HomeMy WebLinkAboutPBA-09/15/2008
WORK SESSION AGENDA
SOUTHOLD TOWN PLANNING BOARD
Monday, September 15, 2008
4:30 p.m.
4:30 p.m. Site Plans & Subdivisions
Site Plans
Project name: Macari Vineyards & Winery SCTM#: 1000-121-1-1.3
Location: The intersection of Bergen Avenue and Sound Avenue, on the north side
of Sound Avenue, in Mattituck.
Description: This site plan is for additions & alterations to an existing winery on a 5.6
acre parcel in the A-C Zone.
Status: Application review & review comments
Recommendations: Consider approving the amended site plan at the Special Meeting on
September 22, 2008.
Attachments: Staff Report
Project name: San Simeon by the Sound SCTM#: 1000-45-2-2
Location: 61700 CR 48, Greenport
Description: Alterations to existing nursing home facility to include change of room
lay-out in existing buildings and additions of stairs, canopy, generator
and freezer, adding two new parking areas for outpatient care area.
Status: Application review & review comments
Recommendations: Consider approving the amended site plan at the Special Meeting on
September 22, 2008.
Attachments: Staff Report
Project name: Outdoor Public Events (Liegey) SCTM#: 1000-55-5-6
Location: CR 48 & Youngs Ave, Southold
Description: Request for a permit to hold an outdoor event from 10/2 – 10/31
Status: ZBA comments for Special Permit
Recommendations: Grant in accordance with prior conditions
Attachments: Draft Memo
Project name: Blue Duck Bakery SCTM#: 1000-63-3-12
Location: 56275 NYS Route 25, Southold
Description: This site plan is for the proposed conversion of an existing automotive
service building to a bakery in the Hamlet Business zone.
Status: Request for Final Inspection
Recommendations: After a site visit and discussion with the Town Engineer, the request for a
final inspection should not be granted at this time. The parking area is
not yet finished, their engineer has not submitted certification that the
drainage is adequate, nor has the applicant submitted an as-built plan
showing changes made to the approved site plan.
Attachments: Copy of Request
Southold Town Planning Board Work Session – Page Two – 9/15/08
Project name: Group for the East End SCTM#: 1000-62-1-4
Location: 54895 Main Road, in Southold.
Description: This site plan is for the proposed re-use and alteration of a building to
office space.
Status: Request for Final Inspection
Recommendations: Consider granting approval with the condition that landscaping will be
completed by 10/31/08.
Attachments: Approval Letter w/ Agreement
Project name: Hart’s True Value Hardware SCTM#: 1000-70-5-6
Location: 50000 Main Road, Southold
Description: Applicant has an approved site plan. Applicant seeks to amend the
approved site plan by adding asphalt pavement to the site in place of the
gravel surface.
Status: Approved Site Plan
Recommendations: Require adequate drainage and coordinate with other agencies with
jurisdiction if necessary (Trustees, NYSDOT).
Attachments: Engineer Report
Subdivisions
Project name: Arlene and Edgar Marvin SCTM#: 1000-117-10-9.1 & 9.2
Location: 1260 Jackson Street, New Suffolk
Description: Proposed lot line change to add 100 s.f. to SCTM#1000-117-10-9.1
(40,030 s.f.) from SCTM#1000-117-10-9.2 (50,603 s.f.). R-40 zone.
Status: Initial Review/Lot Line Modification
Recommendations: Applicant believes the lot-line is necessary to bring lot 9.1 into
conformance because it is less than one acre. Consider returning the
application to the applicant with letter explaining that the code requires
only 40,000 s.f. per lot in the R-40 zone, not a full acre (43,560 s.f.)
Attachments: Staff Report
Project name: Clark’s Beach SCTM#: 1000-40-1-23
Location: CR 48, Greenport
Description: This proposal is to subdivide a 14.835 acre parcel, into two lots, where
Lot 1 would be 6.326 acres and sold to Suffolk County as park land, and
Lot 2 would be 8.509 acres and owned by the Village of Greenport in the
R-80 Zone.
Status: Application
Recommendations: Consider granting Sketch approval at 9-22-08 Special Meeting.
Attachments: Staff Report
Discussion:
Heritage at Cutchogue. Traffic Study review with the traffic engineers who prepared it.