Loading...
HomeMy WebLinkAboutN F Recreational Travel Needs Assessment - Prelim Potential SolutionsNorth Fork Recreational Travel Needs Assessment Preliminary Potential Solutions Apri120t12 Prepared for: New York State Department of Transportation Task 7, Subtask 7.7 Prepared by: DUNN ENGINEERING ASSOCIATES, PC ABRAMS-CHERWONY & ASSOCIATES ENG-WONG TAUB PARSONS BRINCKERHOFF JAC PLANNING 1 1 t 1 LITP 2000 Moving People, Moving Goods Subtask 7.7 Nortb Fork Recreational Travel Needs Analyses Table of Contents Page 1. INTRODUCTION ......................................................................................... 2 2. POTENTIAL HIGHWAY SYSTEM SOLUTIONS ..................................... 5 3. POTENTIAL SAFETY ASSESSMENT SOLUTIONS ................................ 8 4. POTENTIAL PUBLIC TRANSPORTATION SOLUTIONS ...................... 12 5. POTENTIAL FERRY SOLUTIONS ............................................................ 21 6. ACCESS MANAGEMENT OPTIONS ......................................................... 23 WHB\LITP200P94036 File: Preliminary Solutions\TechMemo.doc 1 ' 1. Introduction ' Under PIN 0804.89, the Long Island Transportation Plan to Manage Congestion (latown as LTTP 2000), subtask 7, the North Fork Transportation Study was intended to provide an evaluation of the special transportation needs of the rural, primazily recreational North Fork of Long Island. t As shown in Figure 1.1, the study area covered is that portion of Long Island beginning at the easterly terminus of the Long Island Expressway (LIE), north of the Peconic River in the Town of Riverhead, and extending eastwazd to the Orient Point Terminal Facility for the Cross Sound ' Feny, in eastern Southold Town, and also including Shelter Island. A Technical Advisory Group (TAG) consisting of representatives from the Towns of Riverhead, Southold and Shelter Island, the Village of Greenport, the Long Island Rail Road, Suffolk County Transit and the New York ' State Department of Transportation provided guidance to the study. Suggested strategies for improvements to the local transportation system in this document reflect input from the TAG and from the public through the Local Agency/Stakeholder Participation Program conducted for the ' study. An effort has been made to incorporate input from all involved parties. During the course of the study process, some of the involved agencies expressed concerns regarding the feasibility and desirability of some of the proposals. It is noted that the TAG recommended that no ideas or ' proposal be denied consideration, and suggested solutions proposed in this document have not undergone any analysis regarding economic or engineering feasibility. ' Recently, the New York Metropolitan Transportation Council (NYMTC) designated a consultant team to begin the Sustainable East End Development Strategies (SEEDS) initiative, aconsensus- building process intended to link land use and transportation planning decisions for the five East ' End Long Island towns, including the North Fork Transportation Study area. Therefore, it was decided that strategies for improvements to the local transportation system developed during the course of the North Fork study would serve as input to the SEEDS process. In this manner, the ' SEEDS process, being administered by the East End Transportation Council (EETC) and NYMTC, will be provided with a comprehensive examination of the capacities, demands and highway safety deficiencies of the transportation system on the North Fork, establishing a sound ' basis for decision-making with regard to future strategies for the communities therein. It is through the SEEDS process that the feasibility of these strategies from the standpoint of ' economic and engineering considerations will be determined. Simulation modeling and analysis planned under SEEDS is intended to evaluate the effectiveness of these recommendations in improving the transportation system within the five East End Towns, in a sustainable manner. Three main east-west thoroughfares serve the study azea, NYS Route 25, Suffolk County Road 58, and the combination of Sound Avenue and Suffolk County Road 48. County Road 58 ' extends from the easterly LIE terminus to a point just west of County Road 105 where it rejoins NYS Route 25, a distance of approximately 3 miles. East of CR 105, the two routes, that is, Rt. 25 and CR 48/Sound Avenue, essentially run pazallel to each other out to the Village of t Greenport, where CR 48 ends. From that point, only Rt. 25 provides service further east. CR 58 was originally constructed to serve as a bypass route around downtown Riverhead, where the main road, Rt. 25, had become congested. However, considerable development has occurred ' along CR 58 in recent years, and traffic volumes now exceed those found on either Rt. 25 or CR 48. 1 WHB\ LrfP 2000-94036 2 t File: Preliminary Solutions\ TechMemo.doc ~ ~ ~ 1~ ~~ ~ W ~ ~ ~~~ ~ ~ ~~~~~~ ~ ~ Q~~~~ ~ ~ o ~ ~ 0 g E 0 _.~ ~' ~I. c~ ,.`l r' 3 ~'• ro .ti'x. -- ~, ,- S; _. sHS~t::x'S': ~ ~.. -.wry ~~ H H f J Q W Q ~. Z~~-~ ~S 1 0 H b ~~ ~ ~~ l' s The Long Island Rail Road's Ronkonkoma Branch provides service to the study azea, operating three weekday and two Saturday and Sunday roundtrips as faz east as Greenport. The service is ' provided by diesel locomotive, as the Ronkonkoma Branch is non-electrified east of Ronkonkoma. Ridership on these trains was found to be very low, likely due in part to the limited service provided, as well as low density development patterns and the orientation of North Fork travel The S-8A, 5-62, S-90 and S-92 bus routes operated by Suffolk County Transit also serve the ' study area. The S-92 provides approximately hourly service between Orient Point and East Hampton, with some buses going only as faz east as Greenport. In addition, the 5-192, an express bus service operated by Sunrise Coach Lines, is a premium all reserved express bus route ' that provides service between Greenport and New York City. The number of trips varies depending on the season and day of week. Since it is a reservation-based service, additional units aze sometimes placed in service if needed. Ridership was found to be fairly high for this service. Three ferry routes serve the study azea, one operating between Orient Point and New London, ' CT, the second between the Village of Greenport and Shelter Island, and the third provides passenger-only service to Plum Island for employees of the government facilities located there. The New London service, which transports both passengers and vehicles, attracts travelers from points as faz west as Manhattan, seeking to circumvent congestion on the I-95 corridor, as well as travelers heading to and from Long Island's South Fork. The Greenport to Shelter Island service, which also transports passengers and vehicles, is one of only two means of travel to and from Shelter Island, the second being the ferry service connecting the south side of the Island to North Haven, a community located on the north shore of the South Fork. Many users traveling between ' New England and East Hampton utilize all three ferries, arriving or departing Long Island via Orient Point, and using Shelter Island and the two ferries as a "bridge" to and from the east end of the South Fork. A study conducted by the operator of the North Ferry also indicated that a ' significant number of travelers between western Long Island including NYC and the east end of the South Fork aze also using the Shelter Island "bridge" route. This "bridge" traffic has become a major source of displeasure for residents of eastern Southold Town and Shelter Island, as they perceive no benefit to their communities as a result, while experiencing the traffic generated by this activity. In addition, the recent implementation of high speed passenger-only ferry service from Orient Point to New London, primarily to serve the casinos operating in New England, has ' added to the perception that little or no benefit accrues to the North Fork due to the ferry operation, in that ferry patrons aze not likely to utilize the North Fork for recreational purposes. ' It should be noted that no specific suggestions have been made for physical infrastructure changes to CR 58 or to CR 48. This is due to the fact that there is a current Suffolk County effort that will implement improvements to CR 48, and the County intends to solicit proposals for a ' comprehensive analysis of the CR 58 corridor in the neaz future. Improvement strategies for these two roadway corridors prior to the completion of these studies were not included in this study to avoid redundancy of effort and needless expenditure of resources. However, where appropriate, these roadways have been included in discussions of system or region-wide strategies. The following sections of this report present the potential solutions proposed for evaluation under the auspices of SEEDS. WHB\ L17'P 2000-94036 4 File: Preliminary Sotutions\ TechMemo.doc 1 ll 1 1 2. Potential Highway System Solutions Based on the results of the comprehensive data collection program performed for this study, it was determined that peak demand on the North Fork transportation system occurred between the hours of 11:00 AM and 3:00 PM on Saturdays during the month of July. In recent years, the North Fork has become an increasingly popular tourist and second home destination during the Fall season as well, when the vineyazds aze completing their harvests and producing their wine, and farm stands aze busy with customers preparing for the oncoming holiday season. Irt fact, review of the traffic data indicates that Sundays in October represent the second busiest day of the yeaz. Overwhelmingly, automobiles are the transportation mode of choice for travelers in the study azea, be they residents or visitors. During this peak period, recurrent traffic congestion is evident on most of CR 58 due to the presence of considerable retail and commercial development there, most notably the Tanger Factory Outlet Center at the extreme western end of the study azea. Considerable congestion also occurs in the eastbound direction as vehicles make their way to the vineyazds, wineries, motels, summer homes, etc. located in the eastern portion of the study azea. East of CR 105, congestion is limited to the hamlet azeas on Main Road, with sporadic slowdowns caused by side friction from farmstands with little or no off-sheet pazking and no formal curb cuts or driveways. Through traffic destined to Shelter Island and the Cross Sound Ferry Terminal in Orient Point both contributes to and is hindered by this congestion. Sound Avenue and CR 48 experience little or no congestion. Slow moving traffic is the most significant impediment to mobility along this mute. During the times when traffic on Rt. 25 is experiencing considerable difficulty, traffic on CR48 moves at or above designated speed limits. Notwithstanding the forgoing, a review of the data collected combined with field observations and input obtained through the public participation program conducted for this study indicates that, with a few exceptions at specific locations, sufficient capacity is available on the study area highway system as a whole to accommodate existing demand. Furthermore, seasonal demand doesn't warrant traditional mitigation strategies that add capacity through the widening of existing roads or the construction of new ones. In an azea such as the North Fork, any capacity improvements, such as adding travel lanes, to accommodate seasonal demand would lie unused during the off-season, significantly reducing the cost-effectiveness of these improvements. Therefore, it is suggested that a program incorporating systems management and demand management strategies combined with limited, localized capacity enhancements be considered. Aspects of the program, which should be considered for inclusion, aze described in the following paragraphs. Transportation System Management Approach The origin-destination survey conducted for this study indicates that many vehicles that originate west of the study azea such as western Suffolk County, Nassau County and New York City, and aze destined to the easterly portion of the study azea, including Shelter Island and the Cross Sound Ferry, utilize Rt. 25 for the entire trip east of CR 105. Some of these drivers may use this route by choice, for the purpose of sightseeing or stopping at the farm stands, and other attractions along Rt. 25. However, it is presumed that a significant portion, especially those destined for Shelter Island and the Cross Sound ferry, use this route because they are not awaze of any alternative. This traffic is more appropriately served by Sound Avenue/CR 48 as faz east WHB\ LITP 2000-94036 5 File: Reliminary Solutions\ TechMemo.doc ' as Greenport. This also applies to westbound vehicles with the reverse origins and destinations. ' Therefore, it is suggested that a program be developed which provides motorists the best and safest route to their destinations. Elements of the program could include: • "Best Route to..." signing on the roadways throughout the study azea. These signs should direct eastbound motorists to Greenport, Shelter Island, Orient Point and the Cross Sound Ferry Terminal via Sound Avenue/CR 48, and to the hamlet azeas via Rt. 25. The eastbound signs should be placed on CR 58, CR 105 and Rt. 25, with consideration given to placing an advance sign on the LIE. Eastbound traffic should be directed to use northbound CR 105 to Northville Turnpike to Sound Avenue. Westbound signs should direct motorists to the LIE and Sunrise Highway via CR 48/Sound Avenue, then to Northville Turnpike and CR 105 or CR 58 and to the hamlet azeas via Rt. 25. ' • Signs should also be installed on both CR 48 and Rt. 25 at approaches to intersections with various north-south roadways at which it would be convenient and appropriate to change from one route to the other. The wording would be similaz, such as `Best Route to ' Orient Point". • Consideration should be given to deploying variable message signs with appropriate message sets directing motorists to their preferred routes. Variable message signs are portable electronic devices on which the message can be changed to reflect conditions. CR 48 has substantial excess capacity and a well designed, comprehensive signing plan would help to redirect much of the through traffic from Rt. 25 to CR 48 and Sound Avenue. This would help to alleviate some of the spot congestion along Rt. 25. In addition, reduction in through ' traffic, particularly traffic trying to reach destinations at a specific time (e.g., ferry traffic), will create more gaps in traffic on Rt. 25, thereby improving side street access. However, it should be noted that, in Riverhead Town, Sound Avenue is a two lane, rural scenic roadway. The road is ' lined with old trees and historic homes, farms and farm stands. Tn some cases landscape features of the homes such as fences and plantings encroach on the Town right-of--way. The mad has significant horizontal and vertical curvature, which limits stopping sight distances. In 1974, as part of the 1976 bicentennial celebration, the road was designated a historic corridor by the Office of State Parks and Historic Preservation. ' In recent years, the road has experienced an increase in traffic volume, in part due to the increasing popularity of the rural North Fork as a tourist destination, and also due to traffic seeking to avoid congestion on C.R. 58' and Route 25. What little congestion does occur is ' related to activity at the agriculture-related businesses such as farm stands along the road. Great caze should be taken in preserving the trees and other landscape features along the mad. Minor widening and changes to pavement markings could be employed to provide as wide a shoulder as ' possible, thereby allowing room to pass vehicles waiting to turn into side streets or driveways. The New York Metropolitan Transportation Council is presently considering an application by the Town of Riverhead for funding a safety improvement project along Sound Avenue between C.R. 105 and the Southold Town line. This project will provide for the installation of 5-foot ' wide shoulders on either side of the road and resurfacing of the existing pavement. These W HB\ LITP 2000-94036 6 ' File: Reliminary Solutions\ TechMemo.doc shoulders will allow bicyclists to use the roadway in a much safer manner. The NYSDOT supports the project, and funding is under consideration. It is suggested that the possibility of extending this treatment to the west to Wildwood State Park, and for a short distance in Southold Town, west of the point where Sound Avenue meets C.R. 48, Southold Town be considered. This would provide a continuous comdor where bicyclists could safely shaze the road with motor vehicles. The following measures should also be considered: • Provide sepazate left and right turn lanes at appropriate intersections, with accommodations for bicyclists to negotiate intersections. • Install a traffic signal at the intersection of Sound Avenue at Northville Turnpike, (CR 43) possibly set for flashing operation during the off-season. • Require off-street parking for all farmstands and attractions along Sound Avenue, with defined ingress and egress points. These parking azeas and driveways need not be paved, however, they aze an important safety enhancement. Pazking on the shoulders in the vicinity of the driveways should be prohibited. • Eliminate the traffic circle on CR 58 at Roanoke Avenue, and install a conventional signalized intersection. • Increase the capacity of CR 58 by adding one lane in each direction. ' (Note: It is recognized that SCDPW intends to issue a request for proposals for a study of the CR 58 corridor. It is anticipated that specific capacity enhancements will be recommended in that study.) ' The above strategy should be considered in combination with improvements to the public transportation system, suggestions for which are presented in the Public Transportation section of this report. In addition, certain roadway improvement measures have been developed to address safety issues that were identified during the safety assessment performed for this study, as discussed in the following section of this report. WHB\ LITP 2000-94036 7 File: Preliminary Solutions\ TechMertp.doc LI 3. Potential Safety Assessment Solutions As part of this study, a safety assessment was performed to identify locations in the study area that exhibited the highest number of traffic related accidents, to determine whether a pattern in the types accident experienced at those locations exists, and if so, to suggest measures to improve safety for the traveling public. Figure 3.1 presents the locations of these potential improvements. The results of the analysis indicate that many of the accidents occur due to capacity issues, such as congestion at a signalized intersection, or the lack of a left turn lane or protected left turn phasing on a traffic signal. In these cases, suggestions for remedial measures have been made where appropriate. In the case of the fatalities examined, all were found to have occurred due to driver error or poor driving conditions, such as wet or icy pavement. The following improvements aze suggested to address the locations identified in the safety assessment. The Safety Assessment can be found in the study document entitled "Inventory and Existing Conditions Technical Memorandum." 1. New York State Route 25 (East Main Street) at Suffolk County Route 105 (Cross River Drive) -Riverhead • Widen the eastbound approach to increase the storage lengths of the exclusive right- and left-tom lanes. The left-tom lane is approximately 50 feet long and the right-turn lane is about 100 feet long. Increasing the storage capacity of these tom lanes would reduce the number of fuming vehicles queued in the through lane and increase the overall capacity of the approach. • Revise the signal timing to increase capacity for this approach. ' 2. NYS Route 25 (East Main Street) at Roanoke Avenue (CR 73) -Riverhead • Revise the signal timing to provide a longer cleazance interval between the end of the north/southbound phase and the start of the easUwestbound phase to cleaz northbound righUleft-fuming traffic before the westbound signal toms green. • Install a westbound to southbound left-tom arrow to inform motorists when they have a protected left-turn phase. 3 NYS Route 25 at Court Street / Nugent Drive (County Route 94A) -Riverhead • Install a protected westbound left tom phase to improve the safety and capacity of this movement. According to the New York State Department of Transportation (NI'SDOT) Statewide Accident Reduction estimates, providing a protected left-tom phase could potentially reduce the number ofleft-turn accidents by 46 percent. ' WHB\ UTP 2000-94036 8 File: Preliminary Solutions\ TechMemo.doc i I \ -_~4 ~~ `' ~~ ...... .r Y~ 5~~~ q~ m ~~ A Zi[}+~ b C ~~ ~ s ~ _' ~ h C _` ~~ a E O 1 4. NYS Route 25 (East Main Street) at Ostrander Avenue -Riverhead • To help prevent rear-end accidents involving vehicles waiting to make left-turns from Main Street, a dual left-turn lane should be provided to remove these vehicles from ' the through traffic stream along Main Street. The eastern end of the dual left-turn lane would be used by eastbound left-turning traffic onto Ostrander and the western end of the left-turn lane would be used by westbound motorists turning left into the aquarium and gas station. The left-turn lane could be provided within the existing roadway width since the street is 40-feet wide and curb pazking is prohibited on both sides of the street. According to NYSDOT Accident Reduction Estimates, adding a left-turn lane with a painted separation could potentially reduce reaz-end accidents by 39 percent. ' • Install pedestrian crosswalks at the Ostrander Avenue intersection and possibly mid- block near the entrance to the aquarium. Each crosswalk should have advance pedestrian crosswalk warning signs and warning signs, located adjacent to the t crosswalks, with a device on the centerline to facilitate pedestrian mid-block crossings. 5. Middle Road /North Road (County Route 48) at Wickham Avenue -Southold Provide an exclusive left-turn phase on CR 48 to further protect the left-turn movements onto Wickham Avenue. 6. Middle Road at Northville Turnpike (CR 43) -Riverhead ' • Rumble strips and/or "SLOW 'warning pavement mazkings could be installed on the north and southbound approaches of Northville Turnpike to reduce travel speeds. 7. Sound Avenue at Northville Turnpike (CR 43) -Riverhead • Install a flashing red/yellow traffic signal. According to NYSDOT accident reduction estimates, adding a flashing signal could potentially reduce right-angle accidents by 36 percent. ' • Widen Sound Avenue at the intersection to provide a westbound to southbound left turn lane. ' • Relocate the northbound stop baz. Currently, the stop baz is located approximately 50 feet back from the intersection and should be moved forwazd for two specific safety ' reasons. A stop baz located closer to the intersection would provide for better sight distances and it would encourage westbound left-turning vehicles to enter the southbound travel lane without making the observed, shallow (more dangerous) turn onto Northville Turnpike (Note: This improvement was recently completed by SCDPW). WHB\ LITP 2000-94036 1 ' File: Preliminary Solutions\ TechMcmo.doc • Repaint the pavement markings at the intersection (Note: This improvement was recently completed by SCDPVI~. ' • Reduce the speed limit in the vicinity of Northville Turnpike from 45 mph to 35 or 40 mph. This lower speed limit would be advisable considering that Sound Avenue has 11- to 12-foot lanes, narrow shoulders (where provided) and several blind driveways and roadways in the vicinity of this intersection. ' The foregoing is based on the results of the Safety Assessment performed for this study. They do not represent any significant increases in capacity for any of the study area roadways, rather they ' are intended to present specific measures to address the occurrence of certain accident types at the locations studied. As such, it is suggested that these measures be implemented in the neaz term, over the course of the next several years. n WHB\ LITP 2000-94036 11 ' File: Preliminary Solutions\ TechMemo.doc II 1 4. Potential Public Transportation Solutions The North Fork is served by a variety of public transportation modes. The MTA Long Island Rail Road's Ronkonkoma Branch provides service to the North Fork, with stops in Riverhead, Mattituck, Southold and Greenport. Service on this non-electrified portion of the Ronkonkoma Branch is limited to three weekday round trips and two round trips on Saturday and Sunday. Suffolk County Transit serves the azea with the S-92 bus route, which operates between Orient Point on the North Fork and East Hampton on the South Fork via Riverhead. On the North Fork, this bus route operates approximately hourly service primarily along State Route 25. Some S-92 trips only operate to and from Greenport. Suffolk County Transit also serves Riverhead and its surrounding azea with the S-8A bus route, which functions mainly as a Riverhead circulator route. Several other Suffolk County Transit bus routes operate between Riverhead and points west and serve to connect the North Fork with the rest of Suffolk County. These mutes include S-62 which operates between the County Center in Riverhead and the Hauppauge Industrial Park via N.Y.S. Route 25A, Port Jefferson and the Nesconset Highway as well as S-90 which operates from the County Center in Riverhead to Center Moriches via East Quogue, Quogue, Westhampton Beach, Speonk, and East Moriches. Finally, Sunrise Express operates the S-192 bus route between Greenport and New York City. The number of daily trips operated along this bus route varies depending upon both the season as well as the day of the week. This service is a premium all-reserved express bus route that operates along State Route 25 on the North Fork and utilizes the Long Island Expressway and the Queens-Midtown Tunnel to access Manhattan. Amore detailed description of the rail and bus system can be found in the project document entitled "Inventory and Existing Conditions Technical Memorandum". As noted from the title of this section, the transit proposals presented here are not recommended for implementation. Instead, they provide a broad range of rail and bus proposals that have been suggested for further review and evaluation. Some of the proposals aze quite ambitious and have been formulated for a long range planning horizon (e.g., 2020). They would require significant investment and substantial lead time. Other potential transit solutions aze more modest in scale and more consistent with a neaz term planning period. Moreover, some of the proposals are mutually exclusive which would suggest the need for a comprehensive evaluation. ' It is recognized that these suggestions (i.e., both neaz and long term) will be studied in detail as part of the SEEDS initiative. During the analysis, concerns have been raised regarding the various transit suggestions for a number of reasons: 1 • Sufficient ridership to warrant implementation • Ability to reduce traffic and congestion levels • Existing capacity constraints of LIRR • Magnitude of necessary investment • Extent of operating assistance ' • Ease of construction 1 WFIB\ LITP 2000-94036 12 File: Preliminary Solutions\ TechMemo.doc ' • Neaz-term and permanent environment impacts ' • Competition for limited transit funds • Political Support ' In the can-ent analysis, the objective has been to collate, refine and document transit proposals without analysis of the issues cited above. In this way, the current effort should comprise a timely input to the SEEDS initiative. By formulating the menu of potential transit solutions, ' SEEDS can subject them to rigorous transportation, economic, land use and environmental evaluation. Some of the proposals will not prove warranted or feasible while others may show promise for further analysis by SEEDS. iJltimately, the agencies and participants comprising the ' SEEDS effort will specify a recommended progam of both short and long range transit proposals for the North Fork. This transit program will be integrated with ongoing activities of existing service providers and funding agencies. Long Island Rail Road During the public outreach effort for this study, numerous suggestions were made with regards to improving Long Island Rail Road (LIItR) service on the North Fork. Because of the lazger capital requirements of the LIRR, these alternatives would more properly be considered long- ' range proposals. The portion of the LIRR's Ronkonkoma Branch east of Ronkonkoma to Riverhead and Greenport is not electrified. Diesel locomotives in "push-pull" mode aze utilized with new bi- level coaches along this segment of the L1RR. Passengers traveling between points west of Ronkonkoma and the North Fork must transfer at that station to a diesel train for service to Riverhead and the North Fork. For safety and environmental considerations, the LIRR does not operate diesel locomotives through the East River tunnels to and from Penn Station in Manhattan. ' The new dual mode fleet that operates into Penn Station has not been assigned to the North Fork service. For this reason, persons traveling between the North Fork and Manhattan need to ' transfer between trains at Ronkonkoma. Assignment of dual mode equipment to the North Fork could eliminate this transfer. One concluding point is that the new dual mode fleet will not be able to utilize the 63'~ Street Tunnel to Grand Central Terminal (i.e., East Side Access) because of tunnel clearance limitations. Much of the LIRR's Ronkonkoma Branch east of Ronkonkoma is single track and is "dazk territory" (i.e., not equipped with signals). For these reasons, the capacity of the LIRR on the North Fork is limited. This influences train frequencies and the ability to have aone-seat ride. ' The LIRR alternatives that follow vary in the amount of capital investment related to right-of- way, motive power and other equipment that would be required for their implementation. A number of proposals could include physical improvements to the LIRR facilities in the North Fork area and could be comprised of three possible elements: (1) construct double track or extensive passing sidings; (2) extend electrification east of Ronkonkoma; and (3) fully equip the WFIB\ LI7P 2000-94036 l3 ' File: Preliminary Solutions\TechMemo.doc L~ ~' Ronkonkoma Branch with signals. A capital program could be formulated that includes some or all three elements described above. Further, the plans could differ by the extent of facilities with improvements as far east as Riverhead or Greenport. Four points are worth noting regazding these types of improvements. First, capital improvements could be paired with operating alternatives to take advantage of capacity, frequency and speed changes. Second, a wide range of options is possible. Third, the physical and operating proposals could be implemented in an incremental or staged fashion. Finally, such improvements aze ambitious and would need significant funding and lead time to be accomplished. Hourlv Service to Riverhead One proposal is to operate more trains between Riverhead and Manhattan. The present limited level of service would continue to be provided between Riverhead and Greenport. Service between Riverhead and Manhattan could be operated on an hourly basis on weekdays and every two hours on weekends. This alternative would allow people on the North Fork to travel to Riverhead by whatever mode they prefer and then boazd a relatively frequent westbound train without having to transfer at Ronkonkoma. Through service via Ronkonkoma could be provided either by electrifying the LIRR to Riverhead -thus allowing Riverhead to be served by the L1RR's multiple-unit electric coaches - or by utilizing dual mode locomotives which can operate in non-electrified territory as well as draw motive power from a third rail. This alternative might also require improving the right-of--way east of Ronkonkoma (i.e., passing sidings and/or double track, signals, etc.) as faz as Riverhead. In effect, the high-density operations of the Ronkonkoma Branch would be extended east to Riverhead and this increased level of operations would have to be integrated into the existing operations along the western portions of the LIRR. With this alternative, Riverhead would become more of a "focal point" forNorth Fork residents ' who want to utilize the LIRR. Additional pazking would be required neaz the Riverhead train station, which is already being considered by the Town of Riverhead, and it might become necessary to construct a rail vehicle storage yazd there because of the new service pattern. Note ' that Speonk, on the Montauk Branch, which is a similaz distance from N.Y.C., has hourly L1I2R service. One-Seat Service to Greenport The next proposal is similaz to the first in that it involves operating a significantly higher number ' of trains. lu this proposal, frequent service (i.e., every hour on weekdays and every two hours on weekends) would be operated between Manhattan and the North Fork. However, in this scenario, the more frequent one-seat ride service would be available as far east as Greenport. 1 This alternative would face all of the same challenges as the previous proposal in terms of infrastructure and cost; however, a significantly higher amount of parking at Riverhead might not be as necessary because frequent service would exist as faz east as Greenport. This is offset by the fact that a rail vehicle storage yazd might now be necessary at Greenport instead of in Riverhead in order to accommodate the new service pattern. In any event, the capital costs 1 WHB\ L[TP 2000-94036 14 File: Preliminary Solutions\ rechMemo.doc would be significantly higher than those in the first proposal because the azea served by frequent LIRR service would be extended all the way to the eastern railhead at Greenport. North Fork "Scoot" Service ' The next alternative involves an increased focus on utilization of the LIIZR for trips within the North Fork itself. In order to accomplish this goal, the Jamesport Station, Cutchogue Station and Peconic Station would all be reconstructed at their former locations. These newly constructed stations would all have high platforms in order to expedite the loading and unloading process; they would also be fully compliant with the requirements of the Americans with Disabilities Act. A new Tanger Station neaz the Tanger Outlet Center west of Riverhead would also be constructed. Taken together, these stations - in addition to the existing LIRR stations at Riverhead, Mattituck, Southold and Greenport -would allow for greater access to various points ' along the North Fork. Additionally, a new railroad shuttle service, which has been referred to as "scoot service "could be operated between Greenport Station and the new Tanger Station. The present limited level of service would continue to be provided between the Ronkonkoma Station and the new Tanger Station. With one train, atwo-hour headway could be maintained (i.e., 120 minute cycle time). ' With two trains, aone-hour headway could be maintained. In order to maximize ridership, it is proposed that service operate on an hourly headway. This new service could operate seven days a week. The new North Fork Scoot could require significant investment in terms of track and signals upgrades. Additionally, this alternative would have a high capital cost due to the reconstruction of three former LIRR stations, the construction of one new station, and the need for additional revenue equipment. ' There aze several variations upon this alternative, which also warrant consideration. These aze as follows: ' • The North Fork Shuttle service may be a "summer only" operation. During the remainder of the year, the present limited level of service would continue to be provided between Ronkonkoma and Greenport. ' • The North Fork Shuttle could operate between the Ronkonkoma Station and Greenport. This would greatly increase the cost of this proposal because frequent service would have to be maintained over a significantly longer portion of the Ronkonkoma Branch. However, additional benefits to this variation are that more frequent service would be available to connect with the electrified service to the west ' and that Yaphank -although not part of the study azea -would benefit from more frequent LIRR service. • The North Fork Shuttle could also operate between Riverhead Station and Greenport. This would somewhat lower the cost of the proposal because the new Tanger Station WHB\ LITP 2000-94036 15 ' File: Preliminary Solu[ions\ TechMemo.doc would not need to be constructed. The present limited level of service would continue to be provided between Ronkonkoma Station and Riverhead. ' • A variation of the prior proposal would call for operating the new North Fork Shuttle service between Riverhead Station and Greenport without reconstructing any of the ' former LIItR stations. Clearly, this would further lower the cost of this proposal. The present limited level of service would continue to be provided between Ronkonkoma Station and Riverhead. ' Wine Country Trains ' Another alternative is for LIRR to increase its existing program of special service (e.g., "Wine Country Getaway" and Vineyazd Harvest Getaway"). The North Fork's wineries and aze a ' tourist attraction and present a possible mazket for increasing transit service. Additional Trains Finally, a somewhat straightforward proposal is to simply operate more LIRR trains along the Ronkonkoma Branch. This proposal does not suggest upgrading the line with any significant ' capital construction, although investment is additional revenue equipment would be required. The objective of this scheme is to more fully utilize the physical plant of the existing Ronkonkoma Branch. It is possible that LIRR service between the Ronkonkoma Station and Greenport could be operated on a three-hour (i.e., 180 minute) headway seven days a week. Suffolk County Transit ' There aze several opportunities with regazds to improving Suffolk County Transit bus service on the North Fork. It should be noted that the S-58 bus route has recently been extended to ' Riverhead from Middle Island. Accompanying each alternative is an estimate of the planning horizon for each proposal and its possible implementation period. With bus service, the capital investment would be much more limited than those discussed for the LIRR. Buses would be ' acquired, which typically takes a yeaz to 18 months. For proposals that only require a few buses, Suffolk County Transit might be able to utilize its existing fleet. ' For the most part, the decision to implement a proposal involving increased bus service would be dependent on identifying the necessary funding. It is appazent that passenger fares would only cover a small portion of the cost, as such, would require outside funding sources/subsidies. The ' assumed magnitude of these subsidies suggests an implementation period of either neaz term or mid term, within 5-7 years. None of the proposals have been categorized as long term because of their magnitude and scale. Notwithstanding these qualitative assessments on the ' implementation period, the difficulty of obtaining necessary funding should not be understated. "Rail Feeder" Service ' One suggestion for Suffolk County Transit is to operate a new "Rail Feeder" express bus between the Ronkonkoma Station and the North Fork. The bus would operate as an express 1 WHB\ LITP 2000-94036 16 t File: Preli}rtinary Solutions\TechMemo.doc 1 1 1 service along the Long Island Expressway between Ronkonkoma and Riverhead; between Riverhead and Greenport the bus would utilize State Route 25. In Greenport, the bus would stop at the railroad station, where the Shelter Island North Ferry provides service. This route replicates that utilized by the 5-192 express service as far as Ronkonkoma; however, the 5-192 currently bypasses the Ronkonkoma Station on its trip between the North Fork and New York City. This new bus route would allow for more frequent travel between the Ronkonkoma Station and the North Fork than is presently afforded by the LIRR's Ronkonkoma Branch. It serves to better connect the North Fork with Ronkonkoma without utilizing capital-intensive proposals that primarily involve some type of major investment in the LIRR. This route would require a cycle time of approximately three hours (i.e., 180 minutes). With two vehicles, service could be operated approximately every 90 minutes; with three vehicles, service could be operated approximately every hour. It is proposed that hourly service be operated on weekdays, with 90 minute headways maintained on weekends. While this proposal partially duplicates service on the existing Ronkonkoma Branch, it involves changes to the bus system which require less lead time and cost. For this reason, the service change would be considered a near term proposal. Improved 5-92 Service There are several suggestions for improved service on the existing S-92 bus route that can be considered relatively modest neaz term proposals. These aze as follows: • Increase frequency of service along the existing S-92 bus route (i.e., on a consistent hourly headway in both directions on weekdays and Saturdays). As stated previously, this bus route operates between the North Fork and the South Fork via Riverhead. In order to slightly improve this bus route's headway, one vehicle could be added to the route on weekdays and on Saturdays. In addition, a stop could be added at the Greenport LIl2R station. • Extend all S-92 bus trips to Orient Point (i.e., eliminate the Greenport short turn trips). As is the current practice, approximately half of the trips would continue to use County Route 58 in Riverhead. As with many of the proposals, service could be expanded to include Sunday operations. Initially, this could be oriented to peak travel seasons and them include Sunday service throughout the yeaz. Another consideration would be schedule coordination of bus and Cross Sound Ferry Service. Moreover, schedule coordination of all transit modes would be a desirable attribute of any potential transit solutions. • Allow for "point" or "route" deviation service (i.e., demand responsive service) within three-quarters of a mile of the S-92 bus route at all times that the route is in operation. This proposal would allow the buses to divert off of their route to pick-up or drop-off passengers who have made prior arrangements. This operating scheme enables passengers to utilize the S-92 bus for "curb-to-curb" service, akin to a taxicab. WHB\ LITP 2000-94036 17 File: Preliminary Solutions\ TechMemo.doc 1 This proposal would require that Suffolk County Transit or the operator assign a dispatcher to schedule and arrange the pick-ups and drop-offs for the 5-92 bus route. ' Another additional cost would entail the extra time assigned to the S-92 to account for the possibility of multiple pick-up and drop-off requests. This will likely require the assignment of at least one more vehicle to this route. However, in the aggregate this proposal does not utilize an extraordinary level of resources and is therefore considered to be a mid term alternative. ' New CR 48 Express Route ' Another proposal is to operate a new express bus route along County Route 48. This new "Express Route" would operate between the Tanger Outlet Center and Greenport via Riverhead. Service can operate hourly throughout the week including weekends. This new express bus service would require a two hour cycle time; therefore, two vehicles would be required to maintain an hourly headway. It should be noted that this proposal could be implemented in place of the previously described LIRR "North Fork Shuttle" between the Tanger Station and Greenport along the Ronkonkoma Branch. New park-and-ride lots could be located along the main roads leading out of each hamlet where ' they intersect County Route 48, maximizing the utility and convenience of the new express bus route. Alternatively, or in addition, existing municipal or private parking lots could be utilized for pazk and ride. This proposal can be considered to be a candidate for near term ' implementation. Circulator Bus Service ' Another proposal is for Suffolk County Transit to operate new "circulator" bus routes in the hamlet/village centers within the North Fork. Circulator buses enhance the vitality of core azeas by improving mobility within the central business district. The combination of this circulator bus service with LIRR service would help promote transit oriented development. This type of development incorporates a mixture of land uses azound a transit-stop in apedestrian-friendly ' environment. Circulator bus routes can also become closely identified with a particulaz locality and thereby can help promote a sense of community among residents. These bus routes can also be utilized to connect to the proposed "Express Route" along County Route 48 and to various ' LIRR stations along the Ronkonkoma Branch. Time tables would need to be coordinated to encourage use by riders of those services. It is proposed that new circulator bus routes be operated in Greenport, Mattituck, Cutchogue and Southold throughout the week including weekends. The exact route alignment of each of the circulator bus routes has not yet been determined. However, one bus would be assigned to ' operate in each community; therefore, the headway on each circulator bus route would vary depending upon the cycle time required to operate the bus route. It should be noted that Suffolk County Transit's S-8A bus route already effectively functions as a circulator bus route in and around Riverhead. As part of this proposal, the S-8A would also operate on Sundays. Due to the introduction of a new transit service type to many North Fork communities -and because of the WHB\ LITP 2000-94036 18 ' File: Preliminary Solutions\ TechMena.doc level of resources associated with implementing and effectively mazketing the new circulator bus routes -this proposal can be considered to be a mid term to long term alternative. ' Demand Responsive Service Another alternative is to consider operating a demand responsive service throughout the North Fork. The existing underlying fixed route bus system would continue to operate "as is" while a complementary demand responsive service would provide "curb-to-curb" service throughout the ' entire North Fork Transportation Study azea. Service would operate on weekdays and on Saturdays (i.e., whenever the current Suffolk County Transit system is in operation). This service could either be made available to the general public or only be made available to selected eligible groups (e.g., seniors, persons with disabilities). ' Similaz to the prior proposal for point and/or route deviation service from the S92 bus route, this proposal would require that Suffolk County Transit or the operator assign a dispatcher to schedule and arrange the pick-ups and drop-offs for the new demand responsive service. In the ' aggregate this proposal is not expected to utilize an extraordinary level of resources and is therefore considered to be a "near term" altemative. ' Airport Service Another proposal involves the operation of bus service between the North Fork communities and ' both John F. Kennedy International Airport (JFK) and LaGuazdia Airport (LGA). At the present time, the S-192 express bus stops in Queens at Exit 24 of the Long Island Expressway (i.e., at Kissena Boulevazd) on its way between the North Fork and Manhattan. No direct service is provided to either airport. Service to JFK would require a cycle time of approximately six hours. This is primarily due to the fact that the vehicle would have to circulate around the airport in order to serve all nine airline terminals. However, it should be kept in mind that the new AirTrain rail system will soon connect the Jamaica Station of the LIRR with all the terminals at JFK. It is therefore possible for the bus to travel only between Jamaica and the North Fork, thus reducing the cycle time to approximately five hours, while still providing aone-seat ride to Jamaica Station. Service to LGA would require a cycle time of approximately five and a half hours. ' Were this suggestion implemented, it is proposed that two buses initially be assigned to each bus route in order to test the extent of the possible mazket for bus service to the airports. The ' vehicles should be lazge "over-the-road" motorcoaches with luggage bins. The JFK service would have a headway of approximately either three hours or two and a half hours, depending upon whether or not the service operates only as faz as the Jamaica AirTrain Station. The LGA service would have a headway of approximately two hours and 45 minutes. In order to be useful, the airport services would have to operate throughout the week. Their service span would also have to be relatively long; it is proposed they operate from approximately 6:OOAM to ' 12:OOAM. 1 WHB\ LITP 2000-94036 19 t File: Preliminary Solutions\ rechMemo.doc LJ 1 Due to the level of resources that would be required to operate these routes, along with the specialized mazket being served, both proposals would be considered long-term proposals. Utilize Rail Road Right of Way for Bus Service Another proposal calls for paving over the LIRR's Ronkonkoma Branch right-of--way east of Riverhead and utilizing the new roadway to operate a new shuttle bus route between Riverhead and Greenport. Service could operate hourly throughout the week. This new bus service would require a two hour cycle time; therefore, two vehicles would be required to maintain an hourly headway. It should be noted that -similar to the proposal for a new County Route 48 "Express Route" -this proposal could be implemented in place of the previously described LIRR "North Fork Shuttle" between the Tanger Station and Greenport along the Ronkonkoma Branch. Due to the resources that would be required to implement this alternative and its institutional issues, this proposal would be classified as along-term initiative. Recreational Shuttles Another proposal involves operating a seasonal (i.e., summer/autumn) "recreational shuttle" sponsored in part by the various North Fork wineries. The new shuttle would operate on weekends and could connect the wineries with motels and the various LIRR stations along the North Fork. The exact alignrrrent of the proposed route has not yet been determined. To be effective, approximately two or three specialized vehicles would have to be assigned to this service. As was previously mentioned, the North Fork's wineries aze a tourist attraction in their own right, and special weekend excursion trains could be operated to serve them in a manner similaz to the LIRR's current "Summer Getaways" specials. This bus shuttle route could either connect with new train service or simply serve the existing LIRR trains. In any event, this proposal may be considered a neaz term possibility. Other Transportation Options Encourage local lodging establishments and other major azea destinations to provide shuttle service to/from LIRR train stations. • Local Chambers of Commerce, in cooperation with LIRR, could provide area information at East End LIRR stations, including azea destination maps and phone numbers, taxi cab phone numbers, and local bus information. • One suggestion is to install bike racks on Suffolk County Transit buses to extend the service uses of the fixed rate system. Because of liability and other consideration, SC Transit has chosen not to do so. The SEEDS analysis should more fully explore this issue. WHB\ LITP 2000-94036 20 ' File: Preliminary Solutions\ TechMemo.doc Summary It should be kept in mind that the proposals represent a "menu" of alternatives that may be implemented in whole or in part. Different elements of certain proposals can also be "mixed and matched" with elements of other proposals. The proposals should provide a useful and timely input to the transportation analysis that will be undertaken as part of the SEEDS project. 5. Potential Ferry Solutions The ferry operations in the study azea aze privately owned and operated, for-profit enterprises. As such, changes to their operation aze not in the purview of the agencies involved in the prepazation of this report. The ferry operators, however, have been cooperative in providing input to the study. It is recommended that several new potential ferry services be investigated. However, should it be determined that these new services would be beneficial, it is beyond the scope of this effort to identify possible operators or sources of funding for the establishment of these services. That being stated, the following ferry strategies should be evaluated. New Ferry From Shoreham to Connecticut During the public participation effort for this study, numerous suggestions regazding alternate ferry service between the Northern Shore of Long Island and Connecticut were made. Most often, Shoreham was the suggested location for the Long Island port, likely due to the presence of the defunct LIPA nucleaz power plant and related facilities. Ferry service from Shoreham to New England would be beneficial to the North Fork study area in that those ferry passengers with origins or destinations west of the study azea would be able to reach the ferry terminal without traveling along the North Fork. However, ferry passengers with origins and destinations on the east end of the South Fork of Long Island would likely continue to use the Cross-Sound feny, so as to avoid driving on the crowded South Fork roads. Therefore, this ferry service would be of greatest benefit to the North Fork if the ferry service at Orient Point were terminated in conjunction with the institution of the Shoreham service. It is not likely that this could be accomplished, unless the operator of the Cross Sound Ferry were given significant financial incentive to relocate to Shoreham. Furthermore, were the Orient service terminated, those ferry riders destined to the east end of the South Fork would likely continue to use the Shelter Island "bridge" route to avoid driving on the South Fork; these drivers simply would drive east from Shoreham to Greenport, rather than west from Orient to Greenport, and cross over Shelter Island to the east end of the South Fork. New Ferry From Montauk to Connecticut In recent years, there has been considerable discussion of establishing ferry service from the South Fork of Long Island to Connecticut. Although there has been local opposition to this proposal, it is recommended that it be fiuther investigated, as it would have a positive impact on traffic conditions on both the North and South Forks. The service would carry both vehicles and passengers. Establishment of ferry service to the South Fork would benefit the North Fork by WHB\ L1TP 2000-94036 21 File: Preliminary $olutions\ TechMemo.doc II LJ 1 ll removing from the North Fork roadways those vehicles traveling between New England and the South Fork on the ferry. On the South Fork, travelers between New England and the South Fork would arrive and depart from Montauk. On Friday evenings and Saturday mornings, when eastbound traffic volumes destined to the South Fork are heaviest, those arriving via ferry would travel in the reverse direction from Montauk to their destination. Similazly, on Sunday evenings when departing traffic is heaviest westbound, those leaving via the ferry would travel east to Montauk to depart. It should be noted that this service would result in new traffic patterns in the vicinity of the new ferry terminal; however, there may be locations at which the temrinal could be located so that the impact of these new traffic patterns could be minimized. It is recommended that the potential demand for such a service be investigated through the data acquisition program for the SEEDS initiative, as this is an issue with regional implications, rather than being confined to the North Fork. New Ferry from Greenport to North Haven Recently, a new ferry service, for passengers only, was proposed to operate between Greenport and North Haven, on the north shore of the South Fork. The operator of the existing South Ferry between Shelter Island and North Haven expressed willingness to provide this service. This service would be beneficial to Shelter Island, in that it would provide travelers with a means of traveling between the North and South Forks without traversing Shelter Island. Provision of a service which carried vehicles in addition to passengers would provide even greater benefit to Shelter Island, by allowing those "bridge" travelers to bypass the Island altogether. The Village of Greenport has expressed support for passenger only ferry service, while South Fork municipalities have opposed provision of new ferry service. In light of the existence of a potential operator, docking facilities at both termini of the proposed route, and substantiated demand for the service as documented in the Shelter Island North Ferry Origin and Destination Study, it is suggested that provision of vehicle and passenger ferry service be given serious consideration under the SEEDS process. WHB\ LITP 2000-94036 22 File: Preliminary Solutions\ TechMemo.doc 1 1 1 11 1 1 1 1 6. Access Management Options Discussion Access management is defined as the practice of optimizing access to land uses while preserving traffic flow on the surrounding roadway network in terms of capacity, safety, and speed. Roadways perform the dual role of providing access to abutting properties and accommodating through travel. It is important that these roles be balanced and maintained, in that traffic congestion can result when poorly planned development and improperly located driveways cause operations to degrade. All transportation plans (regional, state, local) should have an access management element. Typically, awell-designed access management plan includes the classification of roadways into various levels of access control. Stricter standazds are applied to major streets while local streets have more flexible requirements. in a statewide access management plan, there might be seven levels in the roadway hierarchy: freeway, expressway, strategic arterial, principal arterial, secondary arterial, collector, and local street. Urban areas may have five levels, while rural areas with low traffic volume might allow for three or four. Major streets should serve through traffic, while collector and local roads provide access to property. In the study area, NYS Rt. 25, CR 48, CR 58 and CR 105 can be considered principal arterials, and thus should primarily serve through traffic. Sound Avenue can also be considered an arterial, in that, with CR 48, it forms an important alternative to Rt. 25 for east west through travel. There aze a small number of roadways that serve as collectors, and the balance of the roadway system serves as local streets providing access to properties located adjacent to them. Commercial development has proliferated along CR 58 with little or no requirement for shared pazking or internal circulation among adjacent businesses, and seemingly no attempt made to limit the number of curb cuts. Rt. 25 functions as a downtown "Main Street" for the many hamlet centers it serves, while outside the hamlet centers it provides the principal means of travel between them, and functions as a through arterial, especially east of Greenport, where it is the only east-west road of any significance. Due to the history of development and the nature of the study area, allowances aze made in the zoning and building codes for roadside businesses related to agricultural activities such as farm stands to exist along the arterial roadways, mainly on Rt. 25 and CR 48/Sound Avenue. Most of these businesses have no formal ofl~street parking, and in many cases, no formal access driveways. Vehicles simply drive off the pavement and park adjacent to the businesses wherever possible. Other vehicles park on the pavement, e.g., on narrow shoulders to visit these sites. This results in considerable friction with through traffic, and is the observed source of a substantial portion of congestion found on the study azea roadways. Imposition of a rigid hierarchy of roadways with strictly defined criteria for allowable access configurations would be contrary to the stated goal of this study to preserve and enhance the rural, agricultural nature of the study area. Therefore, an access management plan in the traditional sense is not offered here; rather, a number of suggestions are made to guide the responsible municipalities in achieving the best WHB\ LITP 2000-94036 23 File: Preliminary Solutions\ TechMemo.doc C 1 1 t 11 1 possible balance possible between the objectives of providing for a well managed highway system and preserving one of the most desirable chazacteristics of the study area, its rural nature. Potential Strategy With the exception of Sound Avenue, which is a Riverhead Town road, access management on the major State and County roadways falls under the purview of those municipalities. However, the Town governments play an important role in the review of subdivision site plans under the SEQRA process, and the establishment of zoning ordinances. Typically, the State or County cannot deny access to an uncontrolled arterial if it is the sole access point to the property. A number of lazge pazcels of farmland still exist, many with frontage along or access to more than one road. Parcels having access to side roads as well as arterials and collectors should have such access preserved during the subdivision review process. When property owners or developers make application for subdivision of such parcels, the site plan review process should be utilized to make certain that new smaller properties aze not created which only have access to arterials, thereby resulting in the necessity to grant individual access to each parcel. Site plans for subdivision of lazge properties zoned for residential development along arterials should provide individual pazcels with access to side roads via internal connections, either driveways or internal roadways. Where practical, the residences in such subdivisions should be oriented so that they back on the arterial, with a suitable buffer between the residences and the highway right of way. Where it is impossible to provide all parcels with access to the side roads, access to the arterial should be limited to a single access point providing combined access to affected pazcels. This can be accomplished through easements that remain with the property, or by design of internal roadway systems that provide access to individual parcels within a subdivision and intersect with the major road at a single point- In this manner, the smallest number of potential conflict points is created on the arterial. With particulaz regazd to commercial development, it is further recommended that the Towns in the study azea develop and adopt design standards that control the design and spacing of access points such as driveways and intersections as well as the length of pazking lot driveway aisles ' and the provision of auxiliary fuming lanes to provide for the deceleration of vehicles turning into driveways or other streets. Driveways should never be located within an intersection's azea of influence- Auxiliary lanes decrease delay and accidents as well as increase capacity by ' reducing the difference in speed between through and fuming vehicles. Proper spacing of driveways and intersections has been shown to increase a driver's reaction time and their ability to avoid conflicts. To the extent possible, fuming movements at unsignalized driveways and ' intersections should be limited. This can be accomplished through driveway design measures such as channelizing islands or constmction of raised medians that can also be used to provide left turn lanes. It should be noted that the conditions discussed above regazding the lack of formal access and parking facilities to serve the agriculture-related activities along the arterials in the study area ' will only be exacerbated by the growth in traffic volumes due to the increasing popularity of the North Fork, both as a recreationaUsecond home destination and as a place of primary residence. Based on extensive analysis of data collected during the course of the LITP 2000 effort, traffic WHB\ LITP 2000-94036 2.4 ' File: Reliminary Solutions\ TechMena.doc 1 volumes on the North Fork expected to grow at an annual rate of neazly 2%. The responsible municipalities should give some consideration to establishing at least minimal standazds for ' providing off street parking and formalizing access to such businesses. Such criteria should include every attempt to provide access on secondary rather than arterial roadways, if possible, as well as driveway location and minimal pazking requirements. Pazking lots and access driveways need not necessarily be paved, but should be cleazly identified as such, by signing or striping. I 1 lJ WHB\ LITP 2000-94036 2.5 ' File: Preliminary Solutions\ TechMemo.doc