Loading...
HomeMy WebLinkAboutTR-6846Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 0521C Date February 1, 2010 THIS CERTIFIES that the removal of remains of wooden dock; cutting down of 32' of existing bulkhead to grade level; re-vegetation of area with spartina altemiflora; cutting down of two (2) bulkheads at marine railway to grade; construction ofa 4'X 12' ramp onto a 4'X 30' fixed dock with a 3'X 20' "T' end section all with open type grating "Flow-Thru" or equal; and the installation of one (1) 6" dia. mooring piling At 5860 Skunk Lane, Cutchogue Suffolk County Tax Map #138-2-27&28 Conforms to the application for a Trustees Permit heretofore filed in this office dated 12/26/07 pursuant to which Trustees Wetland Permit #6846 dated 4/16/08 was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the removal of remains of w0oden dock; cutting down of 32' of existing bulkhead to grade level; re-vegetation of area with spartina alterniflora; cutting down of two (2) bulkheads at marine railway to grade; construction ofa 4'X 12' ramp onto a 4'X 30' fixed dock with a 3'X 20' "T" end section all with open type grating "Flow-Thru" or equal; and the installation of one (1) 6" dia. mooring piling The certificate is issued to THOMAS GIESE owner of the aforesaid property. (,.]Authorized Signature-- James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghos]_o, Jr. Town Hall 53095 Route 25 P.O. Box 1t79 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 1st day of construction ¼ constructed Project complete, compliance inspection. BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK NO. 6846 DATE: APRIL~ TO: THOMAS GIESE ADDRESS: 5860 SKUNK LANE~ CUTCHOGUE ~8-2-27&28 AUTHORIZATION Pursuant to the provisions of Chapter 275 and/or Chapter 111 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on April 16, 2008 in consideration of application fee in the sum of $250.00 paid by Thomas Giese and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and following: Wetland Permit to remove remains of existing wooden dock; cut down 32' of existing bulkhead to grade level or replace with new low-sill vinyl sheathed as needed, and re-vegetate area with spartina alterniflora. Cut down two (2) existing bulkheads at marine railway to grade. Construct a 4'X 12' ramp onto a 4'X 30' fixed dock with a 3'X 20' "T" end section all with open type grating "Flow-Thru" or equal, install 1-6" dia. mooring piling, and as depicted on the plans prepared by Contracting Corp. last dated April 18, 2008. 1N WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. ~ Bob Ghosio, TERMS AND CONDITIONS The Permittee, Thomas Giese, residing at 5960 Skunk Lane, Cutchogue, NY, as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. That there will be no unreasonable interference with navigation as a result of the work herein authorized. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation, the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. That the said Board will be notified by the Permittee of the completion of the work authorized. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD April 16, 2008 Mr. John Costello Costello Marine Contracting Corp. P.O. Box 2124 Greenport, NY 11944 RE: THOMAS GIESE 5860 SKUNK LANE, CUTCHOGUE SCTM#138-2-27&28 Dear Mr. Costello: The Board of Town Trustees took the following action during its regular meeting held on Wed., April 16, 2008 regarding the above matter: WHEREAS, Costello Marine Contracting Corp. on behalf of THOMAS GIESE applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated December 28, 2007, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator recommended that the proposed application be found Inconsistent with the LWRP, and, WHEREAS, the Board of Trustees has furthered Policy 5 of the Local Waterfront Revitalization Program to the greatest extent practical through the imposition of the following Best Management Practice requirements: the two retaining walls will be cut down, the shoreline will be naturalized, and grated decking will be used on the dock, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on April 16, 2008, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, and, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirements imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268-5 of the Southold Town Code, and, RESOLVED, that the Board of Trustees approve the application of THOMAS GIESE to remove remains of existing wooden dock; cut down 32' of existing bulkhead to grade level or replace with new Iow-sill vinyl sheathed retaining wall as needed, and re- vegetate area with spartina alterniflora. Cut down two (2) existing bulkheads at marine railway to grade. Construct a 4'X 12' ramp onto a 4'X 30' fixed dock with a 3'X 20' "T" end section all with open type grating "Flow-Thru" or equal, and install 1-6" dia. mooring piling, and as depicted on the plans prepared by Costello Marine Contracting Corp. last dated April 18, 2008. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) Fees:S530.00 Very truly yours, Jame .~K~ng P reC~si'side~ Board of Trustees DAVID A. PATERSON GOVERNOR STATE OF NEW YORK DEPARTMENT OF STATE ONE COMMERCE PLAZA 99 WASHINGTON AVENUE ALBANY, NY 12231-0001 LORRAINE A, CORTI~S-V~,ZQUEZ SECRETARY OF STATE Ms. Jane Costello Costello Marine Contracting Corp. P.O. Box 2124 Greenport, NY 11944 April 25, 2008 Dear Ms. Costello, Re; F-2007-1006 U.S. Army Corps of Engineers/New York District City of Yonkers - Bulkhead replacement, remove existing wooden docks, construct new 4' x 10' fixed pier, install 32" x 20' ramp and a 6' x 20 floating dock, and 4 pilings. Mud Creek, Town of Southold, Suffolk County General Concurrence - Proposal Modified To Be Consistent The Department of State received your revised drawings and modified proposal regarding this matter on April 22, 2008 (drawings #2 - 7 revised and dated April 18, 2008). The current proposal is as illustrated on the above referenced drawings. The Department of State has determined that this proposed activity, which has been modified to be consistent with the New York Coastal Management Program, meets the Department's general consistency concurrence criteria. Therefore, further review of the proposed activity by the Department of State, and Department's concurrence with an individual consistency certification, are not required. When communicating with us regarding this matter, please contact Gary Haight at (518) 486-3047 (e-mail: gary.haight~dos.state.ny.us) and refer to our file #F-2007-1006. Sincerely, 8~e~ [ e~rvis~o'r oi~Consistency Review and Analysis Division of Coastal Resources JZ/gh ¢: COE/New York District - S. Jensen NYSDEC/Region 1- G. Hammarth Town ofSouthold. L. Standish WWW.DOS.STATE.NY.US ° E-MAIL:INFO~DOS.STATE.NY.US James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: Please be advised that your application dated been reviewed by this Board at the regular meeting of ~///~/0 and your application has been approved pending the completion of the following items checked off below. has __ Revised Plans for proposed project __ Pre-Construction Hay Bale Line inspection Fee ($50.00) __ 1st Day of Construction ($50.00) ½ Constructed ($50.00) ~/"Final Inspection Fee ($50.00) Dock Fees ($3.00 per sq. ft.) Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: TOTAL FEES DUE: $ 5 30, 0~) BY: James F. King, President Board of Trustees James F. King, President Jill M. Doherty, Vice-President Peggy A. Diekerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: ~-~hOT~Oz:~) ~(z,&-~ Please be advised that your application dated /02],.2[4/0'"2 been reviewed by this Board at the regular meeting of ¢//¢/¢0¢ and your application has been approved pending the completion of the following items checked off below. v/Revised Plans for proposed project has __ Pre-Construction Hay Bale Line Inspection Fee ($50.00) __ 1st Day of Construction ($50.00) __ ¼ Constructed ($50.00) ~'/Final Inspection Fee ($50.00) v/ Dock Fees ($3.00 per sq. ft.) -'"¥O Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: TOTAL FEES DUE: BY: James F. King, President Board of Trustees Giese, 5860.5960 Skunk Lane, Cutch0gue (138.2.27;28), Inspect. 12/02/08.Existing bulkhead in advanced deterioration. Looking north. Looking south. Bulkhead destroyed fronting marsh. Few bulkheads in area. Recommend bulkhead removed and not replaced as shore not under active erosion. Marsh habitat should be allowed to regrow ,4 Donald Wilder, Chairman Lauren Standish, Secretary Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (631 ) 765-1892 Fax (631) 765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., February 13, 2008, the following recommendation was made: Moved by Peter Young, seconded by Jack McGreevy, it was RESOLVED to NOT SUPPORT the Wetland Permit application of THOMAS GIESE to remove 58' of existing bulkhead "A" and replace in-place using C-Loc vinyl sheathing. Backfill area behind new bulkhead with clean trucked in soil approx. 26 cy. and revegetate areas with Cape American Beachgrass 12" on center; remove 18' of existing bulkhead "B" and replace in-place using C-Loc vinyl sheathing; and to SUPPORT the application to remove existing marine railway and replace in-kind and in-place with new and approved materials; remove remains of existing wooden dock, and construct a new 4'X 10' fixed dock with a 32"X 20' seasonal aluminum ramp onto a 6'X 20' seasonal floating dock secured by (4) 6" dia. pilings. Located: 5860 Skunk Lane, Cutchogue. SCTM#138-2-27&28 Inspected by: Peter Young, Doug Hardy, Don Wilder The CAC recommends the existing bulkhead be removed and the area be cleaned-up and re-vegetated. The shoreline should be left in its natural state. Vote of Council: Ayes: All Motion Carried James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765~6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Southold Town Board of Trustees Field Inspection/Work session Report Date/Time: O~-) 9/t ~ THOMAS GIESE requests a Wetland Permit to remove 58' of existing bulkhead "A" and replace in-place using C-Loc vinyl sheathing. Backfill area behind new bulkhead with clean trucked in soil approx. 26 cy. and revegetate areas with Cape American Beachgrass 12" on center; Remove 18' of existing bulkhead "B" and replace in-place using C-Loc vinyl sheathing; remove existing marine railway and replace in-kind and in-place with new and approved materials; remove remains of existing wooden dock, and construct a new 4'X 10' fixed dock with a 32"X 20' seasonal aluminum ramp onto a 6'X 20' seasonal floating dock secured by (4) 6" dia. pilings. Located: 5860 Skunk Lane, Cutchogue. SCTM#138-2-27&28 Type of area to be impacted: ~a, Saltwater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of above: ~CC of Town Code proposed work falls under: hapt.275 Chapt. 111 other Type of Application: __Emergency Info needed: .~ Pre-Submission__ Wetland __Coastal Erosion ~Amendment __Administrative Violation Planning Modifications; , Conditidns: Present Were: J.L-J.King ~b/~J..Doherty__P.Dickerson t,"D. Bergen~B. Ghosio, Jr H. Cusack V"D. Dzenkowski Mark Terry__other Form filled out in the field by Mailed/Faxed to: Date: Environmental Technician Review Tom Oiese Skunk Lane Cutchogue 9/2~/07 Tom Giese Skunk Lane Ct~tchogue 9/28/07 Tom Giese Skunk Lane Cutchogue 9/28/07 Tom Giese Skunk Lane Cutchogue 9~8/07 $~v~i' £ ~F 7 ,, , ~/~-E i l I ~t~rr 7 ot~ 7 COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JETTIES · BULKHEADING ° STEEL & WOOD PILING · FLOATS Southold Town Trustees PO Box 1179 Southold, NY 11970 Attention: Lauren and/or Elizabeth 423 FIFTH STREET · P.O. BOX 2124 · GREENPORT, NEW YORK 11944 ·(631) 477-1199/477-1393/477-0682 · FAX (631) 477-0005 April 24, 2008 ............... --~-- , APR 2 5 2008 RE: ApplicaUo~ for Thomas Giese ~ :~ 5860 & 5960 Skunk Lane, Cutchogue, NY 11935 SCTH #1000-138-2-27 & 28 Dear Lauren and/or Elizabeth: Enclosed you will find three copies of revised plans showing the alterations required by the Trustees. The following changes have been made: · The dimensions of the dock now consist of a 4'x12' ramp onto a 4'x30' fixed dock with a 3'x20' "T" end. · ]~nstall one 6" diameter mooring piling. · Remove remains of existing wood dock. · Cut down 32' of existing bulkhead to grade level or replace with new Iow sill vinyl sheathed ~ wall as needed. · Revegetate area with Spartina Alterniflora. · Cut down two existing bulkheads at marine railway to grade. Tf you have any questions or need additional information, please do not hesitate to contact me at the office (631) 477.1199 or via email at janecmcc@optonline.net. SincereJv, ~',lane P. Costello Permit Manager Enclosures NO4-'58'O5"W .32. 25.6 ~ o~ ~ e~'\¥ Lomb c,( 6 L.o Survey for: THOMAS E. G/ESE 3c PAULETTE GIESE Neor Nasso~u Poir~ Town of $otz~h, old Suffolk County, New York S.C.T.M.: 1000-104.00-04.00-002.000. 00.3.000 & 004.000 1000-058.00-02.00-027.000 & 028.000 40 0 40 SCALE: 1"--40' NOTES: 1. AREA OF EAST PARCEL = 4-5,645 S.F. 1. AREA OF WEST PARCEL = 2,051 S.F. 2. · = MONUMENT FOUND, A _- STAKE FOUND. 3. RE: THIS PARCEL IS PART OF PLOT 130 FILED IN YHE OFFICE OF THE CLERK OF SUFFOLK COUNTY ON MAR. 28, 1935 AS FILE NO. 1179 4. REFERENCE OEED L. 6298 CP 500 L. 6551 CP 80 L. 7169 CP 172 SoathhoJd Town Board of Trustees DATE: MAR. 8, 2007 JOB NO: 2007-111 CERTIFIED TO: THOMAS E, GIES~ PAULETTE GIESI~ DAVlD H. FOX, L.S. P.C. N.Y.S.L.S. #50234 FOX LAND SURVF, YINC, 64 SUNSET AVENUE WESTHAMPTON BEACH, N.Y. 11978 (651) 288-0022 DWG: 2007-111 Hydrographic Map Prepared for: Thomas Giase Surveyed: Sept. 20, 2007 SCT# 1000-138-2-27 & 1000-138-2-28 Town: Southold Suffolk County, NY Datum: Low Water Tide: 2,5' +/- I 1" = 30' I SEA LEVEL MAPPING 631.722-,3390 P.O. Box # 368 Aquebogue, NY 11931 N ROBERT H. FO)~ NYS PLS# 50197 COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JETTIES · BULKHEADING · STEEL & WOOD PILING · FLOATS 423 FIFTH STREET · P.O. BOX 2124 · GREENPORT, NEW YORK 11944 · (631) 477-1199/477-1393/477-0682 · FAX (631) 477-0005 May 1, 2008 Southold Town Trustees PO Box 1179 Southold, NY 11971 RE: Thomas Giese Application Dear Lauren and/or Elizabeth: Enclosed is check #3438 in the amount $530.00 which represents the final inspection fee and construction fees for the dock. L l~f you need any additional information, please do not hesitate to contact me. Enclosures OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM COORDINATOR TOWN OF SOUTHOLD MEMORANDUM To: James King, President Town of Southold Board of Trustees From: Mark Terry, LWRP Coordinat/q'A-~)or'F:`/ Principal Planner Date: February 21, 2008 Re~ Request for Wetland Permit for THOMAS GIESE SCTM# 138-2-27&28 NOTE: The proposed action is located within the Cutchogue Harbor Wetlands Significant Fish and Wildlife Area and NYSDEC Critical Environmental Area. THOMAS GIESE requests a Wetland Permit to remove 58' of existing bulkhead "A" and replace in-place using C-Loc vinyl sheathing. Backfill area behind new bulkhead with clean trucked in soil approx. 26 cy. and revegetate areas with Cape American Beachgrass 12" on center; Remove 18' of existing bulkhead "B" and replace in-place using C-Loc vinyl sheathing; remove existing marine railway and replace in-kind and in- place with new and approved materials; remove remains of existing wooden dock, and construct a new 4'X 10' fixed dock with a 32"X 20' seasonal aluminum ramp onto a 6'X 20' seasonal floating dock secured by (4) 6" dia. pilings. Located: 5860 Skunk Lane, Cutchogue. SCTM#138-2-27&28 Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that replacement of bulkhead "A" and "B" and the proposed construction of a new 4'X 10' fixed dock with a 32"X 20' seasonal aluminum ramp onto a 6'X 20' seasonal floating dock secured by (4) 6" dia. pilings action is INCONSISTENT with the following policies and therefore is inconsistent with the LWRP. provided that the following policies and sub policies are met; Policy 5. Protect and improve water quality and supply in the Town of Southold. It is recommended in the event that the dock is approved and to further the above policy that the Board prevent the use of chromated copper arsenate (CCA) treated wood in the construction of the structure pursuant to § 275-11. B,1 (f) Construction and operation standards below. 09 In order to prevent the release of metals and other contaminants into the wetlands and waters of Southold, the use of lumber treated with chromated copper arsenate (also known as "CCA ,), creosote, penta products or homemade wood preservatives is prohibited for use in sheathing and decking. Preservatives of any type, including but not limited to those listed above cannot be applied to any bulkheads, retaining walls or revetments after installation. Encapsulated pilings or native non- chemically treated (untreated) lumber only should be used in sensitive The above designations {Cutchogue Harbor Wetlands Significant Fish and Wildlife Area and NYSDEC Critical Environmental Area.) recognize the wetland complex as "sensitive" The construction methods are not identified and a silt boom is not shown. It is further recommended that the Board require the installation of a silt boom pursuant to § 275-11. (2) Construction and operation standards below. 2) Erosion control. Installation of an erosion control structure is necessary during any building, grading, landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation of a silt fence, hay bales, wood chip berm and silt booms. The placement of the erosion control structure(s) shall be determined by the Trustees or their designee. All intertidal construction and excavation requires the installation of a silt boom that will retain all suspended sediments within the immediate project area. To further Policies 5, Protect and improve water quality in the Town of Southold and 6.3, Protect and restore tidal and freshwater wetlands, item D (which states): D. Provide adequate buffers between wetlands and adjacent or nearby uses and activities in order to ensure protection of the wetland's character, quality, values, and functions. It is recommended that the Board require a pervious non-turf, native vegetation buffer landward of the proposed bulkheads. Office Use Only  oastal Erosion Peaxait Application etland Permit Application Administrative Permit  A mendment/Tram fer/E~ension eeived Fee:$ ~6'O'*a ' -- __..~omp leted Application __Incomplete __SEQRA Classification: Type I Type E[ Unlisted Coordination:(date sen0 --~AC Referral Sent: I .~A)ate of Lqspecfion: __Receipt of CAC Report: __Lead Agency Determination:__ Technical Review: ~-qliblic Hearing Hal& __Resolution: Name of Applicant" . ~Wl. fl ~-~ Address P0 [2X3X ,~q Phone Number:( Suffolk County Tax Map Number: 1000- Property Location: (~/0~ (provide LILCO Pole #, dista~e to cro~s street~, and location) 0f applicable) ~ S0uthh01d Iowa Board of Trustees Board of Trustees Application GENERAL DATA Land Area (in square feet): Previous ,se ofprope : Intended ~e ofpmp~: Prior permits/approvals for site improvements: Agency Date __ No prior permits/approvals for site improvements. Has any permitJapproval ever been revoked or suspended by a governmental agency? .~ No Yes If yes, provide explanation: Project Description (use attachments if necessary):. BULKHEAD "A" REMOVE 58' OF EXlSI-/NG BULKHEAD AND REPLACE IN-PLACE USING C-LOC VINYL SHEATHING, BACK FILL AREA BEHIND NEW BULKHEAD WI-O-I CLEAN TRUCKED IN SOIL APPROXIMATELY 26 CUBIC YARDS. REVEGETATE AREAS WITH CAPE AMERICAN BEACH GRASS 12" O.C. BULKHEAD "B" REMOVE 18' OF EXISTING BULKHEAD AND REPLACE IN-PLACE USING C-LOC VINYL SHEATHING. MARINE RAILWAY REMOVE EXISTING AND REPLACE IN-KIND, IN-PLACE WITH NEW AND APPROVED MATERIALS. DOCKS REMOVE REMAINS OF EXI$T'ING WOODEN DOCK. CONSTRUCT NEW 4'x10' FIXED DOCK WITH A 32"X20' SEASONAL ALUMINUM RAMP ONTO A 6'X20' SEASONAL FLOATING DOCK SECURED BY (4) 6" DIAMETER PILINGS. ~oard of Trustees Application County of Suffolk State of New York DEPOSES AND~AFFIRMS THA~f HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAiNED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH iN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGP~ES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETiNG THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES iN CONJUNCTION WITH REVIEW OF THIS APPLICATION. uomm~ss~on t~res ~. 31, ~ ~otaw Public ' · of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: .-~-'~ ~'?6tS~L~-~Ir~LIC¢ Area of wetlands on lot: ~Q. ~-~] square feet Percent coverage of lot: / o(3 % Closest distance between nearest existing structure and upland edge of wetlands: ~3 feet Closest distance between nearest proposed structure and upland edge of wetlands: d) feet Does the project involve excavation or filling? No X Yes If yes, how much material will be excavated? ~:~ cubic yards How much material will be filled? Il I cubic yards Depth of which material will be removed or deposited: '~ feet Proposed slope throughout the area of operations: Mariner in which material will be removed or deposited: Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachmants if appropriate): :' ~,Env!ro.nm~ptal ~ual, ity Review,,; SHORT ENViRO I' IEi rALASSESSMENT FORM For ,UNLISTED ACTIONS Only .... =ART I - PROJECT INFOR~TION {1'o I~ completed by Al~plicant or ProJeot Sponsor) 1. APPLICANT/SPONSOR 12. P_.~ROJECT NAME 3. PROJECT LOCATION: Mu nicipalit~ ~ ~.,,~'4' v~ County 4, PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map) ~4,,7-c~.-~c~ ~ , /~,.~ I/q-RS 5. PROPOSEOACTION iS: 6, DESCPJBE PROJECT BRIEFLY: 7. AMOUNT OF LAND AFFECTED: ~,~r~:~o/ "' :': ~' acres Initially ¢~*/ acres Ulti 8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? 9. WIIAT IS PRESENT LAND USE IN VIClNn'Y OF PROJECT? E~Resident[al [] Indusffial [] CommarcJal [] ~,gricuitum [] PaWJFomstJOpen Space [] Other 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANy'o3'HER GOVERNMENTAL AGENCY ~ L_~Yes [] No IfYes, listage~w(s)narneandpermit/approvaLs!~~ ' ' '~" 11, DOES ANY ASP ECT OF THE ACTION HAVE A CURRENTLY VALID pERMI;I: oR'APpi~0V~L? ~' [] Yes E~o if Yes, list agen~J(S) name and permi/Japprovats: tz AS ^.~SULT OF PROPOSEO ^C~ON W,U. EXIS~.G p~IT~^PPROW REOU,RE .OD,F,C.T,ON?-~- [] Yaa E~o I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE,TO THE BEST OF MY KNOWLEDGE Applicar,,t/spon$or name:~ ~ ./_~~"-~ g~_.J~,~' ~,~.,~.~e-~a~,"~>~'~,~ ' Date: if the action is in the Coastal Area, and you are a state a~lency, complete the Coastal AsseSSment Form before proceeding with ~s assessment PART II - IMPACT ASSESSMENT 4~be completed by Lead Agency) ·", A. DOES ACTION EXCEED ANy '~'PE ! THRESHOLD IN e NYCRR pA~'T, 617 4? If yes, coordinate the review process and use the F U LL F-AF. S.m LL ACTION RECEIVE COORDINATED ~iE~ A~.P r ' ~V ; , "~ declarationmaybesuoareede~hv=~h., , =,.....~ ?m~FO..,RUN~I =q~.C3~ON N.,6N¥C PART617G? · ;": .,:,:,. . .... C. COULD ACTION RESULT IN ANY ADVERSE Errmu[ A~$OOIATEDWITH EFOLLOVVlNG;(Answersmaybehandwri~ten, illegible) C1. Existing air quality, surface or groundwater quaJit~ Or q[iantity, nol~a levels, axlating t~affic pattern, solid waste production or d aposaJ. p°tentiaif°rer°~i°n'draJnega°rfl°odng?'r°~l!~"~'?'Expai!~r~ll'lY: ,'~ ~ ~. (~ .. ;'i:" ,.~,~,e~ ~gurc~; or community or neighborhood character? Expiain briefly: C3. Vegetation or fauna, fish, shellfish 0;' wildlife Species, significant habJtet~, or threatened or endangered species? Explain briefly: C4. A community's existing plans or goals as Officially a~ opted, Or a change In ~jes or intensity of usa of [and or omel natural resources? E~p[ain bde~y: C5. Growth, subsequent development,. Or related ~ivitJes likal~..to bi ii~luced by the proposed action? Explain.briefly: C6. Long term, short term, cumulative, or ot~er effectx, ~ot identified in C1 ~:57 Explain briefly: C7. Other impacts (including changee in use of either quantity or type of energy? ExplaIn bdafly ' [] Yes [] No If Yes, explain briefly: CRITICAL E. IS THERE. OR iS ' [] Yes [] If Yes, explain briefly: . N'IHoERE LIKELY TO RE, CONTROVERSy RELATED TO POTEI~ ADVERSE ENVIRONMENTAL IMPACTS? PART Ill - DETERMINATION OF S|GNiFic~ANcE (To ~3~, gO/lip eted.by Agency) ~ ,: ..... , INS~UCTION$: For ~Ch'~dve~se e~ ia~na~ ~ . ~h~?d be assessed in ~nne~on w~ ~ve, dete~mewhe~erkissubs~naa, la · im ' '. · ~.~pnlc S~pe; and (~ maani~d. · ~ (a) se~0g, 0,~,,~ or;~ral~':lb~ ~.~,-~ ~. ',~ ' ~o~ntoro~e~lse s~gn[fl~nt Each ........ ,, n~, add a~ments Or'mfe~[~'~ o~ o~ng, (c) duration; (d) irreversib~i ; e ..... ,wumng ma[enais. Ensure ~at explana~ons c~n,~i~ suffident de~il I° sh°w ~at ~1 ~evant adveme impa~ ha~e be~ iden~e~ and adequate~ ad~ressed. If ques~on do¢ pa~ ii was checke0 yes, ~e dete~ination of signifi~n~ m~ evauate ~e ~te~allmpa~ o~e pro~sed a~ on ~e environmen~l chamcteds~ o~e CEA ~ Che~thisboxifyouhavedete~ned bes~onthei~" ..... ~ ....... ' ' ' ~.~ NOT result in any signifi~nt advem .... ~-- ~n and analysis above and any su..~] .... ' · Name of ~ad Agen~ - -- Date Print or Type Name of Responsible Officer In'Lead Agency ' -- .,.~. <~., .. ~ : ,, . Title of Responsible Officer Signature of Responsible Officer in Le~d.,~,g+enc),gna ute o reparer ~ em~I rom/espons~ teo ic~r) COSTELLO MARINE CONTRACTING CORPOI .TION DOCK BUILDING · JETTIES · BULKHEADING ° STEEL & WOOD PILING · FLOATS 423 F!FTH STREET · PO BOX 2124 · GREENPORT, NEW YORK 11944 · (631) 477-1199/477-1393,477-0682 AUTHORIZATION FORM (Name) located at :5~a 9- owner of . 7/z,. ~-~'~r ~ (Business/Property Na~fie) do hereby give Costello Marine Contracting Corp. the authority to act as agent in my behalf in applying for all the necessary permits for work to be completed at my above referenced property. Date gnat're' /ooo -/Z,¢ g Lo ?. 27~2d Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS All applicants for permits* including Town of Southold agencies, shall complete this ('('A}. proposed ac!ions that are subject to the Town ofSouthold Waterfi'ont Consistency Review Law 'lhis assessment is intended to supplement other information used by a Town of Southold agcncx making a determination of consistency. *Except minor exempt actions including Bui/dmg and other ministerial permits not located within the Coastal Erosion Hazard.4rea. Before answering the questions in Section C, the preparer of this form should review tiao exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to /ts significtmt beneficial and adverse effects upon the coastal area (wh/ch includes all ofSouthold Tox~ n) .3. If any question in Section C on this form is answered "yes", then the proposed action may ai't~:cr &c achievement of the LWRP policy standards and conditions contained in the consistency (ev~¢xs lax~ Thus, the action should be analyzed in more detail and, if necessary, modified p~(ot/ to makm~ a determination that it is consistent to the maximum extent practicable with the IWRP pc)lic) standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town o£Southold's ,,x cbgitc (southoldtown.northfork.net), the Board of Trustees Office, the Planning Departmer~t, all lc)cat libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION The Application has been submitted to (check appropriate response): Town Board [] Planning Dept. [~ Building Dept. ~] Board of Trustees 1. Category of Town of Southold agency action (check appropriate response): (a) (b) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) Financial assistance (e.g. grantl loan, subsidy) (c) Permit, approval, license, certification: BULKHEAD "A" REMOVE 58' OF EXIST[NG BULKHEAD AND REPLACE IN-PLACE USING C-LOC VINYL SHEATHING, ~ACK FtLL AREA BEHIND NEW BULKHEAD WITH CLEAN TRUCKED IN SOIL APPROXIMAIELY 26 CUBIC YARDS. REVEGETATE AREAS W1TH CAPE AMERICAN BEACH 12" o.~. BULKHF. AO "B" REMOVE 18' OF EXISTING BULKHEAD AND REPLACE IN-PLACE USING C-LOC VINYL SHEATHING. MAR[NE RAILWAY REMOVE EXISTING AND REPLACE IN-KIND, IN-PLACE WITH NEW AND APPROVED MATEP,~ALS. DOCKS REMOVE REMAINS OF EXISTING WOODEN DOCK. CONSTRUCT NEW 4'X10' FO(ED DOCK WITH A 32'~X20' SEASONAL ALUMINUM RAMP ONTO A 6~X20' ~EASONAL FLOATING DOCK ,~:~UF~) BY (4) 6' DIAMEi~R Pti iNG~. Location Site acreage: Present land use: Present zoning classification: . If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided:, , (b) Mailing address; '~/2X') (c) Telephone number: Area Co~eI (iii~] 7.3- 7~ 2 ~/'t~ (d) Application number, if any: Will the action be directly Undertaken, require funding, or approvai by a state or federal agency? Yes 7 No [~ If yes,.which state or fedoral agency'? N'g~D~-.~,/q¥5'D6~ i ~/_t~. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of Infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development, See LWRP Section III - Policies; Page'2 for evaluation criteria. ~]~Yes [] No [-~ Not Applicable. ~ ~ Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria ~'~ Yes [] No ~ Not Applicable Attach additional sheetS ffnecessar~ .... Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section IH - Policies Pages 6 through 7 for evaluation criteria Yes [--] Not Applicable ~ ~ Aitach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures; and natural resources from floYding and erosion. See LWRP Sectiol~ III - Policies Pages~8.rthrough:16:!f~l;'evalUatl°n'~rlteria. . ..~ ~ : A~ach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III '7 Policies Pages 16 thr9ugh 21 for evaluation criteria Yes No ~Not Applicable Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. Yes ~No~ Not Applicable t ,~ '7' ~'~'~ Attach additional sheets if necessary ~ ~ Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria. [-~ Yes [] No~ Not Appllcable Attach additional sheets if necessary Policy 8. Minimize environmental deg~radatlon !a Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. [] Yes [] No ~Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, publiC lands, and public resources of the Town of Southoid. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. [--~ Yes ~ No [] Not Applicable Attach additional sheets il'necessary . ~ WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria. Yes ~'] No [] Not Applicable .. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, lhe Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. [] Yes ['~ No [] Not Applicable At~ach additional sheets if necessary Policy. 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. [-] Yes [~ NopSI Not Applicable Attach additional sheets if necessary Policy t3. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. [~ Yes [] No~ Not Applicable Created on 5/25/05 11.'20 AM Date; To: December 20, 2007 Southold Town Trustees and Nark Terry DEVELOPED COAST PO~C/ES Policy ! Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development, This project site has been developed and neglected. All structures are existing but failing. Our proposal will revitalize the area creating a more useable and functional area to engage in water dependent activities. Policy 2 Preserve historic resources of the Town of Southold. This property has no significant histodc resources. Policy 3 Enhance visual quality and protect scenic resources throughout the Town of Southold. Our proposal will enhance the visual quality, The present condition of these structures is somewhat an eyesore. Reconstructing the existing structures will make the area look well maintained and non neglected. NATURAL COAST POL/CZES Policy 4 Minimize loss of life, structures, and natural resources from flooding and erosion. The existing bulkheads are small in size and are needed to protect the upland property. The new bulkheads will not increase flooding or erosion in this area. Policy 5 Protect and improve water quality and supply in the Town of Southold. This proposal will not have any impact on the water quality and supply of the Town of Southold. Policy 6 Protect and restore the quality and function of the Town of Southold's ecosystem. This proposal will not have any impact on the Town of Southold's ecosystem. Policy 7 Protect and improve air quality in the Town of Southold, This proposal will not have any impact on the air quality of the Town of Southold. Policy 8 Minimize environmental degradation in the Town of Southold from solid waste and hazardous substances and wastes. This proposal will not degrade the environment with solid waste or hazardous substances. PUBI TC COAST POLZCI'ES Policy 9 Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. Our proposal will not limit public access to the coastal waters or public resources of the Town of Southold. There bulkheads present and we are proposing in-kind, in-place construction. The proposed dock is minimal in size..~ust long enough to reach an adequate water depth but still stay within 15' of the property line. WORKXNG COAST POLXCXES Policy 10 Protect the Town of Southold's water-dependent uses and promote siting of new water- dependent uses in suitable locations, Our proposal will allow the property owners to safely access the water so that they can engage in water-dependent activities. The condition the site is presently deters the property owners to use the area as much as they would like. Page 2of 2 Policy 11 Promote sustainable use of living marine resources in the Town of Southold. During the initial construction there will be minimal disturbance to the area. The area is expected to re-establish itself within a season. Policy 12 Protect agricultural lands in the Town of Southold. This proposal has no impact on the agricultural lands in the Town of Southold. Policy 13 Promote appropriate use and development of energy and mineral resources. This proposal has no influence on the development of energy and mineral resources,