLANNERS, P.C. August 8,2006 Town of Southold Building Department 53095 Main Road Southold, NewYork 11971 Attention: Pat Conklin Plans Examiner Re: Haerr Application Dear Ms. Conklin: This letter is to follow up ()ur phone conversation regarding the building permit application for Julie Haerr. We have revised the grade slightly around the garage and set the elevation of the garage slab to 10.2 feet above sea level. This would put all of the proposed construction above elevation 10 with respect to the tlood plain. --. ~ j We feel that the project can not be considered ~s~'bs~roject or new construction. The current livable area of the house is 1,104 square feet.-'7We ar~"proposing to add 161 square feet to the first floor and 380 square feet to the second floor. With that in mind, the project is adding less ~f th,, ,-,~rre. nt square foota? of the~house. Enclosed you will find three copies of the revised site plans dated August 8, 2006 with my seal and signature. If you require any additional information, please contact me at my office. Thank you for your consideration in these matters. Searles, Stromski, Associates Architects Planners, P.C. 131 ROUTE 25A, SUITE 3 ROCKY POINT, NEWYORK 11778 - ~PHONE (631) 744--2852 FAX (631) 744 6654 f f SEARLES, STROMSKI, ASSOCIATES ARCHITECTS 4~ PLANNERS, P.C. J~e13,2~6 Town of Southold Building Department 53095 Main Road Southold, NewYork 11971 Attention: Pat Conk]in - Plans Examiner Re: Haerr Application JUL Dear Pat: ~s letter is to follow up ou'~phone eonve~sation ye~er~y r~g the app"~tion for ~aie Haerr. We have revised the grade at the northeast .c,o~r~,er o~d~ditio.fi~_~a tl~the project will not be considered within the flood plain elevation of 10 -0 ~cussed yesterday. In addition we are proposing to install the SmartVent flood and ventilation vents. In accordance with the approved guidelines of the SmartVent product each vent can serve 200 sqft of basement/crawlspace area. We are proposing to install 6 in total. The actual area of I~a~ent/crawlspace area total 1133 sqft. We are providing vents to handle 1200 sqft. As requested w~ ~re providing revised site plans (showing the proposed regradIng), specifications for the SmartVent product, and two copies of the energy calculations. If you have any questions do not hesitate to contact me. '~earles, Stromski, Architect* Planners, P.C. aciates 131 ROUTE 25A, SUITE 3 PHONE (631) 744 2852 ROCKY POINT, NEWYORK 11778 FAX (631) 744~6654 Town of Southold Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM PROPERTY LOCATION: S.C.T.M. #: \~o~_L~,-~x~~ ~ ~. L District Section Block Lot THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A STORM-WATER, GRADING, DRAINAGE AND EROSION CONTROL PLaN CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. Item Number: (NOTE: A Check Mark (~) for each Question is Required for a Complete Application) Ye__~s N....~o 1 2 3 4 5 6 7 8 9 Will this Project Retain All Storm-Water Run-Off Generated by a Two (2") Inch Rainfall on Site? (This item will include all mn-off created by site cleadng and/or construction activities as well as all Site Improvements and the permanent creation of impervious surfaces.) Does the Site Plan and/or Survey Show All Proposed Drainage Structures Indicating Size & Location? This Item shall include all Proposed Grade Changes and Slopes Controlling Surface WaterFIowl Will this Project Require any Land Filling, Grading or Excavation where there is a change to the Natural Existing Grade Involving more than 200 Cubic Yards of Matedal within any Pamel? Will this Application Require Land Disturbing Activities Encompassing an Area in Excess of Five Thousand (5,000) Square Feet of Ground Surface? Is there a Natural Water Course Running through the Site? Is this Project within the Trustees jurisdiction or within One Hundred {100') feet of a Wetland or Beach? Will there be Site preparation on Existing Grade Slopes which Exceed Fifteen (15) feet of Vertical Rise to One Hundred (100') of Horizontal Distance? Will Driveways, Parking Areas or other Impervious Surfaces be Sloped to Direct Storm-Water Run-Off into and/or in the direction of a Town dght-of-way? Will this Project Require the Placement of Material, Removal of Vegetation and/or the Construction of any Item Within the Town Right-of-Way or Road Shoulder Area? (This item will NOT include the Installation of Driveway Aprons.) Will this Project Require Site Preparation within the One Hundred (100) Year Floodplain of any Watercourse? NOTE: IfAny Answer to Questions One through Nine is Answered with a Check Mark In the Box, a Storm-Water, Grading, Drainage & Ereelon Control Plan is Required and Must be Submiffed for Review Prior to Issuance of Any Bugdlng Permitt EXEMPTION: Yes No Does this project meet the minimum standards for classification as an Agricultural Project? Note: If You Answered Yes to this Question, a Storm-Water, Grading, Drainage & Erosion Control Plan is NOT Requlredl -- __ STATE OF NEW YORK, COUNTY OF ..~..M..~.....'.'.'.'.'.'.'.'~....I,.~...C:='... ........... SS That .......... .......... d, y sworn, deposes says tha he/s e is the ,pnc ,t for And that he/$he, iSthef ,nd,.__.__,,.,._.,._.,__...;..~** ,,~,..~,....,~l...~[.~(.(~.t.~nel, Contr~:;:}:..~,.~:,l~t:,,C.:...rpo.~;~.i~)~i:::it.t~i;Named ,idualsgning Doct~¢r q ................................................................. Owner and/or representative of the Owner of Owner's, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are tree to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed herewith. Sworn to before me this; 20..~fl dayof MICHELLE L MARTOCCHIA NUTARY PUBLIC - STATE OF NEW YORK FORM - 06~07 NO. O~M~ QUALIFIED IN SUFFOLK ~ MY COMMISSION EXPIRES N~V t7 ~lml ~ Smart VENT 877- 441- 8368 DETAIL DIAGRAM MODEL 1540-510 DUAL FUNCTION FLOOD AND VENTILATION VENT STRRP SLOTS USE T~n BEHIND TIE RO/~NT 'eCR££N, LDUV£RS &UTONATTCALLY OPeN ~lD CLOS~ ~d~TH TE~PERATUR~ NO ELECTRICITY IS #EEI~:n STRAPS 977-441 8368 EL FLOODZONE A£ - 8 C~N~L (ARSHAMOMOQU£ SURVEY OF DESCRIBED PROPERTY SITUATE SOUTHOLD, TOWN OF' SOUTHOLD SUFFOLK COUNTY', N.Y. SURVE'Y£D FOR: JULIE ANNE HAERR TM// 1000-735-03-02S 1 GUARANTEED TO: JULIE ANNE HAERR ELEVATIONS SHOWN ARE IN 1929 NGVD FLOOD ZONE DATA IS FROM MAP NUMBER 5610~C0158 G EFFECTIVE DATE MAY 4, 1998 MAP SHOWING PROPOSED ADDITIONS TO RESIDENCE. EL 9 C£SSPOOL 0 SURVEYED: 31 OCTOBER 2005 SCALE 1'= WELL AREA = 19,768 S.F OR 0453 ACRES STANLEY J. ISAKCJEN, JR P.O. ~0× 294 NEW SLi[Ft)LK. N.Y 11956 PROPOSED ADDITION & ALTERATION FOR and L 305 MILL CREEK DRIVE, SOUTHOLD, NEW YORK ~ SEARLES, STROMSKI, {} ASSOCIATES v ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for IMr. and Mrs. IKARL IHAERR PRESCRIPTIVE DESIGN METFIODS 120 MPH HIND ZONES CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA ICE SHIELD 45 120 TABLE oF CONTENT5 ~LOOR AREAS DESIGN LOADS TE5 SCHEDULE OF ABBREVIATION5 305 Mill Creek Drive ;outhhold, NY 11971 PLUMBING AU. PLUMIIIN~ W~S.T E g WAT.:ER UNES NE~D T~E STIN,~ 15EFORE C~gE~ING APPROVED AS NOTED N©TIFY BUILDI',IG DEPARTMEN! AT %5-1802 8AM TO 4PM FOR THE FC'LLO'/fiNG INSPECTIONS: 1. FOI~DATION - TWO REQUIRED FOr, POURED COqCRETB 3. INSULATION BE COMPLEI E ..... O. ALL OONSTRUCTPDr,I SHAtL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS. PLUMBER CERTIFfCA TION ON LEAD CONTENT BEFORE CERTIFICATE OF OCCUPANCY SOLDER USED IN WA TER SUPPLy SYSTEM CANNOT EXCEED 2./IO OF I% LEAD. OCCUPANCY OR 'LJ :-3 IS UNMWFUL ~ ;' 'OUT CERTIFICATE O,: OCCUPANCY ALL (:CONSTRUCTION 8HALL MEET THE REQUIREMENTS OF THE CODES,OF NEW YORK STATE. CERTIFICATION OF NAILING & CONNECTIONS REQ~IRED~ ;REVISIONS lC). lC). I0. I0. lC). I0. lO I0 I0. I0. I0. I0 RETAIN STORM PURSUANT TO I OF THE TOWN COMPLY WITH ALL CODI NEW YORK STATE & TOWN AS REQUIRED AND CON - '/.~ DIJTHOLD TOWN ZBA SOUTHOLD TOWN PLANNI ~..~80Lr~OLD TOWN T~L~STI u/' N.Y,8, DEC ~O~D~RWRITERS cERTIF~,~ ¢~, REQIJi~D DO NOT'PROCEED WiTH FRAMING UNTIL SURVEY OF EOUNDATION LOGATION Project Information SHEET COMP,L,Y. WITH CHAPTER "46" FLOOPDAMAGE PREVENT 0N SOUTHOL,DT ' N,CQDE "r FOr BATH L~IJ kill, CLO$, Q DEHOLITION PI-AN LIVING RM. EXISTING TO R~IAIN F IIX, ~ Itl -Ii I fit II I Ill CONCRETE PATIO PLAT FORM MASTER BEDROOM EXI5TING TO REMAIN pROVIDE T~IPORART DINNING RM, EXISTING TO BE RE[lOVED \ / ~' ~' J i FI-- -- -I ~n - :l I KITCHEN / I BEDROOH J -- -- ~----- I I I I~ L~_ _ _ _ __ I I I / ~ RE~ED I I I ~E ~ISTI~ [ Rm~EP ~P ~-~ED, F~ P~N F~ N~ P~TE DEMO. LEGEND, ~CRAHL 5PACE EXISTING FULL CELLAR EXISTING (TO BE FILLED NIT~ CLEAN 5AND LEVEL NITH EXISTING FLOOD VENT NOTES: EXIETING (5.) 2j X GIRDER TO I EXI5TING (5) 2~ I I (rrPic~ ALL)-- Q FOUNDATION PLAN TYPICAL CORNER HOLDDONN DETAIL: INSIDE CORNERODNDITION FOUNDATION CON5TRUCTION ('1) 2~ X 6" ACQ 5ILL PLATE HITH 5ILL 5F~L 'COP-R-TEX~ TERHITE 5141ELD HALL LEGEND: __ EXISTING PLALL TO REMAIN - __ _ EXISTING HALL TO BE RFJ'IOVED (2) 2~ X -- ~'~ (2) 2" × 6' AD~. GIRDER (2) 2~ X §" AC~ --0 (TYPICAL ALL) CONSTRUCTION NOTE5: -PROVIDE PRIClRG FOR HEN 2~0 AHP SERVICE -pROVIDE PRICING FOR N?H ERIMNEY FLUE POR BOILER I I [] __GIRDER TO EEHAIN r'~ ..... · ,-' - - ~ GIRDER TO rEtlAIN -- II II -PROVIDE NIBfl DUAL FQUNDATIOfl FOR DBOE A5 REQUIRED UNEXCAVATEP CRANL 5PACE EXISTING JOISTS Iq'-&" 'FOP OF FQUNDATIDfl GARAge DC;ORS A5 REQUIRED (TTRCAL ALL) ~ SEARLES, STROMSKI, ASSOCIATES ~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for JMr and Mrs. IKARL IHAERR 305 Mill Creek Drive outhhold, NY 11971 REVISIONS I0_ El IQ I0__ IQ I© I0__ IQ IQ I0 I0. IQ I© I0 lO. I0__ TITLE Demolition & Foundation Plans SHEET A-2 HINpOH SCHEDULE )OOR SCHEDULE :Wi'ER IOR DOOR5 INTERIOR DOOR5 MASTER BEDROOM MASTER BATH =~ I ~,ST~ - ~', N,I. CLOS. ~ 5NELF ~ I~LE LIVING ROOM OAK FLOOR NOTE #1 HOOD DECK 1 CLOSET im ~. NEN HOOD DECK (2) 2" > PN, ('2) 2" X 10' N,EADER GREAT ROOM OAK FLOOR kAUNDRY ROOM eOLID pOST DINETTE L Lo :.,o[ KITCHEN CERAMIC TILE NEN NALL FRAMING CER. AMIC TILE VENT DRYER CM PROVIDE METAL 16' ON CENTER 2 CAR GARAGE / NDNADDITION FIRST FLOOR PLAN E~ISTING 1104 S,F, - ADDITION 140 5.F. A~'ACgED GARAGE 514 5.F, AT MID 5PAN OF CEILING JOIST, (I~rPICAL) HALL LEGEND: -- DQSTING HALL TO REMAIN SEARLES, STROMSKI, ~ ASSOCIATES ~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for IMr and Mrs. IKARL IHAERR 305 Mill Creek Drive Southhold, NY 11971 REVISIONS (~ ~' F iO6L"L~ ~ED TO SHOW BA$I~MENT I0__ IQ lO_ lO lO lO lO ICL I0_ IQ gEAL~ Cop TITLE RS First Floor Plan SHEET A-3 IF ROOFP~N (4) 2" X 4~ 50LID FOGT~ (2) 2" X 6" ] S BUILDING NOTE, ii PROVIDE CRICKET FOR (2) 2" X 10" ItF~,DER (2) E" X 10' HEADER REDROOH OAK FLOOR CARPET ~LJNE OF HALL5 I I /BEL~ / L ) 21 X 4" (4) 21 X .5OLID POST BAT~ TILE II II BELOH II II ~OVe II pROVIDE Bm' CDX pL'fHGDD ~tJB J m I I m BEL~ ~R mN A~mc, ___ _ _ J / J I HALL LEGEND: ~ 5E~ND FL~ P~N ~ale, v4' = m' o' ~ NIH 2 X 4 N~P ~e ~LL NINDON SCHEDULE DOOR SCHEDULE EXTERIOR DOOR5 INTERIOR DOOR5 ~ SEARLES, STROMSKI, ~ ASSOCIATES ~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for IMf. and Mrs. IKARL IHAERR 305 Mill Creek Drive Southhold, NY 11971 REVISIONS Q m~ m© IQ IQ IQ IQ IQ IQ lO. IQ lO. SEAL SCALE TITLE Second Floor & Roof Plans SHEET A-4 ./fA ,.~. SEARLES, STROMSKI, ~ ASSOCIATES PROVIDE flETAL RIDGE ARCHITECTS PLANNERS, P.C. GENERAL NOTES: sm~F~ * I~' o.c. I ALL O2NSTRUCTION 5{qALL OflNFORP1 TO ALI. Nm yOP~ fiTATEt COUNTY MATERIAL NOTES CONTINUOIJ$ RImE yB4T~ ROCKy pOINT NEW ¥OIZK 11778 ~IALL fiUpERSI~E THESE DRA~INGfl. ROOF CONSTRUCTION N 12 8. THE AR~ITE~ APPR~AL APPLI~ ~LT TO TNlfi P~N'5 fl~L WS' [ml~ fi~[ PL~D ~1~ ~ /~= ~~~~ TO ~AVE AN E-I,~,~ ~1 AND ~ fb=2,4~ ~. ~ ~I~T~ V~ HALL CONSTRUCTION PR~IDE B/8' CDX PL~D ~B X N : ~N~O~ AS P~ ~E~ .-Z LIVING R~H ~ · m~u~r~s. FLOR CONSTRUCTION ' ~ ~,a ~p ~m.mz ~r~, ~m~mN ~' T012' 0F ~E ~P 0F ~CR P~TEt AND ~m~m~ m' ~ } 305 ~11 Creek Drive R~SlBILI~ F~ FIE~ ~ ~l~ VARY ~ THE ~5~U~l~ INSULATION NOTES .... : ~ : Zh T~ ~ ~ ~ ~ ~ ICE ~D NAT~ ~l~P ~ TOP 2' X 0" ACO L~ER ~ARD ~~ ~ ~~~~[~ TITLE S & Notes SHEET A-S /~TOP OF FIIC-~IE~T RII~E FLOOR LEVEl. eEXISTING FI~,R,5~,T FIJ~ LEVEL ELEVATION = 0-0 (TTPICAL ALL) I I J I EXlSTIIN~ CORCR~TE I I I I FOJI~D~ATION TO REMAIN q J-------- q ~ .I I I Q FRONT ELEVATION ~TOP OF WIF.~E.?f~ RIDGE ELEVATION = 211-0 :~ GABLE FASCIA NOTES: FASCIA AND 50FFIT NOTES: ,,ii, sECOND FLOOR LEVEL ~ ELEVATION · &'-q I/4" YIN'it SIDING COLOR AND STTLE TO BE OELECTED BT OHNER - ANN ANN ANN LEVEL FOUNDA~-IOfl Tp ~AiN (T'(PICAL ALL) O LEFT SIDE ELEVATION ~ SEARLES, STROMSKI, afg ASSOCIATES ~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for JMr. and Mrs JKARL IHAERR 305 Mill Creek Drive Southhold, NY 11971 REVISIONS IO I© IO I© I© I© I© I© I© I© SEA A~Noted DATE O6/11/07 RS/STL CHECKED BY RS TITLE Building Elevations SHEET A-6 VINYL 51DING ODLOR AND 51TLE TO BE 5ELECTED BT OHNER ~ ,'~TOP Of: 6ARAGE RIDGE REAR ELEVATION JL J FIXED FIXED FIXED FIXED ~' ~UREP CONCRETE POURED OONCRETE HALL FOOTING I'IINIHU~I OR TO UNDI5TURBED CTmC~L ALL) EXISTING CONCRL:TE I FOUNDATION TO REHAIN I ANN I I I (T'mC~ ALL) (TYPICAL ALL) (~ RIC~IT SIDE ELEVATION CSMT CSMT GABLE FASCIA NOTES: FASCIA AND 50FFIT NOTES: TOP OF HIC-.~IEST RIDGE~ 5~D FLO0~ LEV'EL,~'-, EXISTIN~ FIRST FLO~ LEVELd~, ~]} SEARLES, STROMSKI, ASSOCIATES ~J~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for IMr. and Mrs. IKARL IHAERR 305 Mill Creek Drive Southhold, NY 11971 REVISIONS lC°9 O' 06 REVISED TO SHOw BASEMENTAREA FIL~D IN I0_ IQ lO. lO. IPROJECT NO 05261 TITLE Building Elevations SHEET BTRUCTURAL STRAP MODEUt LSTA (REOUJRED HNEN NO COLLAR TIES ARE USED HITHIN TNE UPPER THIRD OF TNE ATilC 5PACE @ I(d ON CENTER) SEE MATERIAL NOTES FOR BIZE5. TOP OF RIDGE~ RAFTER TO RAFTER CONNECTION",~Il' RII:~E. SEE pLAN FOR DOUBLE TOP PLATE, SEE MATERIAL--- NOTES FOR SIZE5 'LAN FOR SIZES AND 5PACING i JOI5T. SEE PLAN FOR SIZE5AND 5PACING TOP OF PLATE~-, RAFTER TO pLATE CONNECTION~4~' SEE MATERIAL NOTES FOR MODEL NUMBER5 (EACN STUD) --HEADER. SEE pLAN FOR BIZES RAFTER. SEE PLAN FOR $1ZESA HEADER, SEE PLAN 51ZES ,~,TOP OF PLATE ~/RAFTER TO PLATE CONNECTION 'USPI STRUCTURAL- CONNECTOR FOR RAFETR AND STUDS TNAT ARE IN-LINE, EIODELt¢S RTIO (REF N2) (05B LBS UPLIFT) OR RT20 (REF NT) (1105 LBS UPLIFT) CAB BE USED. SEE MATERIAL NOTES FOR MODEL NUMBER5 TO BE USED, (EAON STUD) EE PLANS FOR BIZES AND SPACING (20GAUGE MIN) L5TA HAT BE U5EDTOHRApOVER TNE TOP PLATE AT HINDOH AND DOOR OPENINGS (REFER TO TABLE 3.3BOflSNEET N-I FOR NAILING ~ONEDULE) 5INGLE 5HOE. SEE MATERIAL NOTES-- FOR SIZES FLOOR JOIST. 5E~ PLAN5 FOR SIZES ~ZOOR DIAPHRAGH BRACING HiTNIN LAST THO BAT5 OF FRAHING AT 4~-0' INTERVAL5 DOUBLE TOP PLATE. SEE MATERIAL--- NOTES FOR 51ZE5 BEAM EXTERIO~ HALL 5TUB, SEE MATERIAL NOTES FOR 51ZE5 AND 5PACING ~USP~ STRUCTURAL 5TRAP MODEL:t LTNI2 (REF ~LT5 12) ' (7~ LB5 UPLIFT) MAY ALSO BE USED A5 A 5TOD TO RIM JOIST CONNECTOR ~ADS5~ USP CONNECTOR NITN (2) CARRIDGE EK~-TS FASTEN TO DOUBLE A 5/6" DIAMETER TNREADED ROD CONNECT5 UPPER AND LONER CONNECTORS, PROVIDE DOUBLE STUD5 AND 5TRAPPING FROVi ROOF TO FOUNDATION A5 5NOHN. #-0" USE 5INGLE JACK AND FULL HEIGHT STUD AT EACH END. MODEL~; LFTA6 (REF~ N~) 5TRUCTURAL 5TRAP FOR BTUDS TgAT ARE OFESET MODEL~ LSTA 12 (620 LB5 UPLIFT) _ TOP Of 5UBFLOORd-, .,'~tOP OF SUB FLGOR 5TUB TO 5TUB CONNECTION",-P' '~/5TUD TO 5TUB CONNECTION R RIM JOIST. SEE PLAN FOR DETAIL5 EXTERIOR HALL 5TUB. SEE NOTE5 FOR SIZE5 AND SPACING 'usp' 5TRUOTURAL 5TRAP MODEL~ LSTA 12 FOR OPENING5 GREATER THAN 4LO" GREATER TNAN 4'-0" ROUGH OPENING 4'-0" U5E DOUBLE JACK AND FULL HEIGHT STUD AT EACH END. 5INGLE 5HOE. SEE FOR SIZES FLCOR FLOOR DIAPNRAGM BRACING HITNIN LA5T THO BAT5 OF FRAMING AT 4~-0" INTERVALB DOUBLE TREATED 5ILL PLATE OVER TERMITE SHIELD AND 5ILL SEAL, 5EE MATERIAL NOTES FOR SIZES pOURED CONCRETE FOUNDATIGN MASONRY BLOCK FOUNDATION. SEE FOUNDATION PLAN FOR 51ZES, 4 BEAM/RIM JOI5T TOP Of 5UBFLOOR,d~ 5TUB TO 5ILL CONNECTION"~' (4760 LB5 UPLIFT) CONTINUCO5 REBAR 5ET 4' BELOH TOP OF HALL, iU5Pi STRUCTURAL 5TRAP MODELtt LTNI2 (REF ~LT5 12) ('735 LB5 UPLIFT) MAT ALSO BE USED A5 A STUD TO RIM JOIST CONNEOTCR (EACH STUD) MODEL~ I-STAlE FOR §" TO lO' JOI5T USE LST~24 FOR 12II JOI5T FOR OPENING5 GREATER THAN 4-0" CARRIDGE BOLT5 FASTEN TO ANCHOR NITH 5/6" DIAMETER THREADED ROD AND TNREADED COUPLING, 5EE FOUNDATION PLAN FOR LGCATIONS. PROVIDE DOUBLE STUD5 'AND 5TRAPPING FROM ROOF TO FOUNDATION lAS 5HOHN. Ab. TOP OF suNI FLOOR ~/STUD TO $tLL IONNECTION MODEL~ NPAND22 (47(~g -- LB5 UPLIFT) MAT AL~O BE USED AS A CORNER HOLD DONN SEE FOUNDATION PLAN FOR LO~ATION II II ~4 CONTINUOg5 RESAR 5E1 4~ BELOH TOP OF HALL, MODEL~ LSTAI8 ($70 LE~S UPLIFT) FOR 8" TO I0' JOINT USE L5TA24 (qEo LiE5 UPLI~) FOR 12" JOIST. (~ON STUD) (REFER TO TABLE 3.~B ~ 5HE~ H-I FOR ~ILING ~H~DULE) FOR REBAR ~ SEARLES, STROMSKI, S~ ASSOCIATES ~ ARCHITECTS PLANNERS, P.C. Proposed Addition and Alteration for IMr. and Mrs. JKARL IHAERR 305 Mill Creek Drive Southhold, NY 11971 REVISIONS IO__ IQ_ I0.__ I0.__ I0____ I0___ lO___ IQ__ IL I0___ TITLE Detail Wall Section & Elevation SHEET W-1 O TYPICAL HALL SECTION = TYPICAL HALL ELEVATION ,,-o,, FRAMING AND CONNECTOR DETAIL~ FRAMING AND CONNECTOR DETAIL TABLE 3.1 NAILING SCHEDULE JOINT DESCRIPTION NUMBER OF NAILS [ NAIL SPACING ROOF FRAMING RAFTER TO TOP PLATE (TOE NAILED) SEE TABLE ~,.SA pEN RAFTER CEILING Joist TO TOP pLATE (TOE-NAILED) SEE TABLE 5.5A PER JOIST CEILING JOIST TO pARALLEL RAFTER (FACE-NAILED) SEE TABLE 3.7 EACH LAP CEILING JOIST LAF~ OVER PARTITION5 (FACE-NAILED) 5EE TABLE 3,7 EACN LAp COLLAR TIE TO RAFTEN (FACE-NAILED) SEE TABLE 3,4 PER TIE BLOCKING TO RAFTER (TOE-NAILED) 2-8D EACN END RIM BOARD TO RAFTER (END-NAILED) 2-1(,D EACH END HALL FRAMING TOP PLATE TO TOP PLATE (FACE NAILED) 2-1SD' PER FOOT TOP PLATE AT INTENSECTION5 (FACE NAILED) 4-16D JOINTB-EACH 51DE BTIJD TO 5TUB (FACE NAILED) 2M6D 2,4j O.C. HEADER TO HEADER (FACE NAILED) IF*D If*' O,C, ALONG EDGE5 TOP OR BOFTOM PLATE TO 5TUB (END-NAILED) 2-1(,D PER 2x4 5TUB ~-I(,D PER 2xf* 5TUB 4-16D PER 2x8 5TUB BOTTOM PLATE TO FLOOR JOIST~BANDJOI5T~ENDJOIBT OR BLOCKING (EACE-NAILED) 2-1f*D''~ pEN FOOT FLOOR FRAMING JOIST TO 51LL~ TOP PLATE OR GIRDER (TOE-NAILED) 4-8D PER JOI5T BRIDGING TO JOIST (TOE-NAILED) 2-BP EACH END BLOCKING TO JOI5T (TOE-NAILED) 2-8D EACH END BLOCKING TO 5ILL OR TOP PLATE (TOE-NAILED) 5-16D EACH BLOCK LEDGER 5TRIP TO BEAM (EACE-NAILED) ~-I(,D EACH JOIST JOIST ON LEDGER TO BEAM (TOE-NAILED) ~-BD PER JOIST BAND JOIST TO JOIBT (END-NAILED) ~-16D PER JOIST RAND JOIST TO 5ILL OR TOP PLATE (TOE-NAILED) 2-1(,D~ PER FOOT ROOF SHEATHING CEILING SHEATHING HALL 5t-IEATHING FLOOR SHEATHING -- IRDER 5ER pLAN5 FOR SIZE5 *~(PE (REF~ AC4) (UPLIFT 1818 LBS), I'IOBEL~ pE~6 (REF¢ AC(,) (UPLIFT 1518 1~5) SEE PLAN FOR 51ZES. pOST. SEE PLAN FOR 51ZE5 J- TYPE, --5/6' DIA, ANCHOR BOLT EHBEDDED LENGTH INTO ~TTPICAL POST SECTION FRAMING AND CONNECTOR DETAIL TABLE 3.3B FABTEBT MILE UPLIFT 5TRAP CONNECTION NIND5PEED OMEN) REQUIREMENTS JIB 1,2o FRAMING 5PACING (iN.) ROOF 5PAN (FT) NAILS IN EACH ~ND OJ: 12 24 4 B 12 B 4 20 4 5 TABLE 3.4 FABTEST MILE HINDSPEED (MPN) I10 I 120 ROOF PITCH ROOF 5PAN (FY,) NAIL~ IN ~ t~ND I~ 12 4 4 RIDGE 5TRAP 5PACING (IH.) 12 I(, E1.2 24 48 72 MULTIPLIER .00 3B .f*O 2.00 4.~0 (,.00 I TABLE P-.301.2.1,2 HOOD BORNE DEBRIS PROTECTION FASTENING SCHEDULE FOR HOOD STRUCTURAL PANELSA'B'c'D EABTNER BPACING 4 FOOT LEBB PANEL 6 FOOT LES5 PANEL FA5TENEN TYPE PANEL 5PAN LE55 THAN 5PAN LEB5 THAN OR 5PAN LES5 THAN OR OR ECUAL TO 4 FOOT EOJAL TO 6 FOOT EOUAL TO 8 FOOT TABLE 3.3A RAFTER/CEILING JOIST TO TOP PLATE EABTEBT MILE HIND SPEED (MPN) LATERAL AND SHEAR CONNECTION REQUIREMENTS lib J I20 TABLE 3.7 ROOF OPAN (FT.) ~ER 5LOPE ~FTER 5PACING (IN) e~ UEEL ~1~ 5PLI~ ~E~l 24 ~ 4 ~ i CORNER HOLD-DONN SEE FOUNDATION PLAN FOR LOCATION Bcale~ 514" = I'-0" 'x I / LAST THO BAY5 OF FRAMING BAT5 OF FRAMING BLOCKING 4;-0" INTERVAL5 SECTION A-A (~TTPICAL FLOOR AND ROOF BRACING AT END HALLS 5cole: 3/4'i = ILO" ~} SEARLES, STROMSKI, ,,~ ASSOCIATES '~ ARCHITECTS PI~kNNERS, P.C, Proposed Addition and Alteration for IMr. and Mrs. IKARL IHAERR 30S Mill Creek Drive Southhold, NY 11971 REVISIONS IQ lC). IQ IQ IQ IQ IQ I0. I©. IQ IQ Noted DATE 06/11/07 GS CHECKED By RS TITLE Tables, Schedules and Diagrams SHEET W-2