Loading...
HomeMy WebLinkAboutTR-6824Jill M. Doherty, President James F. King, Vice-President Dave Bergen Bob Ghosio, Jr. John Bredemeyer Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD April 21, 2010 Mr. & Mrs. Richard Israel P.O. Box 825 Greenpor~, NY 11944 RE: 685 OSPREY NEST ROAD, GREENPORT SCTM# 35-6-27 Dear Mr. & Mrs. Israel: The following action was taken at the Southold Town Board of Trustees regular meeting held on Wednesday, April 21,2010: RESOLVED, that the Southold Town Board of Trustees APPROVE the request for a Transfer of Permit #6824 from George Garbe to Richard & Lisa Israel, as issued on February 27, 2008. If you have any questions, please contact our office at (631) 765-1892. Sincerely, President, Board of Trustees JMD:eac Jill M. Dohe~y, President James F. King, Vice-President Dave Bogen Bob Ohosio, Jr. John Bredemeycr Town Hall, 53095 Main Rd. P.O. Box I [ 79 Southold, NY 11971 Telephone (631) 765-1892 Fax (63 I) 765-6641 DATE OF INSPECTION: BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Ch. 111 INSPECTION SCHEDULE INSPECTED BY: COMMENTS: __ Pre-construction, hay bale line/silt boom/silt curtain 1st day of construction ~ constructed Project complete, compliance inspection. CERTIFICATE OF COMPLIANCE: James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town HallAnnex 54375MainRoad P.O. Box 1179 Southold, New York 11971-0959 Telephone(631) 765-1892 Fax(631) 765-6641 July 22, 2009 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Mr. John Costello Costello Madne Contracting Corp. P.O. Box 2124 Greenport, NY 11944 RE: GEORGE GARBE 685 OSPREY NEST RD., GREENPORT SCTM#35-6-27 Dear Mr. Costello: The following action was taken by the Southold Town Board of Trustees at their Regular Meeting held on Wed., July 22, 2009: RESOLVED, that the Southold Town Board of Trustees DENIES the Amendment to Permit #6824 to reduce the size of the non-turf buffer from 15' to 10'. This is not a determination from any other agency. Jam~ F. King, Pr(~esld~t Board of Trustees JFK:lms James F, King. President Jill M. Doherty. Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. PO. Box 1179 Southold. NY 11971 Telephone(631) 765-1892 Fax (631)765-6641 Southold Town Board of Trustees Field InspectiongNorksession Report Costello Marine Contracting Corp. on behalf of GEORGE GARBE requests an Amendment to Permit #6824 to reduce the size of the non-turf buffer from 15' to 10'. Located: 685 Osprey Nest Rd., Greenport. SCTM#35-6.27 lof area to be impacted: twater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of wetland Part of Town Code proposed work falls under: __Chapt.275 Chapt. 111 other Type of Application: __ Wetland __Coastal Erosion __Amendment __Administrative__Emergency Pre-Submission __,Violation Info needed: Modifications: Conditions: Present Were: __J.King __J.Doherty __P.Dickerson __ D. Dzenkowski __.other Form filled out in the field by D. Bergen ~B Ghosio, Mailed/Faxed to: Date: James F. I~ng, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD APPLICATION FOR A TRANSFER OF A WETLAND PERMIT DATE ADDRESS -- 6 AGENT PHONE ADDRESS PROPERTY LOCATION ~" O~SPtP_~'~ l~3LgT ~-o4-oj TAXMAPNO. lOoo -- "~S-- - ~ 1/We -'~,c.~kc~-,r0 '~'N~'/.-- requestaTransferofPermit# {.o~, t~ Signed BY: ~q~2~ ~ · 6932 ~cI ~ dFrom ~f)/'lL~ ~(L,~.,,'~/ COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JET]'IES · BULKHEADING · STEEL & WOOD PILING · FLOATS 423 FIFTH STREET, RO. BOX 2124, GREENPORT, NEW YORK 11944 · (631) 477-ii99,1(4~-1,~3 ~'~0-68~ ~ FA~'(631) 477-0005 June 19, 2009 Southold Town Trustees POBox 1179 S~,NY 11971 · 1:~: Pem~ 06824 issued to George Garbe February 27, 2008 Permit 06822 issued to Kings & Alphas, LLC February 27, 2008 D~ Trustees: The two above-referenced clients are adjacent property owners and it has come to my attention that pemait #6824 requires a 15' non-turf buffer where permit #6822 only requires a 10' non-turf btffi'er. Th~efore, I am requesting an amendment to permit #6824 to reduce the non-turf buffer to t0' wide so that the two properties are consistent. Enclosed are revised plans showing a 10' non-turf buffer, copies of permit #6824 and permit #6822 and check # 4987 in the mount of $50.00. If any other information is needed, please do not hesitate to contact me. Sincerely, Permit Manager enclosures COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JETTIES ° BULKHEADING ° STEEL & WOOD PILING · FLOATS 423 FIFTH STREET · RO, BOX2124 · GREENPORT, NEW YORK 11944 · (631) 477-1199 / 477-1393/477-0682 · FAX (631) 477-0005 March 7, 2008 Southold Town Trustees PO Box 1179 Southold, NY 11971 Attention: Lauren and/or Elizabeth Dear Lauren and/or Elizabeth: In response to the last public hearing, plans have been revised as following: George Garbe ), A 15' buffer is illustrated > The bulkhead will be constructed in-kind, in-place instead of immediately in front. Kings & Alphas, LLC > 10' buffer is provided behind the :~0' wood walkway. ][sabelle Houlbreque Bulkhead is straightened even more than previously submitted. A 10' non-turf buffer is provided. Gardiner's Bay HOA The plans note that the existing drains will be removed. Sections "D' and "E' will have Iow profile bulkhead beneath dock. Dock will be constructed with Flow-Thru grate style decking. If there are any questions or additio~al revisions are needed, please do not ~itate~ to contact me. Permit Manager Enclosures James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 1st day of construction ½ constructed ~'/'Project complete, compliance inspection. PERMIT NO. 6824 DATE: FEBRUARY 27~ 2008 ISSUED TO: GEORGE GARBE PROPERTY ADDRESS: 685 OSPREY NEST ROAD~ GREENPORT SCTM# 35-6-27 BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK AUTHORIZATION Pursuant to the provisions of Chapter 275 and/or Chapter 111 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on February 27, 2008, and in consideration of application fee in the stun of $250.00 paid by George Garbe and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to construct 117' of new bulkhead and 16' south return immediately in-place of the existing bulkhead using vinyl sheathing, and provide a 15' non-turf buffer zone behind the bulkhead, with the conditions of the bulkhead being replaced in-place, a 15' non-turf buffer along bulkhead, and as depicted on the site plan prepared by Costello Marine Contracting Corp., last dated February 29, 2008, and received on March 10, 2008. IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. TERMS AND CONDITIONS The Permittee George Garbe, residing at 685 Osprey Nest Road, Greenport, NY as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and ali damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. That there will be no unreasonable interference with navigation as a result of the work herein authorized. That there shall be no interference with the right of the public to pass and repass along the beach between high and iow water marks. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation, the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffblk County Department of Real Properties Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety (90) calendar days of issuance of this permit. That the said Board will be notified by the Permittee of the completion of the work authorized. That the Permittee will obtain all other permits and consents that may'be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 February 27, 2008 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Ms. Jane P. Costello Costello Marine Contracting Corp. P.O. Box 2124 Greenport, NY 11944 RE: GEORGE GARBE 685 OSPREY NEST ROAD, GREENPORT SCTM# 35-6-27 Dear Ms. Costello: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, February 27, 2008 regarding the above matter: WHEREAS, Costello Marine Contracting Corp., on behalf of GEORGE GARBE applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated December 26, 2007, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator recommended that the proposed application be found Inconsistent with the LWRP, and, WHEREAS, the Board of Trustees has furthered Policy 6 of the Local Waterfront Revitalization Program to the greatest extent possible through the imposition of the following Best Management Practice requirements: the bulkhead to be replaced in-place, a 15' non-turf buffer along bulkhead, and WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on February 27, 2008, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirement imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268-5 of the Southold Town Code, and, RESOLVED, that the Board of Trustees approve the application of GEORGE GARBE to construct 117' of new bulkhead and 16' south return immediately in-place of the existing bulkhead using vinyl sheathing, and provide a 15' non-turf buffer zone behind the bulkhead, with the conditions of the bulkhead being replaced in-place, a 15' non-turf buffer along bulkhead, and as depicted on the site plan prepared by Costello Marine Contracting Corp., last dated February 29, 2008, and received on March 10, 2008. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) Fees: $ 50.00 Very truly yours, James F. King President, Board of Trustees JFK/eac James F. King, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD To: C oxbe_ Please be advised that your application dated' L.~::~Cz~bescS(a/o~Go7 has been reviewed by this Board at the regular meeting of IV--~A~,~-~a(a ~'7, ak:oeo and your application has been approved pending the ¢ompletion'~lf the' following items checked off below. ~eq~ Revised Plans for proposed project __ Pm-Construction Hay Bale Line Inspection Fee ($50.00) __ 1st Day of Construction ($50.00) __ ½ Constructed ($50.00) ~// Final Inspection Fee ($50.00) __ Dock Fees ($3.00 per sq. ft.) Permit fees are now due. Please make check or money order payable to Town of Southo[d. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: TOTAL FEES DUE: BY: James F. King, President Board of Trustees Donald Wilder, Chairman Lauren Standish, Secretary Town Hall, 53095 Main Rd. P.O. Box 1179 Southold, NY 11971 Telephone (631) 765-1892 Fax (631) 765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., February 13, 2008, the following recommendation was made: Moved by Glen McNab, seconded by Jack McGreevy, it was RESOLVED to SUPPORT the Wetland Permit application of GEORGE GARBE to construct 117' of new bulkhead and 16' south return immediately in front of existing bulkhead using vinyl sheathing, and provide a 10' non-turf buffer zone behind the bulkhead. Located: 685 Osprey Nest Rd., Greenport. SCTM#35-6-27 Inspected by: Glen McNab, Jack McGreevy The CAC Supports the application with the Condition a 10' non-turf buffer is installed landward of the bulkhead, however has a concern with the present location of the bulkhead as it is inconsistent with the public trust doctrine. Vote of Council: Ayes: All Motion Carried James F. KLng, President Jill M. Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio, Jr. Town Hall 53095 Route 25 P.O. Box 1179 Sonthold, New York 11971-0959 Telephone ' ' /631) 65-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Southold Town Board of Trustees Field Inspection/Work session Report Date/Time: lO, O~ ~ ~i, :~ GEORGE GARBE requests a Wetland Permit to construct 117' of new bulkhead and 16' south return immediately in front of existing bulkhead using vinyl sheathing, and provide a 10' non-turf buffer zone behind the bulkhead. Located: 685 Osprey Nest Rd., Greenport. SCTM#35-6-27 Type of area to be impacted: ',' Saltwater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of above: ~C of Town Code proposed work falls under: __Chapt.275 Chapt. 111 other Type of Application: v/ Wetland Coastal Erosion Amendment __Administrative __Emergency Pre-Submission Violation _Planning Info needed: / -V , Conditions: Present Were: __J.King __J.Dohert~P.Dickerson D. Bergen__ B. Ghosio, Jr H. Cusack D. Dzenkowski Mark Terry~other Form filled out in the field by Mailed/Faxed to: Date: Enviromnental Technician Review ~%0' r~Ocreuc~-- George Gm'be 685 Osprey Nest Road Greenport t 1/9/07 George Gm'be 685 Osprey Nest Road Greenport 11/9/07 ENPORT 0~ ~ PIPES COVE BOARD OF TRUSTEES TOWN OF SOUTHOLD DATE ~_3/,//.Y//O 8 / SURVEY OF LOT 11 MAP OF CLEAVES POINT SECTION ONE FILE No. 2752 FILED SEPTEMBER 10, 1957 SITUATE EAST MARION TOWN OF $OUTHOLD SUFFOLK COUNTY, NEW YORK S.C. TAX No. 1000-35-06-27 SCALE 1"=20' SEPTEMBER 11, 2007 AREA = 14,647 sq. ff. 0.336 nc. Southhold Town Board of Trustees UN~U~O~Zrn ~.TEPA~ON OR ADDmoN TO THIS SUR~/~EY IS A VIOLATION OF SECTION 720~ OF THE NEW YORK STA3E E])UCATION L~W. THE EXISTENCE OF RIG~ OF WAY AND/OR EASEMENTS OF RECORD, IF ANY, NOT SHOWH ARE NOT GUARANTEED. PREPARED IN ACCORDANCE WITH THE MINtMUM STARD~RDS FOR TITLE SURVEYS AS ES'I-ASU~HED N,Y.S. Lic, No. 50467 Nathan Taft Corwin III Land Surveyor F~tle Sun~eys -- Subdivisions -- Site Plons -- Construction Loyout PHONE (651)727-2090 Fax (631)727-1727 OFFICES LOCATED AT MAIUNG ADDRESS 322 Roonoke Avenue P.O. Box 1931 Riverhead, New York 11901 Riverhe~d, New York 11901-0965 27-29[: COSTELLO MARINE CONTRACTING CORPORATION DOCK BUILDING · JETTIES · BULKHEADING · STEEL & WOOD PILING · FLOATS 423 FIFTH STREET · P.O. BOX 2124 ° GREENPORT, NEW YORK 11944 · (631) 477-1199/477-1393/477-0682 · FAX (631) 477-0005 March 7, 2008 Southold Town Trustees PO Box 1179 Southold, NY 11971 Attention: Lauren and/or Elizabeth Dear Lauren and/or Elizabeth: In response to the last public hearing, plans have been revised as following: George Garbe :~ A 15' buffer is illustrated > The bulkhead will be constructed in-kind, in-place instead of immediately in front. Kings & Alphas, LLC > 10' buffer is provided behind the 10' wood walkway. Isabelle Houlbreque Bulkhead is straightened even more than previously submitted. A 10' non-turf buffer is provided. Gardiner's Bay HOA The plans note that the existing drains will be removed. Sections "D" and "E" will have Iow profile bulkhead beneath dock. Dock will be constructed with Flow-Thru grate style decking. If there are any questions or additiogal revisions are needed, please do not ~lsitate to contact me. Permit Manager EncJosures OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM COORDINATOR TOWN OF SOUTHOLD MEMORANDUM To: From: Date: Re: James King, President Town of Southold Board of Trustees ~ Mark Terry, Principal Planner ~ LWRP Coordinator February 22, 2008 Proposed Wetland Permit for George Garbe SCTM#1000-35-6-27 GEORGE GARBE requests a Wetland Permit to construct 117' of new bulkhead and 16' south return immediately in front of existing bulkhead using vinyl sheathing, and provide a 10' non- turf buffer zone behind the bulkhead. Located: 685 Osprey Nest Rd., Greenport. SCTM# 35-6-27 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the Policy Standards and therefore is INCONSISTENT with the LWRP: Policy 6 Protect and restore the quality and function of the Town of Southold ecosystem. 6.3 Protect and restore tidal and freshwater wetlands. Comply with statutory and regu&to~7 requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. The proposed action does not comply with § 275-11. Construction and operation standards. Section (B1) item (a). "(1) Bulkheads, retaining walls, revetments and gabions. (a) Only in-place replacement of existing functional bulkheads (as defined in § 275- 2) is permitted. In-kind replacement relates to the position and dimensions and does not necessarily require or allow for the use of the same materials. At its discretion, the Board may allow for a one-time projection of the replacement structure seaward of the original, only if such placement will not project the proposed structure seaward of adjacent, neighboring structures and if the proposed installation is in close proximity to the original structure. Any subsequent repair or replacement following the first replacement requires the structure to be built on or landward of the original structure." The proposed action will proiect further seaward of the existing wood bulkheads to the west and east of the property. In the event that that the action is approved, it is recommended that the following BMP's be required to further the below policies: Policy 5. Protect and improve water quality and supply itt the Town of Southold. 1. Minimize the use ofchromated copper arsenate (CCA) treated wood in the construction of the structure pursuant to § 275-11. B,1 (f) Construction and operation standards below. 09 In order to prevent the release of metals and other contaminants into the wetlands and waters of Southold, the use of lumber treated with chromated copper arsenate (also known as "CCA "), creosote, penta products or homemade wood preservatives is prohibited for use in sheathing and decking. Preservatives of any type, including but not limited to those listed above cannot be applied to any bulkheads, retaining walls or revetments after installation. Encapsulated pilings or native nonchemically treated (untreated) lamber only should be used itt sensitive areas. 2. Require the installation of a silt boom (where feasible) pursuant to § 275-11. (2) Construction and operation standards below. 2) Erosion control. Installation of an erosion control structure is necessary during any building, grading, landscaping or site work activity within Trustee jurisdiction. This structure may include, but is not limited to, installation of a silt fence, hay bales, wood chip berm and silt booms. The placement of the erosion control structure(s) shall be determined by the Trustees or their designee. All intertidal construction and excavation requires the installation of a silt boom that will retain all suspended sediments within the immediate project area. In addition to also further Policies 5, Protect and improve water quality in the Town of Southold and 6.3 Protect and restore tidal and freshwater wetlands, item D (below). It is recommended that the buffer be increased to a minimum of 20 feet. The buffer should be pervious. Provide adequate buffers between wetlands and adjacent or nearby uses and activities in order to ensure protection of the wetland's character, quality, values, and functions. Please require that the applicant amend the application to meet the above policies to the greatest extent possible. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Office Use Only ~,,CwOaStal Erosion Permit Application et/and Permit Application Administrative Permit  .~Amendment/Trans f~r/Ex3~ion eceived Applicafion:~ eceivad Fee:$ o,~'SZ> · -~Completed Application __[ucomplete __SEQRA Classification: Type I Type 1I Unlisted __Com-dination:(date sent) ,-~2~-AC Refemd Sent: I ~r~t e of Inspection: _._Receipt of CAC Report: __Lead Agency Determination: Technical Review: ~-'Pablic Heanng Held: __Resolution: Name of Applicant ~e01f/'~_~ Address Suffolk County Tax Map Number: lO00- Property Location: [o~ (~)~¢r'~_~/ (p oide LILCO Pole ~, dist~ce to Jross streets, and location) {If applicable) I - Phone: (~g) 1- ~oard of Trustees Application GENERAL DATA Land Area (in square feet): 14 /,4"-/ t ' Previous use ofproperty:5~ale. f~,l~'~e~e~r~ Intended use of property: ~ 0~1~I t~__ Prior permits/approvals for site improvements: Agency Date __ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? ,M No Yes If yes, provide explanation: Project Description (use attachments if necessary): of Trustees Application County of Suffolk State of New York I~EP6SE~ AND~AFFIRMS THAT ~E/SHE IS THE APPLICANT FOR THE ABOVE DESCRiBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH 1N THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARiSING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF G1LazNTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORiZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. SWORN TO BEFORE ME THIS:~-~--?f DAY 0_ ~r~ ~.L2~_ ,20 /- /_7/// ' // " ~ Qu~flf~ fl ~ Nomw Public ~? of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations.'*'~ :-~t~'J~- 0 iA E×I~ ~tl&Q Axea of wetlands on lot: /[j 6~t9(~ square feet Percent coverage of lot: r~ff) % Closest distance between nearest existing structure and upland edge of wetlands:_ ~ ~ feet Closest distance between nearest proposed structure and upland edge of wetlands:_ _~ ~_ feet Does the project involve excavation or filling? No ~ Yes If yes, how much material will be excavated? How much mate~al will be filled? / ~ ~ Depth of which mater/al will be removed or deposited: Proposed slope throughout the area of operations: 0 Manner in which material will be removed or deposited: ~lfl~ cubic yards cubic yards feet Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attackments if appropriate): COSTELLO MARINE CONTRACTING CORPORATi:, DOCK BUILDING · JETTIES, BULKHEADING · STEEL & WOOD PILING · FLOAT5 E_T · PO BOX2124 · GREENPORT, NEWYORK 11944 · (631)477-1199/477d393 47',,.3d~.. :::.: AUTHORIZATION FORM (Name) located at ~ ~,.,.; :"-' '> >'- '-. ' ;--' owner of ~:'~ ~--- ': (Business/Property Name) do hereby Dve Costello Marine Contracting Corp. the authority to act as agent in m3 behalf in applying for all the necessary permits for work to be completed at my above efemnced property Date /. :2/ ~>'? ,. ~ > ~ , 1.- ( ;SigmStt)re - 617.20 Appendix C State Environmental Quality Review SHORT ENVIRONMENTAL ASSESSMENT FORM For UNLISTED ACTIONS Only PART ! - PROJECT INFORMATION (To be completed by A 1. APPLICANT/SPONSOR )plicant or Project Sponsor) 2. PROJECT NAME 3. PROJECT LOCATION: Municipality County 4. PRECISE LOCATION (Street address and road intemecUons, prominent landmarks, etc., or provide map) ~m-~-~.~r~-, ~./. 5. PROPOSED.~C33ON IS: [~ew [] E~oaesion [] Modification/alteration 7. ~OUNT OF LAND AFFECTED: Initially ~C~./ acres Ultinlately ~::~ .~/ acres S. WILL PROPOSED ACTION COMPLY WITH EXISTIN(~ ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? 9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? ~'l~esidentiaI [] Industrial [] Commercial [] Agriculture [] Park/Forest/Open Space [] Oilier 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY O')~HER GOVERNMENTAL AGENCY (FEDER~ STAT~ OR LOC_,J~)? [] NO If Yes, list ageflcy(s) name and permit/approvals: 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VAUD PERMIT OR APPROVAL? [] Yes [~o If Yes. list agency(s) name and permJtJapprovals: 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? [] Yes [~Jo I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE ApplicantJsponsor name: ~ J. ~/.~//7~.~.,~t~A~v,~_.,~,/c~,,v-'~,¢~ Date: IIf the action is in the Coastal Area, and you are a state agency, complete the I Coastal Asse~ment Form beforo proceeding with ms a~sessment PART II - IMPACT ASSESSMENT ~ completed by Lead A~enc7) A. DOES ACTION EXCEED ANy TYPE I THRESHOLD IN e NYCRR, PART e17,47 If y~, coordinate the review pro.ss and use [he FULL ~F. DY" DNo B. ~LL A~ION ~CEI~ C~I~D R~ pROVi~E~ F~ UNLinED A~ION8 IN 6 NYC~, PART 617.87 tf No, a ~egative C. COULD ACTION RESULT IN A~ ~RSE E~PECT8 A~OC~D ~H THE FOLLO~NG: (~swem may be handwriEen, if legible) potential for er~n, drainage Drilling pm~le~? ~Jain briefly: , ,.,,, C2. AsePtic, agd~Eural, amh~i~, h~todc, o~ o~er natural or cuEural resour~; or ~uni~ or neighbo~ood chara~e~ ~plain briefly: C3 Vegetation or fauna fish, shellfish or wildlife species, eigniflcent habitats, or threatened or endangered species? Explain briefly: C-4 A community*s existing plans or goals ss offic~aJly adopted, or s c~angs in use or In{sns~ty of u~s of land or oU~er natural resource.? Explain bdef~y: C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain bndfly: C5. Long term, short term, cumulative, or other effecte not identified in CI.C57 Explain briefly: C7. O~her impacts (including changes in use of either quantity or type of energy? Explain briefly; VV]LL THE PROJECT HAVEAN MPA'*'" .............. ENVIRONMENTAL AREA (CEA)? .., ~r~ ~ Mt= t=NVlRONMENTAL CHARACTER STICS THAT CAUSED [] Yes [] No If Yea, explain bdefly: THE ESTABLISHMENT OF A CRITICALfl E. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS*~ [] Yes [] No If Yes, explain bdefly: . PART III - DETERMINATION OF $1GNIFICAN~ ~, wmp~e;eg Dy INSTRUCTIONS: F~reachadver~ee~ect~den~jfledab~ve'deten-n~ne~hetheriti~substantia~Iarge~imp~rtant~r~therw~sesgn~cant Each effect should be assessed in connection with Its (el setting (I.e, urban or rural); (b) probability Of occurring; (c) duration; (cJ) irreversibiti~y: (e) geographic scope; and (f~ magnitude. suffident detail If necessary, add attIchments or reference supporting materials. Ensure that explanations conla~n t°sh°wthatailreJevantad~erseimpac~havebeerlicJenUfiedandadequetetyaddressed. If question d of peri ii was checked ._._~t~e determinaUon of significance must ~va'uate ti' spoil I~i I 'mp~ ct c l the prol: c sad action on the environmental charactaris~cs of [he CEA C hack this box/f you have identified one or more POtentially lerge or significant adverse imps cts which MAY occur. EAF and/or p~epare a posflive decisraUon. ' ' Then proceed directly lo t~e FUL [] Check this box if you have determined, based on the inf0rmstJon and analysis above and any suppo~ng documentation lhal [he propose~ ac~io~ W~LL NOT result in any sign flcant adverse environmental impels AND provide, on attachments as neCessary, the reasons suppoc{m9 Name of Lead Agency Print or Type Name of Responsible Officer in Lead Agency Signature or Responsible Q/ricer in Lead Agency Date Title of ResponsibJe Officer gna ute o reparer ~ erent rom responsl 'Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS All applicants for perm/ts* including Town of Southold agencies, shall complete this CCAF proposed actions that are subject to the Town ofSouthold Waterfi'ont Consistency Review kaw assessment is intended to supplement other information used by a Town of Southold agency making a determination of consistency. *Except minor exempt actions including B,ik/mg and other ministerial permits not located within the Coastal Erosion Hazard Area. Before answering the questions in Section C, the preparer of tiffs form should review the ex~nqvI minor action list, policies and explanations of each policy contained in the Town of $ou[i~old l.ocal Waterfront Revitalization Program. A proposed action will be evaluated as to its signil]catqt beneficial and adverse effects upon the coastal area (which includes all of Southold Tox~ n) .3. If any question in Section C on this form is answered "yes", then the proposed action may affect tt~c achievement of the LWRP policy standards and conditions contained in the consistency revicxx lass Thus, the action should be analyzed in more detail and, if necessary, modified prio( to making determination that it is consistent to the maximum extent practicable with the LWRP policx standards and conditions. If an action cannot be certified as consistent with the LWRP polio standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town ofSouthold's wcbsitc (Southoldt0wn.northfork.net), the Board of Trustees Office, the Plarufing Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCT I 35 b 0-7 The Application has been submitted to (check appropriate response): TownBoard [] Planning Dept. [--] Building Dept. [--] BoardofTrustees~]~ Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grantl loan, subsidy) (c) Permit, approval, license, certification: Nature and extent of action: Site acreage: · ~ ~ ' ':"~'~' If an apphcation for the propgsed action .h~ been filed with the Town of Southold agency, the following information shall be provided:.. (b) Maillngaddr,ss: {1~5 ~1~3/" NLc-flc Cc) Telephone numberi Aria C9~* (~ :): ia:~[ - ,4-]~ .-.~ (d) ApplicatiOn number, if any: Will the action be directly undertaken, rexlmro funding, or'approval by a state or federal agency? Yes ~ No [] : If yes,.which state or federal agency? U'~A)ff_f~ DEVELOPED COAST POLICY Policy 1. Foster a pattern of develoPment in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneflcbq use o.f a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. :~. ~ . Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria Attach additional sheets Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section IH - Policies Pages 6 through 7 for evaluation criteria Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from floodino and erosion. See LWRP Section III - Policies Pages'8~through~16:f~r'e¥~luati°n, crite~ia~ Yes [-'] N Ai~ach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III -Policies Pages 16 through 21 for evaluation criteria [--] Yes [-'] No Not ApplieabL-,---F~ Attach additional sheets if necessary Policy 6. Protect and restore the quality'and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. Ail,ach adchtional sheet~ if necessary :~ Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III - Policies Pages 32 through 34 for evaluation criteria. ' [--] Yes [] No Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation la Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - POlicies; Pages 34 through 38 for evaluation criteria. ~ Yes ~ No~. Not Applie~Bl'6-~ PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. [] Yes7 No [~ Not Applicable Attach additional sheets if necessary ~ WORKING COAST POLICIES Policy 10. Protect Southoid's water-dependent uses and promote siting of new water-dependent uses in suik~able locutions. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria. Yes [-~ No ~'] Not Applic~~i~~l~ At~ach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, lhe Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 throngh 62 for evaluation criteria. Anach additional sheets if necessary Policy. 12. Protect agricultural lands in the Town of Southold. See LWRP Section III - Policies; Pages 62 through 65 for evaluation criteria. Yes [] 1No[~ Not Applicabl~ /- A~tach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. Yes [-~ No [X~ Not Applical~ Created on 5/25/05 11.'20 AM Date: To: Proposal: December 3, 2007 Southold Town Trustees and Mark Terry Construct 117' of new bulkhead and 16' south return immediately in front of existing bulkhead using vinyl sheathing. Provide 10' non turf buffer zone behind bulkhead. DEVELOPED Policy 1 COAST POL/CZES Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development The existing bulkhead on this property is beginning to fail. We are proposing to build a new bulkhead immediately in front of the existing bulkhead to ensure that the creosote used on the existing sheathing does not leach into the water. Policy 2 Preserve historic resources of the Town of Southold. This property has no significant historic resources. Policy 3 Enhance visual quality and protect scenic resources throughout the Town of Southold. The bulkhead at this location exists. The present condition of this bulkhead is becoming unstable threatening the integrity of the upland property. A new bulkhead is just an attempt of the upland property owner to maintain his property. There is an existing bulkhead and the surrounding area is bulkheaded so the visual quality and scenic resources will remain the same. NATURAL COAST POLTCZES Policy 4 Minimize loss of life, structures, and natural resources from flooding and erosion. The existing bulkhead is needed to protect the upland property. The new bulkhead will not increase flooding or erosion in this area. Policy 5 Protect and improve water quality and supply in the Town of Southold. This proposal will not have any impact on the water quality and supply of the Town of Southold. Policy 6 Protect and restore the quality and function of the Town of Southold's ecosystem. This proposal will not have any impact on the Town of Southoid's ecosystem. Policy 7 Protect and improve air quality in the Town of Southold. This proposal will not have any impact on the air quality of the Town of Southoid. Policy 8 Minimize environmental degradation in the Town of Southold from solid waste and hazardous substances and wastes. This proposal will not degrade the environment with solid waste or hazardous substances. PUBLTC COAST POI TCTES Policy 9 Provide for public access to, and recreational use of, coastal wators, public lands, and public resources of the Town of Southold. Our proposal will not limit public access to the coastal waters or public resources of the Town of Southold. There is a bulkhead presently existing and we are proposing to construct a new bulkhead immediately in front of the existing bulkhead. The new bulkhead's sheathing will be 10" face to face with the old sheathing. Page 2 of 2 LWRP for George Garbe WORKING COAST POi/C/ES Policy 10 Protect the Town of Southold's water-dependent uses and promote siting of new water- dependent uses in suitable locations. Our proposal is to reconstruct a failing bulkhead. The present condition of the bulkhead is poor and unsafe. This property is used by the upland property owners to engage in water dependent activities such as fishing, swimming and boating. These activities will continue at this site. Policy 11 Promote sustainable use of living marine resources in the Town of Southold. During the initial construction there will be minimal disturbance to there area landward of the bulkhead. Our proposal includes a 10' non turf buffer behind the bulkhead after construction. Policy 12 Protect agricultural lands in the Town of Southold. This proposal has no impact on the agricultural lands in the Town of Southold. Policy 13 Promote appropriate use and development of energy and mineral resources. This proposal has no influence on the development of energy and mineral resources.